Capital Project Tracker

A listing of all capital projects managed by NYC Parks, and a timeline for their completion.

Supporting documentation can be found at the following link (http://www.nycgovparks.org/bigapps/desc/DPR_CapitalProjectTracker_001.txt).

See JSON and XML feeds here https://data.cityofnewyork.us/Recreation/Capital-Project-Tracker/qiwj-i2jk

Recreation Department of Parks and Recreation (DPR) Dataset 4hcv-tc5r 29 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
8523
Trackerid: 8523 • Fmsid: 846 P-4BWIDEN • Title: Queens General Site Work (QG-1316M)
Trackerid
8523
Fmsid
846 P-4BWIDEN
Title
Queens General Site Work (QG-1316M)
Summary
This project will construct new fitness equipment at Alley Pond Park and Alley Athletic Playground, reconstruct the seating area at One Room Schoolhouse Park, and construct a new meditation garden at Kissena Corridor Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-05-01T00:00:00.000
Designprojectedcompletion
2017-05-01T00:00:00.000
Designadjustedcompletion
2017-07-01T00:00:00.000
Designactualcompletion
2017-08-01T00:00:00.000
Procurementstart
2017-08-01T00:00:00.000
Procurementprojectedcompletion
2018-04-01T00:00:00.000
Procurementadjustedcompletion
2018-06-01T00:00:00.000
Procurementactualcompletion
2018-05-01T00:00:00.000
Constructionstart
2018-10-01T00:00:00.000
Constructionprojectedcom
2019-12-01T00:00:00.000
Constructionactualcompletion
2019-12-01T00:00:00.000
Totalfunding
$1,501,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
Lawrence Street, North Hempstead Turnpike, Elder Avenue, Kissena Boulevard
Parkid
Q300
Latitude
40.750129
Longitude
-73.823681
Borough
Queens
VIEW LOCATION
8523
Trackerid: 8523 • Fmsid: 846 P-4BWIDEN • Title: Queens General Site Work (QG-1316M)
Trackerid
8523
Fmsid
846 P-4BWIDEN
Title
Queens General Site Work (QG-1316M)
Summary
This project will construct new fitness equipment at Alley Pond Park and Alley Athletic Playground, reconstruct the seating area at One Room Schoolhouse Park, and construct a new meditation garden at Kissena Corridor Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-05-01T00:00:00.000
Designprojectedcompletion
2017-05-01T00:00:00.000
Designadjustedcompletion
2017-07-01T00:00:00.000
Designactualcompletion
2017-08-01T00:00:00.000
Procurementstart
2017-08-01T00:00:00.000
Procurementprojectedcompletion
2018-04-01T00:00:00.000
Procurementadjustedcompletion
2018-06-01T00:00:00.000
Procurementactualcompletion
2018-05-01T00:00:00.000
Constructionstart
2018-10-01T00:00:00.000
Constructionprojectedcom
2019-12-01T00:00:00.000
Constructionactualcompletion
2019-12-01T00:00:00.000
Totalfunding
$1,501,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
Astoria Boulevard, 90 Street
Parkid
Q116
Latitude
40.763337
Longitude
-73.879397
Borough
Queens
VIEW LOCATION
1946111
Trackerid: 1946111 • Title: Alley Park Retaining Wall Reconstruction • Currentphase: proposed
Trackerid
1946111
Title
Alley Park Retaining Wall Reconstruction
Summary
This project will reconstruct a retaining wall along 67th Avenue between 232nd and 233rd Street in Alley Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designprojectedcompletion
2027-02-01T00:00:00.000
Totalfunding
Less than $1 million
Projectliaison
Contact Us
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
Q356
Latitude
40.747639
Longitude
-73.7444294
Borough
Queens
VIEW LOCATION
9728
Trackerid: 9728 • Fmsid: 846 P-4QNPAV1 • Title: Queens Pavement Areas Reconstruction
Trackerid
9728
Fmsid
846 P-4QNPAV1
Title
Queens Pavement Areas Reconstruction
Summary
This project will reconstruct multipurpose play areas at Oakland Gardens, Alley Park, and Hoover-Manton Playground, and the parking lot near Springfield Boulevard and 76th Avenue in Alley Pond Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2020-09-01T00:00:00.000
Designprojectedcompletion
2021-09-01T00:00:00.000
Designadjustedcompletion
2023-02-01T00:00:00.000
Designactualcompletion
2023-02-01T00:00:00.000
Procurementstart
2023-02-01T00:00:00.000
Procurementprojectedcompletion
2022-07-01T00:00:00.000
Procurementadjustedcompletion
2024-11-01T00:00:00.000
Procurementactualcompletion
2024-08-01T00:00:00.000
Constructionstart
2024-07-01T00:00:00.000
Constructionprojectedcom
2026-07-01T00:00:00.000
Constructionactualcompletion
2026-09-01T00:00:00.000
Totalfunding
$4,162,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
67 Avenue & 230 Street
Parkid
Q356
Latitude
40.747084
Longitude
-73.745224
Borough
Queens
VIEW LOCATION
9728
Trackerid: 9728 • Fmsid: 846 P-4QNPAV1 • Title: Queens Pavement Areas Reconstruction
Trackerid
9728
Fmsid
846 P-4QNPAV1
Title
Queens Pavement Areas Reconstruction
Summary
This project will reconstruct multipurpose play areas at Oakland Gardens, Alley Park, and Hoover-Manton Playground, and the parking lot near Springfield Boulevard and 76th Avenue in Alley Pond Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2020-09-01T00:00:00.000
Designprojectedcompletion
2021-09-01T00:00:00.000
Designadjustedcompletion
2023-02-01T00:00:00.000
Designactualcompletion
2023-02-01T00:00:00.000
Procurementstart
2023-02-01T00:00:00.000
Procurementprojectedcompletion
2022-07-01T00:00:00.000
Procurementadjustedcompletion
2024-11-01T00:00:00.000
Procurementactualcompletion
2024-08-01T00:00:00.000
Constructionstart
2024-07-01T00:00:00.000
Constructionprojectedcom
2026-07-01T00:00:00.000
Constructionactualcompletion
2026-09-01T00:00:00.000
Totalfunding
$4,162,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Little Neck Bay to Springfield Boulevard, Union Turnpike
Parkid
Q001
Latitude
40.74044
Longitude
-73.748164
Borough
Queens
VIEW LOCATION
9728
Trackerid: 9728 • Fmsid: 846 P-4QNPAV1 • Title: Queens Pavement Areas Reconstruction
Trackerid
9728
Fmsid
846 P-4QNPAV1
Title
Queens Pavement Areas Reconstruction
Summary
This project will reconstruct multipurpose play areas at Oakland Gardens, Alley Park, and Hoover-Manton Playground, and the parking lot near Springfield Boulevard and 76th Avenue in Alley Pond Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2020-09-01T00:00:00.000
Designprojectedcompletion
2021-09-01T00:00:00.000
Designadjustedcompletion
2023-02-01T00:00:00.000
Designactualcompletion
2023-02-01T00:00:00.000
Procurementstart
2023-02-01T00:00:00.000
Procurementprojectedcompletion
2022-07-01T00:00:00.000
Procurementadjustedcompletion
2024-11-01T00:00:00.000
Procurementactualcompletion
2024-08-01T00:00:00.000
Constructionstart
2024-07-01T00:00:00.000
Constructionprojectedcom
2026-07-01T00:00:00.000
Constructionactualcompletion
2026-09-01T00:00:00.000
Totalfunding
$4,162,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Manton Street & 83 Avenue
Parkid
Q220G
Latitude
40.712017
Longitude
-73.821431
Borough
Queens
VIEW LOCATION
9728
Trackerid: 9728 • Fmsid: 846 P-4QNPAV1 • Title: Queens Pavement Areas Reconstruction
Trackerid
9728
Fmsid
846 P-4QNPAV1
Title
Queens Pavement Areas Reconstruction
Summary
This project will reconstruct multipurpose play areas at Oakland Gardens, Alley Park, and Hoover-Manton Playground, and the parking lot near Springfield Boulevard and 76th Avenue in Alley Pond Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2020-09-01T00:00:00.000
Designprojectedcompletion
2021-09-01T00:00:00.000
Designadjustedcompletion
2023-02-01T00:00:00.000
Designactualcompletion
2023-02-01T00:00:00.000
Procurementstart
2023-02-01T00:00:00.000
Procurementprojectedcompletion
2022-07-01T00:00:00.000
Procurementadjustedcompletion
2024-11-01T00:00:00.000
Procurementactualcompletion
2024-08-01T00:00:00.000
Constructionstart
2024-07-01T00:00:00.000
Constructionprojectedcom
2026-07-01T00:00:00.000
Constructionactualcompletion
2026-09-01T00:00:00.000
Totalfunding
$4,162,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
E/S Springfield Boulevard & 54 Avenue
Parkid
Q400
Latitude
40.753237
Longitude
-73.759465
Borough
Queens
VIEW LOCATION
1653111
Trackerid: 1653111 • Fmsid: 846 P-4ALYPND • Title: Alley Pond Park Pathway Reconstruction
Trackerid
1653111
Fmsid
846 P-4ALYPND
Title
Alley Pond Park Pathway Reconstruction
Summary
This project will reconstruct paths in Alley Pond Park.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
0.0
Designstart
2023-12-01T00:00:00.000
Designprojectedcompletion
2024-11-01T00:00:00.000
Designactualcompletion
2024-10-01T00:00:00.000
Procurementstart
2024-03-01T00:00:00.000
Procurementprojectedcompletion
2024-08-01T00:00:00.000
Procurementactualcompletion
2024-10-01T00:00:00.000
Constructionstart
2025-12-01T00:00:00.000
Constructionprojectedcom
2026-04-01T00:00:00.000
Totalfunding
$1,400,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Parkid
Q001
Latitude
40.742289
Longitude
-73.738192
Borough
Queens
VIEW LOCATION
1763111
Trackerid: 1763111 • Fmsid: 846 P-4SPRNGF • Title: Alley Pond Park Path Reconstruction
Trackerid
1763111
Fmsid
846 P-4SPRNGF
Title
Alley Pond Park Path Reconstruction
Summary
This project will reconstruct the paths surrounding the parking lot at 76th Avenue and Springfield Boulevard at Alley Pond Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2024-10-01T00:00:00.000
Designprojectedcompletion
2025-01-01T00:00:00.000
Designactualcompletion
2025-08-01T00:00:00.000
Procurementstart
2024-11-01T00:00:00.000
Procurementprojectedcompletion
2025-04-01T00:00:00.000
Procurementactualcompletion
2025-08-01T00:00:00.000
Constructionstart
2026-02-01T00:00:00.000
Constructionprojectedcom
2026-03-01T00:00:00.000
Constructionactualcompletion
2026-03-01T00:00:00.000
Totalfunding
$732,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
Q001
Latitude
40.7561037
Longitude
-73.7469242
Borough
Queens
VIEW LOCATION
1387111
Trackerid: 1387111 • Fmsid: 846 P-4DCTALP • Title: Alley Pond Park Telecommunication Lines Reconstruction
Trackerid
1387111
Fmsid
846 P-4DCTALP
Title
Alley Pond Park Telecommunication Lines Reconstruction
Summary
This project will reconstruct the telecommunication lines at Alley Pond Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-10-01T00:00:00.000
Designprojectedcompletion
2022-05-01T00:00:00.000
Designactualcompletion
2022-05-01T00:00:00.000
Procurementstart
2021-11-01T00:00:00.000
Procurementprojectedcompletion
2022-04-01T00:00:00.000
Procurementactualcompletion
2022-05-01T00:00:00.000
Constructionstart
2022-05-01T00:00:00.000
Constructionprojectedcom
2022-10-01T00:00:00.000
Constructionactualcompletion
2022-10-01T00:00:00.000
Totalfunding
$180,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
Q001
Latitude
40.755525
Longitude
-73.746913
Borough
Queens
VIEW LOCATION
1478111
Trackerid: 1478111 • Fmsid: 846 P-4SPRNGF • Title: Alley Pond Park Parking Lot Reconstruction
Trackerid
1478111
Fmsid
846 P-4SPRNGF
Title
Alley Pond Park Parking Lot Reconstruction
Summary
This project will reconstruct the parking lot at 76th Avenue and Springfield Boulevard at Alley Pond Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-05-01T00:00:00.000
Designprojectedcompletion
2023-02-01T00:00:00.000
Designactualcompletion
2022-10-01T00:00:00.000
Procurementstart
2022-05-01T00:00:00.000
Procurementprojectedcompletion
2022-10-01T00:00:00.000
Procurementactualcompletion
2022-09-01T00:00:00.000
Constructionstart
2024-06-01T00:00:00.000
Constructionprojectedcom
2024-09-01T00:00:00.000
Constructionactualcompletion
2024-08-01T00:00:00.000
Totalfunding
$1,832,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
Q001
Latitude
40.74365
Longitude
-73.74071
Borough
Queens
VIEW LOCATION
3239
Trackerid: 3239 • Fmsid: 846 P-411OAKL • Title: Alley Pond Park Paths and Drainage Reconstruction
Trackerid
3239
Fmsid
846 P-411OAKL
Title
Alley Pond Park Paths and Drainage Reconstruction
Summary
This project will reconstruct the paths and address drainage issues at Oakland Lake in Alley Pond Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2011-03-01T00:00:00.000
Designprojectedcompletion
2013-10-01T00:00:00.000
Designactualcompletion
2013-11-01T00:00:00.000
Procurementstart
2013-11-01T00:00:00.000
Procurementprojectedcompletion
2014-08-01T00:00:00.000
Procurementactualcompletion
2014-07-01T00:00:00.000
Constructionstart
2014-09-01T00:00:00.000
Constructionprojectedcom
2015-09-01T00:00:00.000
Constructionactualcompletion
2015-08-01T00:00:00.000
Totalfunding
$1,288,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President, City Council
Name
46th Avenue between Springfield Boulevard and Cloverdale Boulevard
Parkid
Q001
Latitude
40.757539
Longitude
-73.74551
Borough
Queens
VIEW LOCATION
10029
Trackerid: 10029 • Fmsid: 846 P-411APNA • Title: Alley Pond Park Natural Areas Restoration Phase 3
Trackerid
10029
Fmsid
846 P-411APNA
Title
Alley Pond Park Natural Areas Restoration Phase 3
Summary
This project will restore natural areas within Alley Pond Park.
Currentphase
design
Designpercentcomplete
5.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2026-02-01T00:00:00.000
Designprojectedcompletion
2027-05-01T00:00:00.000
Totalfunding
Between $1 million and $3 million
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Between Northern Blvd and the LIRR tracks, east of the inlet
Parkid
Q001
Latitude
40.75254259
Longitude
-73.74456904
Borough
Queens
VIEW LOCATION
3895
Trackerid: 3895 • Fmsid: 846 P-6BBLDG7 • Title: Citywide Electrical Systems Reconstruction (CNYG-907M)
Trackerid
3895
Fmsid
846 P-6BBLDG7
Title
Citywide Electrical Systems Reconstruction (CNYG-907M)
Summary
This project will reconstruct electrical systems in various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2006-12-01T00:00:00.000
Designactualcompletion
2007-03-01T00:00:00.000
Procurementstart
2007-03-01T00:00:00.000
Procurementprojectedcompletion
2007-11-01T00:00:00.000
Procurementactualcompletion
2008-07-01T00:00:00.000
Constructionstart
2008-08-01T00:00:00.000
Constructionprojectedcom
2011-08-01T00:00:00.000
Constructionadjustedcompletion
2014-12-01T00:00:00.000
Constructionactualcompletion
2014-10-01T00:00:00.000
Totalfunding
$1,330,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Little Neck Bay to Springfield Boulevard, Union Turnpike
Parkid
Q001
Latitude
40.753608
Longitude
-73.746859
Borough
Queens, Brooklyn, Manhattan
VIEW LOCATION
3895
Trackerid: 3895 • Fmsid: 846 P-6BBLDG7 • Title: Citywide Electrical Systems Reconstruction (CNYG-907M)
Trackerid
3895
Fmsid
846 P-6BBLDG7
Title
Citywide Electrical Systems Reconstruction (CNYG-907M)
Summary
This project will reconstruct electrical systems in various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2006-12-01T00:00:00.000
Designactualcompletion
2007-03-01T00:00:00.000
Procurementstart
2007-03-01T00:00:00.000
Procurementprojectedcompletion
2007-11-01T00:00:00.000
Procurementactualcompletion
2008-07-01T00:00:00.000
Constructionstart
2008-08-01T00:00:00.000
Constructionprojectedcom
2011-08-01T00:00:00.000
Constructionadjustedcompletion
2014-12-01T00:00:00.000
Constructionactualcompletion
2014-10-01T00:00:00.000
Totalfunding
$1,330,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Knickerbocker Avenue between Woodbine Street and Putnam Avenue
Parkid
B017
Latitude
40.696004
Longitude
-73.912137
Borough
Queens, Brooklyn, Manhattan
VIEW LOCATION
3895
Trackerid: 3895 • Fmsid: 846 P-6BBLDG7 • Title: Citywide Electrical Systems Reconstruction (CNYG-907M)
Trackerid
3895
Fmsid
846 P-6BBLDG7
Title
Citywide Electrical Systems Reconstruction (CNYG-907M)
Summary
This project will reconstruct electrical systems in various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2006-12-01T00:00:00.000
Designactualcompletion
2007-03-01T00:00:00.000
Procurementstart
2007-03-01T00:00:00.000
Procurementprojectedcompletion
2007-11-01T00:00:00.000
Procurementactualcompletion
2008-07-01T00:00:00.000
Constructionstart
2008-08-01T00:00:00.000
Constructionprojectedcom
2011-08-01T00:00:00.000
Constructionadjustedcompletion
2014-12-01T00:00:00.000
Constructionactualcompletion
2014-10-01T00:00:00.000
Totalfunding
$1,330,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Fort Totten, Cross Island Parkway, Totten Road to 15 Road
Parkid
Q458
Latitude
40.793201
Longitude
-73.777846
Borough
Queens, Brooklyn, Manhattan
VIEW LOCATION
3895
Trackerid: 3895 • Fmsid: 846 P-6BBLDG7 • Title: Citywide Electrical Systems Reconstruction (CNYG-907M)
Trackerid
3895
Fmsid
846 P-6BBLDG7
Title
Citywide Electrical Systems Reconstruction (CNYG-907M)
Summary
This project will reconstruct electrical systems in various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2006-12-01T00:00:00.000
Designactualcompletion
2007-03-01T00:00:00.000
Procurementstart
2007-03-01T00:00:00.000
Procurementprojectedcompletion
2007-11-01T00:00:00.000
Procurementactualcompletion
2008-07-01T00:00:00.000
Constructionstart
2008-08-01T00:00:00.000
Constructionprojectedcom
2011-08-01T00:00:00.000
Constructionadjustedcompletion
2014-12-01T00:00:00.000
Constructionactualcompletion
2014-10-01T00:00:00.000
Totalfunding
$1,330,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Beach 83rd Street & Rockaway Beach Boulevard
Parkid
Q367
Latitude
40.588203
Longitude
-73.809374
Borough
Queens, Brooklyn, Manhattan
VIEW LOCATION
3895
Trackerid: 3895 • Fmsid: 846 P-6BBLDG7 • Title: Citywide Electrical Systems Reconstruction (CNYG-907M)
Trackerid
3895
Fmsid
846 P-6BBLDG7
Title
Citywide Electrical Systems Reconstruction (CNYG-907M)
Summary
This project will reconstruct electrical systems in various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2006-12-01T00:00:00.000
Designactualcompletion
2007-03-01T00:00:00.000
Procurementstart
2007-03-01T00:00:00.000
Procurementprojectedcompletion
2007-11-01T00:00:00.000
Procurementactualcompletion
2008-07-01T00:00:00.000
Constructionstart
2008-08-01T00:00:00.000
Constructionprojectedcom
2011-08-01T00:00:00.000
Constructionadjustedcompletion
2014-12-01T00:00:00.000
Constructionactualcompletion
2014-10-01T00:00:00.000
Totalfunding
$1,330,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Montgomery Street to East 12 Street, FDR Drive
Parkid
M144
Latitude
40.716874
Longitude
-73.975452
Borough
Queens, Brooklyn, Manhattan
VIEW LOCATION
3895
Trackerid: 3895 • Fmsid: 846 P-6BBLDG7 • Title: Citywide Electrical Systems Reconstruction (CNYG-907M)
Trackerid
3895
Fmsid
846 P-6BBLDG7
Title
Citywide Electrical Systems Reconstruction (CNYG-907M)
Summary
This project will reconstruct electrical systems in various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2006-12-01T00:00:00.000
Designactualcompletion
2007-03-01T00:00:00.000
Procurementstart
2007-03-01T00:00:00.000
Procurementprojectedcompletion
2007-11-01T00:00:00.000
Procurementactualcompletion
2008-07-01T00:00:00.000
Constructionstart
2008-08-01T00:00:00.000
Constructionprojectedcom
2011-08-01T00:00:00.000
Constructionadjustedcompletion
2014-12-01T00:00:00.000
Constructionactualcompletion
2014-10-01T00:00:00.000
Totalfunding
$1,330,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
East Houston Street to Canal Street
Parkid
M105
Latitude
40.719632
Longitude
-73.992614
Borough
Queens, Brooklyn, Manhattan
VIEW LOCATION
3895
Trackerid: 3895 • Fmsid: 846 P-6BBLDG7 • Title: Citywide Electrical Systems Reconstruction (CNYG-907M)
Trackerid
3895
Fmsid
846 P-6BBLDG7
Title
Citywide Electrical Systems Reconstruction (CNYG-907M)
Summary
This project will reconstruct electrical systems in various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2006-12-01T00:00:00.000
Designactualcompletion
2007-03-01T00:00:00.000
Procurementstart
2007-03-01T00:00:00.000
Procurementprojectedcompletion
2007-11-01T00:00:00.000
Procurementactualcompletion
2008-07-01T00:00:00.000
Constructionstart
2008-08-01T00:00:00.000
Constructionprojectedcom
2011-08-01T00:00:00.000
Constructionadjustedcompletion
2014-12-01T00:00:00.000
Constructionactualcompletion
2014-10-01T00:00:00.000
Totalfunding
$1,330,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Schermerhorn & Nevins Street
Parkid
B137
Latitude
40.686792
Longitude
-73.981006
Borough
Queens, Brooklyn, Manhattan
VIEW LOCATION
3926
Trackerid: 3926 • Fmsid: 846 P-6CBLDG7 • Title: Citywide Plumbing Systems Reconstruction (CNYG-1007M)
Trackerid
3926
Fmsid
846 P-6CBLDG7
Title
Citywide Plumbing Systems Reconstruction (CNYG-1007M)
Summary
This project will reconstruct the plumbing systems in public restroom buildings at various park facilities citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2006-12-01T00:00:00.000
Designactualcompletion
2007-03-01T00:00:00.000
Procurementstart
2007-03-01T00:00:00.000
Procurementprojectedcompletion
2007-11-01T00:00:00.000
Procurementactualcompletion
2008-05-01T00:00:00.000
Constructionstart
2008-06-01T00:00:00.000
Constructionprojectedcom
2011-06-01T00:00:00.000
Constructionadjustedcompletion
2014-04-01T00:00:00.000
Constructionactualcompletion
2014-04-01T00:00:00.000
Totalfunding
$1,419,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Little Neck Bay to Springfield Boulevard, Union Turnpike
Parkid
Q001
Latitude
40.753608
Longitude
-73.746859
Borough
Queens, Brooklyn, Manhattan
VIEW LOCATION
3926
Trackerid: 3926 • Fmsid: 846 P-6CBLDG7 • Title: Citywide Plumbing Systems Reconstruction (CNYG-1007M)
Trackerid
3926
Fmsid
846 P-6CBLDG7
Title
Citywide Plumbing Systems Reconstruction (CNYG-1007M)
Summary
This project will reconstruct the plumbing systems in public restroom buildings at various park facilities citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2006-12-01T00:00:00.000
Designactualcompletion
2007-03-01T00:00:00.000
Procurementstart
2007-03-01T00:00:00.000
Procurementprojectedcompletion
2007-11-01T00:00:00.000
Procurementactualcompletion
2008-05-01T00:00:00.000
Constructionstart
2008-06-01T00:00:00.000
Constructionprojectedcom
2011-06-01T00:00:00.000
Constructionadjustedcompletion
2014-04-01T00:00:00.000
Constructionactualcompletion
2014-04-01T00:00:00.000
Totalfunding
$1,419,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Knickerbocker Avenue between Woodbine Street and Putnam Avenue
Parkid
B017
Latitude
40.70172
Longitude
-73.939373
Borough
Queens, Brooklyn, Manhattan
VIEW LOCATION
3926
Trackerid: 3926 • Fmsid: 846 P-6CBLDG7 • Title: Citywide Plumbing Systems Reconstruction (CNYG-1007M)
Trackerid
3926
Fmsid
846 P-6CBLDG7
Title
Citywide Plumbing Systems Reconstruction (CNYG-1007M)
Summary
This project will reconstruct the plumbing systems in public restroom buildings at various park facilities citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2006-12-01T00:00:00.000
Designactualcompletion
2007-03-01T00:00:00.000
Procurementstart
2007-03-01T00:00:00.000
Procurementprojectedcompletion
2007-11-01T00:00:00.000
Procurementactualcompletion
2008-05-01T00:00:00.000
Constructionstart
2008-06-01T00:00:00.000
Constructionprojectedcom
2011-06-01T00:00:00.000
Constructionadjustedcompletion
2014-04-01T00:00:00.000
Constructionactualcompletion
2014-04-01T00:00:00.000
Totalfunding
$1,419,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Sumpter Street between Ralph Avenue and Howard Avenue
Parkid
B347
Latitude
40.680304
Longitude
-73.920531
Borough
Queens, Brooklyn, Manhattan
VIEW LOCATION
3926
Trackerid: 3926 • Fmsid: 846 P-6CBLDG7 • Title: Citywide Plumbing Systems Reconstruction (CNYG-1007M)
Trackerid
3926
Fmsid
846 P-6CBLDG7
Title
Citywide Plumbing Systems Reconstruction (CNYG-1007M)
Summary
This project will reconstruct the plumbing systems in public restroom buildings at various park facilities citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2006-12-01T00:00:00.000
Designactualcompletion
2007-03-01T00:00:00.000
Procurementstart
2007-03-01T00:00:00.000
Procurementprojectedcompletion
2007-11-01T00:00:00.000
Procurementactualcompletion
2008-05-01T00:00:00.000
Constructionstart
2008-06-01T00:00:00.000
Constructionprojectedcom
2011-06-01T00:00:00.000
Constructionadjustedcompletion
2014-04-01T00:00:00.000
Constructionactualcompletion
2014-04-01T00:00:00.000
Totalfunding
$1,419,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Fort Totten, Cross Island Parkway, Totten Road to 15 Road
Parkid
Q458
Latitude
40.793201
Longitude
-73.777846
Borough
Queens, Brooklyn, Manhattan
VIEW LOCATION
3926
Trackerid: 3926 • Fmsid: 846 P-6CBLDG7 • Title: Citywide Plumbing Systems Reconstruction (CNYG-1007M)
Trackerid
3926
Fmsid
846 P-6CBLDG7
Title
Citywide Plumbing Systems Reconstruction (CNYG-1007M)
Summary
This project will reconstruct the plumbing systems in public restroom buildings at various park facilities citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2006-12-01T00:00:00.000
Designactualcompletion
2007-03-01T00:00:00.000
Procurementstart
2007-03-01T00:00:00.000
Procurementprojectedcompletion
2007-11-01T00:00:00.000
Procurementactualcompletion
2008-05-01T00:00:00.000
Constructionstart
2008-06-01T00:00:00.000
Constructionprojectedcom
2011-06-01T00:00:00.000
Constructionadjustedcompletion
2014-04-01T00:00:00.000
Constructionactualcompletion
2014-04-01T00:00:00.000
Totalfunding
$1,419,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Beach 83rd Street & Rockaway Beach Boulevard
Parkid
Q367
Latitude
40.588203
Longitude
-73.809374
Borough
Queens, Brooklyn, Manhattan
VIEW LOCATION
3926
Trackerid: 3926 • Fmsid: 846 P-6CBLDG7 • Title: Citywide Plumbing Systems Reconstruction (CNYG-1007M)
Trackerid
3926
Fmsid
846 P-6CBLDG7
Title
Citywide Plumbing Systems Reconstruction (CNYG-1007M)
Summary
This project will reconstruct the plumbing systems in public restroom buildings at various park facilities citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2006-12-01T00:00:00.000
Designactualcompletion
2007-03-01T00:00:00.000
Procurementstart
2007-03-01T00:00:00.000
Procurementprojectedcompletion
2007-11-01T00:00:00.000
Procurementactualcompletion
2008-05-01T00:00:00.000
Constructionstart
2008-06-01T00:00:00.000
Constructionprojectedcom
2011-06-01T00:00:00.000
Constructionadjustedcompletion
2014-04-01T00:00:00.000
Constructionactualcompletion
2014-04-01T00:00:00.000
Totalfunding
$1,419,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
West 189th Street & Amsterdam Avenue
Parkid
M037
Latitude
40.852824
Longitude
-73.927167
Borough
Queens, Brooklyn, Manhattan
VIEW LOCATION
3926
Trackerid: 3926 • Fmsid: 846 P-6CBLDG7 • Title: Citywide Plumbing Systems Reconstruction (CNYG-1007M)
Trackerid
3926
Fmsid
846 P-6CBLDG7
Title
Citywide Plumbing Systems Reconstruction (CNYG-1007M)
Summary
This project will reconstruct the plumbing systems in public restroom buildings at various park facilities citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2006-12-01T00:00:00.000
Designactualcompletion
2007-03-01T00:00:00.000
Procurementstart
2007-03-01T00:00:00.000
Procurementprojectedcompletion
2007-11-01T00:00:00.000
Procurementactualcompletion
2008-05-01T00:00:00.000
Constructionstart
2008-06-01T00:00:00.000
Constructionprojectedcom
2011-06-01T00:00:00.000
Constructionadjustedcompletion
2014-04-01T00:00:00.000
Constructionactualcompletion
2014-04-01T00:00:00.000
Totalfunding
$1,419,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Dyckman Street, Hudson River, Harlem River Ship Canal
Parkid
M042
Latitude
40.873979
Longitude
-73.920126
Borough
Queens, Brooklyn, Manhattan
VIEW LOCATION
3926
Trackerid: 3926 • Fmsid: 846 P-6CBLDG7 • Title: Citywide Plumbing Systems Reconstruction (CNYG-1007M)
Trackerid
3926
Fmsid
846 P-6CBLDG7
Title
Citywide Plumbing Systems Reconstruction (CNYG-1007M)
Summary
This project will reconstruct the plumbing systems in public restroom buildings at various park facilities citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2006-12-01T00:00:00.000
Designactualcompletion
2007-03-01T00:00:00.000
Procurementstart
2007-03-01T00:00:00.000
Procurementprojectedcompletion
2007-11-01T00:00:00.000
Procurementactualcompletion
2008-05-01T00:00:00.000
Constructionstart
2008-06-01T00:00:00.000
Constructionprojectedcom
2011-06-01T00:00:00.000
Constructionadjustedcompletion
2014-04-01T00:00:00.000
Constructionactualcompletion
2014-04-01T00:00:00.000
Totalfunding
$1,419,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
37 Avenue between 112 & 113 Streets
Parkid
Q415
Latitude
40.754874
Longitude
-73.855451
Borough
Queens, Brooklyn, Manhattan
VIEW LOCATION
3926
Trackerid: 3926 • Fmsid: 846 P-6CBLDG7 • Title: Citywide Plumbing Systems Reconstruction (CNYG-1007M)
Trackerid
3926
Fmsid
846 P-6CBLDG7
Title
Citywide Plumbing Systems Reconstruction (CNYG-1007M)
Summary
This project will reconstruct the plumbing systems in public restroom buildings at various park facilities citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2006-12-01T00:00:00.000
Designactualcompletion
2007-03-01T00:00:00.000
Procurementstart
2007-03-01T00:00:00.000
Procurementprojectedcompletion
2007-11-01T00:00:00.000
Procurementactualcompletion
2008-05-01T00:00:00.000
Constructionstart
2008-06-01T00:00:00.000
Constructionprojectedcom
2011-06-01T00:00:00.000
Constructionadjustedcompletion
2014-04-01T00:00:00.000
Constructionactualcompletion
2014-04-01T00:00:00.000
Totalfunding
$1,419,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Schermerhorn & Nevins Street
Parkid
B137
Latitude
40.686792
Longitude
-73.981006
Borough
Queens, Brooklyn, Manhattan
VIEW LOCATION
3926
Trackerid: 3926 • Fmsid: 846 P-6CBLDG7 • Title: Citywide Plumbing Systems Reconstruction (CNYG-1007M)
Trackerid
3926
Fmsid
846 P-6CBLDG7
Title
Citywide Plumbing Systems Reconstruction (CNYG-1007M)
Summary
This project will reconstruct the plumbing systems in public restroom buildings at various park facilities citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2006-12-01T00:00:00.000
Designactualcompletion
2007-03-01T00:00:00.000
Procurementstart
2007-03-01T00:00:00.000
Procurementprojectedcompletion
2007-11-01T00:00:00.000
Procurementactualcompletion
2008-05-01T00:00:00.000
Constructionstart
2008-06-01T00:00:00.000
Constructionprojectedcom
2011-06-01T00:00:00.000
Constructionadjustedcompletion
2014-04-01T00:00:00.000
Constructionactualcompletion
2014-04-01T00:00:00.000
Totalfunding
$1,419,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Middagh Street between Columbia Heights & Furman Street
Parkid
B223
Latitude
40.701059
Longitude
-73.995402
Borough
Queens, Brooklyn, Manhattan
VIEW LOCATION
6010
Trackerid: 6010 • Fmsid: 846 P-4PLG13B • Title: Queens General Site Work (QG-713MA)
Trackerid
6010
Fmsid
846 P-4PLG13B
Title
Queens General Site Work (QG-713MA)
Summary
This project will reconstruct pavements, fencing, plantings, and benches in at various parks in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-01-01T00:00:00.000
Designprojectedcompletion
2013-03-01T00:00:00.000
Designactualcompletion
2014-03-01T00:00:00.000
Procurementstart
2014-03-01T00:00:00.000
Procurementprojectedcompletion
2014-12-01T00:00:00.000
Procurementadjustedcompletion
2015-03-01T00:00:00.000
Procurementactualcompletion
2015-03-01T00:00:00.000
Constructionstart
2015-05-01T00:00:00.000
Constructionprojectedcom
2016-11-01T00:00:00.000
Constructionactualcompletion
2016-11-01T00:00:00.000
Totalfunding
$455,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Little Neck Bay to Springfield Boulevard, Union Turnpike
Parkid
Q001
Latitude
40.756144
Longitude
-73.742885
Borough
Queens, Brooklyn
VIEW LOCATION
6010
Trackerid: 6010 • Fmsid: 846 P-4PLG13B • Title: Queens General Site Work (QG-713MA)
Trackerid
6010
Fmsid
846 P-4PLG13B
Title
Queens General Site Work (QG-713MA)
Summary
This project will reconstruct pavements, fencing, plantings, and benches in at various parks in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-01-01T00:00:00.000
Designprojectedcompletion
2013-03-01T00:00:00.000
Designactualcompletion
2014-03-01T00:00:00.000
Procurementstart
2014-03-01T00:00:00.000
Procurementprojectedcompletion
2014-12-01T00:00:00.000
Procurementadjustedcompletion
2015-03-01T00:00:00.000
Procurementactualcompletion
2015-03-01T00:00:00.000
Constructionstart
2015-05-01T00:00:00.000
Constructionprojectedcom
2016-11-01T00:00:00.000
Constructionactualcompletion
2016-11-01T00:00:00.000
Totalfunding
$455,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Fort Totten, Cross Island Parkway, Totten Road to 15 Road
Parkid
Q458
Latitude
40.795767
Longitude
-73.779503
Borough
Queens, Brooklyn
VIEW LOCATION
6010
Trackerid: 6010 • Fmsid: 846 P-4PLG13B • Title: Queens General Site Work (QG-713MA)
Trackerid
6010
Fmsid
846 P-4PLG13B
Title
Queens General Site Work (QG-713MA)
Summary
This project will reconstruct pavements, fencing, plantings, and benches in at various parks in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-01-01T00:00:00.000
Designprojectedcompletion
2013-03-01T00:00:00.000
Designactualcompletion
2014-03-01T00:00:00.000
Procurementstart
2014-03-01T00:00:00.000
Procurementprojectedcompletion
2014-12-01T00:00:00.000
Procurementadjustedcompletion
2015-03-01T00:00:00.000
Procurementactualcompletion
2015-03-01T00:00:00.000
Constructionstart
2015-05-01T00:00:00.000
Constructionprojectedcom
2016-11-01T00:00:00.000
Constructionactualcompletion
2016-11-01T00:00:00.000
Totalfunding
$455,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Vleigh Place & 141 Street
Parkid
Q336
Latitude
40.718704
Longitude
-73.820572
Borough
Queens, Brooklyn
VIEW LOCATION
6010
Trackerid: 6010 • Fmsid: 846 P-4PLG13B • Title: Queens General Site Work (QG-713MA)
Trackerid
6010
Fmsid
846 P-4PLG13B
Title
Queens General Site Work (QG-713MA)
Summary
This project will reconstruct pavements, fencing, plantings, and benches in at various parks in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-01-01T00:00:00.000
Designprojectedcompletion
2013-03-01T00:00:00.000
Designactualcompletion
2014-03-01T00:00:00.000
Procurementstart
2014-03-01T00:00:00.000
Procurementprojectedcompletion
2014-12-01T00:00:00.000
Procurementadjustedcompletion
2015-03-01T00:00:00.000
Procurementactualcompletion
2015-03-01T00:00:00.000
Constructionstart
2015-05-01T00:00:00.000
Constructionprojectedcom
2016-11-01T00:00:00.000
Constructionactualcompletion
2016-11-01T00:00:00.000
Totalfunding
$455,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Liberty Avenue & 102nd Street
Parkid
Q118
Latitude
40.682115
Longitude
-73.83927
Borough
Queens, Brooklyn
VIEW LOCATION
6010
Trackerid: 6010 • Fmsid: 846 P-4PLG13B • Title: Queens General Site Work (QG-713MA)
Trackerid
6010
Fmsid
846 P-4PLG13B
Title
Queens General Site Work (QG-713MA)
Summary
This project will reconstruct pavements, fencing, plantings, and benches in at various parks in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-01-01T00:00:00.000
Designprojectedcompletion
2013-03-01T00:00:00.000
Designactualcompletion
2014-03-01T00:00:00.000
Procurementstart
2014-03-01T00:00:00.000
Procurementprojectedcompletion
2014-12-01T00:00:00.000
Procurementadjustedcompletion
2015-03-01T00:00:00.000
Procurementactualcompletion
2015-03-01T00:00:00.000
Constructionstart
2015-05-01T00:00:00.000
Constructionprojectedcom
2016-11-01T00:00:00.000
Constructionactualcompletion
2016-11-01T00:00:00.000
Totalfunding
$455,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Jamaica Avenue, Warwick Street, Force Tube Avenues
Parkid
B047A
Latitude
40.682888
Longitude
-73.887972
Borough
Queens, Brooklyn
VIEW LOCATION
5019
Trackerid: 5019 • Fmsid: 846 P-6NY4PGR • Title: Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Trackerid
5019
Fmsid
846 P-6NY4PGR
Title
Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Summary
This project will reconstruct guide rails and fences at various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-10-01T00:00:00.000
Designactualcompletion
2011-02-01T00:00:00.000
Procurementstart
2011-02-01T00:00:00.000
Procurementprojectedcompletion
2011-11-01T00:00:00.000
Procurementactualcompletion
2012-01-01T00:00:00.000
Constructionstart
2012-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionadjustedcompletion
2015-06-01T00:00:00.000
Constructionactualcompletion
2015-06-01T00:00:00.000
Totalfunding
$1,548,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Little Neck Bay, L.I.E., Union Tpk, bet. Springfield Blvd, Douglaston Pkwy, Hanford St
Parkid
Q001
Latitude
40.755303
Longitude
-73.746282
Borough
Queens, Bronx, Brooklyn, Staten Island, Manhattan
VIEW LOCATION
5019
Trackerid: 5019 • Fmsid: 846 P-6NY4PGR • Title: Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Trackerid
5019
Fmsid
846 P-6NY4PGR
Title
Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Summary
This project will reconstruct guide rails and fences at various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-10-01T00:00:00.000
Designactualcompletion
2011-02-01T00:00:00.000
Procurementstart
2011-02-01T00:00:00.000
Procurementprojectedcompletion
2011-11-01T00:00:00.000
Procurementactualcompletion
2012-01-01T00:00:00.000
Constructionstart
2012-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionadjustedcompletion
2015-06-01T00:00:00.000
Constructionactualcompletion
2015-06-01T00:00:00.000
Totalfunding
$1,548,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Burke Ave., E. 180 St. bet. Dr. Kazamiroff Blvd., Southern Blvd. and Bronx Park E., Unionport Rd.
Parkid
X002
Latitude
40.862008
Longitude
-73.875666
Borough
Queens, Bronx, Brooklyn, Staten Island, Manhattan
VIEW LOCATION
5019
Trackerid: 5019 • Fmsid: 846 P-6NY4PGR • Title: Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Trackerid
5019
Fmsid
846 P-6NY4PGR
Title
Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Summary
This project will reconstruct guide rails and fences at various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-10-01T00:00:00.000
Designactualcompletion
2011-02-01T00:00:00.000
Procurementstart
2011-02-01T00:00:00.000
Procurementprojectedcompletion
2011-11-01T00:00:00.000
Procurementactualcompletion
2012-01-01T00:00:00.000
Constructionstart
2012-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionadjustedcompletion
2015-06-01T00:00:00.000
Constructionactualcompletion
2015-06-01T00:00:00.000
Totalfunding
$1,548,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Gravesend Bay, Bay 44 St. to Bay 49 St., Shore Pkwy.
Parkid
B125
Latitude
40.583173
Longitude
-73.998857
Borough
Queens, Bronx, Brooklyn, Staten Island, Manhattan
VIEW LOCATION
5019
Trackerid: 5019 • Fmsid: 846 P-6NY4PGR • Title: Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Trackerid
5019
Fmsid
846 P-6NY4PGR
Title
Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Summary
This project will reconstruct guide rails and fences at various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-10-01T00:00:00.000
Designactualcompletion
2011-02-01T00:00:00.000
Procurementstart
2011-02-01T00:00:00.000
Procurementprojectedcompletion
2011-11-01T00:00:00.000
Procurementactualcompletion
2012-01-01T00:00:00.000
Constructionstart
2012-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionadjustedcompletion
2015-06-01T00:00:00.000
Constructionactualcompletion
2015-06-01T00:00:00.000
Totalfunding
$1,548,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Seaview Ave. bet. Paerdegat Basin and E. 93 St., E. 102 St. and Fresh Creek Basin
Parkid
B018
Latitude
40.624287
Longitude
-73.898933
Borough
Queens, Bronx, Brooklyn, Staten Island, Manhattan
VIEW LOCATION
5019
Trackerid: 5019 • Fmsid: 846 P-6NY4PGR • Title: Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Trackerid
5019
Fmsid
846 P-6NY4PGR
Title
Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Summary
This project will reconstruct guide rails and fences at various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-10-01T00:00:00.000
Designactualcompletion
2011-02-01T00:00:00.000
Procurementstart
2011-02-01T00:00:00.000
Procurementprojectedcompletion
2011-11-01T00:00:00.000
Procurementactualcompletion
2012-01-01T00:00:00.000
Constructionstart
2012-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionadjustedcompletion
2015-06-01T00:00:00.000
Constructionactualcompletion
2015-06-01T00:00:00.000
Totalfunding
$1,548,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Pittsville St., Hylan Blvd. Richard Ave.
Parkid
R006
Latitude
40.501941
Longitude
-74.252218
Borough
Queens, Bronx, Brooklyn, Staten Island, Manhattan
VIEW LOCATION
5019
Trackerid: 5019 • Fmsid: 846 P-6NY4PGR • Title: Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Trackerid
5019
Fmsid
846 P-6NY4PGR
Title
Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Summary
This project will reconstruct guide rails and fences at various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-10-01T00:00:00.000
Designactualcompletion
2011-02-01T00:00:00.000
Procurementstart
2011-02-01T00:00:00.000
Procurementprojectedcompletion
2011-11-01T00:00:00.000
Procurementactualcompletion
2012-01-01T00:00:00.000
Constructionstart
2012-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionadjustedcompletion
2015-06-01T00:00:00.000
Constructionactualcompletion
2015-06-01T00:00:00.000
Totalfunding
$1,548,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Grand Central Pkwy., Whitestone Exwy. bet. 111 St. and College Point Blvd., Park Drive E.
Parkid
Q099
Latitude
40.746357
Longitude
-73.842717
Borough
Queens, Bronx, Brooklyn, Staten Island, Manhattan
VIEW LOCATION
5019
Trackerid: 5019 • Fmsid: 846 P-6NY4PGR • Title: Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Trackerid
5019
Fmsid
846 P-6NY4PGR
Title
Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Summary
This project will reconstruct guide rails and fences at various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-10-01T00:00:00.000
Designactualcompletion
2011-02-01T00:00:00.000
Procurementstart
2011-02-01T00:00:00.000
Procurementprojectedcompletion
2011-11-01T00:00:00.000
Procurementactualcompletion
2012-01-01T00:00:00.000
Constructionstart
2012-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionadjustedcompletion
2015-06-01T00:00:00.000
Constructionactualcompletion
2015-06-01T00:00:00.000
Totalfunding
$1,548,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Forest Ave. Wilcox Ave., between Van Name Ave. & Eunice Pl.
Parkid
R150
Latitude
40.625318
Longitude
-74.153947
Borough
Queens, Bronx, Brooklyn, Staten Island, Manhattan
VIEW LOCATION
5019
Trackerid: 5019 • Fmsid: 846 P-6NY4PGR • Title: Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Trackerid
5019
Fmsid
846 P-6NY4PGR
Title
Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Summary
This project will reconstruct guide rails and fences at various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-10-01T00:00:00.000
Designactualcompletion
2011-02-01T00:00:00.000
Procurementstart
2011-02-01T00:00:00.000
Procurementprojectedcompletion
2011-11-01T00:00:00.000
Procurementactualcompletion
2012-01-01T00:00:00.000
Constructionstart
2012-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionadjustedcompletion
2015-06-01T00:00:00.000
Constructionactualcompletion
2015-06-01T00:00:00.000
Totalfunding
$1,548,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Jackie Robinson Pkwy., Vermont Ave., Highland Blvd. bet. Bulwer Pl. and Cypress Hills St.
Parkid
Q020
Latitude
40.686661
Longitude
-73.885762
Borough
Queens, Bronx, Brooklyn, Staten Island, Manhattan
VIEW LOCATION
5019
Trackerid: 5019 • Fmsid: 846 P-6NY4PGR • Title: Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Trackerid
5019
Fmsid
846 P-6NY4PGR
Title
Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Summary
This project will reconstruct guide rails and fences at various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-10-01T00:00:00.000
Designactualcompletion
2011-02-01T00:00:00.000
Procurementstart
2011-02-01T00:00:00.000
Procurementprojectedcompletion
2011-11-01T00:00:00.000
Procurementactualcompletion
2012-01-01T00:00:00.000
Constructionstart
2012-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionadjustedcompletion
2015-06-01T00:00:00.000
Constructionactualcompletion
2015-06-01T00:00:00.000
Totalfunding
$1,548,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Page Ave., Hylan Blvd., and Amboy Rd.
Parkid
R027
Latitude
40.512532
Longitude
-74.226734
Borough
Queens, Bronx, Brooklyn, Staten Island, Manhattan
VIEW LOCATION
5019
Trackerid: 5019 • Fmsid: 846 P-6NY4PGR • Title: Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Trackerid
5019
Fmsid
846 P-6NY4PGR
Title
Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Summary
This project will reconstruct guide rails and fences at various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-10-01T00:00:00.000
Designactualcompletion
2011-02-01T00:00:00.000
Procurementstart
2011-02-01T00:00:00.000
Procurementprojectedcompletion
2011-11-01T00:00:00.000
Procurementactualcompletion
2012-01-01T00:00:00.000
Constructionstart
2012-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionadjustedcompletion
2015-06-01T00:00:00.000
Constructionactualcompletion
2015-06-01T00:00:00.000
Totalfunding
$1,548,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Quintard St. and Mason Ave, Seaside Blvd., (Father Capodanno Blvd.)
Parkid
R149
Latitude
40.585942
Longitude
-74.077906
Borough
Queens, Bronx, Brooklyn, Staten Island, Manhattan
VIEW LOCATION
5019
Trackerid: 5019 • Fmsid: 846 P-6NY4PGR • Title: Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Trackerid
5019
Fmsid
846 P-6NY4PGR
Title
Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Summary
This project will reconstruct guide rails and fences at various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-10-01T00:00:00.000
Designactualcompletion
2011-02-01T00:00:00.000
Procurementstart
2011-02-01T00:00:00.000
Procurementprojectedcompletion
2011-11-01T00:00:00.000
Procurementactualcompletion
2012-01-01T00:00:00.000
Constructionstart
2012-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionadjustedcompletion
2015-06-01T00:00:00.000
Constructionactualcompletion
2015-06-01T00:00:00.000
Totalfunding
$1,548,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Randall Ave., Lacombe Ave., Soundview Ave. bet. White Plains Rd. and Olmstead Ave.
Parkid
X088
Latitude
40.812674
Longitude
-73.851687
Borough
Queens, Bronx, Brooklyn, Staten Island, Manhattan
VIEW LOCATION
5019
Trackerid: 5019 • Fmsid: 846 P-6NY4PGR • Title: Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Trackerid
5019
Fmsid
846 P-6NY4PGR
Title
Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Summary
This project will reconstruct guide rails and fences at various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-10-01T00:00:00.000
Designactualcompletion
2011-02-01T00:00:00.000
Procurementstart
2011-02-01T00:00:00.000
Procurementprojectedcompletion
2011-11-01T00:00:00.000
Procurementactualcompletion
2012-01-01T00:00:00.000
Constructionstart
2012-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionadjustedcompletion
2015-06-01T00:00:00.000
Constructionactualcompletion
2015-06-01T00:00:00.000
Totalfunding
$1,548,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Riverside Drive to Hudson River, West 59 Street to Clair Place
Parkid
M071
Latitude
40.803083
Longitude
-73.972337
Borough
Queens, Bronx, Brooklyn, Staten Island, Manhattan
VIEW LOCATION
5019
Trackerid: 5019 • Fmsid: 846 P-6NY4PGR • Title: Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Trackerid
5019
Fmsid
846 P-6NY4PGR
Title
Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Summary
This project will reconstruct guide rails and fences at various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-10-01T00:00:00.000
Designactualcompletion
2011-02-01T00:00:00.000
Procurementstart
2011-02-01T00:00:00.000
Procurementprojectedcompletion
2011-11-01T00:00:00.000
Procurementactualcompletion
2012-01-01T00:00:00.000
Constructionstart
2012-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionadjustedcompletion
2015-06-01T00:00:00.000
Constructionactualcompletion
2015-06-01T00:00:00.000
Totalfunding
$1,548,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Bronx River, Bronx River Ave. bet. Lafayette Ave., Surf Dr.
Parkid
X118
Latitude
40.81095
Longitude
-73.859644
Borough
Queens, Bronx, Brooklyn, Staten Island, Manhattan
VIEW LOCATION
10609
Trackerid: 10609 • Fmsid: 846 P-414ARVR • Title: Arverne Playground Reconstruction
Trackerid
10609
Fmsid
846 P-414ARVR
Title
Arverne Playground Reconstruction
Summary
This project will reconstruct the playground and sports courts.
Currentphase
design
Designpercentcomplete
80.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2025-08-01T00:00:00.000
Designprojectedcompletion
2026-03-01T00:00:00.000
Designadjustedcompletion
2026-11-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Arverne Blvd. bet. Beach 56 St. and Beach 54 St.
Parkid
Q313
Latitude
40.592852
Longitude
-73.785152
Borough
Queens
VIEW LOCATION
5019
Trackerid: 5019 • Fmsid: 846 P-6NY4PGR • Title: Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Trackerid
5019
Fmsid
846 P-6NY4PGR
Title
Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1)
Summary
This project will reconstruct guide rails and fences at various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-10-01T00:00:00.000
Designactualcompletion
2011-02-01T00:00:00.000
Procurementstart
2011-02-01T00:00:00.000
Procurementprojectedcompletion
2011-11-01T00:00:00.000
Procurementactualcompletion
2012-01-01T00:00:00.000
Constructionstart
2012-03-01T00:00:00.000
Constructionprojectedcom
2015-03-01T00:00:00.000
Constructionadjustedcompletion
2015-06-01T00:00:00.000
Constructionactualcompletion
2015-06-01T00:00:00.000
Totalfunding
$1,548,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Fountain Ave., 75 St. bet. Belt Pkwy., Flatlands Ave.,
Parkid
B165
Latitude
40.659846
Longitude
-73.859769
Borough
Queens, Bronx, Brooklyn, Staten Island, Manhattan
VIEW LOCATION