Capital Project Schedules and Budgets

List of capital projects with managing organization, phase status and project costs.

Housing & Development School Construction Authority (SCA) Dataset 2xh6-psuq 14 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
4
Project Geographic District : 4 • Project Building Identifier: M112 • Project School Name: P.S. 112 - MANHATTAN
Project Geographic District
4
Project Building Identifier
M112
Project School Name
P.S. 112 - MANHATTAN
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
7/17/2023
Project Phase Planned End Date
1/1/2026
Project Budget Amount
1211023
Final Estimate Of Actual Costs Through End Of Phase Amount
947971
Total Phase Actual Spending Amount
911520
Dsf Number S
DSF0000912339
4
Project Geographic District : 4 • Project Building Identifier: M112 • Project School Name: P.S. 112 - MANHATTAN
Project Geographic District
4
Project Building Identifier
M112
Project School Name
P.S. 112 - MANHATTAN
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
7/17/2023
Project Phase Planned End Date
1/1/2026
Project Budget Amount
19462868
Final Estimate Of Actual Costs Through End Of Phase Amount
18632498
Total Phase Actual Spending Amount
13027477
Dsf Number S
DSF0000912339
4
Project Geographic District : 4 • Project Building Identifier: M112 • Project School Name: P.S. 112 - MANHATTAN
Project Geographic District
4
Project Building Identifier
M112
Project School Name
P.S. 112 - MANHATTAN
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
3/3/2021
Project Phase Planned End Date
8/17/2021
Project Phase Actual End Date
3/27/2023
Project Budget Amount
865016
Final Estimate Of Actual Costs Through End Of Phase Amount
1084681
Total Phase Actual Spending Amount
624193
Dsf Number S
DSF0000912339
4
Project Geographic District : 4 • Project Building Identifier: M112 • Project School Name: P.S. 112 - MANHATTAN
Project Geographic District
4
Project Building Identifier
M112
Project School Name
P.S. 112 - MANHATTAN
Project Type
SCA CIP
Project Description
FULL PROGRAM ACCESSIBILITY
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
7/8/2019
Project Phase Planned End Date
11/21/2019
Project Phase Actual End Date
10/3/2019
Project Budget Amount
173003
Final Estimate Of Actual Costs Through End Of Phase Amount
186673
Total Phase Actual Spending Amount
131173
Dsf Number S
DSF0000912339
4
Project Geographic District : 4 • Project Building Identifier: M112 • Project School Name: P.S. 112 - MANHATTAN
Project Geographic District
4
Project Building Identifier
M112
Project School Name
P.S. 112 - MANHATTAN
Project Type
SCA IEH
Project Description
PO18-P.S. RESPONSE ACTION ABATE AND REPLACE 9X9 FLOOR TILES IN THE FOLLOWING LOCATIONS: SPACE ID #20
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
4/8/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
5/28/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
750
Total Phase Actual Spending Amount
0
Dsf Number S
SCA0000075738
3
Project Geographic District : 3 • Project Building Identifier: M113 • Project School Name: P.S. 241 - MANHATTAN
Project Geographic District
3
Project Building Identifier
M113
Project School Name
P.S. 241 - MANHATTAN
Project Type
DOE - Skilled Trades
Project Description
CAFETERIA CEILING
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
7/14/2025
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
128515
Dsf Number S
DSF0001114248
3
Project Geographic District : 3 • Project Building Identifier: M113 • Project School Name: P.S. 241 - MANHATTAN
Project Geographic District
3
Project Building Identifier
M113
Project School Name
P.S. 241 - MANHATTAN
Project Type
SCA Emergency Response
Project Description
EMERGENCY STABILIZATION
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
4/2/2021
Project Phase Planned End Date
EMER
Project Budget Amount
EMER
Final Estimate Of Actual Costs Through End Of Phase Amount
251827
Total Phase Actual Spending Amount
250727
Dsf Number S
SCA0000069149
2
Project Geographic District : 2 • Project Building Identifier: M114 • Project School Name: M138 SPED - MANHATTAN
Project Geographic District
2
Project Building Identifier
M114
Project School Name
M138 SPED - MANHATTAN
Project Type
DIIT - RESOA
Project Description
FY25 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
Complete
Project Phase Actual Start Date
12/12/2025
Project Phase Planned End Date
DIIR
Project Phase Actual End Date
3/12/2026
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
50000
Total Phase Actual Spending Amount
50000
Dsf Number S
DSF0001112799
2
Project Geographic District : 2 • Project Building Identifier: M114 • Project School Name: I.S. 114 - MANHATTAN
Project Geographic District
2
Project Building Identifier
M114
Project School Name
I.S. 114 - MANHATTAN
Project Type
DIIT - RESOA
Project Description
FY26 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
150000
Total Phase Actual Spending Amount
150000
Dsf Number S
DSF0001163295
2
Project Geographic District : 2 • Project Building Identifier: M114 • Project School Name: M138 SPED - MANHATTAN
Project Geographic District
2
Project Building Identifier
M114
Project School Name
M138 SPED - MANHATTAN
Project Type
DIIT - RESOA
Project Description
FY26 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
50000
Total Phase Actual Spending Amount
50000
Dsf Number S
DSF0001163606
2
Project Geographic District : 2 • Project Building Identifier: M114 • Project School Name: I.S. 114 - MANHATTAN
Project Geographic District
2
Project Building Identifier
M114
Project School Name
I.S. 114 - MANHATTAN
Project Type
DOE - RESOA
Project Description
RESO A LIBRARY UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
7/7/2023
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
551514
Total Phase Actual Spending Amount
27107
Dsf Number S
DSF0001008761
2
Project Geographic District : 2 • Project Building Identifier: M114 • Project School Name: I.S. 114 - MANHATTAN
Project Geographic District
2
Project Building Identifier
M114
Project School Name
I.S. 114 - MANHATTAN
Project Type
Fast Track Projects
Project Description
FY25 RESO A INTERIOR SPACES
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
1/15/2026
Project Phase Planned End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
112982
Total Phase Actual Spending Amount
33813
Dsf Number S
DSF0001112798
2
Project Geographic District : 2 • Project Building Identifier: M114 • Project School Name: I.S. 114 - MANHATTAN
Project Geographic District
2
Project Building Identifier
M114
Project School Name
I.S. 114 - MANHATTAN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL RESO A INTERIOR SPACES
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001113606
2
Project Geographic District : 2 • Project Building Identifier: M114 • Project School Name: I.S. 114 - MANHATTAN
Project Geographic District
2
Project Building Identifier
M114
Project School Name
I.S. 114 - MANHATTAN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL RESO A INTERIOR SPACES
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001113606
2
Project Geographic District : 2 • Project Building Identifier: M114 • Project School Name: I.S. 114 - MANHATTAN
Project Geographic District
2
Project Building Identifier
M114
Project School Name
I.S. 114 - MANHATTAN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL RESO A INTERIOR SPACES
Project Phase Name
Design
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001113606
2
Project Geographic District : 2 • Project Building Identifier: M114 • Project School Name: I.S. 114 - MANHATTAN
Project Geographic District
2
Project Building Identifier
M114
Project School Name
I.S. 114 - MANHATTAN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL RESO A INTERIOR SPACES
Project Phase Name
Scope
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001113606
6
Project Geographic District : 6 • Project Building Identifier: M115 • Project School Name: P.S. 115 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M115
Project School Name
P.S. 115 - MANHATTAN
Project Type
DOE - RESOA
Project Description
FY23 RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
300000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001035668
6
Project Geographic District : 6 • Project Building Identifier: M115 • Project School Name: P.S. 115 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M115
Project School Name
P.S. 115 - MANHATTAN
Project Type
DOE - RESOA
Project Description
FY17 RESO A GYMNASIUM UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
35000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0000844916
6
Project Geographic District : 6 • Project Building Identifier: M115 • Project School Name: P.S. 115 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M115
Project School Name
P.S. 115 - MANHATTAN
Project Type
DOE - RESOA
Project Description
FY25 RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
4/2/2026
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
372833
Dsf Number S
DSF0001112800
6
Project Geographic District : 6 • Project Building Identifier: M115 • Project School Name: P.S. 115 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M115
Project School Name
P.S. 115 - MANHATTAN
Project Type
DOE - RESOA
Project Description
FY24 RESO A BATHROOM UPGRADES
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
11/15/2023
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
274048
Dsf Number S
DSF0001086216
6
Project Geographic District : 6 • Project Building Identifier: M115 • Project School Name: P.S. 115 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M115
Project School Name
P.S. 115 - MANHATTAN
Project Type
DOE - Skilled Trades
Project Description
WATER MAIN REPLACEMENT
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
7/15/2024
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
166413
Dsf Number S
DSF0001112039
6
Project Geographic District : 6 • Project Building Identifier: M115 • Project School Name: KIPP NYC WASHINGTON HEIGHTS ACADEMY I CS
Project Geographic District
6
Project Building Identifier
M115
Project School Name
KIPP NYC WASHINGTON HEIGHTS ACADEMY I CS
Project Type
DOE - Skilled Trades
Project Description
BATHROOM UPGRADES
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
1/14/2022
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
170000
Total Phase Actual Spending Amount
169418
Dsf Number S
DSF0001008692
6
Project Geographic District : 6 • Project Building Identifier: M115 • Project School Name: P.S. 115 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M115
Project School Name
P.S. 115 - MANHATTAN
Project Type
Fast Track Projects
Project Description
CTF ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
9/19/2024
Project Phase Planned End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
1467389
Total Phase Actual Spending Amount
1375439
Dsf Number S
DSF0001112043
6
Project Geographic District : 6 • Project Building Identifier: M115 • Project School Name: P.S. 115 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M115
Project School Name
P.S. 115 - MANHATTAN
Project Type
Fast Track Projects
Project Description
PATH OF TRAVEL CTF ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
11/7/2024
Project Phase Planned End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
371640
Total Phase Actual Spending Amount
211092
Dsf Number S
DSF0001112044
6
Project Geographic District : 6 • Project Building Identifier: M115 • Project School Name: P.S. 115 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M115
Project School Name
P.S. 115 - MANHATTAN
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION / PARAPETS / EXTERIOR MASONRY / WINDOWS / COVID VENTILATION / COVID FIRE ALARM SYSTEM REPLACEMENT / ELECTRICAL UPGRADE
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
1432129
Final Estimate Of Actual Costs Through End Of Phase Amount
1432129
Total Phase Actual Spending Amount
196379
Dsf Number S
DSF0000944110, DSF0000944112, DSF0000944114, DSF0000944113, DSF0000961101, DSF0001018382, DSF0001018389
6
Project Geographic District : 6 • Project Building Identifier: M115 • Project School Name: P.S. 115 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M115
Project School Name
P.S. 115 - MANHATTAN
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION / PARAPETS / EXTERIOR MASONRY / WINDOWS / COVID VENTILATION / COVID FIRE ALARM SYSTEM REPLACEMENT / ELECTRICAL UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
23016375
Final Estimate Of Actual Costs Through End Of Phase Amount
23158582
Total Phase Actual Spending Amount
987185
Dsf Number S
DSF0000944110, DSF0000944112, DSF0000944114, DSF0000944113, DSF0000961101, DSF0001018382, DSF0001018389
6
Project Geographic District : 6 • Project Building Identifier: M115 • Project School Name: P.S. 115 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M115
Project School Name
P.S. 115 - MANHATTAN
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION / PARAPETS / EXTERIOR MASONRY / WINDOWS / COVID VENTILATION / COVID FIRE ALARM SYSTEM REPLACEMENT / ELECTRICAL UPGRADE
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
1/12/2022
Project Phase Planned End Date
6/21/2022
Project Phase Actual End Date
8/15/2022
Project Budget Amount
1022949
Final Estimate Of Actual Costs Through End Of Phase Amount
742519
Total Phase Actual Spending Amount
612300
Dsf Number S
DSF0000944110, DSF0000944112, DSF0000944114, DSF0000944113, DSF0000961101, DSF0001018382, DSF0001018389
6
Project Geographic District : 6 • Project Building Identifier: M115 • Project School Name: P.S. 115 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M115
Project School Name
P.S. 115 - MANHATTAN
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION / PARAPETS / EXTERIOR MASONRY / WINDOWS / COVID VENTILATION / COVID FIRE ALARM SYSTEM REPLACEMENT / ELECTRICAL UPGRADE
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
8/18/2020
Project Phase Planned End Date
11/5/2021
Project Phase Actual End Date
1/7/2022
Project Budget Amount
204589
Final Estimate Of Actual Costs Through End Of Phase Amount
270893
Total Phase Actual Spending Amount
254623
Dsf Number S
DSF0000944110, DSF0000944112, DSF0000944114, DSF0000944113, DSF0000961101, DSF0001018382, DSF0001018389
6
Project Geographic District : 6 • Project Building Identifier: M115 • Project School Name: P.S. 115 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M115
Project School Name
P.S. 115 - MANHATTAN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL RESO A PLAYGROUND UPGRADE
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001113607
6
Project Geographic District : 6 • Project Building Identifier: M115 • Project School Name: P.S. 115 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M115
Project School Name
P.S. 115 - MANHATTAN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL RESO A PLAYGROUND UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001113607
6
Project Geographic District : 6 • Project Building Identifier: M115 • Project School Name: P.S. 115 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M115
Project School Name
P.S. 115 - MANHATTAN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL RESO A PLAYGROUND UPGRADE
Project Phase Name
Design
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001113607
6
Project Geographic District : 6 • Project Building Identifier: M115 • Project School Name: P.S. 115 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M115
Project School Name
P.S. 115 - MANHATTAN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL RESO A PLAYGROUND UPGRADE
Project Phase Name
Scope
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001113607
6
Project Geographic District : 6 • Project Building Identifier: M115 • Project School Name: P.S. 115 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M115
Project School Name
P.S. 115 - MANHATTAN
Project Type
SCA IEH
Project Description
PO18-ABATE AND REPLACE WALLS AND CEILING IN GYM (SPACE ID# 2011) LOCATION #1: BOY'S GYM (WALL) SIZE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
5/14/2026
Project Phase Planned End Date
IEH
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
1359
Total Phase Actual Spending Amount
609
Dsf Number S
SCA0000075969
6
Project Geographic District : 6 • Project Building Identifier: M115 • Project School Name: P.S. 115 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M115
Project School Name
P.S. 115 - MANHATTAN
Project Type
SCA IEH
Project Description
PO18-FOLLOWING LOCATIONS REQUIRES ACM ABATEMENT AND REPAIR: 1ST FL BATHRM 2 - 011A - 4 SQ FT OF DAMA
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
2/13/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
2/16/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
84144
Total Phase Actual Spending Amount
83394
Dsf Number S
SCA0000075448
6
Project Geographic District : 6 • Project Building Identifier: M115 • Project School Name: P.S. 115 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M115
Project School Name
P.S. 115 - MANHATTAN
Project Type
SCA IEH
Project Description
PO18-ABATE WALL TILES LOCATED IN 1ST FL - BOY'S BATHROOM IN GYM AHERA SPACES #2011A
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
1/7/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
3/2/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
74146
Total Phase Actual Spending Amount
2592
Dsf Number S
SCA0000075267
6
Project Geographic District : 6 • Project Building Identifier: M115 • Project School Name: P.S. 115 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M115
Project School Name
P.S. 115 - MANHATTAN
Project Type
SCA IEH
Project Description
PO18-ABATE MASTIC CERAMIC WALL TILES ROOM 562 ( SPACE ID# 6562)
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
2/25/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
5/28/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
14560
Total Phase Actual Spending Amount
2817
Dsf Number S
SCA0000075475
6
Project Geographic District : 6 • Project Building Identifier: M115 • Project School Name: P.S. 115 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M115
Project School Name
P.S. 115 - MANHATTAN
Project Type
SCA IEH
Project Description
PO18-ACM ABATEMENT REQUIRED (WALL PLASTER) LOCATION: 3RD FL, ROOM 307 - DAMAGED WALL PLASTER INSIDE
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
3/2/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
3/10/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
95
Total Phase Actual Spending Amount
95
Dsf Number S
SCA0000075513
2
Project Geographic District : 2 • Project Building Identifier: M116 • Project School Name: P.S. 116 - MANHATTAN
Project Geographic District
2
Project Building Identifier
M116
Project School Name
P.S. 116 - MANHATTAN
Project Type
DIIT - RESOA
Project Description
FY26 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
50000
Total Phase Actual Spending Amount
50000
Dsf Number S
DSF0001163607
2
Project Geographic District : 2 • Project Building Identifier: M116 • Project School Name: P.S. 116 - MANHATTAN
Project Geographic District
2
Project Building Identifier
M116
Project School Name
P.S. 116 - MANHATTAN
Project Type
DIIT - RESOA
Project Description
FY19 RESO A TECHNOLOGY
Project Phase Name
Purch & Install
Project Status Name
In-Progress
Project Phase Actual Start Date
3/14/2021
Project Phase Planned End Date
DIIR
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
49000
Total Phase Actual Spending Amount
49000
Dsf Number S
DSF0000890168
2
Project Geographic District : 2 • Project Building Identifier: M116 • Project School Name: P.S. 116 - MANHATTAN
Project Geographic District
2
Project Building Identifier
M116
Project School Name
P.S. 116 - MANHATTAN
Project Type
DOE - RESOA
Project Description
FY21 RESO A WATER FOUNTAIN UPGRADES
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
8/30/2021
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
324251
Total Phase Actual Spending Amount
228470
Dsf Number S
DSF0000961300
2
Project Geographic District : 2 • Project Building Identifier: M116 • Project School Name: P.S. 116 - MANHATTAN
Project Geographic District
2
Project Building Identifier
M116
Project School Name
P.S. 116 - MANHATTAN
Project Type
DOE - RESOA
Project Description
FY18 RESO A GYMNASIUM UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
7/10/2023
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
307625
Total Phase Actual Spending Amount
269602
Dsf Number S
DSF0000866435
2
Project Geographic District : 2 • Project Building Identifier: M116 • Project School Name: P.S. 116 - MANHATTAN
Project Geographic District
2
Project Building Identifier
M116
Project School Name
P.S. 116 - MANHATTAN
Project Type
DOE - RESOA
Project Description
FY17 RESO A KITCHEN AREAS
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
103801
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0000844793
2
Project Geographic District : 2 • Project Building Identifier: M116 • Project School Name: P.S. 116 - MANHATTAN
Project Geographic District
2
Project Building Identifier
M116
Project School Name
P.S. 116 - MANHATTAN
Project Type
Fast Track Projects
Project Description
FY25 RESO A STEM LAB
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
FTK
Project Phase Planned End Date
FTK
Project Phase Actual End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
240000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001112801
2
Project Geographic District : 2 • Project Building Identifier: M116 • Project School Name: P.S. 116 - MANHATTAN
Project Geographic District
2
Project Building Identifier
M116
Project School Name
P.S. 116 - MANHATTAN
Project Type
SCA CIP
Project Description
ROOFS / EXTERIOR MASONRY / FLOOD ELIMINATION / WINDOWS
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
1619605
Final Estimate Of Actual Costs Through End Of Phase Amount
1619605
Total Phase Actual Spending Amount
126641
Dsf Number S
DSF0001069127, DSF0001069129, DSF0001096830, DSF0001113803
2
Project Geographic District : 2 • Project Building Identifier: M116 • Project School Name: P.S. 116 - MANHATTAN
Project Geographic District
2
Project Building Identifier
M116
Project School Name
P.S. 116 - MANHATTAN
Project Type
SCA CIP
Project Description
ROOFS / EXTERIOR MASONRY / FLOOD ELIMINATION / WINDOWS
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
15413788
Final Estimate Of Actual Costs Through End Of Phase Amount
15413788
Total Phase Actual Spending Amount
248506
Dsf Number S
DSF0001069127, DSF0001069129, DSF0001096830, DSF0001113803
2
Project Geographic District : 2 • Project Building Identifier: M116 • Project School Name: P.S. 116 - MANHATTAN
Project Geographic District
2
Project Building Identifier
M116
Project School Name
P.S. 116 - MANHATTAN
Project Type
SCA CIP
Project Description
ROOFS / EXTERIOR MASONRY / FLOOD ELIMINATION / WINDOWS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
11/8/2024
Project Phase Planned End Date
4/15/2025
Project Phase Actual End Date
3/28/2025
Project Budget Amount
975845
Final Estimate Of Actual Costs Through End Of Phase Amount
391591
Total Phase Actual Spending Amount
391591
Dsf Number S
DSF0001069127, DSF0001069129, DSF0001096830, DSF0001113803
2
Project Geographic District : 2 • Project Building Identifier: M116 • Project School Name: P.S. 116 - MANHATTAN
Project Geographic District
2
Project Building Identifier
M116
Project School Name
P.S. 116 - MANHATTAN
Project Type
SCA CIP
Project Description
ROOFS / EXTERIOR MASONRY / FLOOD ELIMINATION / WINDOWS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
6/14/2024
Project Phase Planned End Date
10/31/2024
Project Phase Actual End Date
10/16/2024
Project Budget Amount
210564
Final Estimate Of Actual Costs Through End Of Phase Amount
187895
Total Phase Actual Spending Amount
184385
Dsf Number S
DSF0001069127, DSF0001069129, DSF0001096830, DSF0001113803
2
Project Geographic District : 2 • Project Building Identifier: M116 • Project School Name: P.S. 116 - MANHATTAN
Project Geographic District
2
Project Building Identifier
M116
Project School Name
P.S. 116 - MANHATTAN
Project Type
SCA CIP RESOA
Project Description
RESO A PATH OF TRAVEL PLAYGROUND UPGRADE
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
4011
Final Estimate Of Actual Costs Through End Of Phase Amount
4011
Total Phase Actual Spending Amount
4011
Dsf Number S
DSF0001033650
2
Project Geographic District : 2 • Project Building Identifier: M116 • Project School Name: P.S. 116 - MANHATTAN
Project Geographic District
2
Project Building Identifier
M116
Project School Name
P.S. 116 - MANHATTAN
Project Type
SCA CIP RESOA
Project Description
FY22 RESO A PLAYGROUND UPGRADE
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
55616
Final Estimate Of Actual Costs Through End Of Phase Amount
55616
Total Phase Actual Spending Amount
17593
Dsf Number S
DSF0001033651
2
Project Geographic District : 2 • Project Building Identifier: M116 • Project School Name: P.S. 116 - MANHATTAN
Project Geographic District
2
Project Building Identifier
M116
Project School Name
P.S. 116 - MANHATTAN
Project Type
SCA CIP RESOA
Project Description
RESO A PATH OF TRAVEL PLAYGROUND UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
20292
Final Estimate Of Actual Costs Through End Of Phase Amount
20292
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001033650