Capital Project Schedules and Budgets

List of capital projects with managing organization, phase status and project costs.

Housing & Development School Construction Authority (SCA) Dataset 2xh6-psuq 14 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
13
Project Geographic District : 13 • Project Building Identifier: K008 • Project School Name: P.S. 8 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K008
Project School Name
P.S. 8 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY27 RESO A ELECTRICAL UPGRADE
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
28500
Final Estimate Of Actual Costs Through End Of Phase Amount
28500
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001115173
13
Project Geographic District : 13 • Project Building Identifier: K008 • Project School Name: P.S. 8 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K008
Project School Name
P.S. 8 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY27 RESO A ELECTRICAL UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
418000
Final Estimate Of Actual Costs Through End Of Phase Amount
418000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001115173
13
Project Geographic District : 13 • Project Building Identifier: K008 • Project School Name: P.S. 8 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K008
Project School Name
P.S. 8 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY27 RESO A ELECTRICAL UPGRADE
Project Phase Name
Design
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
28500
Final Estimate Of Actual Costs Through End Of Phase Amount
28500
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001115173
13
Project Geographic District : 13 • Project Building Identifier: K008 • Project School Name: P.S. 8 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K008
Project School Name
P.S. 8 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY27 RESO A ELECTRICAL UPGRADE
Project Phase Name
Scope
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001115173
13
Project Geographic District : 13 • Project Building Identifier: K008 • Project School Name: P.S. 8 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K008
Project School Name
P.S. 8 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-PART OF WALL PLASTER CAME OUT DURING WASHING A WALL FOR SUMMER LOCATION: CLASSROOM 109 (SPACE I
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
8/4/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
8/8/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
15166
Total Phase Actual Spending Amount
678
Dsf Number S
SCA0000076242
13
Project Geographic District : 13 • Project Building Identifier: K008 • Project School Name: P.S. 8 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K008
Project School Name
P.S. 8 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-ABATE MARKED WALL IN 3RD FLOOR HALLWAY FOR WATER BOTTLE FILLER INSTALLATION SPACE ID:4000 AREA
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
5/22/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
9/24/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
750
Total Phase Actual Spending Amount
0
Dsf Number S
SCA0000076028
13
Project Geographic District : 13 • Project Building Identifier: K009 • Project School Name: PUBLIC SCHOOL 9 THE SARAH SMITH GARNET SCHOOL - BROOKLYN
Project Geographic District
13
Project Building Identifier
K009
Project School Name
PUBLIC SCHOOL 9 THE SARAH SMITH GARNET SCHOOL - BROOKLYN
Project Type
DOE - Skilled Trades
Project Description
WATER HEATERS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
4/4/2017
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
30109
Total Phase Actual Spending Amount
17036
Dsf Number S
DSF0000777935
13
Project Geographic District : 13 • Project Building Identifier: K009 • Project School Name: PUBLIC SCHOOL 9 THE SARAH SMITH GARNET SCHOOL - BROOKLYN
Project Geographic District
13
Project Building Identifier
K009
Project School Name
PUBLIC SCHOOL 9 THE SARAH SMITH GARNET SCHOOL - BROOKLYN
Project Type
SCA CIP
Project Description
ELECTRIFICATION/HEAT PUMP SYSTEMS / ELECTRICAL SERVICE UPGRADE / LOW VOLTAGE ELECTRICAL SYSTEMS / ROOFS / WINDOWS / PARAPETS / LIGHTING UPGRADE
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
4702580
Final Estimate Of Actual Costs Through End Of Phase Amount
4702580
Total Phase Actual Spending Amount
307106
Dsf Number S
DSF0001112302, DSF0001112311, DSF0001113808, DSF0001115545, DSF0001114003, DSF0001115546, DSF0001115541
13
Project Geographic District : 13 • Project Building Identifier: K009 • Project School Name: PUBLIC SCHOOL 9 THE SARAH SMITH GARNET SCHOOL - BROOKLYN
Project Geographic District
13
Project Building Identifier
K009
Project School Name
PUBLIC SCHOOL 9 THE SARAH SMITH GARNET SCHOOL - BROOKLYN
Project Type
SCA CIP
Project Description
ELECTRIFICATION/HEAT PUMP SYSTEMS / ELECTRICAL SERVICE UPGRADE / LOW VOLTAGE ELECTRICAL SYSTEMS / ROOFS / WINDOWS / PARAPETS / LIGHTING UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
45802133
Final Estimate Of Actual Costs Through End Of Phase Amount
45802133
Total Phase Actual Spending Amount
192358
Dsf Number S
DSF0001112302, DSF0001112311, DSF0001113808, DSF0001115545, DSF0001114003, DSF0001115546, DSF0001115541
13
Project Geographic District : 13 • Project Building Identifier: K009 • Project School Name: PUBLIC SCHOOL 9 THE SARAH SMITH GARNET SCHOOL - BROOKLYN
Project Geographic District
13
Project Building Identifier
K009
Project School Name
PUBLIC SCHOOL 9 THE SARAH SMITH GARNET SCHOOL - BROOKLYN
Project Type
SCA CIP
Project Description
ELECTRIFICATION/HEAT PUMP SYSTEMS / ELECTRICAL SERVICE UPGRADE / LOW VOLTAGE ELECTRICAL SYSTEMS / ROOFS / WINDOWS / PARAPETS / LIGHTING UPGRADE
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
12/16/2024
Project Phase Planned End Date
6/17/2025
Project Phase Actual End Date
6/17/2025
Project Budget Amount
2895182
Final Estimate Of Actual Costs Through End Of Phase Amount
798259
Total Phase Actual Spending Amount
773843
Dsf Number S
DSF0001112302, DSF0001112311, DSF0001113808, DSF0001115545, DSF0001114003, DSF0001115546, DSF0001115541
13
Project Geographic District : 13 • Project Building Identifier: K009 • Project School Name: PUBLIC SCHOOL 9 THE SARAH SMITH GARNET SCHOOL - BROOKLYN
Project Geographic District
13
Project Building Identifier
K009
Project School Name
PUBLIC SCHOOL 9 THE SARAH SMITH GARNET SCHOOL - BROOKLYN
Project Type
SCA CIP
Project Description
ELECTRIFICATION/HEAT PUMP SYSTEMS / ELECTRICAL SERVICE UPGRADE / LOW VOLTAGE ELECTRICAL SYSTEMS / ROOFS / WINDOWS / PARAPETS / LIGHTING UPGRADE
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
9/23/2024
Project Phase Planned End Date
2/24/2025
Project Phase Actual End Date
11/12/2024
Project Budget Amount
622980
Final Estimate Of Actual Costs Through End Of Phase Amount
250166
Total Phase Actual Spending Amount
244201
Dsf Number S
DSF0001112302, DSF0001112311, DSF0001113808, DSF0001115545, DSF0001114003, DSF0001115546, DSF0001115541
13
Project Geographic District : 13 • Project Building Identifier: K009 • Project School Name: PUBLIC SCHOOL 9 THE SARAH SMITH GARNET SCHOOL - BROOKLYN
Project Geographic District
13
Project Building Identifier
K009
Project School Name
PUBLIC SCHOOL 9 THE SARAH SMITH GARNET SCHOOL - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-RESPONSE ACTION NEEDED DUE TO OBSERVED DAMAGE (2110)110 CLASSROOM - 9X9 FT TAN-YELLOW (1017A) B
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
8/7/2025
Project Phase Planned End Date
IEH
Project Phase Actual End Date
5/25/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
423648
Total Phase Actual Spending Amount
423648
Dsf Number S
SCA0000074609
15
Project Geographic District : 15 • Project Building Identifier: K010 • Project School Name: P.S. 10 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K010
Project School Name
P.S. 10 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY21 RESO A WATER FOUNTAIN UPGRADES
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
2/7/2022
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
95566
Total Phase Actual Spending Amount
81577
Dsf Number S
DSF0001008250
15
Project Geographic District : 15 • Project Building Identifier: K010 • Project School Name: P.S. 10 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K010
Project School Name
P.S. 10 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY25 RESO A PLAYGROUND UPGRADE
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
142980
Final Estimate Of Actual Costs Through End Of Phase Amount
142980
Total Phase Actual Spending Amount
28655
Dsf Number S
DSF0001112515
15
Project Geographic District : 15 • Project Building Identifier: K010 • Project School Name: P.S. 10 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K010
Project School Name
P.S. 10 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY25 RESO A PLAYGROUND UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
2097040
Final Estimate Of Actual Costs Through End Of Phase Amount
2097040
Total Phase Actual Spending Amount
5336
Dsf Number S
DSF0001112515
15
Project Geographic District : 15 • Project Building Identifier: K010 • Project School Name: P.S. 10 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K010
Project School Name
P.S. 10 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY25 RESO A PLAYGROUND UPGRADE
Project Phase Name
Design
Project Status Name
In-Progress
Project Phase Actual Start Date
11/6/2025
Project Phase Planned End Date
3/27/2026
Project Budget Amount
142980
Final Estimate Of Actual Costs Through End Of Phase Amount
106050
Total Phase Actual Spending Amount
61569
Dsf Number S
DSF0001112515
15
Project Geographic District : 15 • Project Building Identifier: K010 • Project School Name: P.S. 10 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K010
Project School Name
P.S. 10 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY25 RESO A PLAYGROUND UPGRADE
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
2/24/2025
Project Phase Planned End Date
5/22/2025
Project Phase Actual End Date
8/22/2025
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
75359
Total Phase Actual Spending Amount
75199
Dsf Number S
DSF0001112515
15
Project Geographic District : 15 • Project Building Identifier: K010 • Project School Name: P.S. 10 - BROOKLYN
Project Geographic District
15
Project Building Identifier
K010
Project School Name
P.S. 10 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-AHERA P.S RESPONSE ACTION ABATEMENT ABATE AND REPLACE/REPAIR DAMAGED MATERIALS LOCATIONS: RMS#
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
4/1/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
6/9/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
68885
Total Phase Actual Spending Amount
2166
Dsf Number S
SCA0000075691
13
Project Geographic District : 13 • Project Building Identifier: K011 • Project School Name: P.S. 11 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K011
Project School Name
P.S. 11 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY24 RESO A PLAYGROUND UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
4/3/2024
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
756212
Total Phase Actual Spending Amount
678217
Dsf Number S
DSF0001085937
13
Project Geographic District : 13 • Project Building Identifier: K011 • Project School Name: P.S. 11 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K011
Project School Name
P.S. 11 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY27 RESO A ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
141000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001115175
13
Project Geographic District : 13 • Project Building Identifier: K011 • Project School Name: P.S. 11 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K011
Project School Name
P.S. 11 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY25 RESO A GYMNASIUM UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
450000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001112516
13
Project Geographic District : 13 • Project Building Identifier: K011 • Project School Name: P.S. 11 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K011
Project School Name
P.S. 11 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY25 RESO A ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
150000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001112514
13
Project Geographic District : 13 • Project Building Identifier: K011 • Project School Name: P.S. 11 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K011
Project School Name
P.S. 11 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY16 RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
5/2/2022
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
525781
Total Phase Actual Spending Amount
508830
Dsf Number S
DSF0000822741
13
Project Geographic District : 13 • Project Building Identifier: K011 • Project School Name: P.S. 11 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K011
Project School Name
P.S. 11 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY21 RESO A BATHROOM UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
7/12/2021
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
1173167
Total Phase Actual Spending Amount
1173127
Dsf Number S
DSF0001008219
13
Project Geographic District : 13 • Project Building Identifier: K011 • Project School Name: P.S. 11 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K011
Project School Name
P.S. 11 - BROOKLYN
Project Type
DOE - Skilled Trades
Project Description
CAFETERIA ENHANCEMENT EXPEERIENCE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
8/11/2026
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
602865
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001113456
13
Project Geographic District : 13 • Project Building Identifier: K011 • Project School Name: P.S. 11 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K011
Project School Name
P.S. 11 - BROOKLYN
Project Type
DOE - Skilled Trades
Project Description
BATHROOM UPGRADES
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
7/9/2021
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
223492
Total Phase Actual Spending Amount
5241
Dsf Number S
DSF0001008665
13
Project Geographic District : 13 • Project Building Identifier: K011 • Project School Name: P.S. 11 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K011
Project School Name
P.S. 11 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
6/17/2026
Project Phase Planned End Date
5/12/2027
Project Budget Amount
62949
Final Estimate Of Actual Costs Through End Of Phase Amount
36255
Total Phase Actual Spending Amount
4754
Dsf Number S
DSF0001087366
13
Project Geographic District : 13 • Project Building Identifier: K011 • Project School Name: P.S. 11 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K011
Project School Name
P.S. 11 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
6/17/2026
Project Phase Planned End Date
5/12/2027
Project Budget Amount
194005
Final Estimate Of Actual Costs Through End Of Phase Amount
185696
Total Phase Actual Spending Amount
2558
Dsf Number S
DSF0001087366
13
Project Geographic District : 13 • Project Building Identifier: K011 • Project School Name: P.S. 11 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K011
Project School Name
P.S. 11 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
10/1/2025
Project Phase Planned End Date
4/1/2026
Project Phase Actual End Date
3/9/2026
Project Budget Amount
13496
Final Estimate Of Actual Costs Through End Of Phase Amount
12520
Total Phase Actual Spending Amount
12520
Dsf Number S
DSF0001087366
13
Project Geographic District : 13 • Project Building Identifier: K011 • Project School Name: P.S. 11 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K011
Project School Name
P.S. 11 - BROOKLYN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
9/15/2025
Project Phase Planned End Date
1/16/2026
Project Phase Actual End Date
10/1/2025
Project Budget Amount
3374
Final Estimate Of Actual Costs Through End Of Phase Amount
3130
Total Phase Actual Spending Amount
3130
Dsf Number S
DSF0001087366
13
Project Geographic District : 13 • Project Building Identifier: K011 • Project School Name: P.S. 11 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K011
Project School Name
P.S. 11 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY27 RESO A KITCHEN UPGRADE
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
18600
Final Estimate Of Actual Costs Through End Of Phase Amount
18600
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001115174
13
Project Geographic District : 13 • Project Building Identifier: K011 • Project School Name: P.S. 11 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K011
Project School Name
P.S. 11 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY27 RESO A KITCHEN UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
272800
Final Estimate Of Actual Costs Through End Of Phase Amount
272800
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001115174
13
Project Geographic District : 13 • Project Building Identifier: K011 • Project School Name: P.S. 11 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K011
Project School Name
P.S. 11 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY27 RESO A KITCHEN UPGRADE
Project Phase Name
Design
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
18600
Final Estimate Of Actual Costs Through End Of Phase Amount
18600
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001115174
13
Project Geographic District : 13 • Project Building Identifier: K011 • Project School Name: P.S. 11 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K011
Project School Name
P.S. 11 - BROOKLYN
Project Type
SCA CIP RESOA
Project Description
FY27 RESO A KITCHEN UPGRADE
Project Phase Name
Scope
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001115174
13
Project Geographic District : 13 • Project Building Identifier: K011 • Project School Name: P.S. 11 - BROOKLYN
Project Geographic District
13
Project Building Identifier
K011
Project School Name
P.S. 11 - BROOKLYN
Project Type
SCA IEH
Project Description
PO18-AHERA P.S RESPONSE ACTION ABATEMENT CEILING PLASTER LVL 2 HALLWAY-GROUND FLOOR HALLWAY SOUTH OF
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
5/26/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
8/11/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
1217
Total Phase Actual Spending Amount
467
Dsf Number S
SCA0000076047
23
Project Geographic District : 23 • Project Building Identifier: K012 • Project School Name: I.S. 484 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K012
Project School Name
I.S. 484 - BROOKLYN
Project Type
DIIT - RESOA
Project Description
FY26 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
150000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001163527
23
Project Geographic District : 23 • Project Building Identifier: K012 • Project School Name: P.S. 12 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K012
Project School Name
P.S. 12 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY27 RESO A ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
500000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001115176
23
Project Geographic District : 23 • Project Building Identifier: K012 • Project School Name: P.S. 12 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K012
Project School Name
P.S. 12 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY23 RESO A BATHROOM UPGRADES
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
6/21/2024
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
50000
Total Phase Actual Spending Amount
49614
Dsf Number S
DSF0001035369
23
Project Geographic District : 23 • Project Building Identifier: K012 • Project School Name: P.S. 12 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K012
Project School Name
P.S. 12 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY23 RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
215000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001035368
23
Project Geographic District : 23 • Project Building Identifier: K012 • Project School Name: I.S. 484 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K012
Project School Name
I.S. 484 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY20 RESO A ROOM RENOVATION
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
6/4/2021
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
89991
Total Phase Actual Spending Amount
88780
Dsf Number S
DSF0000913198
23
Project Geographic District : 23 • Project Building Identifier: K012 • Project School Name: P.S. 12 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K012
Project School Name
P.S. 12 - BROOKLYN
Project Type
DOE - RESOA
Project Description
FY20 RESO A HYDROPONICS LAB
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
5/9/2022
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
41371
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0000913197
23
Project Geographic District : 23 • Project Building Identifier: K012 • Project School Name: I.S. 484 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K012
Project School Name
I.S. 484 - BROOKLYN
Project Type
DOE - Skilled Trades
Project Description
CAFETERIA ENHANCEMENT EXPERIENCE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
2/9/2024
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
458324
Total Phase Actual Spending Amount
53543
Dsf Number S
DSF0001085710
23
Project Geographic District : 23 • Project Building Identifier: K012 • Project School Name: P.S. 12 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K012
Project School Name
P.S. 12 - BROOKLYN
Project Type
SCA CIP
Project Description
WALK-IN REFRIGERATORS AND FREEZERS
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
7/16/2025
Project Phase Planned End Date
8/19/2026
Project Budget Amount
144478
Final Estimate Of Actual Costs Through End Of Phase Amount
112989
Total Phase Actual Spending Amount
80442
Dsf Number S
DSF0001083797
23
Project Geographic District : 23 • Project Building Identifier: K012 • Project School Name: P.S. 12 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K012
Project School Name
P.S. 12 - BROOKLYN
Project Type
SCA CIP
Project Description
LOW VOLTAGE ELECTRICAL SYSTEMS
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
241231
Final Estimate Of Actual Costs Through End Of Phase Amount
241231
Total Phase Actual Spending Amount
23014
Dsf Number S
DSF0001088032
23
Project Geographic District : 23 • Project Building Identifier: K012 • Project School Name: P.S. 12 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K012
Project School Name
P.S. 12 - BROOKLYN
Project Type
SCA CIP
Project Description
RPZ BACKFLOW PREVENTION DEVICES
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
115450
Final Estimate Of Actual Costs Through End Of Phase Amount
115450
Total Phase Actual Spending Amount
4386
Dsf Number S
DSF0001115616
23
Project Geographic District : 23 • Project Building Identifier: K012 • Project School Name: P.S. 12 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K012
Project School Name
P.S. 12 - BROOKLYN
Project Type
SCA CIP
Project Description
ROOFS / PARAPETS / WINDOWS / EXTERIOR MASONRY / FENCING
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
7/22/2024
Project Phase Planned End Date
1/7/2027
Project Budget Amount
1069762
Final Estimate Of Actual Costs Through End Of Phase Amount
691840
Total Phase Actual Spending Amount
665804
Dsf Number S
DSF0001009615, DSF0001009616, DSF0001009617, DSF0001009618, DSF0001111760
23
Project Geographic District : 23 • Project Building Identifier: K012 • Project School Name: P.S. 12 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K012
Project School Name
P.S. 12 - BROOKLYN
Project Type
SCA CIP
Project Description
ROOFS / PARAPETS / WINDOWS / EXTERIOR MASONRY / FENCING
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
7/22/2024
Project Phase Planned End Date
1/7/2027
Project Budget Amount
15439113
Final Estimate Of Actual Costs Through End Of Phase Amount
13859985
Total Phase Actual Spending Amount
4524886
Dsf Number S
DSF0001009615, DSF0001009616, DSF0001009617, DSF0001009618, DSF0001111760
23
Project Geographic District : 23 • Project Building Identifier: K012 • Project School Name: P.S. 12 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K012
Project School Name
P.S. 12 - BROOKLYN
Project Type
SCA CIP
Project Description
RPZ BACKFLOW PREVENTION DEVICES
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
1164992
Final Estimate Of Actual Costs Through End Of Phase Amount
1164992
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001115616
23
Project Geographic District : 23 • Project Building Identifier: K012 • Project School Name: P.S. 12 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K012
Project School Name
P.S. 12 - BROOKLYN
Project Type
SCA CIP
Project Description
WALK-IN REFRIGERATORS AND FREEZERS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
7/16/2025
Project Phase Planned End Date
8/19/2026
Project Budget Amount
779512
Final Estimate Of Actual Costs Through End Of Phase Amount
676993
Total Phase Actual Spending Amount
177745
Dsf Number S
DSF0001083797
23
Project Geographic District : 23 • Project Building Identifier: K012 • Project School Name: P.S. 12 - BROOKLYN
Project Geographic District
23
Project Building Identifier
K012
Project School Name
P.S. 12 - BROOKLYN
Project Type
SCA CIP
Project Description
LOW VOLTAGE ELECTRICAL SYSTEMS
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
2434237
Final Estimate Of Actual Costs Through End Of Phase Amount
2434237
Total Phase Actual Spending Amount
1241
Dsf Number S
DSF0001088032