Active Projects

List of currently active projects. Project IDs are another way of referring to FMS IDs for an active project.  This project identifier provides a critical way of checking funding and procurement details of City projects.

Please refer to The Mayor’s Office of Operations Capital Project Dashboard to see further project and budget details.

Housing & Development Department of Design and Construction (DDC) Dataset 3ss8-m844 8 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
PW77DDCAC
Project Id: PW77DDCAC • Description: DDC Data Center Upgrade • Client Agency: Department of Design and Construction
Project Id
PW77DDCAC
Description
DDC Data Center Upgrade
Client Agency
Department of Design and Construction
Division
Public Buildings
Phase
3. Construction Procurement
Projected Construction
2023-08-04T00:00:00.000
Scope
A/C replacement with (2) new 12-ton split AC systems at the IT Server Room and (1) 3-ton split AC system for the new UPS Room. Scope also includes the installation of a new UPS and associated panels for the IT server equipment in the new UPS room. Work includes ancillary piping, ductwork, electrical and lighting, general construction, and fire alarm components.
Status
Active
PW77ELEV
Project Id: PW77ELEV • Description: 120-55 QUEENS BLVD. ELEVATOR MODERNIZATION • Client Agency: DCAS
Project Id
PW77ELEV
Description
120-55 QUEENS BLVD. ELEVATOR MODERNIZATION
Client Agency
DCAS
Division
Public Buildings
Phase
1. Initiation
Projected Construction
2027-02-19T00:00:00.000
Scope
Complete modernization/ replacement of one (1) passenger elevator in the Landmark building including all incidental HVAC, electrical & General Construction work.
Status
Active
PW77GLDA2
Project Id: PW77GLDA2 • Description: 100 GOLD ST.- MIS HVAC UPGRADES • Client Agency: DCAS
Project Id
PW77GLDA2
Description
100 GOLD ST.- MIS HVAC UPGRADES
Client Agency
DCAS
Division
Public Buildings
Phase
5. Close-Out
Projected Construction
2019-05-15T00:00:00.000
Scope
HVAC equipment to provide proper cooling and ventilation of communication equipment on second floor.
Status
Active
PW77GOWAN
Project Id: PW77GOWAN • Description: GOWANUS CANAL 1 ST TURNING BASIN • Client Agency: DCAS
Project Id
PW77GOWAN
Description
GOWANUS CANAL 1 ST TURNING BASIN
Client Agency
DCAS
Division
Infrastructure
Phase
2. Design
Projected Construction
2026-09-09T00:00:00.000
Scope
GOWANUS CANAL 1ST STREET TURNING BASIN
Status
Active
PW77LYA
Project Id: PW77LYA • Description: 253 Broadway Landmark's Space Renovations • Client Agency: DCAS
Project Id
PW77LYA
Description
253 Broadway Landmark's Space Renovations
Client Agency
DCAS
Division
Public Buildings
Phase
4. Construction
Projected Construction
2023-07-31T00:00:00.000
Scope
Renovate 4 floors of the building including upgrading the existing utilities for Landmark Preservation Commission
Status
Active
PWDNJUMBO
Project Id: PWDNJUMBO • Description: JUMBOTRON AND INFIELD REPLACEMENT • Client Agency: Homeless Services
Project Id
PWDNJUMBO
Description
JUMBOTRON AND INFIELD REPLACEMENT
Client Agency
Homeless Services
Division
Public Buildings
Phase
4. Construction
Projected Construction
2026-06-01T00:00:00.000
Scope
The project will consist of two components; the replacement of the infield portion of the running track, and a new center-hung video display. The scope outlined below encompasses the sixth phase of improvements to The Armory and represents the continuation of an ongoing process to upgrade the facility to continue to be a premier venue within New York City.
Status
Active
PWDNRIBON
Project Id: PWDNRIBON • Description: Armory LED Ribbon Installation • Client Agency: DCAS
Project Id
PWDNRIBON
Description
Armory LED Ribbon Installation
Client Agency
DCAS
Division
Public Buildings
Phase
3. Construction Procurement
Projected Construction
2027-10-28T00:00:00.000
Scope
A new updated system will provide a state-of-the art video wall to wrap around most of the Arena. This video wall system will give The Armory the ability to continuously update results and relevant information in real time. This wall may also serve as a live ticker
Status
Active
QED1023B
Project Id: QED1023B • Description: REPL. OF TRUNK & DIST. WM IN CYPRESS AVE, QNS • Client Agency: Environmental Protection
Project Id
QED1023B
Description
REPL. OF TRUNK & DIST. WM IN CYPRESS AVE, QNS
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2022-12-31T00:00:00.000
Scope
REPLACEMENT OF TRUNK & DIST. WATER MAINS IN CYPRESS AVENUE, QNS
Status
Active
QED1027
Project Id: QED1027 • Description: WATER MAIN REPLACEMENT IN 222 STREET, QUEENS • Client Agency: Environmental Protection
Project Id
QED1027
Description
WATER MAIN REPLACEMENT IN 222 STREET, QUEENS
Client Agency
Environmental Protection
Division
Infrastructure
Phase
2. Design
Projected Construction
2029-07-13T00:00:00.000
Scope
WATER MAIN REPLACEMENT IN 222 STREET, QUEENS
Status
Active
QED-1051
Project Id: QED-1051 • Description: WATER MAIN INSTALLATION IN 61 STREET • Client Agency: Environmental Protection
Project Id
QED-1051
Description
WATER MAIN INSTALLATION IN 61 STREET
Client Agency
Environmental Protection
Division
Infrastructure
Phase
4. Construction
Projected Construction
2024-06-18T00:00:00.000
Scope
Installation of 3,870 LF of water mains along 61st Street between Maspeth Ave and 55th Dr; 56th Ave betwen 61st St and 64th St; 56th Rd btw 61st St and 64th St, Maspeth Ave btw. 61st St and 64th St; Clinton Ave btw. 64th St and Hamilton Pl; Remsen Pl btw. Perry Ave and Hull Ave. Water main replacement is required due to hydrant flow test problems and aging pipes.
Status
Active
QED-1054
Project Id: QED-1054 • Client Agency: Environmental Protection • Division: Infrastructure
Project Id
QED-1054
Description
Distribution Water Main work in Ellwell Crescent from Alderton Street to Carlton Street, as well as other locations listed in Page 3 of attached CPI. Borough of Queens.
Client Agency
Environmental Protection
Division
Infrastructure
Phase
4. Construction
Projected Construction
2024-09-10T00:00:00.000
Scope
This project will replace a total of 19,100 linear feet of distribution water main in various locations listed in Page 3 of attached CPI. Borough of Queens.

No sewer work is included under this project.

Q2014-20 scope is in proximity to MTA subway line along Queens Blvd. Force account may be required.
Status
Active
QED-1055
Project Id: QED-1055 • Client Agency: Environmental Protection • Division: Infrastructure
Project Id
QED-1055
Description
Distribution Water Main work in Jay Avenue between Borden Avenue and 66th Street, as well as other locations listed in Page 3 of the attached CPI. Borough of Queens.
Client Agency
Environmental Protection
Division
Infrastructure
Phase
4. Construction
Projected Construction
2024-09-14T00:00:00.000
Scope
This project will replace a total of 8,850 linear feet of distrubution water main in various locations listed in Page 3. Borough of Queens.

No sewer work is included under this project.
Status
Active
QED-1056
Project Id: QED-1056 • Client Agency: Environmental Protection • Division: Infrastructure
Project Id
QED-1056
Description
Distribution Water Main replacement work in 43rd Avenue between National Street and 104th Street, as well as other locations listed in Page 3 of the attached CPI. Borough of Queens.
Client Agency
Environmental Protection
Division
Infrastructure
Phase
2. Design
Projected Construction
2026-07-15T00:00:00.000
Scope
This project will replace a total of 14,350 linear feet of distribution water main in various locations listed in Page 3. Borough of Queens.

No sewer work is included under this project.
Status
Active
QED1059
Project Id: QED1059 • Client Agency: Environmental Protection • Division: Infrastructure
Project Id
QED1059
Description
Install Distribution water mains throughout Queens and/or Bronx as directed by Distribution Engineer.
Client Agency
Environmental Protection
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2025-09-16T00:00:00.000
Scope
Distribution water main area contract, water main replacement in Queens and/or Bronx, as directed by Distribution Engineer.
Status
Active
RED368
Project Id: RED368 • Description: DIST. WATER MAIN EXTENSIONS, STATEN IS. & BROOKLYN • Client Agency: Environmental Protection
Project Id
RED368
Description
DIST. WATER MAIN EXTENSIONS, STATEN IS. & BROOKLYN
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2013-05-11T00:00:00.000
Scope
This is an annual contract for furnishing, delivering and installing distribution water main extensions/replacements for new buildings in various locations, Boroughs of Staten Island & Brooklyn
Status
Active
RED369
Project Id: RED369 • Description: DISTRIBUTION WM EXTENSION/REPLACEMENTS; NEW BLDGS • Client Agency: Environmental Protection
Project Id
RED369
Description
DISTRIBUTION WM EXTENSION/REPLACEMENTS; NEW BLDGS
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2014-05-29T00:00:00.000
Scope
This is an annual contract for furnishing, delivering and installing distribution water main extensions/replacements for new buildingsas well as valves and hydrant replacements in various locations, Boroughs of Staten Island & Brooklyn.
Status
Active
RED371
Project Id: RED371 • Description: DISTRIBUTION WM EXTENSIONS / REPLACEMENTS, SI & BK • Client Agency: Environmental Protection
Project Id
RED371
Description
DISTRIBUTION WM EXTENSIONS / REPLACEMENTS, SI & BK
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2015-06-30T00:00:00.000
Scope
DISTRIBUTION WATER MAIN EXTENSIONS / REPLACEMENTS, SI & BK
Status
Active
RED377
Project Id: RED377 • Description: DISTRIBUTION WM EXTENSIONS/REPLACEMENTS • Client Agency: Environmental Protection
Project Id
RED377
Description
DISTRIBUTION WM EXTENSIONS/REPLACEMENTS
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2017-05-23T00:00:00.000
Scope
DISTRIBUTION WATER MAIN EXTENSIONS/REPLACEMENTS
Status
Active
RED386
Project Id: RED386 • Description: INSTALLATION OF DISTRIBUTION WATER MAINS, SOUTH AV • Client Agency: Environmental Protection
Project Id
RED386
Description
INSTALLATION OF DISTRIBUTION WATER MAINS, SOUTH AV
Client Agency
Environmental Protection
Division
Infrastructure
Phase
4. Construction
Projected Construction
2024-06-11T00:00:00.000
Scope
Installation of distribution water mains and appurtenances in South Avenue between Richmond Terrace and Netherland Avenue, Arlington Place between South Avenue and Arlington Avenue, Cable Way between South Avenue and Dead End, Staten Island.
Status
Active
RED-388
Project Id: RED-388 • Description: INSTALL DIST. WATER MAINS IN BKLYN AND SI • Client Agency: Environmental Protection
Project Id
RED-388
Description
INSTALL DIST. WATER MAINS IN BKLYN AND SI
Client Agency
Environmental Protection
Division
Infrastructure
Phase
4. Construction
Projected Construction
2023-06-06T00:00:00.000
Scope
DISTRIBUTION WATER MAIN REPLACEMENT IN BROOKLYN AND STATEN ISLAND
Status
Active
RED394
Project Id: RED394 • Client Agency: Environmental Protection • Division: Infrastructure
Project Id
RED394
Description
Install Distribution water mains throughout Brooklyn and Staten Island as directed by Distribution Engineer.
Client Agency
Environmental Protection
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2025-11-25T00:00:00.000
Scope
Distribution water main area contract, water main replacement in Brooklyn and Staten Island, as directed by Distribution Engineer.
Status
Active
RED395AC
Project Id: RED395AC • Client Agency: Environmental Protection • Division: Infrastructure
Project Id
RED395AC
Description
Install Distribution water mains throughout Brooklyn and Staten Island as directed by Distribution Engineer.
Client Agency
Environmental Protection
Division
Infrastructure
Phase
2. Design
Projected Construction
2025-12-27T00:00:00.000
Scope
Distribution water main area contract, water main replacement in Brooklyn and Staten Island, as directed by Distribution Engineer.
Status
Active
REDA001
Project Id: REDA001 • Description: ACCEL DIST. WM REPLACEMENT AND SEWER REHAB., SI • Client Agency: Environmental Protection
Project Id
REDA001
Description
ACCEL DIST. WM REPLACEMENT AND SEWER REHAB., SI
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2016-09-12T00:00:00.000
Scope
ACCELERATED DISTRIBUTION WATER MAIN REPLACEMENT AND SEWER REHABILITATION/REPLACEMENT, SI
Status
Active
REDA002
Project Id: REDA002 • Description: ACCELERATED DISTRIBUTION WATER MAIN REPLACEMENT • Client Agency: Environmental Protection
Project Id
REDA002
Description
ACCELERATED DISTRIBUTION WATER MAIN REPLACEMENT
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2018-09-10T00:00:00.000
Scope
ACCELERATED DISTRIBUTION WATER MAIN REPLACEMENT AND SEWER REHABILITATION/REPLACEMENT, STATEN ISLAND
Status
Active
REDA003
Project Id: REDA003 • Description: ACCELERATED DIST WM REPL. & SE REHAB. SI • Client Agency: Environmental Protection
Project Id
REDA003
Description
ACCELERATED DIST WM REPL. & SE REHAB. SI
Client Agency
Environmental Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2020-12-10T00:00:00.000
Scope
ACCELERATED DISTRIBUTION WATER MAIN REPLACEMENT AND SEWER REHABILITATION/REPLACEMENT, STATEN ISLAND
Status
Active
REG-HP06
Project Id: REG-HP06 • Description: Reconstruction of Regulator HP06 • Client Agency: Environmental Protection
Project Id
REG-HP06
Description
Reconstruction of Regulator HP06
Client Agency
Environmental Protection
Division
Infrastructure
Phase
4. Construction
Projected Construction
2025-06-12T00:00:00.000
Scope
Project REG-HP06 is for the reconstruction of Regulator HP06 . The work shall include, but is not limited to, the following items:

1. Reconstruction of the existing Diversion Chamber (see attachment labeled 'REG-HP06 As-builts').
2. Reconstruction of the existing Regulator Chamber (see attachment labeled 'REG-HP06 As-builts').
3. Rehabilitation of the existing Interceptor (scope previously included in PS-312MX)
4. Replacement of existing instrumentation and monitoring systems, as needed (i.e., sensors, probes, conduits, cables, etc.).
5. Restoration of construction areas as needed (i.e., roadways, sidewalks, etc.)
6. Implementation of an approved plan to maintain regulator and interceptor operations during construction.
7. Shop drawings, as-built drawings, and equipment information.
Status
Active
REMPIV
Project Id: REMPIV • Description: Remsen Yard Phase IV • Client Agency: Environmental Protection
Project Id
REMPIV
Description
Remsen Yard Phase IV
Client Agency
Environmental Protection
Division
Public Buildings
Phase
5. Close-Out
Projected Construction
2022-06-16T00:00:00.000
Scope
Modifications to the existing building to achieve OSHA compliance and provide operational improvements to reduce resource consumption by operation staff maintaining the building.
Status
Active
RWM017
Project Id: RWM017 • Description: W. 155th RETAINING WALL-RIVERSIDE TO BROADWAY • Client Agency: Transportation
Project Id
RWM017
Description
W. 155th RETAINING WALL-RIVERSIDE TO BROADWAY
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2017-01-13T00:00:00.000
Scope
Retaining Walls Reconstruction/Repair at 4 locations previously under 4 different projects:

RWM017: Capital rehabilitation of the concrete retaining wall along west 155th Street (Lower Level). The limits of the project are from Riverside Drive to Broadway, The project also includes combined sewer replacement on W. 155th St. (SEN002176), Borough of Manhattan.

RWM013: Capital rehabilitation of the concrete retaining wall along Edgecombe Avenue from West 165th Street to West 168th Street in Manhattan

RWM015: Capital Rehabilitation of the Stone Retaining Wall along the left side of Riverside Drive Northbound. The limits of the project are from West 177th Street to West 178th Street. The approximate length of the wall is 200 LF, Manhattan.

RWX019: Rehabilitation of the Retaining wall (450 LF) at Macomb Dam Bridge approach to 161 Street , south bound (Behind stairs) including reconstruction of street (470 LF), in the borough of the Bronx.
Status
Active
S136-367
Project Id: S136-367 • Description: Staten Island 1 & 3 Garage Construction & Rehab • Client Agency: Sanitation
Project Id
S136-367
Description
Staten Island 1 & 3 Garage Construction & Rehab
Client Agency
Sanitation
Division
Public Buildings
Phase
4. Construction
Projected Construction
2024-03-25T00:00:00.000
Scope
Construction of new garage to serve Staten Island Districts 1 and 3. Relocate Staten Island District 1 and 3 Garage operations to the newly constructed garage. The existing building containing the Staten Island 3 Garage and Richmond Borough Repair Shop will be rehabilitated, maintaining and expanding the building's use for the Borough Repair Shop and accommodating District 1 and 3 Garage Vehicular Storage Facility for weather sensitive vehicles. Develop site facilities including a 2,000 ton capacity salt shed, a free-standing fueling facility, open-air household waste drop-off area, outdoor DSNY truck and personnel parking and a potential new force main sanitary line to connect to the NYC DEP system.
Status
Active
S136-383K
Project Id: S136-383K • Description: Queens 5/5A Garage HVAC • Client Agency: Sanitation
Project Id
S136-383K
Description
Queens 5/5A Garage HVAC
Client Agency
Sanitation
Division
Public Buildings
Phase
5. Close-Out
Projected Construction
2018-04-27T00:00:00.000
Scope
Mechanical HVAC replacement/ upgrade and associated electrical work which includes Fire Alarm.
Status
Active
S136-383N
Project Id: S136-383N • Description: Brkyln District 17/18 Garage: HVAC Replacement • Client Agency: Sanitation
Project Id
S136-383N
Description
Brkyln District 17/18 Garage: HVAC Replacement
Client Agency
Sanitation
Division
Public Buildings
Phase
4. Construction
Projected Construction
2024-10-31T00:00:00.000
Scope
Rehabilitation includes replacement of the roof and select areas of roof drains and domes, structural work; stiffening of structural steel frame supports for new HVAC equipment, solar panels, and select parapet replacements, including fire alarm system work, and select replacement of building systems. Offices, locker rooms, and bathrooms will be phased and temporarily partitioned to allow for overhead HVAC work.
Status
Active
S136-383S
Project Id: S136-383S • Description: Staten Island 3 Garage - HVAC Replacement • Client Agency: Sanitation
Project Id
S136-383S
Description
Staten Island 3 Garage - HVAC Replacement
Client Agency
Sanitation
Division
Public Buildings
Phase
4. Construction
Projected Construction
2023-08-14T00:00:00.000
Scope
Replacement of roof system and all HVAC equipment with all of mechanical and electrical work associated. Design a new rooftop solar PV (Photovoltaic) system. Provide a new Building Management System. Provide a new Fire Alarm System.
Status
Active
S136-419L
Project Id: S136-419L • Description: OAU Office Expansion at CRS • Client Agency: Sanitation
Project Id
S136-419L
Description
OAU Office Expansion at CRS
Client Agency
Sanitation
Division
Public Buildings
Phase
4. Construction
Projected Construction
2023-05-31T00:00:00.000
Scope
This project consists of interior renovation in multiple locations within DSNY Central Repair Shop (CRS). Work in the Fourth Floor includes modifications to the existing Air handling Unit "AC-2" and duct system that serves the project area, and interior finish work required in conjunction with the ductwork modification. Work on the Fifth Floor consists of a full renovation of the DSNY Operations Assistance Unit (OAU) Office suite including office space, toilet rooms, and an employee breakroom. Work on the Sixth Floor includes a full renovation of the OAU Satellite Office and work in the separate DSNY Queens West Borough Operations Office related to the upgrade of AC-2. Roof level work includes the installation of a new rooftop package unit that will serve the sixth floor OAU Satellite Office and the installation of an exhaust duct termination to serve the fifth floor OAU office breakroom.
Status
Active
S136-423
Project Id: S136-423 • Description: Rehab of Queens District 11/13 Sanitation Garage • Client Agency: Sanitation
Project Id
S136-423
Description
Rehab of Queens District 11/13 Sanitation Garage
Client Agency
Sanitation
Division
Public Buildings
Phase
2. Design
Projected Construction
2027-04-16T00:00:00.000
Scope
Extensive structural work, replacement of all building systems (electrical, fire protection, plumbing, HVAC, & BMS), architectural renovation of the entire building, and site improvements. Structural scope of work includes: Removing and replacing cellar level slab, and first floor slab along with stiffening first floor framing to minimize deflection to make it usable space for DSNY to park their vehicles. Enlarge and strengthen existing footings to resist the increased design loads. DCAS funded photovoltaic (PV) roof panels. DCAS 80x50 deep energy conservation measures: improved envelope, lighting power reduction, hydronic heating system with condensing boiler, high efficiency pumps and fans, solar thermal water heating. Added Scope of Work: Design of two DSNY Swing Spaces (1) Creedmoor, and (2) BCC Temporary Structure. The swing spaces need to be constructed prior to the Garage rehabilitation construction to start.
Status
Active
S136-436
Project Id: S136-436 • Description: Brooklyn District 6 Sanitation Garage: Rehab. • Client Agency: Sanitation
Project Id
S136-436
Description
Brooklyn District 6 Sanitation Garage: Rehab.
Client Agency
Sanitation
Division
Public Buildings
Phase
3. Construction Procurement
Projected Construction
2026-12-11T00:00:00.000
Scope
Replacement of the deteriorating garage slab, along with minor concrete slab work at the Annex. New sanitary drainage lines underneath the garage slab that requires trenching. Minor exterior masonry repair work, Interior renovation work at offices, locker room, and bathrooms. Replacement of Boiler, HVAC system and sprinkler. Added Scope of Work: Swing Space Design including phasing. Start of Construction will be impacted by a separate work under DDC Tanks unit that has not started design; Replacement of Underground Storage Tanks in the Garage.
Status
Active
S136-438
Project Id: S136-438 • Description: Rehabilitation of Queens Dist.7 Sanitation Garage • Client Agency: Sanitation
Project Id
S136-438
Description
Rehabilitation of Queens Dist.7 Sanitation Garage
Client Agency
Sanitation
Division
Public Buildings
Phase
5. Close-Out
Projected Construction
2022-11-17T00:00:00.000
Scope
Replacement of sub-slab sanitary drainage system, with new sub-slab sand separator and oil/water separator tanks. This involves trenching through existing slab for new piping, partial slab replacement and surface patching of concrete slab. New raised storm piping hung from garage joists, and storm leaders at west exterior wall. New truck wash equipment and area, new Garage Utility room, bathroom, control room, and spreader room will be built. Existing underground electrical conduits to be replaced with above slab electrical conduits. New convenience outlets and electrical panels also added. Existing house trap to be relocated outside and tied into existing sewer.
Status
Active
S216-401A
Project Id: S216-401A • Description: E91st Marine Transfer Station • Client Agency: Sanitation
Project Id
S216-401A
Description
E91st Marine Transfer Station
Client Agency
Sanitation
Division
Public Buildings
Phase
5. Close-Out
Projected Construction
2018-12-31T00:00:00.000
Scope
Scope of Work includes pre-deconstruction environmental remediation of existing transfer station structure. Closure of fuel oil storage tank, removal of building-associated equipment and appurtenances. Removal of containerized chemicals, ACMs, loose paint, bird excrement & environmental waste transportation and disposition.

Deconstruction of existing transfer station structures and disposition. Dredging in area of new transfer station. Construction of new underground utility system & foundation. Construction of new transfer station. Construction and installation of new gantry crane, & new container transport system.

Location of Work:
East 91st Street at the foor of East 91st Street between Franklin D. Roosevelt Drive and East River
Status
Active
S216-415A2
Project Id: S216-415A2 • Description: West 59th St. MTS - Project 2 • Client Agency: Sanitation
Project Id
S216-415A2
Description
West 59th St. MTS - Project 2
Client Agency
Sanitation
Division
Public Buildings
Phase
4. Construction
Projected Construction
2023-06-30T00:00:00.000
Scope
Project 2 Scope: Refurbishment of the existing pier buildling including: repair of existing pier structure including pile caps and fendering; construction of new emergency generator, electrical, mechanical, fire pump and fire valve rooms; new exit passageway construction and existing exit passageway refurbishment; re-arrangement and refurbishment of the Operations Building interiors; replacement of fire suppression system throughout the entire pier structure; mechanical, electrical and plumbing system upgrades; refurbishment and painting the existing pier interior steel framing and wall/roof surfaces; recoating the structure's exterior cladding systems including metal wall and roof panel system and translucent panel wall cladding system.
Status
Active
SAND1048
Project Id: SAND1048 • Description: SUNSET PARK NORTH BK WATERFRONT GREENWAY • Client Agency: Transportation
Project Id
SAND1048
Description
SUNSET PARK NORTH BK WATERFRONT GREENWAY
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2027-09-30T00:00:00.000
Scope
This project will construct a two-way, grade-separated greenway path along 29th Street between the Gowanus Expressway (3rd Avenue) and 2nd Avenue and on 2nd Avenue from 29th street to the railway tracks North of 39th street, in Sunset Park, Brooklyn. The 39th Street intersection will be designed and reconstructed by NYC EDC.

The project will provide safer access to parks and recreational spaces along the waterfront, encourage healthy lifestyles by promoting the use of non-motorized forms of transportation, and stimulate economic development by providing connections to employment centers in the Sunset Park, Gowanus, Red Hook and Downtown Brooklyn neighborhoods. The project will bring the streets to a state of good repair and incorporate any necessary hazard mitigation measures into the design (including green infrastructure and infrastructure hardening) to provide long-term climate resiliency. Additional improvements such a concrete curb extensions will shorten crossing distances to enhance pedestrian safety at key intersections.

A total of $10,411,000 is funded for this project. The project will be funded with FEMA and HUD CDBG-DR funding. The FEMA grant is currently approved under Pre-Award Authorization. FEMA grants have not yet reached obligation but require 10% local (Mayoral) matching funds. Federal funds (FEMA) may be used for final design, construction and supervision. $800,000 is funded in FY18 for design, $8,021,000 in FY19 for construction, and $1,590,000 in FY19 for REI. Please see the enclosed CPI for additional details.
Status
Active
SAND349F2
Project Id: SAND349F2 • Description: FHWA FUNDED CONTRACT RESURFACING • Client Agency: Transportation
Project Id
SAND349F2
Description
FHWA FUNDED CONTRACT RESURFACING
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2018-03-26T00:00:00.000
Scope
Resurfacing, pavement improvements and general repairs contract to rehabilitate Hurricane Sandy related damaged streets citywide.
Status
Active
SAND350FM
Project Id: SAND350FM • Description: RESURFACING PHASE 2B FEMA FUNDED • Client Agency: Transportation
Project Id
SAND350FM
Description
RESURFACING PHASE 2B FEMA FUNDED
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2017-11-03T00:00:00.000
Scope
Resurfacing, pavement improvements and general repairs to rehabilitate Hurricane Sandy related damaged streets citywide.
Status
Active
SANDBHFW
Project Id: SANDBHFW • Client Agency: Health & Hospitals Corporation (HHC) • Division: Infrastructure
Project Id
SANDBHFW
Description
CONSTRUCTION OF A FLOOD PROTECTION SYSTEM FROM EAST 25TH ST TO EAST 30TH ST ALONG THE EAST SIDE OF MANHATTAN
Client Agency
Health & Hospitals Corporation (HHC)
Division
Infrastructure
Phase
2. Design
Projected Construction
2028-10-19T00:00:00.000
Scope
Develop a community flood wall along the FDR East River Drive. When constructed this wall will run from 26th Street to 30th Street, and tie into the Eastside Coastal Resiliency (ESCR) community floodwall efforts. This East Side Drive mitigation strategy will be protecting Bellevue’s campus to a 500-year Stillwater elevation, with 2080 sea-rise adjustments and 500 year wave conditions. When designing the community flood wall, vehicular and pedestrian flood gates at the North and South alignments, as well as drainage management concepts incorporating interceptor gates, regulator chambers, and storage containment are to be considered.
Status
Active
SANDBOMB
Project Id: SANDBOMB • Description: BOMB SQUAD BUILDING RECONSTRUCTION • Client Agency: Police
Project Id
SANDBOMB
Description
BOMB SQUAD BUILDING RECONSTRUCTION
Client Agency
Police
Division
Public Buildings
Phase
3. Construction Procurement
Projected Construction
2024-09-30T00:00:00.000
Scope
Building new building to house Bomb Squad training and offices, vehicle storage and supply storage. Grading and landscaping to protect buildings from Long Island Sound flooding.
Status
Active
SANDELEC4
Project Id: SANDELEC4 • Description: electrical system replacement at 60th Precinct • Client Agency: Police
Project Id
SANDELEC4
Description
electrical system replacement at 60th Precinct
Client Agency
Police
Division
Public Buildings
Phase
5. Close-Out
Projected Construction
2022-10-10T00:00:00.000
Scope
Replacement of electrical system and generator at Coney Island Precinct that was flooded during Superstorm Sandy. Work includes providing temporary power to precinct while permanent system is being designed and installed. This work will be done via an emergency declaration.
Status
Active
SANDELEC5
Project Id: SANDELEC5 • Description: electrical system replacement at the 100th Precict • Client Agency: Police
Project Id
SANDELEC5
Description
electrical system replacement at the 100th Precict
Client Agency
Police
Division
Public Buildings
Phase
5. Close-Out
Projected Construction
2021-10-13T00:00:00.000
Scope
Replacement of electrical system and generator at Rockaway Queens Precinct that was flooded during Superstorm Sandy. Work includes providing temporary power to precinct while permanent system is being designed and installed. This work will be done via an emergency declaration.
Status
Active
SANDELEC8
Project Id: SANDELEC8 • Description: ERIE BASIN TOW POUND ELECTRICAL (SANDY) • Client Agency: Police
Project Id
SANDELEC8
Description
ERIE BASIN TOW POUND ELECTRICAL (SANDY)
Client Agency
Police
Division
Public Buildings
Phase
4. Construction
Projected Construction
2023-11-30T00:00:00.000
Scope
Restoration and installation of the new electrical power at NYPD's tow pound facility in Red Hook due to flooding during Sandy.
Status
Active
SANDHW06
Project Id: SANDHW06 • Description: RECONSTRUCTION OF VESTRY STREET, MANHATTAN • Client Agency: Transportation
Project Id
SANDHW06
Description
RECONSTRUCTION OF VESTRY STREET, MANHATTAN
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2022-06-30T00:00:00.000
Scope
RECONSTRUCTION OF VESTRY STREET, MANHATTAN
Status
Active
SANDHW08
Project Id: SANDHW08 • Description: RECONSTRUCTION OF FRONT STREET, MANHATTAN • Client Agency: Transportation
Project Id
SANDHW08
Description
RECONSTRUCTION OF FRONT STREET, MANHATTAN
Client Agency
Transportation
Division
Infrastructure
Phase
4. Construction
Projected Construction
2023-10-13T00:00:00.000
Scope
RECONSTRUCTION OF FRONT STREET, MANHATTAN
Status
Active
SANDHW12
Project Id: SANDHW12 • Description: RECONSTRUCTION OF EDGMERE, QUEENS • Client Agency: Transportation
Project Id
SANDHW12
Description
RECONSTRUCTION OF EDGMERE, QUEENS
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2021-10-05T00:00:00.000
Scope
RECONSTRUCTION OF EDGMERE, QUEENS
Status
Active
SANDHW14
Project Id: SANDHW14 • Description: RECONSTRUCTION OF SOUTH BEACH, STATEN ISLAND • Client Agency: Transportation
Project Id
SANDHW14
Description
RECONSTRUCTION OF SOUTH BEACH, STATEN ISLAND
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2020-10-09T00:00:00.000
Scope
RECONSTRUCTION OF FATHER CAPODANNO BOULEVARD FROM 200 FEET +/- NORTH EAST OF SEAVIEW AVENUE TO 420 FEET +/- NORTH EAST OF SAND LANE IN SOUTH BEACH, BOROUGH OF STATEN ISLAND
Status
Active