Capital Project Tracker

A listing of all capital projects managed by NYC Parks, and a timeline for their completion.

Supporting documentation can be found at the following link (http://www.nycgovparks.org/bigapps/desc/DPR_CapitalProjectTracker_001.txt).

See JSON and XML feeds here https://data.cityofnewyork.us/Recreation/Capital-Project-Tracker/qiwj-i2jk

Recreation Department of Parks and Recreation (DPR) Dataset 4hcv-tc5r 29 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
10303
Trackerid: 10303 • Title: Cunningham Park Lower Redwood Playground Spray Shower Area Reconstruction • Currentphase: completed
Trackerid
10303
Title
Cunningham Park Lower Redwood Playground Spray Shower Area Reconstruction
Summary
This project will reconstruct the spray shower area at Lower Redwood Playground in Cunningham Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-02-01T00:00:00.000
Designprojectedcompletion
2022-11-01T00:00:00.000
Designactualcompletion
2022-09-01T00:00:00.000
Procurementstart
2022-09-01T00:00:00.000
Procurementprojectedcompletion
2023-06-01T00:00:00.000
Procurementadjustedcompletion
2023-09-01T00:00:00.000
Procurementactualcompletion
2023-08-01T00:00:00.000
Constructionstart
2023-10-01T00:00:00.000
Constructionprojectedcom
2024-07-01T00:00:00.000
Constructionactualcompletion
2023-12-01T00:00:00.000
Totalfunding
Less than $1 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Name
East side of Cunningham Park at 193rd Street and Aberdeen Road.
Parkid
Q021
Latitude
40.738989
Longitude
-73.772655
Borough
Queens
VIEW LOCATION
11077
Trackerid: 11077 • Title: Cunningham Park Ballfields 18 and 19 Reconstruction • Summary: This project will reconstruct the ballfields 18 and 19 at Cunningham Park.
Trackerid
11077
Title
Cunningham Park Ballfields 18 and 19 Reconstruction
Summary
This project will reconstruct the ballfields 18 and 19 at Cunningham Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Greater than $10 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Francis Lewis Boulevard north of 73rd Avenue
Parkid
Q021
Latitude
40.73523027
Longitude
-73.76949591
Borough
Queens
VIEW LOCATION
6486
Trackerid: 6486 • Fmsid: 846 P-408CPPA • Title: Cunningham Park Picnic Area Reconstruction and Performance Area Construction
Trackerid
6486
Fmsid
846 P-408CPPA
Title
Cunningham Park Picnic Area Reconstruction and Performance Area Construction
Summary
This project will reconstruct the picnic area and the adjacent pathways, and construct a performance area in Cunningham Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-04-01T00:00:00.000
Designprojectedcompletion
2016-03-01T00:00:00.000
Designadjustedcompletion
2016-04-01T00:00:00.000
Designactualcompletion
2016-05-01T00:00:00.000
Procurementstart
2016-05-01T00:00:00.000
Procurementprojectedcompletion
2017-01-01T00:00:00.000
Procurementadjustedcompletion
2017-04-01T00:00:00.000
Procurementactualcompletion
2017-03-01T00:00:00.000
Constructionstart
2017-06-01T00:00:00.000
Constructionprojectedcom
2018-09-01T00:00:00.000
Constructionactualcompletion
2018-09-01T00:00:00.000
Totalfunding
$2,506,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Grand Central Parkway between 193rd Street, Francis Lewis Boulevard, Hollis Hills Terrace and 210th Street.
Parkid
Q021
Latitude
40.729473
Longitude
-73.770314
Borough
Queens
VIEW LOCATION
11261
Trackerid: 11261 • Title: Cunningham Park Pickleball Court Construction and Parking Lot Reconstruction • Currentphase: proposed
Trackerid
11261
Title
Cunningham Park Pickleball Court Construction and Parking Lot Reconstruction
Summary
This project will reconstruct pickleball courts and reconstruct the parking lot on Hollis Hills Terrace in Cunningham Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $3 million and $5 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council, State
Name
Hollis Hills Terrace near 73rd Avenue
Parkid
Q021
Latitude
40.73441044
Longitude
-73.76866908
Borough
Queens
VIEW LOCATION
9202
Trackerid: 9202 • Fmsid: 846 P-408VAN2 • Title: Vanderbilt Motor Parkway Reconstruction Phase 2
Trackerid
9202
Fmsid
846 P-408VAN2
Title
Vanderbilt Motor Parkway Reconstruction Phase 2
Summary
This project will reconstruct Vanderbilt Motor Parkway from Springfield Boulevard to 199th Street, north of 67th Avenue.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-09-01T00:00:00.000
Designprojectedcompletion
2020-03-01T00:00:00.000
Designactualcompletion
2020-03-01T00:00:00.000
Procurementstart
2020-03-01T00:00:00.000
Procurementprojectedcompletion
2020-12-01T00:00:00.000
Procurementadjustedcompletion
2022-04-01T00:00:00.000
Procurementactualcompletion
2022-04-01T00:00:00.000
Constructionstart
2022-07-01T00:00:00.000
Constructionprojectedcom
2023-07-01T00:00:00.000
Constructionactualcompletion
2023-04-01T00:00:00.000
Totalfunding
$3,685,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Horace Harding Expressway, Grand Central Parkway
Parkid
Q021
Latitude
40.734757
Longitude
-73.768316
Borough
Queens
VIEW LOCATION
9202
Trackerid: 9202 • Fmsid: 846 P-408VAN2 • Title: Vanderbilt Motor Parkway Reconstruction Phase 2
Trackerid
9202
Fmsid
846 P-408VAN2
Title
Vanderbilt Motor Parkway Reconstruction Phase 2
Summary
This project will reconstruct Vanderbilt Motor Parkway from Springfield Boulevard to 199th Street, north of 67th Avenue.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-09-01T00:00:00.000
Designprojectedcompletion
2020-03-01T00:00:00.000
Designactualcompletion
2020-03-01T00:00:00.000
Procurementstart
2020-03-01T00:00:00.000
Procurementprojectedcompletion
2020-12-01T00:00:00.000
Procurementadjustedcompletion
2022-04-01T00:00:00.000
Procurementactualcompletion
2022-04-01T00:00:00.000
Constructionstart
2022-07-01T00:00:00.000
Constructionprojectedcom
2023-07-01T00:00:00.000
Constructionactualcompletion
2023-04-01T00:00:00.000
Totalfunding
$3,685,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Underhill Avenue, Peck Avenue, 199 Street between Fresh Meadow Lane and Francis Lewis Bouelvard, Union Turnpike
Parkid
Q300A
Latitude
40.737211
Longitude
-73.773801
Borough
Queens
VIEW LOCATION
9202
Trackerid: 9202 • Fmsid: 846 P-408VAN2 • Title: Vanderbilt Motor Parkway Reconstruction Phase 2
Trackerid
9202
Fmsid
846 P-408VAN2
Title
Vanderbilt Motor Parkway Reconstruction Phase 2
Summary
This project will reconstruct Vanderbilt Motor Parkway from Springfield Boulevard to 199th Street, north of 67th Avenue.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-09-01T00:00:00.000
Designprojectedcompletion
2020-03-01T00:00:00.000
Designactualcompletion
2020-03-01T00:00:00.000
Procurementstart
2020-03-01T00:00:00.000
Procurementprojectedcompletion
2020-12-01T00:00:00.000
Procurementadjustedcompletion
2022-04-01T00:00:00.000
Procurementactualcompletion
2022-04-01T00:00:00.000
Constructionstart
2022-07-01T00:00:00.000
Constructionprojectedcom
2023-07-01T00:00:00.000
Constructionactualcompletion
2023-04-01T00:00:00.000
Totalfunding
$3,685,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Cloverdale-Hollis Court Boulevards, Kingsbury-Richland Avenues
Parkid
Q130
Latitude
40.736724
Longitude
-73.755357
Borough
Queens
VIEW LOCATION
6009
Trackerid: 6009 • Fmsid: 846 P-4PLG13C • Title: Queens General Site Work (QG-413M)
Trackerid
6009
Fmsid
846 P-4PLG13C
Title
Queens General Site Work (QG-413M)
Summary
This project will reconstruct the handball courts and sidewalks at various locations in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-01-01T00:00:00.000
Designprojectedcompletion
2013-03-01T00:00:00.000
Designadjustedcompletion
2013-08-01T00:00:00.000
Designactualcompletion
2013-08-01T00:00:00.000
Procurementstart
2013-08-01T00:00:00.000
Procurementprojectedcompletion
2014-05-01T00:00:00.000
Procurementadjustedcompletion
2015-09-01T00:00:00.000
Procurementactualcompletion
2015-10-01T00:00:00.000
Constructionstart
2016-03-01T00:00:00.000
Constructionprojectedcom
2017-09-01T00:00:00.000
Constructionactualcompletion
2017-07-01T00:00:00.000
Totalfunding
$231,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral State
Name
LIE., 73 Ave., Union Turnpike, GCP bet. 193 St., Francis Lewis Blvd., Hollis Hills Ter., and 210 St.
Parkid
Q021
Latitude
40.735687
Longitude
-73.76924
Borough
Queens
VIEW LOCATION
6009
Trackerid: 6009 • Fmsid: 846 P-4PLG13C • Title: Queens General Site Work (QG-413M)
Trackerid
6009
Fmsid
846 P-4PLG13C
Title
Queens General Site Work (QG-413M)
Summary
This project will reconstruct the handball courts and sidewalks at various locations in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-01-01T00:00:00.000
Designprojectedcompletion
2013-03-01T00:00:00.000
Designadjustedcompletion
2013-08-01T00:00:00.000
Designactualcompletion
2013-08-01T00:00:00.000
Procurementstart
2013-08-01T00:00:00.000
Procurementprojectedcompletion
2014-05-01T00:00:00.000
Procurementadjustedcompletion
2015-09-01T00:00:00.000
Procurementactualcompletion
2015-10-01T00:00:00.000
Constructionstart
2016-03-01T00:00:00.000
Constructionprojectedcom
2017-09-01T00:00:00.000
Constructionactualcompletion
2017-07-01T00:00:00.000
Totalfunding
$231,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral State
Name
58 Ave. bet. Brown Pl. and 69 St.
Parkid
Q360M
Latitude
40.724703
Longitude
-73.895263
Borough
Queens
VIEW LOCATION
6009
Trackerid: 6009 • Fmsid: 846 P-4PLG13C • Title: Queens General Site Work (QG-413M)
Trackerid
6009
Fmsid
846 P-4PLG13C
Title
Queens General Site Work (QG-413M)
Summary
This project will reconstruct the handball courts and sidewalks at various locations in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-01-01T00:00:00.000
Designprojectedcompletion
2013-03-01T00:00:00.000
Designadjustedcompletion
2013-08-01T00:00:00.000
Designactualcompletion
2013-08-01T00:00:00.000
Procurementstart
2013-08-01T00:00:00.000
Procurementprojectedcompletion
2014-05-01T00:00:00.000
Procurementadjustedcompletion
2015-09-01T00:00:00.000
Procurementactualcompletion
2015-10-01T00:00:00.000
Constructionstart
2016-03-01T00:00:00.000
Constructionprojectedcom
2017-09-01T00:00:00.000
Constructionactualcompletion
2017-07-01T00:00:00.000
Totalfunding
$231,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral State
Name
52 St., Woodside Ave. bet. 39 Rd. and 39 Dr.
Parkid
Q031
Latitude
40.747507
Longitude
-73.910736
Borough
Queens
VIEW LOCATION
3157
Trackerid: 3157 • Fmsid: 846 P-408CPB2 • Title: Cunningham Park Ballfields 2-4 Reconstruction
Trackerid
3157
Fmsid
846 P-408CPB2
Title
Cunningham Park Ballfields 2-4 Reconstruction
Summary
This project will reconstruct ballfields 2, 3 and 4 in Cunningham Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2008-08-01T00:00:00.000
Designprojectedcompletion
2009-06-01T00:00:00.000
Designadjustedcompletion
2011-05-01T00:00:00.000
Designactualcompletion
2011-05-01T00:00:00.000
Procurementstart
2011-05-01T00:00:00.000
Procurementprojectedcompletion
2012-02-01T00:00:00.000
Procurementactualcompletion
2012-05-01T00:00:00.000
Constructionstart
2012-07-01T00:00:00.000
Constructionprojectedcom
2013-07-01T00:00:00.000
Constructionadjustedcompletion
2013-07-01T00:00:00.000
Constructionactualcompletion
2013-07-01T00:00:00.000
Totalfunding
$1,461,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council
Name
Near Union Turnpike and 193rd Street.
Parkid
Q021
Latitude
40.729602
Longitude
-73.776011
Borough
Queens
VIEW LOCATION
8649
Trackerid: 8649 • Fmsid: 846 P-408CPGA • Title: Cunningham Park Garage Reconstruction
Trackerid
8649
Fmsid
846 P-408CPGA
Title
Cunningham Park Garage Reconstruction
Summary
This project will reconstruct the garage in Cunningham Park.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
57.25
Designstart
2018-11-01T00:00:00.000
Designprojectedcompletion
2020-02-01T00:00:00.000
Designadjustedcompletion
2020-12-01T00:00:00.000
Designactualcompletion
2020-12-01T00:00:00.000
Procurementstart
2020-12-01T00:00:00.000
Procurementprojectedcompletion
2021-09-01T00:00:00.000
Procurementadjustedcompletion
2024-07-01T00:00:00.000
Procurementactualcompletion
2024-08-01T00:00:00.000
Constructionstart
2024-11-01T00:00:00.000
Constructionprojectedcom
2026-05-01T00:00:00.000
Constructionadjustedcompletion
2026-12-01T00:00:00.000
Totalfunding
$41,294,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Union Turnpike and 199th Street
Parkid
Q021
Latitude
40.730905
Longitude
-73.771143
Borough
Queens
VIEW LOCATION
9821
Trackerid: 9821 • Fmsid: 846 P-202CUGP • Title: Cuyler Gore Park Reconstruction
Trackerid
9821
Fmsid
846 P-202CUGP
Title
Cuyler Gore Park Reconstruction
Summary
This project will reconstruct the entrances, playground and passive recreation area at Cuyler Gore Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-01-01T00:00:00.000
Designprojectedcompletion
2022-01-01T00:00:00.000
Designadjustedcompletion
2022-05-01T00:00:00.000
Designactualcompletion
2022-05-01T00:00:00.000
Procurementstart
2022-05-01T00:00:00.000
Procurementprojectedcompletion
2023-02-01T00:00:00.000
Procurementadjustedcompletion
2024-08-01T00:00:00.000
Procurementactualcompletion
2024-07-01T00:00:00.000
Constructionstart
2024-11-01T00:00:00.000
Constructionprojectedcom
2025-11-01T00:00:00.000
Constructionactualcompletion
2025-11-01T00:00:00.000
Totalfunding
$5,600,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Carlton Avenue, Fulton Street, Greene Avenue
Parkid
B026
Latitude
40.685788
Longitude
-73.971849
Borough
Brooklyn
VIEW LOCATION
7083
Trackerid: 7083 • Fmsid: 846 P-205CYPS • Title: Cypress Hills Playground Synthetic Turf Field Construction
Trackerid
7083
Fmsid
846 P-205CYPS
Title
Cypress Hills Playground Synthetic Turf Field Construction
Summary
This project will construct a new synthetic turf multi-purpose athletic field to replace an existing natural turf field at Cypress Hills Playground. The work will include a new perimeter recreation path, reconstructed dugouts, drinking fountains and misting stations.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-04-01T00:00:00.000
Designprojectedcompletion
2017-04-01T00:00:00.000
Designadjustedcompletion
2017-07-01T00:00:00.000
Designactualcompletion
2017-08-01T00:00:00.000
Procurementstart
2017-08-01T00:00:00.000
Procurementprojectedcompletion
2018-04-01T00:00:00.000
Procurementadjustedcompletion
2018-06-01T00:00:00.000
Procurementactualcompletion
2018-05-01T00:00:00.000
Constructionstart
2018-08-01T00:00:00.000
Constructionprojectedcom
2019-11-01T00:00:00.000
Constructionactualcompletion
2019-10-01T00:00:00.000
Totalfunding
$5,464,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council
Name
Euclid Avenue, Blake Avenue, Dumont Avenue
Parkid
B103
Latitude
40.67044361
Longitude
-73.87168111
Borough
Brooklyn
VIEW LOCATION
10515
Trackerid: 10515 • Fmsid: 846 P-2CPIDMC • Title: D'Emic Playground Reconstruction
Trackerid
10515
Fmsid
846 P-2CPIDMC
Title
D'Emic Playground Reconstruction
Summary
The project will reconstruct D'Emic Playground.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
40.5
Designstart
2023-06-01T00:00:00.000
Designprojectedcompletion
2024-10-01T00:00:00.000
Designactualcompletion
2024-10-01T00:00:00.000
Procurementstart
2025-06-01T00:00:00.000
Procurementprojectedcompletion
2026-06-01T00:00:00.000
Procurementactualcompletion
2026-04-01T00:00:00.000
Constructionstart
2026-06-01T00:00:00.000
Constructionprojectedcom
2027-06-01T00:00:00.000
Totalfunding
$5,888,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
3 Avenue between 35 Street and 34 Street
Parkid
B210B
Latitude
40.65615407
Longitude
-74.00511003
Borough
Brooklyn
VIEW LOCATION
10600
Trackerid: 10600 • Fmsid: 846 P-306DAGP • Title: Dag Hammarskjold Plaza Reconstruction Phase 2
Trackerid
10600
Fmsid
846 P-306DAGP
Title
Dag Hammarskjold Plaza Reconstruction Phase 2
Summary
This project will reconstruct Dag Hammarskjold Plaza Phase 2.
Currentphase
procurement
Designpercentcomplete
100.0
Procurementpercentcomplete
60.0
Constructionpercentcomplete
0.0
Designstart
2023-10-01T00:00:00.000
Designprojectedcompletion
2024-10-01T00:00:00.000
Designactualcompletion
2024-10-01T00:00:00.000
Procurementstart
2026-04-01T00:00:00.000
Procurementprojectedcompletion
2027-04-01T00:00:00.000
Totalfunding
Between $3 million and $5 million
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council
Name
East 47th Street between 1st and 2nd Avenues.
Parkid
M203C
Latitude
40.75228519
Longitude
-73.96887709
Borough
Manhattan
VIEW LOCATION
8628
Trackerid: 8628 • Fmsid: 846 P-3DAGHAM • Title: Dag Hammarskjold Plaza Reconstruction
Trackerid
8628
Fmsid
846 P-3DAGHAM
Title
Dag Hammarskjold Plaza Reconstruction
Summary
This project will reconstruct Dag Hammarskjold Plaza including the fences, benches, pavements, trees, planting beds lighting for art stage lighting.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-05-01T00:00:00.000
Designprojectedcompletion
2018-05-01T00:00:00.000
Designadjustedcompletion
2022-09-01T00:00:00.000
Designactualcompletion
2022-09-01T00:00:00.000
Procurementstart
2022-09-01T00:00:00.000
Procurementprojectedcompletion
2019-02-01T00:00:00.000
Procurementadjustedcompletion
2023-10-01T00:00:00.000
Procurementactualcompletion
2023-12-01T00:00:00.000
Constructionstart
2024-06-01T00:00:00.000
Constructionprojectedcom
2025-06-01T00:00:00.000
Constructionadjustedcompletion
2025-10-01T00:00:00.000
Constructionactualcompletion
2025-08-01T00:00:00.000
Totalfunding
$1,869,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
East 47th Street between First Avenue and Second Avenue
Parkid
M203C
Latitude
40.752335
Longitude
-73.968883
Borough
Manhattan
VIEW LOCATION
10884
Trackerid: 10884 • Title: Dan Ross Playground Reconstruction • Summary: This project will reconstruct Dan Ross Playground.
Trackerid
10884
Title
Dan Ross Playground Reconstruction
Summary
This project will reconstruct Dan Ross Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $3 million and $5 million
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
7th Avenue between 81st Street and 82nd Street
Parkid
B210P
Latitude
40.62278603
Longitude
-74.02163396
Borough
Brooklyn
VIEW LOCATION
10598
Trackerid: 10598 • Title: Daniel Boone Playground Public Restroom Construction • Summary: This project will construct a public restroom at Daniel Boone Playground.
Trackerid
10598
Title
Daniel Boone Playground Public Restroom Construction
Summary
This project will construct a public restroom at Daniel Boone Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $3 million and $5 million
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Boone Avenue & West Farms Road
Parkid
X147B
Latitude
40.82975447
Longitude
-73.88598404
Borough
Bronx
VIEW LOCATION
10110
Trackerid: 10110 • Fmsid: 846 P-1DBPLYG • Title: Daniel Boone Playground Reconstruction
Trackerid
10110
Fmsid
846 P-1DBPLYG
Title
Daniel Boone Playground Reconstruction
Summary
This project will reconstruct Daniel Boone Playground.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
74.0
Designstart
2022-04-01T00:00:00.000
Designprojectedcompletion
2023-04-01T00:00:00.000
Designactualcompletion
2023-06-01T00:00:00.000
Procurementstart
2023-06-01T00:00:00.000
Procurementprojectedcompletion
2025-09-01T00:00:00.000
Procurementadjustedcompletion
2025-07-01T00:00:00.000
Procurementactualcompletion
2025-07-01T00:00:00.000
Constructionstart
2025-10-01T00:00:00.000
Constructionprojectedcom
2026-10-01T00:00:00.000
Totalfunding
$8,401,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council
Name
West Farms Road and Boone Avenue
Parkid
X147B
Latitude
40.82957267
Longitude
-73.88602864
Borough
Bronx
VIEW LOCATION
9553
Trackerid: 9553 • Fmsid: 846 P-412DOP3 • Title: Daniel O'Connell Playground Reconstruction
Trackerid
9553
Fmsid
846 P-412DOP3
Title
Daniel O'Connell Playground Reconstruction
Summary
This project will reconstruct Daniel O'Connell Playground.
Currentphase
procurement
Designpercentcomplete
100.0
Procurementpercentcomplete
5.0
Constructionpercentcomplete
0.0
Designstart
2020-10-01T00:00:00.000
Designprojectedcompletion
2021-10-01T00:00:00.000
Designadjustedcompletion
2026-02-01T00:00:00.000
Designactualcompletion
2026-02-01T00:00:00.000
Procurementstart
2026-08-01T00:00:00.000
Procurementprojectedcompletion
2027-08-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoralPrivate
Name
196th Street, Murdock Avenue, 197th Street, 113th Avenue
Parkid
Q106
Latitude
40.71482689
Longitude
-74.0000704
Borough
Queens
VIEW LOCATION
6129
Trackerid: 6129 • Fmsid: 846 P-412DOP2 • Title: O'Connell Playground Recreation Building Reconstruction
Trackerid
6129
Fmsid
846 P-412DOP2
Title
O'Connell Playground Recreation Building Reconstruction
Summary
This project will reconstruct the recreation building in Daniel M. O'Connell Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-03-01T00:00:00.000
Designprojectedcompletion
2013-05-01T00:00:00.000
Designactualcompletion
2013-12-01T00:00:00.000
Procurementstart
2013-12-01T00:00:00.000
Procurementprojectedcompletion
2014-09-01T00:00:00.000
Procurementadjustedcompletion
2015-04-01T00:00:00.000
Procurementactualcompletion
2018-12-01T00:00:00.000
Constructionstart
2018-10-01T00:00:00.000
Constructionprojectedcom
2019-04-01T00:00:00.000
Constructionactualcompletion
2019-04-01T00:00:00.000
Totalfunding
$2,053,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Murdock Avenue, 113th Avenues, 196th Street, 197th Street
Parkid
Q106
Latitude
40.69986778
Longitude
-73.75809722
Borough
Queens
VIEW LOCATION
11292
Trackerid: 11292 • Title: Davis Playground Reconstruction • Summary: This project will reconstruct Davis Playground.
Trackerid
11292
Title
Davis Playground Reconstruction
Summary
This project will reconstruct Davis Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Less than $1 million
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Jersey Street, Crescent Avenue, Layton Avenue, Beechwood Avenue
Parkid
R086
Latitude
40.64229878
Longitude
-74.0856359
Borough
Staten Island
VIEW LOCATION
10340
Trackerid: 10340 • Fmsid: 846 P-1CPIDPG • Title: Dawson Playground Reconstruction
Trackerid
10340
Fmsid
846 P-1CPIDPG
Title
Dawson Playground Reconstruction
Summary
This project will reconstruct Dawson Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-11-01T00:00:00.000
Designprojectedcompletion
2023-11-01T00:00:00.000
Designactualcompletion
2023-11-01T00:00:00.000
Procurementstart
2023-11-01T00:00:00.000
Procurementprojectedcompletion
2024-11-01T00:00:00.000
Procurementadjustedcompletion
2025-03-01T00:00:00.000
Procurementactualcompletion
2025-01-01T00:00:00.000
Constructionstart
2025-04-01T00:00:00.000
Constructionprojectedcom
2026-04-01T00:00:00.000
Constructionactualcompletion
2026-06-01T00:00:00.000
Totalfunding
$2,839,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Dawson Street and Rogers Place
Parkid
X164
Latitude
40.819526
Longitude
-73.898438
Borough
Bronx
VIEW LOCATION
10079
Trackerid: 10079 • Title: De Hostos Playground Reconstruction • Summary: This project will reconstruct the playground at De Hostos Playground.
Trackerid
10079
Title
De Hostos Playground Reconstruction
Summary
This project will reconstruct the playground at De Hostos Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Less than $1 million
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Harrison Avenue & Lorimer Street
Parkid
B358
Latitude
40.702716
Longitude
-73.949304
Borough
Brooklyn
VIEW LOCATION
7040
Trackerid: 7040 • Fmsid: 846 P-5CPIDMT • Title: DeMatti Park Reconstruction
Trackerid
7040
Fmsid
846 P-5CPIDMT
Title
DeMatti Park Reconstruction
Summary
This project will reconstruct DeMatti Park, with a new playground, spray shower, adult fitness area, lawn, bocce courts, and performance space.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-12-01T00:00:00.000
Designprojectedcompletion
2015-12-01T00:00:00.000
Designactualcompletion
2015-12-01T00:00:00.000
Procurementstart
2015-12-01T00:00:00.000
Procurementprojectedcompletion
2016-09-01T00:00:00.000
Procurementactualcompletion
2016-07-01T00:00:00.000
Constructionstart
2016-09-01T00:00:00.000
Constructionprojectedcom
2018-03-01T00:00:00.000
Constructionactualcompletion
2018-03-01T00:00:00.000
Totalfunding
$5,283,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral State
Name
Tompkins Avenue between Chestnut Street and Shaughnessy Lane
Parkid
R035
Latitude
40.61453278
Longitude
-74.07418472
Borough
Staten Island
VIEW LOCATION
8625
Trackerid: 8625 • Fmsid: 846 P-304DWIT • Title: DeWitt Clinton Park Staircase Reconstruction
Trackerid
8625
Fmsid
846 P-304DWIT
Title
DeWitt Clinton Park Staircase Reconstruction
Summary
This project will reconstruct the staircases in DeWitt Clinton Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-05-01T00:00:00.000
Designprojectedcompletion
2019-05-01T00:00:00.000
Designactualcompletion
2019-05-01T00:00:00.000
Procurementstart
2019-05-01T00:00:00.000
Procurementprojectedcompletion
2020-02-01T00:00:00.000
Procurementactualcompletion
2020-02-01T00:00:00.000
Constructionstart
2020-09-01T00:00:00.000
Constructionprojectedcom
2021-09-01T00:00:00.000
Constructionactualcompletion
2021-09-01T00:00:00.000
Totalfunding
$1,607,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
11th Avenue, 12th Avenue, West 52nd Street, West 54th Street
Parkid
M022
Latitude
40.768191
Longitude
-73.994289
Borough
Manhattan
VIEW LOCATION
10449
Trackerid: 10449 • Fmsid: 846 P-304DWCP • Title: De Witt Clinton Park Reconstruction
Trackerid
10449
Fmsid
846 P-304DWCP
Title
De Witt Clinton Park Reconstruction
Summary
This project will reconstruct De Witt Clinton Park.
Currentphase
design
Designpercentcomplete
50.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2025-06-01T00:00:00.000
Designprojectedcompletion
2026-07-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
De Witt Clinton Playground in De Witt Clinton Park on the 12th Ave side between West 52nd Street and West 54th Streets
Parkid
M022
Latitude
40.76825276
Longitude
-73.99441844
Borough
Manhattan
VIEW LOCATION
6101
Trackerid: 6101 • Fmsid: 846 P-3PLG13B • Title: Manhattan General Site Work (MG-213M)
Trackerid
6101
Fmsid
846 P-3PLG13B
Title
Manhattan General Site Work (MG-213M)
Summary
This project will reconstruct pavements, fences, plantings, plumbing and general site work in Manhattan.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-03-01T00:00:00.000
Designprojectedcompletion
2014-05-01T00:00:00.000
Designactualcompletion
2014-06-01T00:00:00.000
Procurementstart
2014-06-01T00:00:00.000
Procurementprojectedcompletion
2015-03-01T00:00:00.000
Procurementadjustedcompletion
2015-05-01T00:00:00.000
Procurementactualcompletion
2015-06-01T00:00:00.000
Constructionstart
2015-06-01T00:00:00.000
Constructionprojectedcom
2016-12-01T00:00:00.000
Constructionactualcompletion
2016-12-01T00:00:00.000
Totalfunding
$1,059,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
W. 52 St. To W. 54 St., 11 Ave. To 12 Ave.
Parkid
M022
Latitude
40.767975
Longitude
-73.994061
Borough
Manhattan
VIEW LOCATION
6101
Trackerid: 6101 • Fmsid: 846 P-3PLG13B • Title: Manhattan General Site Work (MG-213M)
Trackerid
6101
Fmsid
846 P-3PLG13B
Title
Manhattan General Site Work (MG-213M)
Summary
This project will reconstruct pavements, fences, plantings, plumbing and general site work in Manhattan.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-03-01T00:00:00.000
Designprojectedcompletion
2014-05-01T00:00:00.000
Designactualcompletion
2014-06-01T00:00:00.000
Procurementstart
2014-06-01T00:00:00.000
Procurementprojectedcompletion
2015-03-01T00:00:00.000
Procurementadjustedcompletion
2015-05-01T00:00:00.000
Procurementactualcompletion
2015-06-01T00:00:00.000
Constructionstart
2015-06-01T00:00:00.000
Constructionprojectedcom
2016-12-01T00:00:00.000
Constructionactualcompletion
2016-12-01T00:00:00.000
Totalfunding
$1,059,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
10 Ave., W. 47 St. To W. 48 St.
Parkid
M277
Latitude
40.762942
Longitude
-73.99258
Borough
Manhattan
VIEW LOCATION
6101
Trackerid: 6101 • Fmsid: 846 P-3PLG13B • Title: Manhattan General Site Work (MG-213M)
Trackerid
6101
Fmsid
846 P-3PLG13B
Title
Manhattan General Site Work (MG-213M)
Summary
This project will reconstruct pavements, fences, plantings, plumbing and general site work in Manhattan.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-03-01T00:00:00.000
Designprojectedcompletion
2014-05-01T00:00:00.000
Designactualcompletion
2014-06-01T00:00:00.000
Procurementstart
2014-06-01T00:00:00.000
Procurementprojectedcompletion
2015-03-01T00:00:00.000
Procurementadjustedcompletion
2015-05-01T00:00:00.000
Procurementactualcompletion
2015-06-01T00:00:00.000
Constructionstart
2015-06-01T00:00:00.000
Constructionprojectedcom
2016-12-01T00:00:00.000
Constructionactualcompletion
2016-12-01T00:00:00.000
Totalfunding
$1,059,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
71 St. Between West End Ave. and Amsterdam Ave.
Parkid
M282
Latitude
40.778632
Longitude
-73.984343
Borough
Manhattan
VIEW LOCATION
6101
Trackerid: 6101 • Fmsid: 846 P-3PLG13B • Title: Manhattan General Site Work (MG-213M)
Trackerid
6101
Fmsid
846 P-3PLG13B
Title
Manhattan General Site Work (MG-213M)
Summary
This project will reconstruct pavements, fences, plantings, plumbing and general site work in Manhattan.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-03-01T00:00:00.000
Designprojectedcompletion
2014-05-01T00:00:00.000
Designactualcompletion
2014-06-01T00:00:00.000
Procurementstart
2014-06-01T00:00:00.000
Procurementprojectedcompletion
2015-03-01T00:00:00.000
Procurementadjustedcompletion
2015-05-01T00:00:00.000
Procurementactualcompletion
2015-06-01T00:00:00.000
Constructionstart
2015-06-01T00:00:00.000
Constructionprojectedcom
2016-12-01T00:00:00.000
Constructionactualcompletion
2016-12-01T00:00:00.000
Totalfunding
$1,059,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
E. 4 St. bet. Ave. C and Ave. D
Parkid
M354
Latitude
40.721339
Longitude
-73.978454
Borough
Manhattan
VIEW LOCATION
6260
Trackerid: 6260 • Fmsid: 846 P-6RFMN14 • Title: Manhattan Roofing Systems Reconstruction (MG-614M)
Trackerid
6260
Fmsid
846 P-6RFMN14
Title
Manhattan Roofing Systems Reconstruction (MG-614M)
Summary
This project will reconstruct roofing systems in Manhattan.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-12-01T00:00:00.000
Designprojectedcompletion
2014-01-01T00:00:00.000
Designactualcompletion
2014-03-01T00:00:00.000
Procurementstart
2014-03-01T00:00:00.000
Procurementprojectedcompletion
2014-12-01T00:00:00.000
Procurementadjustedcompletion
2015-07-01T00:00:00.000
Procurementactualcompletion
2015-07-01T00:00:00.000
Constructionstart
2015-09-01T00:00:00.000
Constructionprojectedcom
2018-09-01T00:00:00.000
Constructionactualcompletion
2017-09-01T00:00:00.000
Totalfunding
$929,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
W. 52 St. To W. 54 St., 11 Ave. To 12 Ave.
Parkid
M022
Latitude
40.768663
Longitude
-73.994496
Borough
Manhattan
VIEW LOCATION
6260
Trackerid: 6260 • Fmsid: 846 P-6RFMN14 • Title: Manhattan Roofing Systems Reconstruction (MG-614M)
Trackerid
6260
Fmsid
846 P-6RFMN14
Title
Manhattan Roofing Systems Reconstruction (MG-614M)
Summary
This project will reconstruct roofing systems in Manhattan.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-12-01T00:00:00.000
Designprojectedcompletion
2014-01-01T00:00:00.000
Designactualcompletion
2014-03-01T00:00:00.000
Procurementstart
2014-03-01T00:00:00.000
Procurementprojectedcompletion
2014-12-01T00:00:00.000
Procurementadjustedcompletion
2015-07-01T00:00:00.000
Procurementactualcompletion
2015-07-01T00:00:00.000
Constructionstart
2015-09-01T00:00:00.000
Constructionprojectedcom
2018-09-01T00:00:00.000
Constructionactualcompletion
2017-09-01T00:00:00.000
Totalfunding
$929,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Riverside Drive to Broadway, West 192 to Dyckman Streets
Parkid
M029
Latitude
40.862503
Longitude
-73.930722
Borough
Manhattan
VIEW LOCATION
6260
Trackerid: 6260 • Fmsid: 846 P-6RFMN14 • Title: Manhattan Roofing Systems Reconstruction (MG-614M)
Trackerid
6260
Fmsid
846 P-6RFMN14
Title
Manhattan Roofing Systems Reconstruction (MG-614M)
Summary
This project will reconstruct roofing systems in Manhattan.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-12-01T00:00:00.000
Designprojectedcompletion
2014-01-01T00:00:00.000
Designactualcompletion
2014-03-01T00:00:00.000
Procurementstart
2014-03-01T00:00:00.000
Procurementprojectedcompletion
2014-12-01T00:00:00.000
Procurementadjustedcompletion
2015-07-01T00:00:00.000
Procurementactualcompletion
2015-07-01T00:00:00.000
Constructionstart
2015-09-01T00:00:00.000
Constructionprojectedcom
2018-09-01T00:00:00.000
Constructionactualcompletion
2017-09-01T00:00:00.000
Totalfunding
$929,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Northern Extreme of Park including 2 Ballfields, Lawn Areas, Sitting Areas
Parkid
M144
Latitude
40.723859
Longitude
-73.972833
Borough
Manhattan
VIEW LOCATION
6260
Trackerid: 6260 • Fmsid: 846 P-6RFMN14 • Title: Manhattan Roofing Systems Reconstruction (MG-614M)
Trackerid
6260
Fmsid
846 P-6RFMN14
Title
Manhattan Roofing Systems Reconstruction (MG-614M)
Summary
This project will reconstruct roofing systems in Manhattan.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-12-01T00:00:00.000
Designprojectedcompletion
2014-01-01T00:00:00.000
Designactualcompletion
2014-03-01T00:00:00.000
Procurementstart
2014-03-01T00:00:00.000
Procurementprojectedcompletion
2014-12-01T00:00:00.000
Procurementadjustedcompletion
2015-07-01T00:00:00.000
Procurementactualcompletion
2015-07-01T00:00:00.000
Constructionstart
2015-09-01T00:00:00.000
Constructionprojectedcom
2018-09-01T00:00:00.000
Constructionactualcompletion
2017-09-01T00:00:00.000
Totalfunding
$929,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Lenox Ave, W. 113 St. To W. 114 St.
Parkid
M198
Latitude
40.800324
Longitude
-73.950319
Borough
Manhattan
VIEW LOCATION
6260
Trackerid: 6260 • Fmsid: 846 P-6RFMN14 • Title: Manhattan Roofing Systems Reconstruction (MG-614M)
Trackerid
6260
Fmsid
846 P-6RFMN14
Title
Manhattan Roofing Systems Reconstruction (MG-614M)
Summary
This project will reconstruct roofing systems in Manhattan.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-12-01T00:00:00.000
Designprojectedcompletion
2014-01-01T00:00:00.000
Designactualcompletion
2014-03-01T00:00:00.000
Procurementstart
2014-03-01T00:00:00.000
Procurementprojectedcompletion
2014-12-01T00:00:00.000
Procurementadjustedcompletion
2015-07-01T00:00:00.000
Procurementactualcompletion
2015-07-01T00:00:00.000
Constructionstart
2015-09-01T00:00:00.000
Constructionprojectedcom
2018-09-01T00:00:00.000
Constructionactualcompletion
2017-09-01T00:00:00.000
Totalfunding
$929,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
W. 45 St. Between 9 Ave. and 10 Ave.
Parkid
M154
Latitude
40.761465
Longitude
-73.992671
Borough
Manhattan
VIEW LOCATION
6260
Trackerid: 6260 • Fmsid: 846 P-6RFMN14 • Title: Manhattan Roofing Systems Reconstruction (MG-614M)
Trackerid
6260
Fmsid
846 P-6RFMN14
Title
Manhattan Roofing Systems Reconstruction (MG-614M)
Summary
This project will reconstruct roofing systems in Manhattan.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-12-01T00:00:00.000
Designprojectedcompletion
2014-01-01T00:00:00.000
Designactualcompletion
2014-03-01T00:00:00.000
Procurementstart
2014-03-01T00:00:00.000
Procurementprojectedcompletion
2014-12-01T00:00:00.000
Procurementadjustedcompletion
2015-07-01T00:00:00.000
Procurementactualcompletion
2015-07-01T00:00:00.000
Constructionstart
2015-09-01T00:00:00.000
Constructionprojectedcom
2018-09-01T00:00:00.000
Constructionactualcompletion
2017-09-01T00:00:00.000
Totalfunding
$929,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
West 43 Street, 8 & 9 Avenues
Parkid
M161
Latitude
40.758986
Longitude
-73.991283
Borough
Manhattan
VIEW LOCATION
6260
Trackerid: 6260 • Fmsid: 846 P-6RFMN14 • Title: Manhattan Roofing Systems Reconstruction (MG-614M)
Trackerid
6260
Fmsid
846 P-6RFMN14
Title
Manhattan Roofing Systems Reconstruction (MG-614M)
Summary
This project will reconstruct roofing systems in Manhattan.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-12-01T00:00:00.000
Designprojectedcompletion
2014-01-01T00:00:00.000
Designactualcompletion
2014-03-01T00:00:00.000
Procurementstart
2014-03-01T00:00:00.000
Procurementprojectedcompletion
2014-12-01T00:00:00.000
Procurementadjustedcompletion
2015-07-01T00:00:00.000
Procurementactualcompletion
2015-07-01T00:00:00.000
Constructionstart
2015-09-01T00:00:00.000
Constructionprojectedcom
2018-09-01T00:00:00.000
Constructionactualcompletion
2017-09-01T00:00:00.000
Totalfunding
$929,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Canal St, Essex St, Jefferson St & E Broadway
Parkid
M082
Latitude
40.714777
Longitude
-73.98905
Borough
Manhattan
VIEW LOCATION
11068
Trackerid: 11068 • Fmsid: 846 SEED-DEAN • Title: Dean Playground Reconstruction
Trackerid
11068
Fmsid
846 SEED-DEAN
Title
Dean Playground Reconstruction
Summary
This project will reconstruct Dean Playground.
Currentphase
design
Designpercentcomplete
5.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2026-10-01T00:00:00.000
Designprojectedcompletion
2027-11-01T00:00:00.000
Totalfunding
Greater than $10 million
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Dean Street to Bergen Street between Sixth Avenue and Carlton Avenue
Parkid
B232
Latitude
40.68094254
Longitude
-73.97321642
Borough
Brooklyn
VIEW LOCATION
10604
Trackerid: 10604 • Fmsid: 846 P-4DELGRP • Title: Delphin H. Greene Playground Reconstruction
Trackerid
10604
Fmsid
846 P-4DELGRP
Title
Delphin H. Greene Playground Reconstruction
Summary
This project will reconstruct Delphin H. Greene Playground.
Currentphase
design
Designpercentcomplete
50.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2025-06-01T00:00:00.000
Designprojectedcompletion
2026-07-01T00:00:00.000
Designadjustedcompletion
2026-09-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council
Name
121 Avenue between 235 Street and 237 Street
Parkid
Q307
Latitude
40.68467999
Longitude
-73.72883442
Borough
Queens
VIEW LOCATION
8669
Trackerid: 8669 • Fmsid: 846 P-3DELURY • Title: DeLury Square Reconstruction
Trackerid
8669
Fmsid
846 P-3DELURY
Title
DeLury Square Reconstruction
Summary
This project will reconstruct DeLury Square.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-11-01T00:00:00.000
Designprojectedcompletion
2018-11-01T00:00:00.000
Designactualcompletion
2018-11-01T00:00:00.000
Procurementstart
2018-11-01T00:00:00.000
Procurementprojectedcompletion
2019-08-01T00:00:00.000
Procurementadjustedcompletion
2019-11-01T00:00:00.000
Procurementactualcompletion
2019-10-01T00:00:00.000
Constructionstart
2020-02-01T00:00:00.000
Constructionprojectedcom
2020-11-01T00:00:00.000
Constructionactualcompletion
2020-11-01T00:00:00.000
Totalfunding
$303,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Fulton Street between Gold and Cliff Streets
Parkid
M385
Latitude
40.70909
Longitude
-74.005071
Borough
Manhattan
VIEW LOCATION
5971
Trackerid: 5971 • Fmsid: 846 P-302DPCA • Title: DeSalvio Playground Reconstruction
Trackerid
5971
Fmsid
846 P-302DPCA
Title
DeSalvio Playground Reconstruction
Summary
This project will reconstruct DeSalvio Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-10-01T00:00:00.000
Designprojectedcompletion
2015-06-01T00:00:00.000
Designadjustedcompletion
2015-08-01T00:00:00.000
Designactualcompletion
2015-09-01T00:00:00.000
Procurementstart
2015-09-01T00:00:00.000
Procurementprojectedcompletion
2016-06-01T00:00:00.000
Procurementadjustedcompletion
2016-12-01T00:00:00.000
Procurementactualcompletion
2016-12-01T00:00:00.000
Constructionstart
2017-07-01T00:00:00.000
Constructionprojectedcom
2018-07-01T00:00:00.000
Constructionadjustedcompletion
2019-01-01T00:00:00.000
Constructionactualcompletion
2019-02-01T00:00:00.000
Totalfunding
$1,739,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council
Name
Mulberry and Spring Streets
Parkid
M218
Latitude
40.72164861
Longitude
-73.99611194
Borough
Manhattan
VIEW LOCATION
1214111
Trackerid: 1214111 • Fmsid: 846 P-4LIBTPL • Title: Liberty Pool Deck Reconstruction
Trackerid
1214111
Fmsid
846 P-4LIBTPL
Title
Liberty Pool Deck Reconstruction
Summary
This project will reconstruct the pool deck at Liberty Pool.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-09-01T00:00:00.000
Designprojectedcompletion
2020-09-01T00:00:00.000
Designadjustedcompletion
2021-12-01T00:00:00.000
Designactualcompletion
2021-09-01T00:00:00.000
Procurementstart
2019-09-01T00:00:00.000
Procurementprojectedcompletion
2020-02-01T00:00:00.000
Procurementactualcompletion
2021-09-01T00:00:00.000
Constructionstart
2021-10-01T00:00:00.000
Constructionprojectedcom
2022-06-01T00:00:00.000
Constructionactualcompletion
2022-05-01T00:00:00.000
Totalfunding
$1,301,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
Q121
Latitude
40.703165
Longitude
-73.784593
Borough
Queens
VIEW LOCATION
6008
Trackerid: 6008 • Fmsid: 846 P-4PLG13D • Title: Queens General Site Work (QG-513M)
Trackerid
6008
Fmsid
846 P-4PLG13D
Title
Queens General Site Work (QG-513M)
Summary
This project will reconstruct pavements, handball courts, fencing, and plantings in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-02-01T00:00:00.000
Designprojectedcompletion
2013-03-01T00:00:00.000
Designactualcompletion
2013-04-01T00:00:00.000
Procurementstart
2013-04-01T00:00:00.000
Procurementprojectedcompletion
2014-01-01T00:00:00.000
Procurementactualcompletion
2014-06-01T00:00:00.000
Constructionstart
2014-08-01T00:00:00.000
Constructionprojectedcom
2016-02-01T00:00:00.000
Constructionactualcompletion
2016-02-01T00:00:00.000
Totalfunding
$891,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
106th Avenue, 173rd Street, Liberty Avenue, 172nd Street
Parkid
Q121
Latitude
40.703684
Longitude
-73.784901
Borough
Queens
VIEW LOCATION
6008
Trackerid: 6008 • Fmsid: 846 P-4PLG13D • Title: Queens General Site Work (QG-513M)
Trackerid
6008
Fmsid
846 P-4PLG13D
Title
Queens General Site Work (QG-513M)
Summary
This project will reconstruct pavements, handball courts, fencing, and plantings in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-02-01T00:00:00.000
Designprojectedcompletion
2013-03-01T00:00:00.000
Designactualcompletion
2013-04-01T00:00:00.000
Procurementstart
2013-04-01T00:00:00.000
Procurementprojectedcompletion
2014-01-01T00:00:00.000
Procurementactualcompletion
2014-06-01T00:00:00.000
Constructionstart
2014-08-01T00:00:00.000
Constructionprojectedcom
2016-02-01T00:00:00.000
Constructionactualcompletion
2016-02-01T00:00:00.000
Totalfunding
$891,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Poppenhusen Ave. bet. 115 St. and College Pl.
Parkid
Q009
Latitude
40.792419
Longitude
-73.853222
Borough
Queens
VIEW LOCATION
6008
Trackerid: 6008 • Fmsid: 846 P-4PLG13D • Title: Queens General Site Work (QG-513M)
Trackerid
6008
Fmsid
846 P-4PLG13D
Title
Queens General Site Work (QG-513M)
Summary
This project will reconstruct pavements, handball courts, fencing, and plantings in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-02-01T00:00:00.000
Designprojectedcompletion
2013-03-01T00:00:00.000
Designactualcompletion
2013-04-01T00:00:00.000
Procurementstart
2013-04-01T00:00:00.000
Procurementprojectedcompletion
2014-01-01T00:00:00.000
Procurementactualcompletion
2014-06-01T00:00:00.000
Constructionstart
2014-08-01T00:00:00.000
Constructionprojectedcom
2016-02-01T00:00:00.000
Constructionactualcompletion
2016-02-01T00:00:00.000
Totalfunding
$891,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Greenpoint & 47th Avenues, 43 Street
Parkid
Q044
Latitude
40.741191
Longitude
-73.922587
Borough
Queens
VIEW LOCATION
6008
Trackerid: 6008 • Fmsid: 846 P-4PLG13D • Title: Queens General Site Work (QG-513M)
Trackerid
6008
Fmsid
846 P-4PLG13D
Title
Queens General Site Work (QG-513M)
Summary
This project will reconstruct pavements, handball courts, fencing, and plantings in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-02-01T00:00:00.000
Designprojectedcompletion
2013-03-01T00:00:00.000
Designactualcompletion
2013-04-01T00:00:00.000
Procurementstart
2013-04-01T00:00:00.000
Procurementprojectedcompletion
2014-01-01T00:00:00.000
Procurementactualcompletion
2014-06-01T00:00:00.000
Constructionstart
2014-08-01T00:00:00.000
Constructionprojectedcom
2016-02-01T00:00:00.000
Constructionactualcompletion
2016-02-01T00:00:00.000
Totalfunding
$891,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Lewis Ave. bet. 101 St. and 102 St.
Parkid
Q473
Latitude
40.740342
Longitude
-73.859087
Borough
Queens
VIEW LOCATION
6132
Trackerid: 6132 • Fmsid: 846 P-6BLD14B • Title: Queens General Public Restroom Building and Facility Reconstruction (QG-1513MA1)
Trackerid
6132
Fmsid
846 P-6BLD14B
Title
Queens General Public Restroom Building and Facility Reconstruction (QG-1513MA1)
Summary
This project will reconstruct public restroom buildings and facilities at various parks and recreation locations in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-05-01T00:00:00.000
Designprojectedcompletion
2013-05-01T00:00:00.000
Designadjustedcompletion
2015-08-01T00:00:00.000
Designactualcompletion
2015-07-01T00:00:00.000
Procurementstart
2015-07-01T00:00:00.000
Procurementprojectedcompletion
2016-04-01T00:00:00.000
Procurementadjustedcompletion
2017-04-01T00:00:00.000
Procurementactualcompletion
2017-03-01T00:00:00.000
Constructionstart
2017-04-01T00:00:00.000
Constructionprojectedcom
2019-04-01T00:00:00.000
Constructionactualcompletion
2018-09-01T00:00:00.000
Totalfunding
$1,470,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
173 St., 172 St. bet. Liberty Ave., 106 Ave., Polhemas Ave. and 107 Ave.
Parkid
Q121
Latitude
40.701901
Longitude
-73.783479
Borough
Queens
VIEW LOCATION
6132
Trackerid: 6132 • Fmsid: 846 P-6BLD14B • Title: Queens General Public Restroom Building and Facility Reconstruction (QG-1513MA1)
Trackerid
6132
Fmsid
846 P-6BLD14B
Title
Queens General Public Restroom Building and Facility Reconstruction (QG-1513MA1)
Summary
This project will reconstruct public restroom buildings and facilities at various parks and recreation locations in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-05-01T00:00:00.000
Designprojectedcompletion
2013-05-01T00:00:00.000
Designadjustedcompletion
2015-08-01T00:00:00.000
Designactualcompletion
2015-07-01T00:00:00.000
Procurementstart
2015-07-01T00:00:00.000
Procurementprojectedcompletion
2016-04-01T00:00:00.000
Procurementadjustedcompletion
2017-04-01T00:00:00.000
Procurementactualcompletion
2017-03-01T00:00:00.000
Constructionstart
2017-04-01T00:00:00.000
Constructionprojectedcom
2019-04-01T00:00:00.000
Constructionactualcompletion
2018-09-01T00:00:00.000
Totalfunding
$1,470,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
111 Av, 134 and 135 Sts, Lincoln St
Parkid
Q119
Latitude
40.68313
Longitude
-73.807923
Borough
Queens
VIEW LOCATION