HWP21KQC
Project Id: HWP21KQC • Client Agency: Transportation • Division: Infrastructure
Project Id
HWP21KQC
Description
Installation of pedestrian ramps at 48 non-standard locations in Brooklyn and Queens.
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2027-04-21T00:00:00.000
Scope
Installation of pedestrian ramps at 48 non-standard corners.
Status
Active
HWP21KRC
Project Id: HWP21KRC • Client Agency: Transportation • Division: Infrastructure
Project Id
HWP21KRC
Description
Installation of pedestrian ramps at 44 non-standard corners in Brooklyn and Staten Island.
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2027-04-14T00:00:00.000
Scope
Installation of pedestrian ramps at 44 non standard corners in Brooklyn and Staten Island.
Status
Active
HWP21MXQC
Project Id: HWP21MXQC • Client Agency: Transportation • Division: Infrastructure
Project Id
HWP21MXQC
Description
Installation of pedestrian ramps at 51 non-standard intersections in Manhattan, Bronx, and Queens.
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2028-02-15T00:00:00.000
Scope
Installation of pedestrian ramps at non-standard corners.
Status
Active
HWPEDSF3A
Project Id: HWPEDSF3A • Description: MULTI-SITE PEDESTRIAN SAFETY - 5 LOCATIONS • Client Agency: Transportation
Project Id
HWPEDSF3A
Description
MULTI-SITE PEDESTRIAN SAFETY - 5 LOCATIONS
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2020-12-22T00:00:00.000
Scope
Construction of roadway and sidewalk treatments to enhance pedestrian safety in the locations listed below, Citywide.

These locations and funding were transferred from original contract # HWPEDSF3.

Manhattan:
1 - E. 14th Street & 1st Avenue (Reso-A - $165,000) - Design deleted location due to utility manholes. - NYCT
2 - Lexington Ave and E. 59th St. / E. 60th St. (Reso-A - $300,000/2) - NYCT
3 - E. 84th St./Transverse # 3 and 5th Ave. (Reso-A - $300,000/2) - Historic District/Scenic Landmark
13 - W. 71st St. and Broadway/Amsterdam Ave. - NYCT & Historic District
14 - Nagle Ave. and Hillside Ave./Broadway/Bennett Ave. (Additional location from revised CPI 8/31/11)
16 – West 70th and West End. (Additional location from revised CPI dated 08/30/13) - NYCT One block & Historic District

Brooklyn:
5 - York St. & Navy St//Hudson Avenue

Queens:
8 - Hempstead Ave. and Springfield Blvd.
17 – Parsons Blvd./ 84th Ave./ Hoover Ave. (Additional location from revised CPI dated 08/30/13).
Status
Active
HWPEDSF4
Project Id: HWPEDSF4 • Description: MULTI-SITE PEDESTRIAN SAFETY • Client Agency: Transportation
Project Id
HWPEDSF4
Description
MULTI-SITE PEDESTRIAN SAFETY
Client Agency
Transportation
Division
Infrastructure
Phase
4. Construction
Projected Construction
2023-12-29T00:00:00.000
Scope
MULTI-SITE PEDESTRIAN SAFETY, CITYWIDE

PROJECT SCOPE AND LOCATIONS:
BRONX- Loc.#1- Bruckner Blvd. (Body of water by Concrete Plant Park)
BROOKLYN - Loc.# 2 -8th Ave./57th St.; Loc. #3 -92nd St. /Ft. Hamilton Parkway (Removed).; Loc.#4 Cortelyou Rd./Rugby Rd.;Loc.#5 -Linden Blvd./E. 51st St.; Loc.#6 -Linden Blvd./E. 52nd St.; Loc.#7 -Ocean Parkway N./In front of Coney Island Hosp.(Pending S.G.D)
MANHATTAN- Loc.#8 -E. 125th St/Lexington Ave.; Loc.#9 -W. 125th St./Amsterdam Ave.; Loc.#10-W. 181st St./Broadway; Loc.#11-W. 181st St./St. Nicholas Ave.; Loc.#12-W. 181st St./Amsterdam Ave.; Loc. (Removed).#13-Delancey St./Orchard St.; (Removed) Loc.#14-Delancey St./Essex St. (Removed)
ADDED Location in Manhattan #18 NW corner of W34th St and 8th AVE.
QUEENS- Loc.#15 -Hoyt Ave. South/Columbus Triangle (Will be given to NYCT to bid)
STATEN ISLAND - Loc.#16-Amundsen Circle Roads/Amboy Rd, Riedel Ave., Clark Ave., Savoy St.; (ROW Issues) Loc. #17-Richmond Ave./300' N. from N. Leg of Yukon Ave. to 310' S. of S. leg of Yukon Ave.
Status
Active
HWPEDSF4A
Project Id: HWPEDSF4A • Description: MULTI SITE PEDESTRIAN SAFETY PHASE 4A • Client Agency: Transportation
Project Id
HWPEDSF4A
Description
MULTI SITE PEDESTRIAN SAFETY PHASE 4A
Client Agency
Transportation
Division
Infrastructure
Phase
4. Construction
Projected Construction
2023-06-14T00:00:00.000
Scope
THE PROJECT WILL IMPROVE SAFETY AND CIRCULATION AT THIS HEAVILY USED TRANSIT HUB BY PERMANENTLY INCORPORATING THE TEMPORARY PEDESTRIAN SAFETY IMPROVEMENTS INSTALLED IN 2018 THROUGH FULL RECONSTRUCTION OF PARSONS BOULEVARD (FROM ARCHER TO JAMAICA AVENUES) INVOLVING EXPANDED AND ENHANCED PEDESTRIAN SPACE, INSTALLATION OF CURB EXTENSIONS AT KEY INTERSECTIONS, AND DEDICATED LOCATIONS FOR COMMUTER VAN PICK-UP.
Status
Active
HWPEDSF5
Project Id: HWPEDSF5 • Description: MULTI-SITE PEDESTRIAN SAFETY PHASE 5 • Client Agency: Transportation
Project Id
HWPEDSF5
Description
MULTI-SITE PEDESTRIAN SAFETY PHASE 5
Client Agency
Transportation
Division
Infrastructure
Phase
4. Construction
Projected Construction
2024-06-01T00:00:00.000
Scope
CONSTRUCT A RANGE OF PEDESTRIAN SAFETY GEOMETRIC IMPROVEMENTS AT VARIOUS SPECIFIED LOCATIONS, CITYWIDE.
Status
Active
HWPLZ001K
Project Id: HWPLZ001K • Description: Myrtle Ave. Plaza & Street Reconstruction/BED-792 • Client Agency: Transportation
Project Id
HWPLZ001K
Description
Myrtle Ave. Plaza & Street Reconstruction/BED-792
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2017-05-17T00:00:00.000
Scope
Construction of Myrtle Avenue Plaza and Streetscape in the Borough of Brooklyn.

This project will fully reconstruct the street on Myrtle Avenue from Hall Street to Emerson Place, in the Clinton Hill neighborhood of Brooklyn. The project will provide many pedestrian improvements to make crossing Myrtle Avenue safer, including bulb outs at Hall Street, Grand Street and Emerson Place; a new signalized crossing at Grand St; an expanded center median; the consolidation of bus stops; and conversion of two blocks of the service road to pedestrian plaza. Amenities to be added including seating, lighting, trees/plants, decorative paving, drinking fountain(s), bike racks, public art, etc.
Status
Active
HWPLZ003M
Project Id: HWPLZ003M • Description: Montefiore Park & Plaza Improvement (MED-629) • Client Agency: Transportation
Project Id
HWPLZ003M
Description
Montefiore Park & Plaza Improvement (MED-629)
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2021-12-17T00:00:00.000
Scope
Reconstruction of Montefiore Park bounded by Broadway, Hamilton Place, & 138th Street, including expansion onto Hamilton Place to create a pedestrian plaza

MED-629-Trunk water main and distribution water main replacement in Broadway bet. W. 136th and W. 138th Sts. and W. 138th St. bet. Broadway and Hamilton Place.
Status
Active
HWPLZ004M
Project Id: HWPLZ004M • Description: Pershing Sq Plaza/Streetscape (MED-622) • Client Agency: Transportation
Project Id
HWPLZ004M
Description
Pershing Sq Plaza/Streetscape (MED-622)
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2020-04-30T00:00:00.000
Scope
Roadway reconstruction, in conjunction with water main replacement, to create a pedestrian plaza on the west side of Park Avenue between 41st and 42nd Streets, adjacent to the viaduct.
Status
Active
HWPLZ008M
Project Id: HWPLZ008M • Description: Forsyth Streetscape and Plaza Reconstruction • Client Agency: Transportation
Project Id
HWPLZ008M
Description
Forsyth Streetscape and Plaza Reconstruction
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2018-01-31T00:00:00.000
Scope
Plaza Construction along Forsyth Street from Canal Street to Division Street, and Creation of Plaza on Upper Portion of Manhattan Bridge, Manhattan
Status
Active
HWPLZ012M
Project Id: HWPLZ012M • Description: BOGARDUS PLAZA • Client Agency: Transportation
Project Id
HWPLZ012M
Description
BOGARDUS PLAZA
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2020-12-15T00:00:00.000
Scope
To make permanent improvements to the temporary plaza on Hudson Street from Reade Street to Chambers Street. The Bogardus Garden Park will also be incorporated into the plaza design.
Status
Active
HWPLZ014M
Project Id: HWPLZ014M • Client Agency: Transportation • Division: Infrastructure
Project Id
HWPLZ014M
Description
Curb to curb reconstruction of 2 blocks of Broadway (between W 38th and W 40th Streets) to build out Broadway Boulevard Plaza and Shared Street.
Client Agency
Transportation
Division
Infrastructure
Phase
1. Initiation
Projected Construction
2028-04-21T00:00:00.000
Scope
The scope of work in comprised of curb to curb reconstruction on Broadway between West 38th to West 40th Streets, creating a new pedestrian plaza and shared street in the heart of midtown Manhattan. This project will also implement pedestrian security safety measures, landscaping, standard kiosk utility connections, wayfinding, and other typical plaza elements. All affected pedestrian ramps will be upgraded to comply with ADA specifications.
Status
Active
HWPLZ015M
Project Id: HWPLZ015M • Description: PERSHING SQUARE EAST PLAZA / STREETSCAPE • Client Agency: Transportation
Project Id
HWPLZ015M
Description
PERSHING SQUARE EAST PLAZA / STREETSCAPE
Client Agency
Transportation
Division
Infrastructure
Phase
4. Construction
Projected Construction
2023-10-11T00:00:00.000
Scope
THIS PROJECT WILL RECONSTRUCT THE EASTERN HALF OF PARK AVENUE BETWEEN 41ST AND 42ND STREETS, ALSO KNOWN AS PERSHING SQUARE EAST. THIS BLOCK WILL INTEGRATE WITH THE PERSHING SQUARE WEST PLAZA TO CREATE A SINGULAR PUBLIC SPACE COLLECTIVELY KNOWN AS PERSHING SQUARE PLAZA.
Status
Active
HWPLZ016K
Project Id: HWPLZ016K • Description: BROADWAY BEDFORD PLAZA, BROOKLYN • Client Agency: Transportation
Project Id
HWPLZ016K
Description
BROADWAY BEDFORD PLAZA, BROOKLYN
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2018-07-09T00:00:00.000
Scope
To construct a pedestrian plaza on Broadway at South 6th Street and Bedford Avenue in Brooklyn. This project will reconfigure traffic circulation, enhance pedestrian safety in the project area and create a new public space. Also, water main work in the project area.
Status
Active
HWPLZ017K
Project Id: HWPLZ017K • Description: OSBORN STREET PLAZA • Client Agency: Transportation
Project Id
HWPLZ017K
Description
OSBORN STREET PLAZA
Client Agency
Transportation
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2024-12-31T00:00:00.000
Scope
THIS PROJECT WILL RECONSTRUCT THE DEAD END SEGMENT OF OSBORN STREET SOUTH OF BELMONT AVE TO CREATE AN INVITING PLAZA SPACE FOR PEDESTRIANS. THE ROADBED WILL BE RAISED TO SIDEWALK LEVEL, STREET TREES WILL REMAIN WHERE THE FORMER CURB LINE EXISTED AND BIKE RACKS AND BENCHES WILL BE INSTALLED. THE PLAZA ITSELF WILL BECOME CONCRETE. ADDITIONALLY THE INTERSECTION OF OSBORN STREET AND BELMONT AVE WILL BE RAISED TO SIDEWALK LEVEL. THIS RAISED INTERSECTION WILL PROVIDE TRAFFIC CALMING AND FURTHER CREATE A WELCOMING PEDESTRIAN ENVIRONMENT. OSBORN STREET IS PART OF THE ROUND 7 PLAZA PROGRAM AND WILL BE MAINTAINED BY THE BROWNSVILLE COMMUNITY JUSTICE CENTER.
Status
Active
HWPR16M
Project Id: HWPR16M • Description: Rehabilitation of Pedestrian Ramps, Manhattan • Client Agency: Transportation
Project Id
HWPR16M
Description
Rehabilitation of Pedestrian Ramps, Manhattan
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2019-06-18T00:00:00.000
Scope
Rehabilitation (repair and upgrade to ADA specifications) of existing pedestrian ramps in Manhattan.
Status
Active
HWPR17K
Project Id: HWPR17K • Description: Pedestrian Ramp Rehabilitation, Brooklyn • Client Agency: Transportation
Project Id
HWPR17K
Description
Pedestrian Ramp Rehabilitation, Brooklyn
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2020-06-01T00:00:00.000
Scope
Rehabilitation (repair and upgrade to ADA specifications) of existing pedestrian ramps in the borough of Brooklyn. The list of final locations for this contract will be provided by CPM at a later date. The pedestrian ramp repairs will follow resurfacing schedules.
Status
Active
HWPR17R
Project Id: HWPR17R • Description: Pedestrian Ramp Rehabilitation, Staten Island • Client Agency: Transportation
Project Id
HWPR17R
Description
Pedestrian Ramp Rehabilitation, Staten Island
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2019-03-30T00:00:00.000
Scope
Rehabilitation (repair and upgrade to ADA specifications) of existing pedestrian ramps in the borough of Staten Island. The list of final locations for this contract will be provided by SIM at a later date. The pedestrian ramp repairs will follow resurfacing schedules.
Status
Active
HWPR18K1
Project Id: HWPR18K1 • Description: REHABILITATION OF PEDESTRIAN RAMPS • Client Agency: Transportation
Project Id
HWPR18K1
Description
REHABILITATION OF PEDESTRIAN RAMPS
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2020-02-07T00:00:00.000
Scope
Rehabilitation (repair and upgrade to ADA specifications to the maximum extent feasible) of existing pedestrian ramps in the borough of Brooklyn. The list of final locations for this contract will be provided by SIM at a later date. The pedestrian ramp repairs will follow resurfacing schedules.

Any upgrades to the ramps must also rehabilitate the receiving corner where possible. Any deviation will require DOT's approval. This contract will be addressing simple pedestrian ramps upgrades.
Status
Active
HWPR18M
Project Id: HWPR18M • Description: REHABILITATION OF PEDESTRIAN RAMPS • Client Agency: Transportation
Project Id
HWPR18M
Description
REHABILITATION OF PEDESTRIAN RAMPS
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2020-09-19T00:00:00.000
Scope
Rehabilitation (repair and upgrade to ADA specifications to the maximum extent feasible) of existing pedestrian ramps in the borough of Manhattan. The list of final locations for this contract will be provided by SIM at a later date. The pedestrian ramp repairs will follow resurfacing schedules.

Any upgrades to the ramps must also rehabilitate the receiving corner where possible. Any deviation will require DOT's approval. This contract will be addressing simple pedestrian ramps upgrades.
Status
Active
HWPR19K1
Project Id: HWPR19K1 • Description: PEDESTRIAN RAMP REHAB - BK • Client Agency: Transportation
Project Id
HWPR19K1
Description
PEDESTRIAN RAMP REHAB - BK
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2021-10-29T00:00:00.000
Scope
REHABILITATION (REPAIR AND UPGRADE TO ADA SPECIFICATIONS TO THE MAXIMUM EXTENT FEASIBLE) OF EXISTING PEDESTRIAN RAMPS IN THE BOROUGH OF BROOKLYN. THE LIST OF LOCATIONS FOR THIS CONTRACT WILL BE PROVIDED BY SIM AT A LATER DATE. THE PED RAMP REPAIRS WILL FOLLOW RESURFACING SCHEDULES. ANY UPGRADES TO THE RAMPS MUST ALSO REHABILITATE THE RECEIVING CORNER WHERE POSSIBLE. ANY DEVIATION WILL REQUIRE DOT'S APPROVAL. THIS CONTRACT WILL BE ADDRESSING SIMPLE PED RAMP UPGRADES. THIS CONTRACT WILL BE ESTABLISHED FOR 1 YEAR AND MAY ONLY BE RENEWED IF A TIME EXTENSION IS NEEDED. ALL THE PROJECT FUNDS MUST BE REGISTERED IN THE 1ST YEAR.
Status
Active
HWPR19KC
Project Id: HWPR19KC • Description: Complex Upgrades Ped Ramps - Brooklyn • Client Agency: Transportation
Project Id
HWPR19KC
Description
Complex Upgrades Ped Ramps - Brooklyn
Client Agency
Transportation
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2025-06-28T00:00:00.000
Scope
The scope of this project includes Complex Pedestrian Ramps Upgrades, for 54 corners in the borough of
Brooklyn.
Status
Active
HWPR19M
Project Id: HWPR19M • Description: PEDESTIRAN RAMP REHAB - MN • Client Agency: Transportation
Project Id
HWPR19M
Description
PEDESTIRAN RAMP REHAB - MN
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2021-08-14T00:00:00.000
Scope
REHABILITATION (REPAIR AND UPGRADE TO ADA SPECIFICATIONS TO THE MAXIMUM EXTENT FEASIBLE) OF EXISTING PEDESTRIAN RAMPS IN THE BOROUGH OF BROOKLYN. THE LIST OF LOCATIONS FOR THIS CONTRACT WILL BE PROVIDED BY SIM AT A LATER DATE. THE PED RAMP REPAIRS WILL FOLLOW RESURFACING SCHEDULES. ANY UPGRADES TO THE RAMPS MUST ALSO REHABILITATE THE RECEIVING CORNER WHERE POSSIBLE. ANY DEVIATION WILL REQUIRE DOT'S APPROVAL. THIS CONTRACT WILL BE ADDRESSING SIMPLE PED RAMP UPGRADES. THIS CONTRACT WILL BE ESTABLISHED FOR 1 YEAR AND MAY ONLY BE RENEWED IF A TIME EXTENSION IS NEEDED. ALL THE PROJECT FUNDS MUST BE REGISTERED IN THE 1ST YEAR.
Status
Active
HWPR19MC1
Project Id: HWPR19MC1 • Description: Complex Upgrades Ped Ramps - Manhattan • Client Agency: Transportation
Project Id
HWPR19MC1
Description
Complex Upgrades Ped Ramps - Manhattan
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2026-02-22T00:00:00.000
Scope
Complex Upgrades Ped Ramps - Manhattan
Status
Active
HWPR19MC2
Project Id: HWPR19MC2 • Description: Complex Upgrades Ped Ramps - Manhattan • Client Agency: Transportation
Project Id
HWPR19MC2
Description
Complex Upgrades Ped Ramps - Manhattan
Client Agency
Transportation
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2025-12-20T00:00:00.000
Scope
The scope of this project includes Complex Pedestrian Ramps Upgrades, for 50 corners in the borough of Manhattan.
Status
Active
HWPR19MXC
Project Id: HWPR19MXC • Description: Complex Upgrades Ped Ramps - Manhattan & the Bronx • Client Agency: Transportation
Project Id
HWPR19MXC
Description
Complex Upgrades Ped Ramps - Manhattan & the Bronx
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2026-06-30T00:00:00.000
Scope
Complex Upgrades Ped Ramps - Manhattan and the Bronx
Status
Active
HWPR19QRC
Project Id: HWPR19QRC • Description: Complex Upgrades Ped Ramps-Queens & Staten Island • Client Agency: Transportation
Project Id
HWPR19QRC
Description
Complex Upgrades Ped Ramps-Queens & Staten Island
Client Agency
Transportation
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2025-08-12T00:00:00.000
Scope
Complex Upgrades Ped Ramps - Queens and Staten Island
Status
Active
HWPR19R
Project Id: HWPR19R • Description: PEDESTRIAN RAMP REHAB - SI • Client Agency: Transportation
Project Id
HWPR19R
Description
PEDESTRIAN RAMP REHAB - SI
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2021-09-29T00:00:00.000
Scope
REHABILITATION (REPAIR AND UPGRADE TO ADA SPECIFICATIONS TO THE MAXIMUM EXTENT FEASIBLE) OF EXISTING PEDESTRIAN RAMPS IN THE BOROUGH OF BROOKLYN. THE LIST OF LOCATIONS FOR THIS CONTRACT WILL BE PROVIDED BY SIM AT A LATER DATE. THE PED RAMP REPAIRS WILL FOLLOW RESURFACING SCHEDULES. ANY UPGRADES TO THE RAMPS MUST ALSO REHABILITATE THE RECEIVING CORNER WHERE POSSIBLE. ANY DEVIATION WILL REQUIRE DOT'S APPROVAL. THIS CONTRACT WILL BE ADDRESSING SIMPLE PED RAMP UPGRADES. THIS CONTRACT WILL BE ESTABLISHED FOR 1 YEAR AND MAY ONLY BE RENEWED IF A TIME EXTENSION IS NEEDED. ALL THE PROJECT FUNDS MUST BE REGISTERED IN THE 1ST YEAR.
Status
Active
HWPR20K1
Project Id: HWPR20K1 • Description: Pedestrian Ramps Rehabilitation - Brooklyn • Client Agency: Transportation
Project Id
HWPR20K1
Description
Pedestrian Ramps Rehabilitation - Brooklyn
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2023-04-17T00:00:00.000
Scope
The scope includes rehabilitation (repair and upgrade to the maximum extent feasible under Federal ADA 2010 specifications and PROWAG requirements as outlined In the Minimum Design Requirements section of this document) of existing pedestrian ramps In Brooklyn' Community Districts 310, 311, 313, 315, 318, and 356.
Status
Active
HWPR20K2
Project Id: HWPR20K2 • Description: Pedestrian Ramp Rehabilitation - Brooklyn • Client Agency: Transportation
Project Id
HWPR20K2
Description
Pedestrian Ramp Rehabilitation - Brooklyn
Client Agency
Transportation
Division
Infrastructure
Phase
4. Construction
Projected Construction
2023-08-08T00:00:00.000
Scope
The scope includes rehabilitation (repair and upgrade to the maximum extent feasible under Federal ADA 2010 specifications and PROWAG guidelines as outlined In the Minimum Design Requirements section of this document) of existing pedestrian ramps in Brooklyn's Community Districts 307, 312, 314, 317, 318, and 305.
Status
Active
HWPR20K3
Project Id: HWPR20K3 • Description: Pedestrian Ramps Rehabilitation - Brooklyn • Client Agency: Transportation
Project Id
HWPR20K3
Description
Pedestrian Ramps Rehabilitation - Brooklyn
Client Agency
Transportation
Division
Infrastructure
Phase
4. Construction
Projected Construction
2025-04-15T00:00:00.000
Scope
The scope includes rehabilitation (repair and upgrade to the maximum extent feasible under Federal ADA 2010 specifications and PROWAG guidelines as outlined in the Minimum Design Requirements section of this document) of existing pedestrian ramps In Brooklyn's Community Districts 301, 302, 308, 355, 309, 308, 303, and 304.
Status
Active
HWPR20KC
Project Id: HWPR20KC • Description: Complex Upgrades Ped Ramps - Brooklyn • Client Agency: Transportation
Project Id
HWPR20KC
Description
Complex Upgrades Ped Ramps - Brooklyn
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2026-06-05T00:00:00.000
Scope
The scope of this project includes the upgrade of pedestrian ramps at 49 complex corners in the borough of Brooklyn.
Status
Active
HWPR20KMC
Project Id: HWPR20KMC • Description: COMPLEX UPGRADES PED RAMPS - BROOKLYN AND MANHATTAN • Client Agency: Transportation
Project Id
HWPR20KMC
Description
COMPLEX UPGRADES PED RAMPS - BROOKLYN AND MANHATTAN
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2026-03-31T00:00:00.000
Scope
The scope of this project includes the upgrade of pedestrian ramps at 50 complex corners in the boroughs of Manhattan and Brooklyn.
Status
Active
HWPR20MCL
Project Id: HWPR20MCL • Description: COMPLEX UPGRADES PED RAMPS - LANDMARK IN MANHATTAN • Client Agency: Department of Transporation (DOT)
Project Id
HWPR20MCL
Description
COMPLEX UPGRADES PED RAMPS - LANDMARK IN MANHATTAN
Client Agency
Department of Transporation (DOT)
Division
Infrastructure
Phase
2. Design
Projected Construction
2026-02-26T00:00:00.000
Scope
The scope of this project includes the upgrade of pedestrian ramps at 42 complex corners in the borough of Manhattan.
Status
Active
HWPR20MKL
Project Id: HWPR20MKL • Description: COMPLEX UPGRADES PED RAMPS - LANDMARK IN MANHATTAN AND BROOKLYN • Client Agency: Transportation
Project Id
HWPR20MKL
Description
COMPLEX UPGRADES PED RAMPS - LANDMARK IN MANHATTAN AND BROOKLYN
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2026-03-05T00:00:00.000
Scope
The scope of this project includes the upgrade of pedestrian ramps at 41 complex corners in the boroughs of Manhattan and Brooklyn.
Status
Active
HWPR20MKT
Project Id: HWPR20MKT • Description: Complex Upgrades Ped Ramp - TA Manhattan & Brookly • Client Agency: Transportation
Project Id
HWPR20MKT
Description
Complex Upgrades Ped Ramp - TA Manhattan & Brookly
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2026-05-08T00:00:00.000
Scope
The scope of this project includes the upgrade of pedestrian ramps at 39 complex corners in the boroughs of Manhattan and Brooklyn. The list of locations for this contract is attached. All ramps must be designed and constructed to the maximum extent feasible in accordance with the Minimum Design Requirements included in this document. DDC should identify any encroachments prior to design and inform DOT of such findings. Stop controls and types (stop sign or traffic signal) must be clearly indicated at the intersections on the design drawings. This contract shall be established for two years with an option for extension.
Status
Active
HWPR20MQC
Project Id: HWPR20MQC • Description: COMPLEX UPGRADES PED RAMPS - MANHATTAN AND QUEENS • Client Agency: Department of Transporation (DOT)
Project Id
HWPR20MQC
Description
COMPLEX UPGRADES PED RAMPS - MANHATTAN AND QUEENS
Client Agency
Department of Transporation (DOT)
Division
Infrastructure
Phase
2. Design
Projected Construction
2026-08-04T00:00:00.000
Scope
The scope of this project includes the upgrade of pedestrian ramps at 48 complex corners in the boroughs of Manhattan and Queens.
Status
Active
HWPR20MQX
Project Id: HWPR20MQX • Description: COMPLEX UPGRADES PED RAMPS - TA IN MANHATTAN, QUEENS AND THE BRONX • Client Agency: Department of Transporation (DOT)
Project Id
HWPR20MQX
Description
COMPLEX UPGRADES PED RAMPS - TA IN MANHATTAN, QUEENS AND THE BRONX
Client Agency
Department of Transporation (DOT)
Division
Infrastructure
Phase
2. Design
Projected Construction
2026-08-11T00:00:00.000
Scope
The scope of this project includes the upgrade of pedestrian ramps at 39 complex corners in the boroughs of Manhattan, Queens, and the Bronx.
Status
Active
HWPR20MX
Project Id: HWPR20MX • Description: Pedestrian Ramp Rehabilitation - Manhattan and Bro • Client Agency: Transportation
Project Id
HWPR20MX
Description
Pedestrian Ramp Rehabilitation - Manhattan and Bro
Client Agency
Transportation
Division
Infrastructure
Phase
4. Construction
Projected Construction
2023-08-29T00:00:00.000
Scope
The scope includes rehabilitation (repair and upgrade to the maximum extent feasible under Federal ADA 2010 specifications and PROWAG guidelines as outlined in the Minimum Design Requirements section of this document) of existing pedestrian ramps in Manhattan and the Bronx.
Status
Active
HWPR20MXC
Project Id: HWPR20MXC • Description: COMPLEX UPGRADES PED RAMPS - MANHATTAN AND THE BRONX • Client Agency: Department of Transporation (DOT)
Project Id
HWPR20MXC
Description
COMPLEX UPGRADES PED RAMPS - MANHATTAN AND THE BRONX
Client Agency
Department of Transporation (DOT)
Division
Infrastructure
Phase
2. Design
Projected Construction
2026-02-25T00:00:00.000
Scope
The scope of this project includes the upgrade of pedestrian ramps at 50 complex corners in the boroughs of Manhattan and the Bronx.
Status
Active
HWPR20Q2
Project Id: HWPR20Q2 • Description: Pedestrian Ramp Rehabilitation - Queens • Client Agency: Transportation
Project Id
HWPR20Q2
Description
Pedestrian Ramp Rehabilitation - Queens
Client Agency
Transportation
Division
Infrastructure
Phase
4. Construction
Projected Construction
2023-06-13T00:00:00.000
Scope
The scope Includes rehabilitation (repair and upgrade to the maximum extent feasible under Federal ADA 2010 specifications and PROWAG guidelines as outlined In the Minimum Design Requirements section of this document) of existing pedestrian ramps In Queens' Community Districts 408, 412, 413 and 483.
Status
Active
HWPR20Q3
Project Id: HWPR20Q3 • Description: Pedestrian Ramp Rehabilitation - Queens • Client Agency: Transportation
Project Id
HWPR20Q3
Description
Pedestrian Ramp Rehabilitation - Queens
Client Agency
Transportation
Division
Infrastructure
Phase
4. Construction
Projected Construction
2023-08-01T00:00:00.000
Scope
The scope Includes rehabilitation (repair and upgrade to the maximum extent feasible under Federal ADA 2010 specifications and PROWAG guidelines as outlined In the Minimum Design Requirements section of this document) of existing pedestrian ramps In Queens' Community Districts 401, 403, 404, 481, 407, 411 and 480.
Status
Active
HWPR20QC
Project Id: HWPR20QC • Description: Complex Upgrades Ped Ramp - Queens • Client Agency: Transportation
Project Id
HWPR20QC
Description
Complex Upgrades Ped Ramp - Queens
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2026-07-28T00:00:00.000
Scope
The scope of this project includes the upgrade of pedestrian ramps at 47 complex corners in the borough of Queens. The list of locations for this contract is attached. All ramps must be designed and constructed to the maximum extent feasible in accordance with the Minimum Design Requirements included in this document. DDC should identify any encroachments prior to design and inform DOT of such findings. Stop controls and types (stop sign or traffic signal) must be clearly indicated at the intersections on the design drawings. This contract shall be established for two years with an option for extension.
Status
Active
HWPR21K1
Project Id: HWPR21K1 • Description: Simple Upgrades Ped Ramps- Brooklyn • Client Agency: Transportation
Project Id
HWPR21K1
Description
Simple Upgrades Ped Ramps- Brooklyn
Client Agency
Transportation
Division
Infrastructure
Phase
4. Construction
Projected Construction
2024-08-06T00:00:00.000
Scope
The scope of this project includes rehabilitation (repair and upgrade to Federal ADA 2010 specifications to the maximum extent feasible) of existing pedestrian ramps in Brooklyn.
Status
Active
HWPR21KR
Project Id: HWPR21KR • Description: Simple Upgrades Ped Ramps- Brooklyn and Staten Island • Client Agency: Transportation
Project Id
HWPR21KR
Description
Simple Upgrades Ped Ramps- Brooklyn and Staten Island
Client Agency
Transportation
Division
Infrastructure
Phase
4. Construction
Projected Construction
2024-07-27T00:00:00.000
Scope
The scope of this project includes rehabilitation (repair and upgrade to Federal ADA 2010 specifications to the maximum extent feasible) of existing pedestrian ramps in Brooklyn and Staten Island.
Status
Active
HWPR21KRC
Project Id: HWPR21KRC • Client Agency: Transportation • Division: Infrastructure
Project Id
HWPR21KRC
Description
Upgrading of pedestrian ramps at 51 non standard locations in Brooklyn and Staten Island.
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2026-10-12T00:00:00.000
Scope
Upgrading of pedestrian ramps at non-standard locations, Boroughs of Brooklyn and Staten Island.
Status
Active
HWPR21LMT
Project Id: HWPR21LMT • Description: Upgrading pedestrian ramps at 52 non-standard landmarked locations in Manhattan. • Client Agency: Transportation
Project Id
HWPR21LMT
Description
Upgrading pedestrian ramps at 52 non-standard landmarked locations in Manhattan.
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2027-05-31T00:00:00.000
Scope
Upgrading of non-standard pedestrian ramps in Manhattan.
Status
Active
HWPR21MQ
Project Id: HWPR21MQ • Description: Simple Upgrades Ped Ramps- Manhattan and Queens • Client Agency: Transportation
Project Id
HWPR21MQ
Description
Simple Upgrades Ped Ramps- Manhattan and Queens
Client Agency
Transportation
Division
Infrastructure
Phase
4. Construction
Projected Construction
2024-08-06T00:00:00.000
Scope
The scope of this project includes rehabilitation (repair and upgrade to Federal ADA 2010 specifications to the maximum extent feasible) of existing pedestrian ramps in Manhattan and Queens
Status
Active
HWPR21MTA
Project Id: HWPR21MTA • Description: Upgrading pedestrian ramps at 61 non-standard locations in Manhattan. • Client Agency: Transportation
Project Id
HWPR21MTA
Description
Upgrading pedestrian ramps at 61 non-standard locations in Manhattan.
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2027-09-27T00:00:00.000
Scope
Upgrading of pedestrian ramps at 61 locations.
Status
Active