Active Projects

List of currently active projects. Project IDs are another way of referring to FMS IDs for an active project.  This project identifier provides a critical way of checking funding and procurement details of City projects.

Please refer to The Mayor’s Office of Operations Capital Project Dashboard to see further project and budget details.

Housing & Development Department of Design and Construction (DDC) Dataset 3ss8-m844 8 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
HWKP2027
Project Id: HWKP2027 • Description: CHURCH AVENUE SIDEWALKS AND NECKDOWNS • Client Agency: Transportation
Project Id
HWKP2027
Description
CHURCH AVENUE SIDEWALKS AND NECKDOWNS
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2018-10-05T00:00:00.000
Scope
Replacement and Reconstruction of Sidewalks and Neckdowns on Church Avenue Area, Brooklyn.
The scope of the project also includes full reconstruction of the intersection at Church Avenue and McDonald Avenue.
Status
Active
HWKP2029
Project Id: HWKP2029 • Description: RECONSTRUCTION OF PUTNAM PLAZA TRIANGLE • Client Agency: Transportation
Project Id
HWKP2029
Description
RECONSTRUCTION OF PUTNAM PLAZA TRIANGLE
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2019-09-29T00:00:00.000
Scope
Putnam Plaza is an existing plaza implemented in temporary materials that also includes an existing Department of Parks and Recreation (DPR) Green street triangle with trees and a landscape area. This project will create a large, permanent public space for the Clinton Hill and Bedford-Stuyvesant neighborhoods by permanently pedestrianizing Putnam Avenue from Grand Avenue to Fulton Street, increasing the amount of open space for the local residents, shoppers, and transit users. The design will incorporate the existing Green street and will likely include additional trees, benches, movable tables and chairs, trash receptacles, green infrastructure elements, pedestrian Wayfinding signage and an NYC Bike Share station.
Status
Active
HWM100SNC
Project Id: HWM100SNC • Description: 79TH STREET CROSSTOWN SELECT BUS SERVICE • Client Agency: Transportation
Project Id
HWM100SNC
Description
79TH STREET CROSSTOWN SELECT BUS SERVICE
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2028-06-24T00:00:00.000
Scope
79TH STREET CROSSTOWN SELECT BUS SERVICE (M79 SBS)
Status
Active
HWM10INWD
Project Id: HWM10INWD • Description: Inwood 10th Avenue Safety Improvements • Client Agency: Transportation
Project Id
HWM10INWD
Description
Inwood 10th Avenue Safety Improvements
Client Agency
Transportation
Division
Infrastructure
Phase
1. Initiation
Projected Construction
2028-02-21T00:00:00.000
Scope
The Inwood 10th Avenue Safety Improvements Project targets seven intersections along 10th Avenue and builds out an existing SIP in Fort George, improving the pedestrian experience in these northern Manhattan neighborhoods.
Status
Active
HWM12AVE
Project Id: HWM12AVE • Description: 12th Avenue Accessibility Improvements • Client Agency: Transportation
Project Id
HWM12AVE
Description
12th Avenue Accessibility Improvements
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2026-12-30T00:00:00.000
Scope
This project will address the two distinct needs on 12th Avenue through restoration of the collapsed street and new sidewalk construction on the street’s west side. The project will investigate the subsurface void that resulted in the 12th Avenue collapse and return the damaged street to a state of good repair. The project will also reconstruct the existing sidewalk on the west side of 12th Avenue – a portion of which was also damaged in the collapse – to its current endpoint, at the north end of the building at 701 West 135th Street. The project will then construct entirely new sidewalk on the street’s west side, from its current endpoint to 12th Avenue’s intersection with West 138th Street, adjacent to the Riverside Valley Community Garden. Please refer to Attachment 3, Conceptual Drawing, for details.

Secondary Project Scope – Eastern Sidewalk Reconstruction:
Beyond the core scope detailed above, the design consultant should also include reconstruction of 12th Avenue’s eastern sidewalk between West 135th and West 138th Streets in the project’s Schematic Geometric Design (SGD). This sidewalk is currently less than five feet wide at many locations, is in generally poor condition, and ends abruptly 100 feet north of West 135th Street. NYC Parks and the Riverside Park Conservancy have expressed interest in DOT reconstructing this sidewalk in this project, a request DOT would like to accommodate, if possible.

DOT believes the eastern sidewalk scope may be possible to include in this project at the current funding level. The core scope above is currently funded to $5,433,000, which includes approximately $3,300,000 estimated for restoration of the sinkhole outside of 701 West 135th Street, inclusive of soft costs. The sinkhole remediation cost estimate includes a conservative assumption of 2,800 square feet of roadway reconstruction, comprising 12th Avenue’s southbound moving and parking lanes west of NYC Parks’ median Greenstreet. DOT is funding the restoration work to this level to allow DDC to address the wide range of subsurface conditions that could have produced this sinkhole, the exact cause of which is not known at the time of this correspondence.

Given the cost uncertainties associated with sinkhole remediation, and the possibility of surplus funding being available for the eastern sidewalk scope, the design consultant should prepare two final SGD cost estimates – one estimate including only the sinkhole remediation and western sidewalk scope (i.e., the core scope), and a second including the sinkhole remediation, western sidewalk construction, and eastern sidewalk reconstruction (i.e., the core scope + secondary scope). Once the survey, geotechnical investigation, and final SGD cost estimates for both the core and secondary scopes are available, DOT and DDC will determine whether the east sidewalk scope can be included in in the project’s final design and ultimately the capital buildout. This decision point has been included in the project schedule.

Additional Items: City Elements:
The following considerations apply to all aspects of the project area.

Distinctive Materials:
There are no distinctive materials to consider in the project area.

Drainage:
The project should evaluate drainage conditions on the west side of 12th Avenue, near the observed low point in the roadway near 701 West 135th Street. Construction of the west side sidewalk and new curbing is expected to help redirect water in the street toward existing catchbasins and alleviate some of the drainage issues observed at this location. The cost estimate also includes two additional catchbasins, as well as 12-inch ductile chute and related appurtenances, to further address drainage conditions on this block.

Pedestrian Ramps:
The design consultant should verify the ADA compliance of all pedestrian ramps in the project area, and all non-compliant ramps should be upgraded through the capital effort. DOT anticipates 3 pedestrian ramps in the project area will require upgrade. Please refer to the Pedestrian Ramp Inventory attachment for details.

Roadway Markings:
There are currently no markings for bicycle infrastructure within the project limits. This project will introduce new bicycle markings to 12th Avenue, the exact configuration of which will be determined during Schematic Geometric Design, once curb lines have been established for the new sidewalks.

Signage:
Existing signage will be reviewed and all existing and new signage will be consolidated to the greatest extent feasible, including the removal of redundant signs. For any missing regulatory or parking signage, please contact the Manhattan Borough Engineering office.

Signals:
There are no existing signals in the project area, and the project scope does not include the installation of any new signals. Thus, Accessible Pedestrian Signals (APS) are not included in the project scope.

Street Trees:
Tree pits and street trees will be included along the western sidewalk.
Status
Active
HWM1683
Project Id: HWM1683 • Description: RECONSTRUCTION OF W 33RD ST (SEN002165) • Client Agency: Transportation
Project Id
HWM1683
Description
RECONSTRUCTION OF W 33RD ST (SEN002165)
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2018-12-31T00:00:00.000
Scope
Full Reconstruction of West 33rd Street between 10th Avenue and 11th Avenue, including sewer and water main replacement, Manhattan
As of 10/21/09 The Scope of work has changed
Phase 1 & 2 is the construction of the north retaining wall, The MPT and street reconstruction up to the viaduct (abutment)
Phase 3 is the South retaining wall
Phase 4 is the bridge from the abutment wall to the intersection of 11 St
Status
Active
HWM2025
Project Id: HWM2025 • Description: DELANCEY STREET SAFETY IMPROVEMENTS • Client Agency: Transportation
Project Id
HWM2025
Description
DELANCEY STREET SAFETY IMPROVEMENTS
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2028-08-24T00:00:00.000
Scope
DELANCEY STREET SAFETY IMPROVEMENTS
Status
Active
HWM42PSM
Project Id: HWM42PSM • Description: 42nd Street Pedestrian Security Measures • Client Agency: Transportation
Project Id
HWM42PSM
Description
42nd Street Pedestrian Security Measures
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2029-05-29T00:00:00.000
Scope
i. Curb Extensions: The project will construct block-long curb extensions on both sides of West 42nd Street between 7th and 8th Avenues, a block-long curb extension on the west side of 7th Avenue from West 41st Street to West 42nd Street, and conventional curb extensions at the northeast and southeast corners of 8th Avenue at 42nd Street. These curb extensions will ease the sidewalk congestion observed within the project area, and will improve safety conditions by reducing pedestrian crossing distances, calming turning vehicle traffic, and eliminating excess roadway capacity. West 42nd Street from 7th Avenue to 8th Avenue (north and south side curb extensions): The project will expand the northern sidewalk by 6 feet and the southern sidewalk by 5 feet for the length of this block. In October 2019, in preparation for the capital project, DOT reduced the roadway capacity on this block from three moving lanes in each direction to two moving lanes in each direction. The current roadway condition is one standard 11-foot moving lane for general traffic, and one extra-wide designated bus lane marked with red paint. The curb extensions being constructed in this project will expand the sidewalk into the footprint of the current extra-wide bus lanes, ultimately leaving two standard 11-foot moving lanes in each direction (one lane for general traffic and one lane exclusively for buses). Given the size of these curb extensions and their impact on local drainage conditions, full reconstruction of this block is anticipated. Construction of the block-long 42nd Street curb extensions will require relocation of several bus stops from the current curblines to the new curblines. Impacted stops include the westbound tour bus stop at 42nd Street and 8th Avenue (used by Gray Line, NY Sightseeing, The Ride, and Skyline LLC); the westbound multipurpose stop at 42nd Street and 7th Avenue (used by MTA’s M42 bus, the NY Waterway ferry shuttle, and private commuter buses); and the eastbound MTA stop at 42nd Street and 7th Avenue (used by the M42 and commuter buses). Coordination with the DOT Bus Stop Management, DOT Transit Development, and the applicable bus operators will be necessary during design. 7th Avenue from 41st Street to 42nd Street (west side curb extension): The project will expand 7th Avenue’s western sidewalk by one lane width, reducing the pedestrian crossing distance by approximately 10 feet and bringing this block’s curbline into alignment with the block immediately north. The footprint of this new curb extension is currently occupied by a SIP curb extension near 41st Street, installed in 2018, and a temporary bus boarder that DOT Transit Development installed at midblock in 2019. The bus boarder on 7th Avenue serves riders of the MTA’s M7, M20, M104, BxM2, and express commuter buses, all of which utilize the stop. As a part of the capital effort, DDC’s contractor shall disassemble the temporary bus boarder and return it to DOT Sidewalk Inspection & Management’s (SIM’s) Staten Island yard. DOT CPM must be notified prior to disassembly so that SIM personnel can be available for oversight of the contractor. Please refer to the disassembly instructions provided by Zicla, the boarder’s manufacturer, found in this document’s Appendix, Attachment 8. Much of 7th Avenue’s western sidewalk within these limits features curbside grates ventilating the MTA’s underground 1, 2, and 3 subway lines.
Status
Active
HWMBRT5A
Project Id: HWMBRT5A • Description: 34th STREET TRANSITWAY - Phase I • Client Agency: Transportation
Project Id
HWMBRT5A
Description
34th STREET TRANSITWAY - Phase I
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2016-11-13T00:00:00.000
Scope
As part of the 34th Street Select Bus Service project, work includes installation of pavement markings on 34th St. from FDR Drive to First Ave. and installation of bus bulbs & pavement markings on 34th St. from First Ave. to Lexington Ave.

DEP Work: Trunk and Distribution Watermains replacement in E34th St. between 1st Ave. & 3rd Ave.
Status
Active
HWMME43ST
Project Id: HWMME43ST • Description: 43rd STREET SHARED STREET • Client Agency: Transportation
Project Id
HWMME43ST
Description
43rd STREET SHARED STREET
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2027-03-30T00:00:00.000
Scope
THIS PROJECT WILL IMPLEMENT A SHARED STREET ON 43RD STREET BETWEEN LEXINGTON AVENUE AND 3RD AVENUE. THIS ENTAILS THE RECONSTRUCTION OF THE ENTIRE BLOCK IN ORDER TO ACHIEVE THE DESIRED PEDESTRIAN SAFETY BENEFITS. THE PROJECT WILL ALSO BUILD OUT THE TWO "TOP OF THE T" NECKDOWNS NEXT TO GRAND CENTRAL TERMINAL LOCATED ALONG LEXINGTON AVENUE AT 43RD AND 44TH STREETS. THIS IS ONE OF THE FIRST PROJECTS TO BE BUILD OUT AS PART OF THE NEW EAST MIDTOWN REZONING AGREEMENT.
Status
Active
HWMMLEXAV
Project Id: HWMMLEXAV • Description: Lexington Avenue Pedestrian Safety Improvements • Client Agency: Transportation
Project Id
HWMMLEXAV
Description
Lexington Avenue Pedestrian Safety Improvements
Client Agency
Transportation
Division
Infrastructure
Phase
1. Initiation
Projected Construction
2026-04-25T00:00:00.000
Scope
Curb Extension Locations:
The project will construct seven curb extensions, distributed across the following locations:

1. Lexington Avenue & East 41st Street: half curb extension at southeast corner, crossing Lexington Avenue
2. Lexington Avenue & East 45th Street: half curb extension at southeast corner, crossing Lexington Avenue
3. Lexington Avenue & East 45th Street: full curb extension at northeast corner, crossing both Lexington & 45th St
4. Lexington Avenue & East 46th Street: full curb extension at southeast corner, crossing both both Lexington & 46th St
5. Lexington Avenue & East 47th Street: half curb extension at southeast corner, crossing Lexington Avenue
6. Lexington Avenue & East 47th Street: full curb extension at northeast corner crossing both Lexington & 47th St
7. Lexington Avenue & East 48th Street: half curb extension at northeast corner, crossing Lexington Avenue

Please refer to Attachment 3, Conceptual Plans, for details.

Pedestrian Ramp Upgrades:
Consistent with DOT standard practice, this capital project will ensure that all corner ramps and pedestrian crossings in the project area are built to ADA compliance. Eleven complex corners have been identified in the project area and have been specifically accounted for in the project cost estimate (Attachment 6).

Distinctive Materials – Removal of Pink Granite Corners:
Most of the street corners in the project area have been constructed using pink granite, a treatment that was previously approved by the Public Design Commission (PDC) and which is currently maintained by the Grand Central Partnership (GCP). Both PDC and GCP now support eliminating these distinctive corner treatments – which are not historically protected – and reconstructing the corners using standard materials.

As all of these corners fall with Commercial Zoning districts, all should be reconstructed with tinted concrete consistent with the surrounding sidewalks. Pedestrian ramps on the tinted-concrete corners should include white detectable warning surfaces, as per the standard detail.
Status
Active
HWMNYPL
Project Id: HWMNYPL • Description: New York Public Library Pedestrian Improvements • Client Agency: Transportation
Project Id
HWMNYPL
Description
New York Public Library Pedestrian Improvements
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2029-05-02T00:00:00.000
Scope
New York Public Library Pedestrian Improvements at the following locations in Manhattan:

- Southern sidewalk and curb of West 42nd Street between 5th Avenue and 6th Avenue
- Northern sidewalk and curb of West 40th Street between 5th Avenue and 6th Avenue
- Curb extension at 6th Avenue on West 40th Street
Status
Active
HWMP116
Project Id: HWMP116 • Description: RECONST OF ASTOR PL (SEN002163) • Client Agency: Transportation
Project Id
HWMP116
Description
RECONST OF ASTOR PL (SEN002163)
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2018-10-31T00:00:00.000
Scope
The creation of new pedestrian public spaces and improvement of Cooper Park. The Resurfacing of East 4th Street between Bowery and Lafayette Street, Lafayette Street and Broadway. And the reconstruction of the following Street segments:
Lafayette Street between Astor Place and East 9th Street,
East 8th Street between Lafayette and 3rd Avenue,
East 4th Street between Bowery and 2nd Avenue,
Astor Place between Lafayette Street and 3rd Avenue,
3rd Avenue between East 5th Street and East 9th Street,
Fourth Avenue/ Cooper Square/ Bowery between East 4th Street and East 9th Street, and
Median construction on Third Ave b/t East 4th Street and East 9th Street.
Status
Active
HWMP2012
Project Id: HWMP2012 • Description: TIMES & DUFFY SQUARES RECONSTRUCTION (SEN002160) • Client Agency: Transportation
Project Id
HWMP2012
Description
TIMES & DUFFY SQUARES RECONSTRUCTION (SEN002160)
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2018-12-20T00:00:00.000
Scope
Reconstruction of streets and implementation of pedestrian spaces in the Times Square and Duffy Square areas, including reconstruction of watermains and sewers as deemed necessary, Borough of Manhattan
Status
Active
HWMP2012-ER
Project Id: HWMP2012-ER • Description: URGENT SAFETY IMPROVEMENTS IN TIMES SQUARE • Client Agency: Transportation
Project Id
HWMP2012-ER
Description
URGENT SAFETY IMPROVEMENTS IN TIMES SQUARE
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2019-12-27T00:00:00.000
Scope
Urgent safety improvements in Times Square between W. 42nd Street and W. 47th Street, Manhattan
Status
Active
HWMP2017
Project Id: HWMP2017 • Description: WADSWORTH TERRACE, FAIRVIEW TO W 190TH ST (MED626) • Client Agency: Transportation
Project Id
HWMP2017
Description
WADSWORTH TERRACE, FAIRVIEW TO W 190TH ST (MED626)
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2016-06-02T00:00:00.000
Scope
Reconstruction of Wadsworth Terrace from Fairview Avenue to West 190th Street, Manhattan
Status
Active
HWMP2019
Project Id: HWMP2019 • Description: EAST HOUSTON ST PEDESTRIAN IMPROVEMENTS (MED604) • Client Agency: Transportation
Project Id
HWMP2019
Description
EAST HOUSTON ST PEDESTRIAN IMPROVEMENTS (MED604)
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2018-12-25T00:00:00.000
Scope
Street Reconstruction of East Houston St. from Bowery to FDR Drive. Originally scoped to improve pedestrian and bicycle circulation on East Houston, this project will implement watermain and sewer replacement in addition to neckdowns, sidewalk widenings, and median enlargements in Manhattan.
Status
Active
HWMP2020
Project Id: HWMP2020 • Description: RECONSTRUCTION OF GANSEVOORT AREA • Client Agency: Transportation
Project Id
HWMP2020
Description
RECONSTRUCTION OF GANSEVOORT AREA
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2022-06-30T00:00:00.000
Scope
Street Reconstruction and Pedestrian Space improvement within the following limits:

- Ninth Avenue from Gansevoort Street to West 16 th Street
-Gansevoort Street from Ninth Ave to Hudson Street
-Hudson Street from West 14th Street to a point approximately 100' south of West 14th Street

The project corridor is bordered by Chelsea and Gansevoort Market Historic District on the north and south, respectively.

DEP Scope:Trunk Water Main in W. 13th St. and in following locations to connect Shaft 27B of City Water Tunnel #3 to the water distribution system, Phase 2, Borough of Manhattan:
Status
Active
HWMWTCA7E
Project Id: HWMWTCA7E • Description: RECONSTRUCTION OF WORTH STREET (SEN002152) • Client Agency: Transportation
Project Id
HWMWTCA7E
Description
RECONSTRUCTION OF WORTH STREET (SEN002152)
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2022-05-01T00:00:00.000
Scope
Reconstruction of Worth Street from Hudson Street to Park Row in Manhattan, including roadways, sidewalks, curbs, sewers and watermain work.
Status
Active
HWMWTCA7F
Project Id: HWMWTCA7F • Description: RECONSTRUCTION OF WARREN & JOHN STS. (SEN002156) • Client Agency: Transportation
Project Id
HWMWTCA7F
Description
RECONSTRUCTION OF WARREN & JOHN STS. (SEN002156)
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2020-07-31T00:00:00.000
Scope
Street Reconstruction of Warren St. from West St. to Broadway and John St. from Broadway to William St.
Status
Active
HWMWTCB1
Project Id: HWMWTCB1 • Description: NASSAU STRET RECONSTRUCTION • Client Agency: Transportation
Project Id
HWMWTCB1
Description
NASSAU STRET RECONSTRUCTION
Client Agency
Transportation
Division
Infrastructure
Phase
4. Construction
Projected Construction
2025-06-27T00:00:00.000
Scope
The proposed project will reconstruct 3 blocks of Nassau Street, from Pine St to Maiden Ln. Vaults will be reinforced and filled. The sidewalks and curbs will be upgraded to the Lower Manhattan standards of 6" wide granite curbs and dark pigmented concrete sidewalks. Street lights, signals and curb ramps will be upgraded. This project is part of the WTC Emergency Relief fund from FHWA to reconstruct resources damaged during the events 9/11.

The following work will be included:
Sidewalks and curbs; Roadway; Vaults; Pedestrian Ramps; Street Lights; Street Signals; Tree Planting; Street Markings; Wayfinding Considerations
Status
Active
HWMWTCB2
Project Id: HWMWTCB2 • Description: GREENWICH STREET RECONSTRUCTION • Client Agency: Transportation
Project Id
HWMWTCB2
Description
GREENWICH STREET RECONSTRUCTION
Client Agency
Transportation
Division
Infrastructure
Phase
4. Construction
Projected Construction
2024-11-06T00:00:00.000
Scope
The proposed project will reconstruct 4 blocks of Greenwich St, from Barclay St to Chambers St. Any vaults encountered will be reinforced and filled. South of Murray St, the sidewalks and curbs will be upgraded to the Lower Manhattan standards of 6" wide granite curbs and dark pigmented concrete sidewalks. North of Murray St. the typical city standards will be used. Street lights, signals, and curb ramps will be upgraded. This project is part of the WTC Emergency Relief fund from FHWA to reconstruct resources damaged during 9/11.

The scope includes the following:
Roadway work; sidewalks and curbs; vaults; pedestrian ramps; street lights and signals; street tree plantings; greenstreet; street markings and wayfinding considerations
Status
Active
HWMWTCB5A
Project Id: HWMWTCB5A • Description: LIBERTY STREET WEST RECONSTRUCTION • Client Agency: Transportation
Project Id
HWMWTCB5A
Description
LIBERTY STREET WEST RECONSTRUCTION
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2020-06-12T00:00:00.000
Scope
THIS PROJECT WILL RECONSTRUCT ONE BLOCK OF LIBERTY STREET BETWEEN GREENWICH STREET AND CHURCH STREET. THE INTERSECTION OF LIBERTY STREET WITH CHURCH STREET WILL BE RESURFACED. THE SOUTHERN SIDEWALK AND CURB LINE WILL BE RECONSTRUCTED TO MEET GRADES AND ADA ACCESSIBILITY STANDARDS. THE NEW SIDEWALK WILL MEET LOWER MANHATTAN STANDARDS OF GRANITE CURBING AND DARK PIGMENTED CONCRETE. SECURITY DEVICES WILL BE INSTALLED BY THE PORT AUTHORITY OF NY/NJ ON THE WESTERN END OF THE BLOCK, AND ARE OUTSIDE OF THE SCOPE OF THIS PROJECT.
Status
Active
HWMWTCB6
Project Id: HWMWTCB6 • Description: VESEY STREET RECONSTRUCTION • Client Agency: Transportation
Project Id
HWMWTCB6
Description
VESEY STREET RECONSTRUCTION
Client Agency
Transportation
Division
Infrastructure
Phase
4. Construction
Projected Construction
2024-09-17T00:00:00.000
Scope
The proposed scope will reconstruct one block of Vesey St from Church to Broadway. Vaults will be reinforced and back-filled. The sidewalks and curbs will be upgraded to the Lower Manhattan standards of 6" wide granite curbs and dark pigmented concrete sidewalks. Street lights, signals, and curb ramps will be upgraded where necessary. This project is part of the WTC Emergency Relief fund from FHWA (80/20) to reconstruct resources damaged during the events of 9/11.
Status
Active
HWMWTCB7
Project Id: HWMWTCB7 • Description: RECONSTRUCTION OF TRINITY PL • Client Agency: Transportation
Project Id
HWMWTCB7
Description
RECONSTRUCTION OF TRINITY PL
Client Agency
Transportation
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2027-06-28T00:00:00.000
Scope
The proposed scope will reconstruct 4 blocks of Trinity Place, from Morris St to Cedar St. Any vaults encountered will be reinforced and filled. The sidewalks and curbs will be upgraded to the Lower Manhattan standards of 6" wide granite curbs and dark pigmented concrete sidewalks. Street lights, signals and curb ramps will be upgraded to modern safety standards where necessary. This project is part of the WTC Emergency Relief fund from FHWA to reconstruct resources damaged during the events of 9/11.
Status
Active
HWP14MTA
Project Id: HWP14MTA • Description: COMPLEX PED RAMPS (TRANSIT AUTHORITY) - MANHATTAN • Client Agency: Transportation
Project Id
HWP14MTA
Description
COMPLEX PED RAMPS (TRANSIT AUTHORITY) - MANHATTAN
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2018-08-09T00:00:00.000
Scope
Design of complex pedestrian ramps adjacent to transit facilities within the borough of Manhattan.
Locations of the pedestrian ramps will be provided by the NYCDOT Division of Sidewalks and Inspection Management.
Since, We still have left over ramp locations for Manhattan from a list we received last year TA locations. We will continue to use that list until it is completed.
Status
Active
HWP15KCL
Project Id: HWP15KCL • Description: SIMPLE, COMPLEX & LANDMARK PED. RAMPS, BK • Client Agency: Transportation
Project Id
HWP15KCL
Description
SIMPLE, COMPLEX & LANDMARK PED. RAMPS, BK
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2019-06-28T00:00:00.000
Scope
SIMPLE, COMPLEX & LANDMARK PED. RAMPS, BK
Status
Active
HWP15KTA
Project Id: HWP15KTA • Description: COMPLEX PED. RAMPS - TRANSIT AUTHORITY, BK • Client Agency: Transportation
Project Id
HWP15KTA
Description
COMPLEX PED. RAMPS - TRANSIT AUTHORITY, BK
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2018-08-14T00:00:00.000
Scope
COMPLEX PED. RAMPS - TRANSIT AUTHORITY, BK
Status
Active
HWP15QTA
Project Id: HWP15QTA • Description: COMPLEX PED. RAMPS - TRANSIT AUTHORITY, QNS • Client Agency: Transportation
Project Id
HWP15QTA
Description
COMPLEX PED. RAMPS - TRANSIT AUTHORITY, QNS
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2018-06-03T00:00:00.000
Scope
COMPLEX PED. RAMPS - TRANSIT AUTHORITY, QNS
Status
Active
HWP15XMCL
Project Id: HWP15XMCL • Description: SIMPLE, COMPLEX & LANDMARKS PED. RAMPS, MN • Client Agency: Transportation
Project Id
HWP15XMCL
Description
SIMPLE, COMPLEX & LANDMARKS PED. RAMPS, MN
Client Agency
Transportation
Division
Infrastructure
Phase
4. Construction
Projected Construction
2023-06-25T00:00:00.000
Scope
SIMPLE, COMPLEX & LANDMARKS PED. RAMPS, BX & MN
Status
Active
HWP15XMTA
Project Id: HWP15XMTA • Description: COMPLEX PED. RAMPS - TRANSIT AUTHORITY, BX & MN • Client Agency: Transportation
Project Id
HWP15XMTA
Description
COMPLEX PED. RAMPS - TRANSIT AUTHORITY, BX & MN
Client Agency
Transportation
Division
Infrastructure
Phase
4. Construction
Projected Construction
2023-06-30T00:00:00.000
Scope
COMPLEX PED. RAMPS - TRANSIT AUTHORITY, BX & MN
Status
Active
HWP16KC
Project Id: HWP16KC • Description: CITYWIDE COMPLEX PED RAMPS - BROOKLYN • Client Agency: Transportation
Project Id
HWP16KC
Description
CITYWIDE COMPLEX PED RAMPS - BROOKLYN
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2019-06-30T00:00:00.000
Scope
RECONSTRUCTION OF CITYWIDE COMPLEX PED RAMPS - BROOKLYN
Status
Active
HWP16MTAL
Project Id: HWP16MTAL • Description: COMPLEX PEDESTRIAN RAMP-MTA & LANDMARK PHASE II MA • Client Agency: Transportation
Project Id
HWP16MTAL
Description
COMPLEX PEDESTRIAN RAMP-MTA & LANDMARK PHASE II MA
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2020-02-25T00:00:00.000
Scope
COMPLEX PEDESTRIAN RAMPS ADJACENT TO TRANSIT AND LANDMARK FACILITIES WITHIN LOWER MANHATTTAN COMMUNITY BOARDS 1, 2 AND 3.
Status
Active
HWP19CWLM
Project Id: HWP19CWLM • Description: CITYWIDE COMPLEX RAMPS (LANDMARK) MANHATTAN, BRONX • Client Agency: Transportation
Project Id
HWP19CWLM
Description
CITYWIDE COMPLEX RAMPS (LANDMARK) MANHATTAN, BRONX
Client Agency
Transportation
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2025-12-23T00:00:00.000
Scope
COMPLEX PEDESTRIAN RAMPS ADJACENT TO LANDMARK FACILITIES IN 54 CORNERS IN MANHATTAN AND THE BRONX. DESIGNS OF THE RAMPS MUST COMPLY WITH APPLICABLE FEDERAL ADA REQUIREMENTS. ALL NYS APPROVED STANDARD DESIGN ALTERNATIVES MUST BE CONSIDERED TO THE MAXIMUM EXTENT OF FEASIBILITY.
Status
Active
HWP19KC1
Project Id: HWP19KC1 • Description: CITYWIDE COMPLEX PEDESTRIAN RAMPS - BK • Client Agency: Transportation
Project Id
HWP19KC1
Description
CITYWIDE COMPLEX PEDESTRIAN RAMPS - BK
Client Agency
Transportation
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2025-09-28T00:00:00.000
Scope
COMPLEX PEDESTRIAN RAMPS IN 48 CORNERS IN BROOKLYN. DESIGNS OF THE RAMPS MUST COMPLY WITH APPLICABLE FEDERAL ADA REQUIREMENTS. ALL NYS APPROVED STANDARD DESIGN ALTERNATIVES MUST BE CONSIDERED TO THE MAXIMUM EXTENT OF FEASIBILITY.
Status
Active
HWP19KC2
Project Id: HWP19KC2 • Description: CITYWIDE COMPLEX PEDESTRIAN RAMPS - BK • Client Agency: Transportation
Project Id
HWP19KC2
Description
CITYWIDE COMPLEX PEDESTRIAN RAMPS - BK
Client Agency
Transportation
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2025-09-10T00:00:00.000
Scope
COMPLEX PEDESTRIAN RAMPS IN 48 CORNERS IN BROOKLYN. DESIGNS OF THE RAMPS MUST COMPLY WITH APPLICABLE FEDERAL ADA REQUIREMENTS. ALL NYS APPROVED STANDARD DESIGN ALTERNATIVES MUST BE CONSIDERED TO THE MAXIMUM EXTENT OF FEASIBILITY.
Status
Active
HWP19KC3
Project Id: HWP19KC3 • Description: CITYWIDE COMPLEX PEDESTRIAN RAMPS - BK • Client Agency: Transportation
Project Id
HWP19KC3
Description
CITYWIDE COMPLEX PEDESTRIAN RAMPS - BK
Client Agency
Transportation
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2025-08-29T00:00:00.000
Scope
COMPLEX PEDESTRIAN RAMPS IN 48 CORNERS IN BROOKLYN. DESIGNS OF THE RAMPS MUST COMPLY WITH APPLICABLE FEDERAL ADA REQUIREMENTS. ALL NYS APPROVED STANDARD DESIGN ALTERNATIVES MUST BE CONSIDERED TO THE MAXIMUM EXTENT OF FEASIBILITY.
Status
Active
HWP19KQTA
Project Id: HWP19KQTA • Description: CITYWIDE COMPLEX PEDESTRIAN RAMPS-TA, BK & QNS • Client Agency: Transportation
Project Id
HWP19KQTA
Description
CITYWIDE COMPLEX PEDESTRIAN RAMPS-TA, BK & QNS
Client Agency
Transportation
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2025-08-22T00:00:00.000
Scope
COMPLEX PEDESTRIAN RAMPS ADJACENT TO TRANSIT FACILITIES IN 44 CORNERS IN BROOKLYN AND QUEENS. DESIGNS OF THE RAMPS MUST COMPLY WITH APPLICABLE FEDERAL ADA REQUIREMENTS. ALL NYS APPROVED STANDARD DESIGN ALTERNATIVES MUST BE CONSIDERED TO THE MAXIMUM EXTENT OF FEASIBILITY.
Status
Active
HWP19QRC
Project Id: HWP19QRC • Description: CITYWIDE COMPLEX PEDESTRIAN RAMPS - QUEENS & SI • Client Agency: Transportation
Project Id
HWP19QRC
Description
CITYWIDE COMPLEX PEDESTRIAN RAMPS - QUEENS & SI
Client Agency
Transportation
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2025-05-13T00:00:00.000
Scope
COMPLEX PEDESTRIAN RAMPS IN QUEENS AND STATEN ISLAND. DESIGNS OF THE RAMPS MUST COMPLY WITH APPLICABLE FEDERAL ADA REQUIREMENTS. ALL NYS APPROVED STANDARD DESIGN ALTERNATIVES MUST BE CONSIDERED TO THE MAXIMUM EXTENT OF FEASIBILITY.
Status
Active
HWP2010R
Project Id: HWP2010R • Description: STATEN ISLAND COMPLEX PED RAMPS • Client Agency: Transportation
Project Id
HWP2010R
Description
STATEN ISLAND COMPLEX PED RAMPS
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2013-06-28T00:00:00.000
Scope
Installation of Complex Pedestrian Ramps at Designated Locations in Borough of Staten Island
Status
Active
HWP2013LM
Project Id: HWP2013LM • Description: COMPLEX PED RAMPS AT LAND MARK LOCATIONS, BK & MAN • Client Agency: Transportation
Project Id
HWP2013LM
Description
COMPLEX PED RAMPS AT LAND MARK LOCATIONS, BK & MAN
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2019-12-25T00:00:00.000
Scope
Complex Pedestrian Ramps adjacent to Historic and /or Landmark facilities within the Boroughs of Brooklyn & Manhattan.
09/04/2013 - Origianl list of locations 108 corners. 4 corners were added when performing preliminary investigation. There is a total 112 corners. Out of the 112 corners, 63 corners (38 intersections) require detailed design, 7 corners require vault investigation, 1 corner is a simple corner/not in historic district and 41 corners do not required work.
Status
Active
HWP2019S
Project Id: HWP2019S • Description: CITYWIDE SIMPLE PEDESTRIAN RAMPS • Client Agency: Transportation
Project Id
HWP2019S
Description
CITYWIDE SIMPLE PEDESTRIAN RAMPS
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2023-04-18T00:00:00.000
Scope
CONSTRUCTION OF SIMPLE PEDESTRIAN RAMPS IN 424 CORNERS CITYWIDE. RAMPS MUST COMPLY WITH APPLICABLE FEDERAL ADA REQUIREMENTS. ALL NYS APPROVED STANDARD DESIGN ALTERNATIVES MUST BE CONSIDERED TO THE MAXIMUM EXTENT OF FEASIBILITY.
Status
Active
HWP2020KC
Project Id: HWP2020KC • Description: Complex Ped Ramp Installs - Brooklyn • Client Agency: Transportation
Project Id
HWP2020KC
Description
Complex Ped Ramp Installs - Brooklyn
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2026-05-31T00:00:00.000
Scope
The scope of this project includes installation of 53 Complex Pedestrian Ramps in the borough of Brooklyn. The list of locations for this contract is attached. All ramps must be designed and constructed to the maximum extent feasible in accordance with the Minimum Design Requirements included in this document. DDC should identify any encroachments prior to design and inform DOT of such findings. Stop controls and types (stop sign or traffic signal) must be clearly indicated at the intersections on the design drawings. This contract shall be established for two years with an option for extension(s).
Status
Active
HWP2020LM
Project Id: HWP2020LM • Description: Complex Ped Ramp Installs - Citywide Landmark Loca • Client Agency: Transportation
Project Id
HWP2020LM
Description
Complex Ped Ramp Installs - Citywide Landmark Loca
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2026-07-25T00:00:00.000
Scope
The scope of this project includes installation of 54 Complex Pedestrian Ramps at Landmarked locations in the boroughs of Manhattan, Bronx, Brooklyn, Queens, and Staten Island. The list of locations for this contract is attached. All ramps must be designed and constructed to the maximum extent feasible in accordance with the Minimum Design Requirements included in this document. DDC should identify any encroachments prior to design and inform DOT of such findings. Stop controls and types (stop sign or traffic signal) must be clearly indicated at the intersections on the design drawings. This contract shall be established for two years with an option for extension.
Status
Active
HWP2020TA
Project Id: HWP2020TA • Description: Complex Ped Ramp Installs-Manh, Brnx,Bk, & Queens • Client Agency: Transportation
Project Id
HWP2020TA
Description
Complex Ped Ramp Installs-Manh, Brnx,Bk, & Queens
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2026-07-05T00:00:00.000
Scope
The scope of this project includes installation of 44 Complex Pedestrian Ramps in the boroughs of Manhattan, Bronx, Brooklyn, and Queens. The list of locations for this contract is attached. All ramps must be designed and constructed to the maximum extent feasible in accordance with the Minimum Design Requirements included in this document. DDC should identify any encroachments prior to design and inform DOT of such findings. Stop controls and types (stop sign or traffic signal) must be clearly indicated at the intersections on the design drawings. This contract shall be established for two years with an option for extension.
Status
Active
HWP2021LM
Project Id: HWP2021LM • Client Agency: Transportation • Division: Infrastructure
Project Id
HWP2021LM
Description
Installation of pedestrian ramps at 54 non-standard landmarked locations in Manhattan, Brooklyn, and Queens.
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2027-03-18T00:00:00.000
Scope
Installation of pedestrian ramps in landmarked areas in Manhattan, Brooklyn, and Queens.
Status
Active
HWP2021RC
Project Id: HWP2021RC • Description: Installation of pedestrian ramps at 48 non-standard locations in Staten Island. • Client Agency: Transportation
Project Id
HWP2021RC
Description
Installation of pedestrian ramps at 48 non-standard locations in Staten Island.
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2026-06-15T00:00:00.000
Scope
Installation of pedestrian ramps at 48 non-standard corners in Staten Island.
Status
Active
HWP2021TA
Project Id: HWP2021TA • Client Agency: Transportation • Division: Infrastructure
Project Id
HWP2021TA
Description
Installation of pedestrian ramps at 44 non-standard locations in Manhattan, Bronx, Staten Island, Brooklyn, and Queens.
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2027-07-14T00:00:00.000
Scope
Installation of pedestrian ramps near transit assets in all 5 boroughs.
Status
Active
HWP20KRC
Project Id: HWP20KRC • Description: Complex Ped Ramp Installs - Brooklyn & Staten Island • Client Agency: Transportation
Project Id
HWP20KRC
Description
Complex Ped Ramp Installs - Brooklyn & Staten Island
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2027-07-20T00:00:00.000
Scope
The scope of this project includes upgrade (to Federal ADA 2010 specifications to the maximum extent feasible) of complex pedestrian ramps in Brooklyn and Staten Island
Status
Active
HWP20MKC
Project Id: HWP20MKC • Description: Complex Ped Ramp Installs - Manhattan & Brooklyn • Client Agency: Department of Transporation (DOT)
Project Id
HWP20MKC
Description
Complex Ped Ramp Installs - Manhattan & Brooklyn
Client Agency
Department of Transporation (DOT)
Division
Infrastructure
Phase
2. Design
Projected Construction
2026-11-29T00:00:00.000
Scope
The scope of this project includes install (to Federal ADA 2010 specifications to the maximum extent feasible) of complex pedestrian ramps in Brooklyn and Staten Island
Status
Active