Housing & Development Department of Design and Construction (DDC) Dataset 3ss8-m844 8 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
HWPR21LMT
Project Id: HWPR21LMT • Description: Upgrading pedestrian ramps at 52 non-standard landmarked locations in Manhattan. • Client Agency: Transportation
Project Id
HWPR21LMT
Description
Upgrading pedestrian ramps at 52 non-standard landmarked locations in Manhattan.
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2027-05-31T00:00:00.000
Scope
Upgrading of non-standard pedestrian ramps in Manhattan.
Status
Active
HWPR21MQ
Project Id: HWPR21MQ • Description: Simple Upgrades Ped Ramps- Manhattan and Queens • Client Agency: Transportation
Project Id
HWPR21MQ
Description
Simple Upgrades Ped Ramps- Manhattan and Queens
Client Agency
Transportation
Division
Infrastructure
Phase
4. Construction
Projected Construction
2024-08-06T00:00:00.000
Scope
The scope of this project includes rehabilitation (repair and upgrade to Federal ADA 2010 specifications to the maximum extent feasible) of existing pedestrian ramps in Manhattan and Queens
Status
Active
HWPR21Q1
Project Id: HWPR21Q1 • Description: Simple Upgrades Ped Ramps- Queens • Client Agency: Transportation
Project Id
HWPR21Q1
Description
Simple Upgrades Ped Ramps- Queens
Client Agency
Transportation
Division
Infrastructure
Phase
4. Construction
Projected Construction
2024-08-06T00:00:00.000
Scope
The scope of this project includes rehabilitation (repair and upgrade to Federal ADA 2010 specifications to the maximum extent feasible) of existing pedestrian ramps in Queens.
Status
Active
HWPR21QC
Project Id: HWPR21QC • Description: Upgrading of pedestrian ramps at 51 non-standard locations in Queens. • Client Agency: Transportation
Project Id
HWPR21QC
Description
Upgrading of pedestrian ramps at 51 non-standard locations in Queens.
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2027-09-14T00:00:00.000
Scope
Upgrading of 51 pedestrian ramps in Queens.
Status
Active
HWPR21QX
Project Id: HWPR21QX • Description: Simple Upgrades Ped Ramps- Queens and the Bronx • Client Agency: Transportation
Project Id
HWPR21QX
Description
Simple Upgrades Ped Ramps- Queens and the Bronx
Client Agency
Transportation
Division
Infrastructure
Phase
4. Construction
Projected Construction
2024-08-13T00:00:00.000
Scope
The scope of this project includes rehabilitation (repair and upgrade to Federal ADA 2010 specifications to the maximum extent feasible) of existing pedestrian ramps in Queens and the Bronx.
Status
Active
HWPR21XC
Project Id: HWPR21XC • Description: Upgrades of pedestrian ramps at 51 non-standard locations in the Bronx. • Client Agency: Transportation
Project Id
HWPR21XC
Description
Upgrades of pedestrian ramps at 51 non-standard locations in the Bronx.
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2027-03-23T00:00:00.000
Scope
Upgrading of pedestrian ramps at 51 locations.
Status
Active
HWPR22K1
Project Id: HWPR22K1 • Description: Simple Upgrades Ped Ramps- Brooklyn • Client Agency: Transportation
Project Id
HWPR22K1
Description
Simple Upgrades Ped Ramps- Brooklyn
Client Agency
Transportation
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2025-05-18T00:00:00.000
Scope
The scope of this project includes rehabilitation (repair and upgrade to Federal ADA 2010 specifications to the maximum extent feasible) of existing pedestrian ramps in Brooklyn.
Status
Active
HWPR22KR
Project Id: HWPR22KR • Description: Simple Upgrades Ped Ramps- Brooklyn and Staten Island • Client Agency: Transportation
Project Id
HWPR22KR
Description
Simple Upgrades Ped Ramps- Brooklyn and Staten Island
Client Agency
Transportation
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2025-11-07T00:00:00.000
Scope
The scope of this project includes rehabilitation (repair and upgrade to Federal ADA 2010 specifications to the maximum extent feasible) of existing pedestrian ramps in Brooklyn and Staten Island.
Status
Active
HWPR22MQ
Project Id: HWPR22MQ • Description: Simple Upgrades Ped Ramps- Manhattan and Queens • Client Agency: Transportation
Project Id
HWPR22MQ
Description
Simple Upgrades Ped Ramps- Manhattan and Queens
Client Agency
Transportation
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2025-08-24T00:00:00.000
Scope
The scope of this project includes rehabilitation (repair and upgrade to Federal ADA 2010 specifications to the maximum extent feasible) of existing pedestrian ramps in Manhattan and Queens.
Status
Active
HWPR22Q1
Project Id: HWPR22Q1 • Description: Rehabilitation of Standard Ped Ramps- Queens • Client Agency: Transportation
Project Id
HWPR22Q1
Description
Rehabilitation of Standard Ped Ramps- Queens
Client Agency
Transportation
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2025-05-13T00:00:00.000
Scope
The scope of this project includes rehabilitation (repair and upgrade to Federal ADA 2010 specifications & PROWAG guidelines to the maximum extent feasible) of existing pedestrian ramps in Queens.
Status
Active
HWPR22QX
Project Id: HWPR22QX • Description: Simple Upgrades Ped Ramps- Queens and the Bronx • Client Agency: Transportation
Project Id
HWPR22QX
Description
Simple Upgrades Ped Ramps- Queens and the Bronx
Client Agency
Transportation
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2025-09-02T00:00:00.000
Scope
The scope of this project includes rehabilitation (repair and upgrade to Federal ADA 2010 specifications to the maximum extent feasible) of existing pedestrian ramps in Queens and Bronx.
Status
Active
HWPR23K1
Project Id: HWPR23K1 • Description: Simple Upgrades Ped Ramps - Brooklyn • Client Agency: Transportation
Project Id
HWPR23K1
Description
Simple Upgrades Ped Ramps - Brooklyn
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2026-06-17T00:00:00.000
Scope
The scope of this project includes rehabilitation (repair and upgrade to Federal ADA 2010 and PROWAG specifications) of existing pedestrian ramps in Brooklyn.
Status
Active
HWPR23KQ
Project Id: HWPR23KQ • Description: Simple Upgrades Ped Ramps - Brooklyn and Queens • Client Agency: Transportation
Project Id
HWPR23KQ
Description
Simple Upgrades Ped Ramps - Brooklyn and Queens
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2026-02-04T00:00:00.000
Scope
The scope of this project includes rehabilitation (repair and upgrade to Federal ADA 2010 and PROWAG specifications) of existing pedestrian ramps in Brooklyn.
Status
Active
HWPR23KR
Project Id: HWPR23KR • Description: Simple Upgrades Ped Ramps - Brooklyn and Staten Island • Client Agency: Transportation
Project Id
HWPR23KR
Description
Simple Upgrades Ped Ramps - Brooklyn and Staten Island
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2026-06-30T00:00:00.000
Scope
The scope of this project includes rehabilitation (repair and upgrade to Federal ADA 2010 and PROWAG specifications) of existing pedestrian ramps in Brooklyn.
Status
Active
HWPR23MQ
Project Id: HWPR23MQ • Description: Simple Upgrades Ped Ramps - Manhattan and Queens • Client Agency: Transportation
Project Id
HWPR23MQ
Description
Simple Upgrades Ped Ramps - Manhattan and Queens
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2026-06-29T00:00:00.000
Scope
The scope of this project includes rehabilitation (repair and upgrade to Federal ADA 2010 and PROWAG specifications) of existing pedestrian ramps in Brooklyn.
Status
Active
HWPR23Q1
Project Id: HWPR23Q1 • Description: Simple Upgrades Ped Ramps - Queens • Client Agency: Transportation
Project Id
HWPR23Q1
Description
Simple Upgrades Ped Ramps - Queens
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2026-06-20T00:00:00.000
Scope
The scope of this project includes rehabilitation (repair and upgrade to Federal ADA 2010 and PROWAG specifications) of existing pedestrian ramps in Queens.
Status
Active
HWPR23QX
Project Id: HWPR23QX • Description: Simple Upgrades Ped Ramps - Queens and the Bronx • Client Agency: Transportation
Project Id
HWPR23QX
Description
Simple Upgrades Ped Ramps - Queens and the Bronx
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2026-07-14T00:00:00.000
Scope
The scope of this project includes rehabilitation (repair and upgrade to Federal ADA 2010 and PROWAG specifications) of existing pedestrian ramps in Brooklyn.
Status
Active
HWQ100SBB
Project Id: HWQ100SBB • Description: Woodhaven Blvd SBS Phase B • Client Agency: Transportation
Project Id
HWQ100SBB
Description
Woodhaven Blvd SBS Phase B
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2028-05-08T00:00:00.000
Scope
HWQ100SBB, Woodhaven Blvd – SBS – Phase B, calls for capital improvements along Woodhaven Blvd between Union Turnpike and 107th Avenue in the borough of Queens.These improvements include but are not limited to median widening, building out neck downs, normalizing intersections and other features to increase safety and support the Woodhaven SBS.
Status
Active
HWQ1182B
Project Id: HWQ1182B • Description: BROAD CHANNEL BULKHEADS - PH II • Client Agency: Transportation
Project Id
HWQ1182B
Description
BROAD CHANNEL BULKHEADS - PH II
Client Agency
Transportation
Division
Infrastructure
Phase
4. Construction
Projected Construction
2024-06-14T00:00:00.000
Scope
BROAD CHANNEL STREET AND BULKHEADS RECONSTRUCTION - PHASE 2
Status
Active
HWQ1187
Project Id: HWQ1187 • Description: WESTBOURNE - DUNBAR ROADWAYS/BULKHEADS, QNS • Client Agency: Transportation
Project Id
HWQ1187
Description
WESTBOURNE - DUNBAR ROADWAYS/BULKHEADS, QNS
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2030-09-12T00:00:00.000
Scope
RECONSTRUCTION OF WESTBOURNE - DUNBAR ROADWAYS/BULKHEADS, QUEENS
Status
Active
HWQ1190A
Project Id: HWQ1190A • Description: RECONSTRUCTION OF QUEENS BLVD - PHASE 1 • Client Agency: Transportation
Project Id
HWQ1190A
Description
RECONSTRUCTION OF QUEENS BLVD - PHASE 1
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2028-08-31T00:00:00.000
Scope
Vision Zero - Queens Boulevard - Segment 1: Roosevelt Avenue to 73rd Street. Variety of safety and streetscape improvements including partial street reconstruction and resurfacing to address roadway conditions
Status
Active
HWQ1190B
Project Id: HWQ1190B • Description: RECONSTRUCTION OF QUEENS BLVD - PHASE 2 • Client Agency: Transportation
Project Id
HWQ1190B
Description
RECONSTRUCTION OF QUEENS BLVD - PHASE 2
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2030-08-31T00:00:00.000
Scope
Vision Zero - Queens Boulevard - Segment 2: 73rd Street to Eliot Avenue. Variety of safety and streetscape improvements including partial street reconstruction and resurfacing to address roadway conditions
Status
Active
HWQ1190-C
Project Id: HWQ1190-C • Description: RECONSTRUCTION OF QUEENS BLVD - PHASE 3 • Client Agency: Transportation
Project Id
HWQ1190-C
Description
RECONSTRUCTION OF QUEENS BLVD - PHASE 3
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2032-08-30T00:00:00.000
Scope
Vision Zero - Queens Boulevard - Segment 3: Eliot Avenue to Yellowstone Boulevard. Variety of safety and streetscape improvements including partial street reconstruction and resurfacing to address roadway conditions.
Status
Active
HWQ1193
Project Id: HWQ1193 • Description: UNION TURNPIKE CENTER MEDIAN REPLACEMENT • Client Agency: Transportation
Project Id
HWQ1193
Description
UNION TURNPIKE CENTER MEDIAN REPLACEMENT
Client Agency
Transportation
Division
Infrastructure
Phase
4. Construction
Projected Construction
2024-08-20T00:00:00.000
Scope
Union Turnpike Center Median Replacement from Hollis Court Blvd to 226th Street, Borough of Queens
Status
Active
HWR100PAD
Project Id: HWR100PAD • Description: HYLAN BLVD SBS BUS PADS • Client Agency: Transportation
Project Id
HWR100PAD
Description
HYLAN BLVD SBS BUS PADS
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2017-11-20T00:00:00.000
Scope
HYLAN BOULEVARD BUS PADS FOR SELECT BUS SERVICES
Status
Active
LNCAL15CC
Project Id: LNCAL15CC • Description: Countee Cullen Exterior Rehabiliation • Client Agency: Libraries-NYPL
Project Id
LNCAL15CC
Description
Countee Cullen Exterior Rehabiliation
Client Agency
Libraries-NYPL
Division
Public Buildings
Phase
4. Construction
Projected Construction
2024-01-02T00:00:00.000
Scope
Countee Cullen Branch Exterior Rehabilitation
Status
Active
HWQ1198
Project Id: HWQ1198 • Description: Reconstruction of Beach Channel Drive -- Phase B • Client Agency: Transportation
Project Id
HWQ1198
Description
Reconstruction of Beach Channel Drive -- Phase B
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2029-09-13T00:00:00.000
Scope
Beach Channel Drive from Beach 145th Street to Beach 124th Street:
Full street reconstruction and addition of a grade separated bike path

Beach Channel Drive from Beach 116th Street to Beach 108th Street:
Full street reconstruction and addition of a grade separated bike path

Beach Channel Drive from Beach 123rd Street to Beach 116th Street:
This project will only construct a grade separated bike within these limits, which are on DPR and SBS property. These segments will undergo full curb to curb reconstruction as part of SANDHW11.
Status
Active
HWQ1201
Project Id: HWQ1201 • Description: Astoria Boulevard Safety Improvements • Client Agency: Transportation
Project Id
HWQ1201
Description
Astoria Boulevard Safety Improvements
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2028-08-08T00:00:00.000
Scope
This project will enhance pedestrian safety and improve pedestrian circulation by constructing curb extensions, bus bulbs, missing sidewalks, and median tip extensions along Astoria Boulevard, as well as create left turn bays and crosswalks. These interventions will increase pedestrian safety, reduce conflicts between pedestrians, cars, and bikes, and improve pedestrian circulation. In addition, the capital improvements will build on the successes of the operational improvements DOT implemented within these project limits in 2016.

The interventions listed below, when implemented together, will make meaningful strides towards permanent safety enhancements along this dangerous corridor in Queens. Please refer to the Context Map (pg. 9) for location references:

LOCATION A
• 82nd Street and Astoria Boulevard
o Create a new left turnbay in addition to median tip and curb extensions
o Install complex pedestrian ramp at NE corner of 82nd St and Astoria Blvd
o Add bus bulb on SW corner
• 83rd Ave and Astoria Boulevard
o Build out of channelized area at 24th Ave
o Add neckdown on 83rd St/24th Ave

LOCATION B
• 88th Street and Astoria Boulevard
o Close slip lane, expand sidewalk, add crosswalks
o Median tip extension on Astoria Blvd and 88th St
• 89th Street and Astoria Boulevard
o Add bus bulb on south side of Astoria Blvd between 88th and 89th Streets
o Add crosswalk at 25th avenue and at 89th Street
• 90th Place and Astoria Boulevard
o Construct missing sidewalk and install missing crosswalk
• 90th Place and 25th Ave
o Install missing crosswalk
o Possible reconstruction of sloping sidewalk at closed slip on 25th Ave in order to provide ADA
accessibility (dependent on survey)

LOCATION C
• 102nd Street and 29th Avenue
o Widen median to ADA compliance
o Construct two curb extensions on the northern side of the intersection
o Add two curb extensions at Astoria Blvd and Humphreys Street
Status
Active
HWQ1205
Project Id: HWQ1205 • Description: Belt Parkway Barrier Reconstruction at Sunrise Highway • Client Agency: Transportation
Project Id
HWQ1205
Description
Belt Parkway Barrier Reconstruction at Sunrise Highway
Client Agency
Transportation
Division
Infrastructure
Phase
1. Initiation
Projected Construction
2027-02-08T00:00:00.000
Scope
Project Area & Site Context:
The project area is located on Belt Parkway immediately southwest of Sunrise Highway, approximately three miles east of the Van Wyck Expressway and roughly 3,200 feet west of the City line. The project area’s eastern extent is the Sunrise Highway overpass. The project area then runs approximately 470 feet west along the Belt Parkway median to the end of the displaced barriers, which marks the western extent of the project limits.

The eastbound Belt Parkway carries three lanes of traffic at this location, ultimately passing under bridges carrying the Sunrise Highway (i.e., the eastern project extent), the Long Island Rail Road Atlantic Branch, and North Conduit Avenue. In the westbound direction, the parkway carries four lanes of traffic that temporarily split into two divided thoroughfares as a result of these bridges' piers. This pair of two-lane westbound thoroughfares converges on the north side of the project area, and continue as a four-lane expressway.

Throughout the project limits, the Belt Parkway’s eastbound traffic is carried at a higher elevation than the westbound traffic. As a result of this grade separation between the east- and westbound
roadways, the existing barrier system was constructed as back-to-back half section barriers (as seen in the image to the right), but without either continuity plates or backup posts. Over time this back-to-back half section barrier system has become displaced, creating a hazard for parkway traffic moving in both directions.

2018 HDR Study – Existing Conditions & Recommendations:
In 2018, DOT contracted with Henningson, Durham and Richardson, Engineers & Architects (HDR) to investigate three city-owned expressway barriers known to be substandard condition – including the Belt Parkway barrier at Sunrise Highway – and to prepare a feasibility study for future capital improvements.

HDR’s geotechnical investigation of the Belt Parkway site determined that the barrier’s horizontal displacement is not likely the result of ground settlement, as previously hypothesized. The consultant identified several possible alternative causes of this displacement, among them: routine vehicle strikes (as evidenced by the numerous paint streaks observed on the existing jersey barriers), ground-borne vibration, the project area’s gentle sloping grade, and the median barrier lacking an anchor to the pavement.

As a solution, HDR has recommended construction of new concrete median barriers with L-shaped deep foundations to prevent future displacement. The consultant’s recommended alternative will maintain structural support of the new barrier, stay stable after vehicular strikes, and eliminate the localized tilting observed in the current half section barrier system.

The full 2018 HDR report is included in this document’s Appendix, Attachment 6.

Project Scope:

Install New Concrete Median Barrier with Deep Foundation
Consistent with HDR’s recommended alternative, this project will remove the existing half section barrier system on Belt Parkway and construct a single, reinforced cast-in-place barrier system with an L-shaped deep foundation running the 470-foot length of the project area. The deep foundation median barrier will have a similar section to the NYSDOT Standard Sheet 606-14, Concrete Median Barrier, but will need to be designed to a heights appropriate for the grade separation between the east- and westbound Belt Parkway roadways (as reflected in HDR’s Conceptual Design, Attachment 4).

As this state of good repair project is focused solely on the deteriorated condition of the half-section barrier system, the project scope does not include any curbline changes, roadway reconstruction (beyond that required to construct the new barrier), or resurfacing of the adjacent parkway.

HDR provided a preliminary cost estimate for the barrier replacement as a part of their 2018 deliverable, which serves as the basis for the cost estimate included in this document (Attachment 5).

Light Poles:
The project area contains three light poles sited within the existing barrier system, the foundations for which will need to be integrated into the redesigned barrier to maintain appropriate lighting conditions along this segment of the Belt Parkway. HDR has prepared a conceptual design for these light fixture foundations, which is also included in this document’s Conceptual Design section, Attachment 4. All impacts to the existing lighting system will require coordination with DOT Street Lighting, as discussed in greater detail within the Other Comments/Issues section of this document (see page 5).

Barrier Transition:
At the western extent of the project area, approximately 470 feet southwest of the Sunrise Highway overpass, the east- and westbound expressways reach approximately the same grade and the half-section barrier system transitions to a standard jersey barrier system. DOT anticipates that the new transition piece will also need to be constructed
Status
Active
HWQ121B3
Project Id: HWQ121B3 • Description: RECONSTRUCTION OF SOUTH JAMAICA AREA (SEQ200562) • Client Agency: Transportation
Project Id
HWQ121B3
Description
RECONSTRUCTION OF SOUTH JAMAICA AREA (SEQ200562)
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2026-08-27T00:00:00.000
Scope
Project Limit/ location stage1:
Reconstruction of the following streets:
- 115 Rd. b/n 157th Street and Bedell Street;
- 116 Ave. b/n 157th Street and Bedell Street;
- Meyer Ave b/n 157th Street and Bedell Street;
- 158 St. b/n 116th Ave. and DE N/O 111 th Ave.;
- 159 St b/n 116th Ave. and 111th Ave.;
- Beddell St. b/n 116th Ave. and Meyer Ave. - SEQ200332

Project Limit/ location stage2:
- 113 Ave. b/n Sutphin Blvd. and 155th St.;
- 122th Ave. b/n Sutphin Blvd. and 155th St.;
- 111th Rd. b/n Sutphin Blvd. and 155th St.;
111th Ave. b/n Sutphin Blvd. and 155th St.;
- 110 Rd. b/n Sutphin Blvd. and 155th St.;
- 109th Rd. b/n Sutphin Blvd. and 155th St.;
- 109th Drive b/n Sutphin Blvd. and 155th St.;
- 109 Ave. b/n Sutphin Blvd. and 155th St.;
- 153rd Street b/n 112th Ave. and DE N/O 109 Ave.;
- 155th Street b/n Linden Blvd. and 114th Rd.
Status
Active
HWQ121B4
Project Id: HWQ121B4 • Description: RECONSTRUCTION OF SOUTH JAMAICA AREA (SEQ200436) • Client Agency: Transportation
Project Id
HWQ121B4
Description
RECONSTRUCTION OF SOUTH JAMAICA AREA (SEQ200436)
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2018-05-31T00:00:00.000
Scope
Project Limit/ locations:
Reconstruction of the following streets:
-118th Ave. from Long Street to Lakeview Blvd. East
- 122 Ave. from Lakeview Lane to Lakeview Blvd. East
- Lakeview Blvd. East from 118th Ave. to 122nd Ave.
- Lakeview Lane from 122nd Ave. to Baisley Blvd.
Storm Sewer (Extension.) with BMP:
- 164 Street from 119th Ave to 120th e
- 119 Ave. from Long Street to 164th Street
- 122 Ave. from Lakeview Lane to Lakeview Blvd. East
- Lakeview Blvd. East from 118th Ave. to 122nd Ave.
- Lakeview Lane from 122nd Ave. to Baisley Blvd.
- 119th Rd. between 180th St. and 178th Pl. - canselled

Sanitary Sewer (Replacement)
- Lakeview Blvd. East from 118th Rd to 119 Rd.
- 122 Ave. from Lakeview Lane to Lakeview Blvd. East
- 119th Rd. between 180th St. and 178th Pl. -
- 119 Ave. from Long Street to Guy Brewer Blvd.
- - 164 Street from 119th Ave to 120th Ave

Water Main Work:
- 118 Ave. between Lakeview Blvd. East and Long St.
- Lakeview Blvd. East from 118th Ave. to 122nd Ave.
Status
Active
HWQ274F2
Project Id: HWQ274F2 • Description: RECONSTRUCTION OF ROSEDALE AREA, PHASE 2 • Client Agency: Transportation
Project Id
HWQ274F2
Description
RECONSTRUCTION OF ROSEDALE AREA, PHASE 2
Client Agency
Transportation
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2027-03-02T00:00:00.000
Scope
RECONSTRUCTION OF STREETS IN ROSEDALE AREA - PHASE 2
Status
Active
HWQ724B
Project Id: HWQ724B • Description: Brookville Blvd and Edgewood Triangle (SEQ200519) • Client Agency: Transportation
Project Id
HWQ724B
Description
Brookville Blvd and Edgewood Triangle (SEQ200519)
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2029-06-05T00:00:00.000
Scope
Project Limit / locations:

Reconstruction of Streets - Brookville Boulevard Area

1. Bentley Road between 235th Street and Brookville Boulevard.
2. Brookville Boulevard between Newhall Avenue and Dead-End south of 149th Avenue.
3. Edgewood Street between 147th Avenue and Brookville Boulevard.
4. 146th Avenue between Brookville Boulevard and Edgewood Street.
5. 147th Avenue between 230th Place & 200' east of Edgewood Street.
6. 147th Drive between 235th Street and Brookville Boulevard to 241st Street.
7. 147th Road between 235th Street and Brookville Blvd. to 241st Street.
8. 148th Avenue between 235th Street and Brookville Boulevard to 241st Street.
9. 148th Drive between 235th Street and Brookville Boulevard to 241st Street.
10. 148th Road between 235th Street and Brookville Boulevard to 241st Street.
11. 149th Avenue between Brookville Boulevard and 241st Street.
12. 235th Street between 147th Avenue and 148th Avenue.
13. 235th Street between Bentley Rd. and DE SO Bentley Rd.
14. 236th Street between Bentley Road and 148th Drive.
15. 240th Street between 147th Avenue and 147th Road.
16. 232nd Street between 147th Ave. and Dead End.
17. 231st Street between 145th Ave. and 146th Ave.
18. 231st Street between 148th Ave. & Dead End.
19. 148th Ave. between 231st Street and Brookville Park
Status
Active
HWQ787B3
Project Id: HWQ787B3 • Description: SUTTER AVE, ETC - PHASE V (B3) • Client Agency: Transportation
Project Id
HWQ787B3
Description
SUTTER AVE, ETC - PHASE V (B3)
Client Agency
Transportation
Division
Infrastructure
Phase
3. Construction Procurement
Projected Construction
2031-03-17T00:00:00.000
Scope
142nd Street from 135th Avenue to North Conduit Avenue
Status
Active
HWQ788CS
Project Id: HWQ788CS • Description: Court Square Pedestrian Improvements • Client Agency: Transportation
Project Id
HWQ788CS
Description
Court Square Pedestrian Improvements
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2028-04-19T00:00:00.000
Scope
This project will modernize the local street network in this dynamic outer-borough growth center to better meet the needs of its expanding residential population and workforce. The project scope is distributed across the following four sites in the vicinity of Court Square:

A. Court Square West from Jackson Avenue to midblock (Construction of a shared street)
B. Thomson Avenue from 44th Drive to Jackson Avenue (Full reconstruction, including additional public space on both the east and west sidewalks, and a raised crosswalk at the intersection with Court Square East)
C. Pearson Street at Jackson Avenue (New pedestrian crossing and new curb extension for receiving ramp)
D. Jackson Avenue from Court Square West to Thomson Avenue (Sidewalk reconstruction using standard materials, to eliminate the distinctive pavers along north side of Court Square Park).
Status
Active
HWR00508
Project Id: HWR00508 • Description: AMBOY ROAD IMPROVEMENTS AT ELTINGVILLE CORRIDOR • Client Agency: Transportation
Project Id
HWR00508
Description
AMBOY ROAD IMPROVEMENTS AT ELTINGVILLE CORRIDOR
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2026-09-19T00:00:00.000
Scope
Roadway widening and related work on Amboy Road between Richmond Ave. and Armstrong Ave., Borough of Staten Island
Status
Active
HWR00511
Project Id: HWR00511 • Description: TRAVIS AVENUE WIDENING • Client Agency: Transportation
Project Id
HWR00511
Description
TRAVIS AVENUE WIDENING
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2029-12-28T00:00:00.000
Scope
TRAVIS AVENUE WIDENING
Status
Active
HWR00512
Project Id: HWR00512 • Description: RICHMOND VALLEY ROAD, SI • Client Agency: Transportation
Project Id
HWR00512
Description
RICHMOND VALLEY ROAD, SI
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2025-12-26T00:00:00.000
Scope
RECONSTRUCTION OF RICHMOND VALLEY ROAD, SI
Status
Active
HWR1132B
Project Id: HWR1132B • Description: Reconstruction of South Beach Area (SE-793) • Client Agency: Trans. & Env. Protection
Project Id
HWR1132B
Description
Reconstruction of South Beach Area (SE-793)
Client Agency
Trans. & Env. Protection
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2020-10-30T00:00:00.000
Scope
Reconstruction of the following streets in South Beach area, including street grading, installation of new storm sewers and the replacement of existing sanitary sewers and water mains as required.
1- McClean Ave b/t Norway Ave & Hickory Ave.
2- Foch Ave. b/t Norway Ave & Hickory Ave.
3- Olympia Blvd. b/t Quintard St.& Hickory Ave.
4- Cameron Ave b/t Norway Ave & Quintard Street.
5- Scott Ave b/t Norway Ave & Quintard Street
6- Appleby Ave b/t Norway Ave & Quintard Street.
7- Nugent Ave b/t Norway Ave & Quintard St. 8- Norway Ave b/t McClean Ave & Olympia Blvd.
9- Mallory Ave b/t McClean Ave & Olympia Blvd.
10- Lamport Blvd b/t McClean Ave & Olympia Blvd.
11- Kensington Ave b/t McClean Ave & Olympia Blvd.
12- Jerome Ave b/t McClean Ave & Olympia Blvd.
13- Bionia Ave b/t McClean Ave & Olympia Blvd.
14- Vulcan St. b/t Nugent Ave & Olympia Blvd.
15- Winfield St. b/t Nugent Ave & Olympia Blvd.
16. Patterson b/t Quintard Street & Vulcan Street.
Status
Active
HWR1140A
Project Id: HWR1140A • Description: Reconstruction of Arthur Kill Road, Phase I • Client Agency: Transportation
Project Id
HWR1140A
Description
Reconstruction of Arthur Kill Road, Phase I
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2028-06-30T00:00:00.000
Scope
HWR1140A: Reconstruction of Arthur Kill Rd from Clark Avenue to Richmond Avenue including widening of roadway
Status
Active
HWR669C
Project Id: HWR669C • Description: ROMA & HETT AVENUE, STATEN IS (W/SE-413A/SE-414A) • Client Agency: Trans. & Env. Protection
Project Id
HWR669C
Description
ROMA & HETT AVENUE, STATEN IS (W/SE-413A/SE-414A)
Client Agency
Trans. & Env. Protection
Division
Infrastructure
Phase
4. Construction
Projected Construction
2023-12-22T00:00:00.000
Scope
Installation of Storm, Sanitary Sewers in the following Streets:
=================================
1- Cedar Grove Avenue between Ebbitts Street and new Dorp Lane.
2- Milton Avenue between Ebbitts Street and new Dorp Lane.
3- Finley Avenue between Ebbitts Street and new Dorp Lane.
4- Roma Avenue between Ebbitts Street and new Dorp Lane.
5- Hett Avenue between Ebbitts Street and new Dorp Lane.
6- Marine Way between Cedar Grove and Milton Avenue
7- Beacon Avenue between Roma Avenue and Milton Avenue.
8- Dustan Avenue between Marine way and Milton Avenue.
9- Garibaldi Avenue between Roma Avenue and Cedar Grove Avenue.
10- Cedar Grove Court between Cedar Grove Avenue and Dustan Street.
11- Topping Street between Cedar Grove Avenue and Dustan Street.
12- Center Way between Cedar Grove Avenue and Dustan Street.
13- Neptune Street between Cedar Grove Avenue and Dustan Street.
14- Seafoam Street between Cedar Grove Avenue and Dustan Street.
15- Waterside Street between Cedar Grove Avenue and Dustan Street.
16- Maple Terrace between Cedar Grove Avenue and Dustan Street.
17- Herman Street between Cedar Grove Avenue and Dustan Street.
18- Neutral Avenue between Cedar Grove Avenue and Dustan Street.
19- Milbank Drive between Cedar Grove Avenue and Dustan Street.
Status
Active
HWR700
Project Id: HWR700 • Description: Richmond Terrace-Bay Street Safety Improvements • Client Agency: Transportation
Project Id
HWR700
Description
Richmond Terrace-Bay Street Safety Improvements
Client Agency
Transportation
Division
Infrastructure
Phase
2. Design
Projected Construction
2028-06-29T00:00:00.000
Scope
Safety through reconstruction of the roadway, planted median, curb/sidewalk extensions, construction of raised bike paths on Bay Street/ Stuyvesant Place at Barrett Triangle and reconstruction of the bus pad on Bay Street by Barrett Triangle. It will also relocate traffic signals and light poles to enable extended sidewalks as needed
Status
Active
HWR703
Project Id: HWR703 • Description: BAY STREET AREA SAFETY IMPROVEMENT • Client Agency: Transportation
Project Id
HWR703
Description
BAY STREET AREA SAFETY IMPROVEMENT
Client Agency
Transportation
Division
Infrastructure
Phase
1. Initiation
Projected Construction
2027-12-15T00:00:00.000
Scope
In 2016, EDC in collaboration with DCP and the other City agencies released the North Shore Transportation
Improvement Strategy report with recommendations for transportation improvements in the neighborhoods.
This project will enhance pedestrian safety through safety and streetscape improvements to the medians and/or sidewalks and crosswalks around some of the congested intersections (listed above) within Vision Zero Priority Area of Bay Street area corridor.

The project scope of work includes median extensions, street trees (where feasible),
sidewalks/curbs extensions, crossing distance(s) reductions and Wayfinding signs
installations within expanded sidewalks.
Status
Active
HWRF05R
Project Id: HWRF05R • Description: Replacement of roof , sprinkler & related repairs • Client Agency: Transportation
Project Id
HWRF05R
Description
Replacement of roof , sprinkler & related repairs
Client Agency
Transportation
Division
Public Buildings
Phase
2. Design
Projected Construction
2025-03-03T00:00:00.000
Scope
Roof replacement and related repairs caused by water damage. Replace wet sprinkler system with dry system.
Status
Active
HWS17CW1
Project Id: HWS17CW1 • Description: PRIOR NOTICE SIDEWALKS FY17 - CITYWIDE (BK & QU) • Client Agency: Transportation
Project Id
HWS17CW1
Description
PRIOR NOTICE SIDEWALKS FY17 - CITYWIDE (BK & QU)
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2019-09-21T00:00:00.000
Scope
PRIOR NOTICE SIDEWALKS FY17 - CITYWIDE (BK & QU)
Status
Active
HWS2014CW
Project Id: HWS2014CW • Description: PRIOR NOTICE SIDEWALKS - CITYWIDE • Client Agency: Transportation
Project Id
HWS2014CW
Description
PRIOR NOTICE SIDEWALKS - CITYWIDE
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2016-06-13T00:00:00.000
Scope
Replacement of Sidewalks that Have Violations and for Which Property Owners Have Received Prior Notice, Citywide
Status
Active
HWS2015M
Project Id: HWS2015M • Description: PRIOR NOTICE SIDEWALKS - MANHATTAN • Client Agency: Transportation
Project Id
HWS2015M
Description
PRIOR NOTICE SIDEWALKS - MANHATTAN
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2016-06-27T00:00:00.000
Scope
PRIOR NOTICE SIDEWALKS - MANHATTAN
Status
Active
HWS2016K1
Project Id: HWS2016K1 • Description: PRIOR NOTICE SIDEWALKS - BROOKLYN • Client Agency: Transportation
Project Id
HWS2016K1
Description
PRIOR NOTICE SIDEWALKS - BROOKLYN
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2021-05-13T00:00:00.000
Scope
PRIOR NOTICE SIDEWALKS - BROOKLYN
Status
Active
HWS2016K2
Project Id: HWS2016K2 • Description: PRIOR NOTICE SIDEWALKS - BROOKLYN • Client Agency: Transportation
Project Id
HWS2016K2
Description
PRIOR NOTICE SIDEWALKS - BROOKLYN
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2021-06-03T00:00:00.000
Scope
PRIOR NOTICE SIDEWALKS - BROOKLYN
Status
Active
HWS2016M
Project Id: HWS2016M • Description: PRIOR NOTICE SIDEWALKS - MANHATTAN • Client Agency: Transportation
Project Id
HWS2016M
Description
PRIOR NOTICE SIDEWALKS - MANHATTAN
Client Agency
Transportation
Division
Infrastructure
Phase
5. Close-Out
Projected Construction
2019-03-08T00:00:00.000
Scope
PRIOR NOTICE SIDEWALKS - MANHATTAN
Status
Active