6
Project Geographic District : 6 • Project Building Identifier: M132 • Project School Name: DOS PUENTES ELEMENTARY SCHOOL
Project Geographic District
6
Project Building Identifier
M132
Project School Name
DOS PUENTES ELEMENTARY SCHOOL
Project Type
DOE - RESOA
Project Description
FY22 RESO A ELECTRICAL UPGRADE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
7/31/2023
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
219706
Total Phase Actual Spending Amount
90809
Dsf Number S
DSF0001033645
6
Project Geographic District : 6 • Project Building Identifier: M132 • Project School Name: P.S. 132 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M132
Project School Name
P.S. 132 - MANHATTAN
Project Type
DOE - RESOA
Project Description
FY23 RESO A EXTERIOR UPGRADES
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
7/26/2024
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
374782
Total Phase Actual Spending Amount
98294
Dsf Number S
DSF0001035687
6
Project Geographic District : 6 • Project Building Identifier: M132 • Project School Name: P.S. 132 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M132
Project School Name
P.S. 132 - MANHATTAN
Project Type
DOE - RESOA
Project Description
RESO A ELECTRICAL UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
360918
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001085117
6
Project Geographic District : 6 • Project Building Identifier: M132 • Project School Name: P.S. 132 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M132
Project School Name
P.S. 132 - MANHATTAN
Project Type
DOE - RESOA
Project Description
FY24 RESO A STEM LAB
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
113836
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001086227
6
Project Geographic District : 6 • Project Building Identifier: M132 • Project School Name: DOS PUENTES ELEMENTARY SCHOOL
Project Geographic District
6
Project Building Identifier
M132
Project School Name
DOS PUENTES ELEMENTARY SCHOOL
Project Type
DOE - RESOA
Project Description
FY25 RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
239220
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001112809
6
Project Geographic District : 6 • Project Building Identifier: M132 • Project School Name: P.S. 132 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M132
Project School Name
P.S. 132 - MANHATTAN
Project Type
DOE - RESOA
Project Description
FY25 RESO A GYMNASIUM UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
212360
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001112810
6
Project Geographic District : 6 • Project Building Identifier: M132 • Project School Name: P.S. 132 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M132
Project School Name
P.S. 132 - MANHATTAN
Project Type
Fast Track Projects
Project Description
FY18 RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
FTK
Project Phase Planned End Date
FTK
Project Phase Actual End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
38400
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0000867266
6
Project Geographic District : 6 • Project Building Identifier: M132 • Project School Name: DOS PUENTES ELEMENTARY SCHOOL
Project Geographic District
6
Project Building Identifier
M132
Project School Name
DOS PUENTES ELEMENTARY SCHOOL
Project Type
Fast Track Projects
Project Description
FY26 RESO A ROOM CONVERSION
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
FTK
Project Phase Planned End Date
FTK
Project Phase Actual End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
120000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001163668
6
Project Geographic District : 6 • Project Building Identifier: M132 • Project School Name: P.S. 132 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M132
Project School Name
P.S. 132 - MANHATTAN
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION / ROOFS / WINDOWS / EXTERIOR MASONRY / PARAPETS
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
2096786
Final Estimate Of Actual Costs Through End Of Phase Amount
2096786
Total Phase Actual Spending Amount
124849
Dsf Number S
DSF0001097056, DSF0001097059, DSF0001113787, DSF0001124809, DSF0001124808
6
Project Geographic District : 6 • Project Building Identifier: M132 • Project School Name: P.S. 132 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M132
Project School Name
P.S. 132 - MANHATTAN
Project Type
SCA CIP
Project Description
COVID VENTILATION / COVID ELECTRICAL SYSTEM UPGRADE / COVID FIRE ALARM SYSTEM REPLACEMENT
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
8/7/2023
Project Phase Planned End Date
8/5/2025
Project Budget Amount
894461
Final Estimate Of Actual Costs Through End Of Phase Amount
712311
Total Phase Actual Spending Amount
705544
Dsf Number S
DSF0000993115, DSF0001018640, DSF0001018630
6
Project Geographic District : 6 • Project Building Identifier: M132 • Project School Name: P.S. 132 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M132
Project School Name
P.S. 132 - MANHATTAN
Project Type
SCA CIP
Project Description
DEFECTIVE WROUGHT IRON FENCE & HANDRAILS / FY16 RESO A PLAYGROUND REDEVELOPMENT / WATER INFILTRATION / BOILER REPAIR / RPZ BACKFLOW PREVENTION DEVICES
Project Phase Name
CM,F&E
Project Status Name
Complete
Project Phase Actual Start Date
7/16/2018
Project Phase Planned End Date
11/1/2020
Project Phase Actual End Date
1/31/2025
Project Budget Amount
889516
Final Estimate Of Actual Costs Through End Of Phase Amount
2015721
Total Phase Actual Spending Amount
1965364
Dsf Number S
DSF0000809387, DSF0000822927, DSF0000853418, DSF0000888992, DSF0000876030
6
Project Geographic District : 6 • Project Building Identifier: M132 • Project School Name: P.S. 132 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M132
Project School Name
P.S. 132 - MANHATTAN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
7/30/2025
Project Phase Planned End Date
6/24/2026
Project Budget Amount
147371
Final Estimate Of Actual Costs Through End Of Phase Amount
135194
Total Phase Actual Spending Amount
74076
Dsf Number S
DSF0001087481
6
Project Geographic District : 6 • Project Building Identifier: M132 • Project School Name: P.S. 132 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M132
Project School Name
P.S. 132 - MANHATTAN
Project Type
SCA CIP
Project Description
DEFECTIVE WROUGHT IRON FENCE & HANDRAILS / FY16 RESO A PLAYGROUND REDEVELOPMENT / WATER INFILTRATION / BOILER REPAIR / RPZ BACKFLOW PREVENTION DEVICES
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
7/16/2018
Project Phase Planned End Date
11/1/2020
Project Phase Actual End Date
1/31/2025
Project Budget Amount
11140918
Final Estimate Of Actual Costs Through End Of Phase Amount
11943423
Total Phase Actual Spending Amount
10341072
Dsf Number S
DSF0000809387, DSF0000822927, DSF0000853418, DSF0000888992, DSF0000876030
6
Project Geographic District : 6 • Project Building Identifier: M132 • Project School Name: P.S. 132 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M132
Project School Name
P.S. 132 - MANHATTAN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
7/30/2025
Project Phase Planned End Date
6/24/2026
Project Budget Amount
231971
Final Estimate Of Actual Costs Through End Of Phase Amount
219756
Total Phase Actual Spending Amount
178833
Dsf Number S
DSF0001087481
6
Project Geographic District : 6 • Project Building Identifier: M132 • Project School Name: P.S. 132 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M132
Project School Name
P.S. 132 - MANHATTAN
Project Type
SCA CIP
Project Description
COVID VENTILATION / COVID ELECTRICAL SYSTEM UPGRADE / COVID FIRE ALARM SYSTEM REPLACEMENT
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
8/7/2023
Project Phase Planned End Date
8/5/2025
Project Budget Amount
12798419
Final Estimate Of Actual Costs Through End Of Phase Amount
13078301
Total Phase Actual Spending Amount
10988439
Dsf Number S
DSF0000993115, DSF0001018640, DSF0001018630
6
Project Geographic District : 6 • Project Building Identifier: M132 • Project School Name: P.S. 132 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M132
Project School Name
P.S. 132 - MANHATTAN
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION / ROOFS / WINDOWS / EXTERIOR MASONRY / PARAPETS
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
21158473
Final Estimate Of Actual Costs Through End Of Phase Amount
21158473
Total Phase Actual Spending Amount
97085
Dsf Number S
DSF0001097056, DSF0001097059, DSF0001113787, DSF0001124809, DSF0001124808
6
Project Geographic District : 6 • Project Building Identifier: M132 • Project School Name: P.S. 132 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M132
Project School Name
P.S. 132 - MANHATTAN
Project Type
SCA CIP
Project Description
COVID VENTILATION / COVID ELECTRICAL SYSTEM UPGRADE / COVID FIRE ALARM SYSTEM REPLACEMENT
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
11/29/2021
Project Phase Planned End Date
5/23/2022
Project Phase Actual End Date
8/30/2022
Project Budget Amount
595229
Final Estimate Of Actual Costs Through End Of Phase Amount
464567
Total Phase Actual Spending Amount
432286
Dsf Number S
DSF0000993115, DSF0001018640, DSF0001018630
6
Project Geographic District : 6 • Project Building Identifier: M132 • Project School Name: P.S. 132 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M132
Project School Name
P.S. 132 - MANHATTAN
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION / ROOFS / WINDOWS / EXTERIOR MASONRY / PARAPETS
Project Phase Name
Design
Project Status Name
In-Progress
Project Phase Actual Start Date
10/29/2025
Project Phase Planned End Date
4/3/2026
Project Budget Amount
1334318
Final Estimate Of Actual Costs Through End Of Phase Amount
1334318
Total Phase Actual Spending Amount
261961
Dsf Number S
DSF0001097056, DSF0001097059, DSF0001113787, DSF0001124809, DSF0001124808
6
Project Geographic District : 6 • Project Building Identifier: M132 • Project School Name: P.S. 132 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M132
Project School Name
P.S. 132 - MANHATTAN
Project Type
SCA CIP
Project Description
DEFECTIVE WROUGHT IRON FENCE & HANDRAILS / FY16 RESO A PLAYGROUND REDEVELOPMENT / WATER INFILTRATION / BOILER REPAIR / RPZ BACKFLOW PREVENTION DEVICES
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
1/26/2018
Project Phase Planned End Date
6/27/2018
Project Phase Actual End Date
5/9/2018
Project Budget Amount
635343
Final Estimate Of Actual Costs Through End Of Phase Amount
1621525
Total Phase Actual Spending Amount
1575856
Dsf Number S
DSF0000809387, DSF0000822927, DSF0000853418, DSF0000888992, DSF0000876030
6
Project Geographic District : 6 • Project Building Identifier: M132 • Project School Name: P.S. 132 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M132
Project School Name
P.S. 132 - MANHATTAN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
7/9/2024
Project Phase Planned End Date
1/6/2025
Project Phase Actual End Date
12/26/2024
Project Budget Amount
17998
Final Estimate Of Actual Costs Through End Of Phase Amount
924
Total Phase Actual Spending Amount
924
Dsf Number S
DSF0001087481
6
Project Geographic District : 6 • Project Building Identifier: M132 • Project School Name: P.S. 132 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M132
Project School Name
P.S. 132 - MANHATTAN
Project Type
SCA CIP
Project Description
DEFECTIVE WROUGHT IRON FENCE & HANDRAILS / FY16 RESO A PLAYGROUND REDEVELOPMENT / WATER INFILTRATION / BOILER REPAIR / RPZ BACKFLOW PREVENTION DEVICES
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
4/6/2015
Project Phase Planned End Date
2/1/2018
Project Phase Actual End Date
12/18/2017
Project Budget Amount
157058
Final Estimate Of Actual Costs Through End Of Phase Amount
163421
Total Phase Actual Spending Amount
163421
Dsf Number S
DSF0000809387, DSF0000822927, DSF0000853418, DSF0000888992, DSF0000876030
6
Project Geographic District : 6 • Project Building Identifier: M132 • Project School Name: P.S. 132 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M132
Project School Name
P.S. 132 - MANHATTAN
Project Type
SCA CIP
Project Description
COVID VENTILATION / COVID ELECTRICAL SYSTEM UPGRADE / COVID FIRE ALARM SYSTEM REPLACEMENT
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
12/15/2020
Project Phase Planned End Date
4/5/2021
Project Phase Actual End Date
11/16/2021
Project Budget Amount
120420
Final Estimate Of Actual Costs Through End Of Phase Amount
130350
Total Phase Actual Spending Amount
130350
Dsf Number S
DSF0000993115, DSF0001018640, DSF0001018630
6
Project Geographic District : 6 • Project Building Identifier: M132 • Project School Name: P.S. 132 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M132
Project School Name
P.S. 132 - MANHATTAN
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION / ROOFS / WINDOWS / EXTERIOR MASONRY / PARAPETS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
7/12/2024
Project Phase Planned End Date
11/27/2024
Project Phase Actual End Date
8/20/2025
Project Budget Amount
285926
Final Estimate Of Actual Costs Through End Of Phase Amount
226820
Total Phase Actual Spending Amount
226820
Dsf Number S
DSF0001097056, DSF0001097059, DSF0001113787, DSF0001124809, DSF0001124808
6
Project Geographic District : 6 • Project Building Identifier: M132 • Project School Name: P.S. 132 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M132
Project School Name
P.S. 132 - MANHATTAN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
7/3/2024
Project Phase Planned End Date
11/1/2024
Project Phase Actual End Date
7/9/2024
Project Budget Amount
4000
Final Estimate Of Actual Costs Through End Of Phase Amount
231
Total Phase Actual Spending Amount
231
Dsf Number S
DSF0001087481
6
Project Geographic District : 6 • Project Building Identifier: M132 • Project School Name: P.S. 132 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M132
Project School Name
P.S. 132 - MANHATTAN
Project Type
SCA Emergency Response
Project Description
HEATING PLANT UPGRADE @ M132
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
6/7/2024
Project Phase Planned End Date
EMER
Project Budget Amount
EMER
Final Estimate Of Actual Costs Through End Of Phase Amount
4712784
Total Phase Actual Spending Amount
4638877
Dsf Number S
SCA0000073057
6
Project Geographic District : 6 • Project Building Identifier: M132 • Project School Name: P.S. 132 - MANHATTAN
Project Geographic District
6
Project Building Identifier
M132
Project School Name
P.S. 132 - MANHATTAN
Project Type
SCA IEH
Project Description
PO18-REMOVE 18' OF ACM IN ROOM 214. PIPES EXTEND FROM FLOOR TO CEILING OVER 10 FEET HIGH.
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
12/24/2025
Project Phase Planned End Date
IEH
Project Phase Actual End Date
3/15/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
16586
Total Phase Actual Spending Amount
16586
Dsf Number S
SCA0000075229
5
Project Geographic District : 5 • Project Building Identifier: M133 • Project School Name: P.S. 133 - MANHATTAN
Project Geographic District
5
Project Building Identifier
M133
Project School Name
P.S. 133 - MANHATTAN
Project Type
DIIT - Project Connect
Project Description
CLASSROOM CONNECTIVITY
Project Phase Name
Purch & Install
Project Status Name
In-Progress
Project Phase Actual Start Date
11/1/2019
Project Phase Planned End Date
DIIT
Project Budget Amount
DIIT
Final Estimate Of Actual Costs Through End Of Phase Amount
445236066
Total Phase Actual Spending Amount
257505
Dsf Number S
DSF0000960012
5
Project Geographic District : 5 • Project Building Identifier: M133 • Project School Name: P.S. 133 - MANHATTAN
Project Geographic District
5
Project Building Identifier
M133
Project School Name
P.S. 133 - MANHATTAN
Project Type
DOE - Skilled Trades
Project Description
FACILITY ENHANCEMENT
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
7/16/2024
Project Phase Planned End Date
DOES
Project Phase Actual End Date
6/22/2026
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
144998
Total Phase Actual Spending Amount
20647
Dsf Number S
DSF0001112138
5
Project Geographic District : 5 • Project Building Identifier: M133 • Project School Name: P.S. 133 - MANHATTAN
Project Geographic District
5
Project Building Identifier
M133
Project School Name
P.S. 133 - MANHATTAN
Project Type
SCA IEH
Project Description
PO18-OIL TANK LINE/PIPE INSULATION ABATEMENT FOR ISOLATION VALVE INSTALLS
Project Phase Name
Construction
Project Status Name
Complete
Project Phase Actual Start Date
2/6/2026
Project Phase Planned End Date
IEH
Project Phase Actual End Date
3/26/2026
Project Budget Amount
IEH
Final Estimate Of Actual Costs Through End Of Phase Amount
6529
Total Phase Actual Spending Amount
1524
Dsf Number S
SCA0000075396
1
Project Geographic District : 1 • Project Building Identifier: M134 • Project School Name: P.S. 134 - MANHATTAN
Project Geographic District
1
Project Building Identifier
M134
Project School Name
P.S. 134 - MANHATTAN
Project Type
DIIT - RESOA
Project Description
FY22 RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
100000
Total Phase Actual Spending Amount
100000
Dsf Number S
DSF0001033658
1
Project Geographic District : 1 • Project Building Identifier: M134 • Project School Name: P.S. 134 - MANHATTAN
Project Geographic District
1
Project Building Identifier
M134
Project School Name
P.S. 134 - MANHATTAN
Project Type
DIIT - RESOA
Project Description
RESO A TECHNOLOGY UPGRADE
Project Phase Name
Purch & Install
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DIIR
Final Estimate Of Actual Costs Through End Of Phase Amount
50000
Total Phase Actual Spending Amount
50000
Dsf Number S
DSF0001111926
1
Project Geographic District : 1 • Project Building Identifier: M134 • Project School Name: P.S. 134 - MANHATTAN
Project Geographic District
1
Project Building Identifier
M134
Project School Name
P.S. 134 - MANHATTAN
Project Type
DOE - RESOA
Project Description
FY20 RESO A SUPPLEMENTAL COOLING
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
400000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0000913319
1
Project Geographic District : 1 • Project Building Identifier: M134 • Project School Name: P.S. 134 - MANHATTAN
Project Geographic District
1
Project Building Identifier
M134
Project School Name
P.S. 134 - MANHATTAN
Project Type
DOE - Skilled Trades
Project Description
ADA SHELTER COMPLIANCE
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
1/18/2022
Project Phase Planned End Date
DOES
Project Budget Amount
DOES
Final Estimate Of Actual Costs Through End Of Phase Amount
391092
Total Phase Actual Spending Amount
179320
Dsf Number S
DSF0000911918
1
Project Geographic District : 1 • Project Building Identifier: M134 • Project School Name: P.S. 134 - MANHATTAN
Project Geographic District
1
Project Building Identifier
M134
Project School Name
P.S. 134 - MANHATTAN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
CM,F&E
Project Status Name
In-Progress
Project Phase Actual Start Date
2/12/2026
Project Phase Planned End Date
1/7/2027
Project Budget Amount
75538
Final Estimate Of Actual Costs Through End Of Phase Amount
47405
Total Phase Actual Spending Amount
22142
Dsf Number S
DSF0001087482
1
Project Geographic District : 1 • Project Building Identifier: M134 • Project School Name: P.S. 134 - MANHATTAN
Project Geographic District
1
Project Building Identifier
M134
Project School Name
P.S. 134 - MANHATTAN
Project Type
SCA CIP
Project Description
RPZ BACKFLOW PREVENTION DEVICES
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
256069
Final Estimate Of Actual Costs Through End Of Phase Amount
256069
Total Phase Actual Spending Amount
4387
Dsf Number S
DSF0001124837
1
Project Geographic District : 1 • Project Building Identifier: M134 • Project School Name: P.S. 134 - MANHATTAN
Project Geographic District
1
Project Building Identifier
M134
Project School Name
P.S. 134 - MANHATTAN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
2/12/2026
Project Phase Planned End Date
1/7/2027
Project Budget Amount
199257
Final Estimate Of Actual Costs Through End Of Phase Amount
193545
Total Phase Actual Spending Amount
7159
Dsf Number S
DSF0001087482
1
Project Geographic District : 1 • Project Building Identifier: M134 • Project School Name: P.S. 134 - MANHATTAN
Project Geographic District
1
Project Building Identifier
M134
Project School Name
P.S. 134 - MANHATTAN
Project Type
SCA CIP
Project Description
RPZ BACKFLOW PREVENTION DEVICES
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
998237
Final Estimate Of Actual Costs Through End Of Phase Amount
998237
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001124837
1
Project Geographic District : 1 • Project Building Identifier: M134 • Project School Name: P.S. 134 - MANHATTAN
Project Geographic District
1
Project Building Identifier
M134
Project School Name
P.S. 134 - MANHATTAN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Design
Project Status Name
Complete
Project Phase Actual Start Date
4/3/2025
Project Phase Planned End Date
9/29/2025
Project Phase Actual End Date
8/26/2025
Project Budget Amount
13861
Final Estimate Of Actual Costs Through End Of Phase Amount
3915
Total Phase Actual Spending Amount
3915
Dsf Number S
DSF0001087482
1
Project Geographic District : 1 • Project Building Identifier: M134 • Project School Name: P.S. 134 - MANHATTAN
Project Geographic District
1
Project Building Identifier
M134
Project School Name
P.S. 134 - MANHATTAN
Project Type
SCA CIP
Project Description
RPZ BACKFLOW PREVENTION DEVICES
Project Phase Name
Design
Project Status Name
In-Progress
Project Phase Actual Start Date
4/27/2026
Project Phase Planned End Date
10/1/2026
Project Budget Amount
69443
Final Estimate Of Actual Costs Through End Of Phase Amount
69443
Total Phase Actual Spending Amount
6631
Dsf Number S
DSF0001124837
1
Project Geographic District : 1 • Project Building Identifier: M134 • Project School Name: P.S. 134 - MANHATTAN
Project Geographic District
1
Project Building Identifier
M134
Project School Name
P.S. 134 - MANHATTAN
Project Type
SCA CIP
Project Description
IPDVS INSTALLATIONS
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
3/12/2025
Project Phase Planned End Date
7/11/2025
Project Phase Actual End Date
4/3/2025
Project Budget Amount
3465
Final Estimate Of Actual Costs Through End Of Phase Amount
979
Total Phase Actual Spending Amount
979
Dsf Number S
DSF0001087482
1
Project Geographic District : 1 • Project Building Identifier: M134 • Project School Name: P.S. 134 - MANHATTAN
Project Geographic District
1
Project Building Identifier
M134
Project School Name
P.S. 134 - MANHATTAN
Project Type
SCA CIP
Project Description
RPZ BACKFLOW PREVENTION DEVICES
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
10/9/2025
Project Phase Planned End Date
2/12/2026
Project Phase Actual End Date
2/18/2026
Project Budget Amount
17361
Final Estimate Of Actual Costs Through End Of Phase Amount
31829
Total Phase Actual Spending Amount
1632
Dsf Number S
DSF0001124837
5
Project Geographic District : 5 • Project Building Identifier: M136 • Project School Name: EAGLE ACADEMY FOR YOUNG MEN OF HARLEM
Project Geographic District
5
Project Building Identifier
M136
Project School Name
EAGLE ACADEMY FOR YOUNG MEN OF HARLEM
Project Type
DIIT - Project Connect
Project Description
CLASSROOM CONNECTIVITY
Project Phase Name
Purch & Install
Project Status Name
In-Progress
Project Phase Actual Start Date
11/1/2019
Project Phase Planned End Date
DIIT
Project Budget Amount
DIIT
Final Estimate Of Actual Costs Through End Of Phase Amount
445236066
Total Phase Actual Spending Amount
182118
Dsf Number S
DSF0000960014
5
Project Geographic District : 5 • Project Building Identifier: M136 • Project School Name: MOTT HALL HS - MANHATTAN
Project Geographic District
5
Project Building Identifier
M136
Project School Name
MOTT HALL HS - MANHATTAN
Project Type
DOE - RESOA
Project Description
FY24 RESO A BATHROOM UPGRADES
Project Phase Name
Construction
Project Status Name
In-Progress
Project Phase Actual Start Date
11/21/2023
Project Phase Planned End Date
DOER
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
312360
Total Phase Actual Spending Amount
9700
Dsf Number S
DSF0001086228
5
Project Geographic District : 5 • Project Building Identifier: M136 • Project School Name: MOTT HALL HS - MANHATTAN
Project Geographic District
5
Project Building Identifier
M136
Project School Name
MOTT HALL HS - MANHATTAN
Project Type
DOE - RESOA
Project Description
RESO A AUDITORIUM UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
DOER
Final Estimate Of Actual Costs Through End Of Phase Amount
118978
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001085316
5
Project Geographic District : 5 • Project Building Identifier: M136 • Project School Name: EAGLE ACADEMY FOR YOUNG MEN OF HARLEM
Project Geographic District
5
Project Building Identifier
M136
Project School Name
EAGLE ACADEMY FOR YOUNG MEN OF HARLEM
Project Type
Fast Track Projects
Project Description
FY26 LSP RESO A PLAYGROUND UPGRADE
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
FTK
Project Phase Planned End Date
FTK
Project Phase Actual End Date
FTK
Project Budget Amount
FTK
Final Estimate Of Actual Costs Through End Of Phase Amount
80000
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001163671
5
Project Geographic District : 5 • Project Building Identifier: M136 • Project School Name: EAGLE ACADEMY FOR YOUNG MEN OF HARLEM
Project Geographic District
5
Project Building Identifier
M136
Project School Name
EAGLE ACADEMY FOR YOUNG MEN OF HARLEM
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION / EXTERIOR MASONRY
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
758669
Final Estimate Of Actual Costs Through End Of Phase Amount
758669
Total Phase Actual Spending Amount
61057
Dsf Number S
DSF0001097109, DSF0001124850
5
Project Geographic District : 5 • Project Building Identifier: M136 • Project School Name: EAGLE ACADEMY FOR YOUNG MEN OF HARLEM
Project Geographic District
5
Project Building Identifier
M136
Project School Name
EAGLE ACADEMY FOR YOUNG MEN OF HARLEM
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION / EXTERIOR MASONRY
Project Phase Name
Construction
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
7655657
Final Estimate Of Actual Costs Through End Of Phase Amount
7655657
Total Phase Actual Spending Amount
1558
Dsf Number S
DSF0001097109, DSF0001124850
5
Project Geographic District : 5 • Project Building Identifier: M136 • Project School Name: EAGLE ACADEMY FOR YOUNG MEN OF HARLEM
Project Geographic District
5
Project Building Identifier
M136
Project School Name
EAGLE ACADEMY FOR YOUNG MEN OF HARLEM
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION / EXTERIOR MASONRY
Project Phase Name
Design
Project Status Name
In-Progress
Project Phase Actual Start Date
11/10/2025
Project Phase Planned End Date
4/15/2026
Project Budget Amount
482789
Final Estimate Of Actual Costs Through End Of Phase Amount
482789
Total Phase Actual Spending Amount
11254
Dsf Number S
DSF0001097109, DSF0001124850
5
Project Geographic District : 5 • Project Building Identifier: M136 • Project School Name: EAGLE ACADEMY FOR YOUNG MEN OF HARLEM
Project Geographic District
5
Project Building Identifier
M136
Project School Name
EAGLE ACADEMY FOR YOUNG MEN OF HARLEM
Project Type
SCA CIP
Project Description
FLOOD ELIMINATION / EXTERIOR MASONRY
Project Phase Name
Scope
Project Status Name
Complete
Project Phase Actual Start Date
5/30/2024
Project Phase Planned End Date
10/16/2024
Project Phase Actual End Date
10/29/2025
Project Budget Amount
103455
Final Estimate Of Actual Costs Through End Of Phase Amount
147006
Total Phase Actual Spending Amount
147006
Dsf Number S
DSF0001097109, DSF0001124850
5
Project Geographic District : 5 • Project Building Identifier: M136 • Project School Name: MOTT HALL HS - MANHATTAN
Project Geographic District
5
Project Building Identifier
M136
Project School Name
MOTT HALL HS - MANHATTAN
Project Type
SCA CIP RESOA
Project Description
PATH OF TRAVEL RESO A PLAYGROUND UPGRADE
Project Phase Name
CM,F&E
Project Status Name
PNS
Project Phase Actual Start Date
PNS
Project Phase Planned End Date
PNS
Project Phase Actual End Date
PNS
Project Budget Amount
0
Final Estimate Of Actual Costs Through End Of Phase Amount
0
Total Phase Actual Spending Amount
0
Dsf Number S
DSF0001113610