Capital Project Tracker

A listing of all capital projects managed by NYC Parks, and a timeline for their completion.

Supporting documentation can be found at the following link (http://www.nycgovparks.org/bigapps/desc/DPR_CapitalProjectTracker_001.txt).

See JSON and XML feeds here https://data.cityofnewyork.us/Recreation/Capital-Project-Tracker/qiwj-i2jk

Recreation Department of Parks and Recreation (DPR) Dataset 4hcv-tc5r 29 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
8551
Trackerid: 8551 • Currentphase: proposed • Designpercentcomplete: 0.0
Trackerid
8551
Title
Flushing Meadows Corona Park World's Fair Marina Reconstruction (Hurricane Sandy)
Summary
This project will reconstruct the deteriorated fixed piers, floating docks, bulkhead, and related components, including Sandy-damaged elements.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Greater than $10 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
FederalMayoral
Name
Flushing Bay, at 125-00 Northern Boulevard
Parkid
Q099
Latitude
40.75980597
Longitude
-73.84868069
Borough
Queens
VIEW LOCATION
11387
Trackerid: 11387 • Title: Flushing Meadows Corona Park Fountain of the Fairs Reconstruction Phase 2 • Currentphase: proposed
Trackerid
11387
Title
Flushing Meadows Corona Park Fountain of the Fairs Reconstruction Phase 2
Summary
This project will reconstruct the center fountain at Fountain of the Fairs at Flushing Meadows Corona Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $3 million and $5 million
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Fountain of the Fairs Promenade at United Nations Avenue
Parkid
Q099
Latitude
40.746247
Longitude
-73.8449653
Borough
Queens
VIEW LOCATION
7260
Trackerid: 7260 • Fmsid: 846 P-415WRLD • Title: World's Fair Playground Asphalt Field Reconstruction
Trackerid
7260
Fmsid
846 P-415WRLD
Title
World's Fair Playground Asphalt Field Reconstruction
Summary
This project will reconstruct the asphalt field at World's Fair Playground in Flushing Meadows Corona Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-10-01T00:00:00.000
Designprojectedcompletion
2017-05-01T00:00:00.000
Designadjustedcompletion
2017-06-01T00:00:00.000
Designactualcompletion
2017-06-01T00:00:00.000
Procurementstart
2017-06-01T00:00:00.000
Procurementprojectedcompletion
2018-03-01T00:00:00.000
Procurementadjustedcompletion
2018-04-01T00:00:00.000
Procurementactualcompletion
2018-04-01T00:00:00.000
Constructionstart
2018-06-01T00:00:00.000
Constructionprojectedcom
2019-06-01T00:00:00.000
Constructionactualcompletion
2019-06-01T00:00:00.000
Totalfunding
$1,563,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President
Name
Grand Central Parkway near 62nd Road
Parkid
Q099
Latitude
40.737993
Longitude
-73.846105
Borough
Queens
VIEW LOCATION
9321
Trackerid: 9321 • Fmsid: 846 SANDY4-29 • Title: Flushing Meadows Corona Park Electrical Vault Reconstruction (Hurricane Sandy)
Trackerid
9321
Fmsid
846 SANDY4-29
Title
Flushing Meadows Corona Park Electrical Vault Reconstruction (Hurricane Sandy)
Summary
This project will reconstruct the electrical vaults in Flushing Meadows Corona Park that were damaged by Hurricane Sandy.
Currentphase
design
Designpercentcomplete
80.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2019-08-01T00:00:00.000
Designprojectedcompletion
2021-10-01T00:00:00.000
Designadjustedcompletion
2026-04-01T00:00:00.000
Totalfunding
Greater than $10 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
FederalMayoral
Name
Grand Central Parkway, Whitestone Expressway between 111th Street and College Point Boulevard, Park Drive East
Parkid
Q099
Latitude
40.74791891
Longitude
-73.84122069
Borough
Queens
VIEW LOCATION
3526
Trackerid: 3526 • Fmsid: 846 P-4PLG11A • Title: Flushing Meadows Corona Park Pavement and Fence Reconstruction
Trackerid
3526
Fmsid
846 P-4PLG11A
Title
Flushing Meadows Corona Park Pavement and Fence Reconstruction
Summary
This project will reconstruct pavements and fences at the tennis courts and near the LIRR tracks in Flushing Meadows Corona Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2010-11-01T00:00:00.000
Designactualcompletion
2011-06-01T00:00:00.000
Procurementstart
2011-06-01T00:00:00.000
Procurementprojectedcompletion
2012-03-01T00:00:00.000
Procurementactualcompletion
2012-09-01T00:00:00.000
Constructionstart
2012-10-01T00:00:00.000
Constructionprojectedcom
2014-04-01T00:00:00.000
Constructionadjustedcompletion
2014-04-01T00:00:00.000
Constructionactualcompletion
2013-09-01T00:00:00.000
Totalfunding
$750,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Federal
Name
Grand Central Pkwy., Whitestone Exwy. bet. 111 St. and College Point Blvd., Park Drive E.
Parkid
Q099
Latitude
40.74814639
Longitude
-73.84129556
Borough
Queens
VIEW LOCATION
3530
Trackerid: 3530 • Fmsid: 846 P-4PLG12B • Title: Queens General Site Work (QG-212M)
Trackerid
3530
Fmsid
846 P-4PLG12B
Title
Queens General Site Work (QG-212M)
Summary
This multisite contract will reconstruct pavements, fencing, plantings and general site work in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2012-09-01T00:00:00.000
Designprojectedcompletion
2012-11-01T00:00:00.000
Designactualcompletion
2013-11-01T00:00:00.000
Procurementstart
2013-11-01T00:00:00.000
Procurementprojectedcompletion
2014-08-01T00:00:00.000
Procurementadjustedcompletion
2014-11-01T00:00:00.000
Procurementactualcompletion
2014-11-01T00:00:00.000
Constructionstart
2015-03-01T00:00:00.000
Constructionprojectedcom
2016-08-01T00:00:00.000
Constructionadjustedcompletion
2016-10-01T00:00:00.000
Constructionactualcompletion
2016-10-01T00:00:00.000
Totalfunding
$546,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council
Name
Grand Central Pkwy., Whitestone Exwy. bet. 111 St. and College Point Blvd., Park Drive E.
Parkid
Q099
Latitude
40.752122
Longitude
-73.836646
Borough
Queens
VIEW LOCATION
3530
Trackerid: 3530 • Fmsid: 846 P-4PLG12B • Title: Queens General Site Work (QG-212M)
Trackerid
3530
Fmsid
846 P-4PLG12B
Title
Queens General Site Work (QG-212M)
Summary
This multisite contract will reconstruct pavements, fencing, plantings and general site work in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2012-09-01T00:00:00.000
Designprojectedcompletion
2012-11-01T00:00:00.000
Designactualcompletion
2013-11-01T00:00:00.000
Procurementstart
2013-11-01T00:00:00.000
Procurementprojectedcompletion
2014-08-01T00:00:00.000
Procurementadjustedcompletion
2014-11-01T00:00:00.000
Procurementactualcompletion
2014-11-01T00:00:00.000
Constructionstart
2015-03-01T00:00:00.000
Constructionprojectedcom
2016-08-01T00:00:00.000
Constructionadjustedcompletion
2016-10-01T00:00:00.000
Constructionactualcompletion
2016-10-01T00:00:00.000
Totalfunding
$546,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council
Name
Baisley & Merrick Boulevards, 115 Avenue
Parkid
Q448
Latitude
40.689658
Longitude
-73.773501
Borough
Queens
VIEW LOCATION
3530
Trackerid: 3530 • Fmsid: 846 P-4PLG12B • Title: Queens General Site Work (QG-212M)
Trackerid
3530
Fmsid
846 P-4PLG12B
Title
Queens General Site Work (QG-212M)
Summary
This multisite contract will reconstruct pavements, fencing, plantings and general site work in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2012-09-01T00:00:00.000
Designprojectedcompletion
2012-11-01T00:00:00.000
Designactualcompletion
2013-11-01T00:00:00.000
Procurementstart
2013-11-01T00:00:00.000
Procurementprojectedcompletion
2014-08-01T00:00:00.000
Procurementadjustedcompletion
2014-11-01T00:00:00.000
Procurementactualcompletion
2014-11-01T00:00:00.000
Constructionstart
2015-03-01T00:00:00.000
Constructionprojectedcom
2016-08-01T00:00:00.000
Constructionadjustedcompletion
2016-10-01T00:00:00.000
Constructionactualcompletion
2016-10-01T00:00:00.000
Totalfunding
$546,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council
Name
Yellowstone Blvd. bet. 68 Ave. and 68 Rd.
Parkid
Q425
Latitude
40.726379
Longitude
-73.847707
Borough
Queens
VIEW LOCATION
9199
Trackerid: 9199 • Fmsid: 846 P-415CAND • Currentphase: design
Trackerid
9199
Fmsid
846 P-415CAND
Title
Flushing Meadows Corona Park World's Fair Marina Pavilion Structures Reconstruction
Summary
This project will reconstruct the World's Fair Marina Pavilion Structures at Flushing Meadows Corona Park. The project also includes vehicular and pedestrian improvements at the intersection of Marina Road and Boat Basin Place.
Currentphase
design
Designpercentcomplete
100.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2021-04-01T00:00:00.000
Designprojectedcompletion
2022-10-01T00:00:00.000
Designadjustedcompletion
2026-07-01T00:00:00.000
Designactualcompletion
2026-09-01T00:00:00.000
Procurementstart
2025-12-01T00:00:00.000
Procurementprojectedcompletion
2026-12-01T00:00:00.000
Totalfunding
Between $3 million and $5 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoralPrivate
Name
Marina Road at Boat Basin Place
Parkid
Q099
Latitude
40.75957329
Longitude
-73.84998759
Borough
Queens
VIEW LOCATION
11102
Trackerid: 11102 • Title: Flushing Meadows Corona Park Triassic Playground Reconstruction • Currentphase: proposed
Trackerid
11102
Title
Flushing Meadows Corona Park Triassic Playground Reconstruction
Summary
This project will reconstruct Triassic Playground in Flushing Meadows Corona Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $5 million and $10 million
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Meadow Lake Drive north of Jewel Avenue
Parkid
Q099
Latitude
40.73704308
Longitude
-73.84568977
Borough
Queens
VIEW LOCATION
2883
Trackerid: 2883 • Fmsid: 846 P-400SFR2 • Title: Flushing Meadows Corona Park Fields 2,3,5 Reconstruction
Trackerid
2883
Fmsid
846 P-400SFR2
Title
Flushing Meadows Corona Park Fields 2,3,5 Reconstruction
Summary
This project will reconstruct synthetic turf fields 2, 3, and 5 in Flushing Meadows Corona Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2010-07-01T00:00:00.000
Designprojectedcompletion
2011-03-01T00:00:00.000
Designadjustedcompletion
2011-05-01T00:00:00.000
Designactualcompletion
2011-05-01T00:00:00.000
Procurementstart
2011-05-01T00:00:00.000
Procurementprojectedcompletion
2012-02-01T00:00:00.000
Procurementactualcompletion
2012-04-01T00:00:00.000
Constructionstart
2012-06-01T00:00:00.000
Constructionprojectedcom
2013-06-01T00:00:00.000
Constructionadjustedcompletion
2013-07-01T00:00:00.000
Constructionactualcompletion
2013-07-01T00:00:00.000
Totalfunding
$1,973,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council
Name
Near Fountain of the Fairs
Parkid
Q099
Latitude
40.748346
Longitude
-73.839081
Borough
Queens
VIEW LOCATION
6495
Trackerid: 6495 • Fmsid: 846 P-415MEA2 • Title: Flushing Meadows Corona Park Meadow Lake Northwest Area Reconstruction
Trackerid
6495
Fmsid
846 P-415MEA2
Title
Flushing Meadows Corona Park Meadow Lake Northwest Area Reconstruction
Summary
This project will reconstruct the pedestrian and vehicle pathways in Flushing Meadow Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-06-01T00:00:00.000
Designprojectedcompletion
2020-09-01T00:00:00.000
Designactualcompletion
2020-10-01T00:00:00.000
Procurementstart
2020-10-01T00:00:00.000
Procurementprojectedcompletion
2021-07-01T00:00:00.000
Procurementadjustedcompletion
2022-11-01T00:00:00.000
Procurementactualcompletion
2022-09-01T00:00:00.000
Constructionstart
2022-12-01T00:00:00.000
Constructionprojectedcom
2023-12-01T00:00:00.000
Constructionadjustedcompletion
2024-06-01T00:00:00.000
Constructionactualcompletion
2024-05-01T00:00:00.000
Totalfunding
$6,811,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Northwest side of Meadow Lake, east of Grand Central Parkway between Long Island Expressway and 64th Road.
Parkid
Q099
Latitude
40.737182
Longitude
-73.844272
Borough
Queens
VIEW LOCATION
7271
Trackerid: 7271 • Fmsid: 846 P-4FMMAUR • Title: Flushing Meadows Corona Park Mauro Playground Reconstruction
Trackerid
7271
Fmsid
846 P-4FMMAUR
Title
Flushing Meadows Corona Park Mauro Playground Reconstruction
Summary
This project will reconstruct Mauro Playground in Flushing Meadows Corona Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-05-01T00:00:00.000
Designprojectedcompletion
2018-05-01T00:00:00.000
Designactualcompletion
2018-06-01T00:00:00.000
Procurementstart
2018-06-01T00:00:00.000
Procurementprojectedcompletion
2019-03-01T00:00:00.000
Procurementadjustedcompletion
2019-04-01T00:00:00.000
Procurementactualcompletion
2019-04-01T00:00:00.000
Constructionstart
2019-04-01T00:00:00.000
Constructionprojectedcom
2020-10-01T00:00:00.000
Constructionactualcompletion
2019-11-01T00:00:00.000
Totalfunding
$4,786,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Park Drive East at 73rd Terrace
Parkid
Q099
Latitude
40.723222
Longitude
-73.827194
Borough
Queens
VIEW LOCATION
7009
Trackerid: 7009 • Fmsid: 846 P-415PAVI • Title: New York State Pavilion Observation Towers Reconstruction - Phase 1
Trackerid
7009
Fmsid
846 P-415PAVI
Title
New York State Pavilion Observation Towers Reconstruction - Phase 1
Summary
This project will reconstruct portions of the New York State Pavilion Observation Towers in Flushing Meadows Corona Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-09-01T00:00:00.000
Designprojectedcompletion
2016-09-01T00:00:00.000
Designadjustedcompletion
2017-06-01T00:00:00.000
Designactualcompletion
2018-04-01T00:00:00.000
Procurementstart
2018-04-01T00:00:00.000
Procurementprojectedcompletion
2019-01-01T00:00:00.000
Procurementadjustedcompletion
2019-07-01T00:00:00.000
Procurementactualcompletion
2019-07-01T00:00:00.000
Constructionstart
2019-10-01T00:00:00.000
Constructionprojectedcom
2021-04-01T00:00:00.000
Constructionadjustedcompletion
2023-06-01T00:00:00.000
Constructionactualcompletion
2023-04-01T00:00:00.000
Totalfunding
$58,237,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoralState
Name
Perimeter Road and United Nations Avenue South
Parkid
Q099
Latitude
40.743969
Longitude
-73.844729
Borough
Queens
VIEW LOCATION
10751
Trackerid: 10751 • Title: New York State Pavilion Observation Towers Reconstruction - Phase 2 • Currentphase: construction
Trackerid
10751
Title
New York State Pavilion Observation Towers Reconstruction - Phase 2
Summary
This project will reconstruct portions of the New York State Pavilion Observation Towers in Flushing Meadows Corona Park.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
41.8
Designstart
2015-09-01T00:00:00.000
Designprojectedcompletion
2016-09-01T00:00:00.000
Designadjustedcompletion
2017-06-01T00:00:00.000
Designactualcompletion
2018-04-01T00:00:00.000
Procurementstart
2018-04-01T00:00:00.000
Procurementprojectedcompletion
2019-01-01T00:00:00.000
Procurementadjustedcompletion
2019-07-01T00:00:00.000
Procurementactualcompletion
2023-10-01T00:00:00.000
Constructionstart
2023-10-01T00:00:00.000
Constructionprojectedcom
2025-10-01T00:00:00.000
Constructionadjustedcompletion
2026-10-01T00:00:00.000
Totalfunding
$56,756,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Name
Perimeter Road and United Nations Avenue South
Parkid
Q099
Latitude
40.74398316
Longitude
-73.84471823
Borough
Queens
VIEW LOCATION
7062
Trackerid: 7062 • Fmsid: 846 P-415ENTR • Title: Flushing Meadows Corona Park Roosevelt Avenue Entrance Reconstruction
Trackerid
7062
Fmsid
846 P-415ENTR
Title
Flushing Meadows Corona Park Roosevelt Avenue Entrance Reconstruction
Summary
This project will reconstruct the Roosevelt Avenue entrance to Flushing Meadows Corona Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-09-01T00:00:00.000
Designprojectedcompletion
2015-09-01T00:00:00.000
Designadjustedcompletion
2015-11-01T00:00:00.000
Designactualcompletion
2015-12-01T00:00:00.000
Procurementstart
2015-12-01T00:00:00.000
Procurementprojectedcompletion
2016-09-01T00:00:00.000
Procurementadjustedcompletion
2017-01-01T00:00:00.000
Procurementactualcompletion
2017-01-01T00:00:00.000
Constructionstart
2017-02-01T00:00:00.000
Constructionprojectedcom
2018-08-01T00:00:00.000
Constructionactualcompletion
2018-06-01T00:00:00.000
Totalfunding
$2,324,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Roosevelt Avenue between Grand Central Parkway and Long Island Rail Road
Parkid
Q099
Latitude
40.752805
Longitude
-73.85026
Borough
Queens
VIEW LOCATION
2877
Trackerid: 2877 • Fmsid: 846 P-400MEAD • Title: Flushing Meadows Corona Park Meadow Lake Habitat Restoration
Trackerid
2877
Fmsid
846 P-400MEAD
Title
Flushing Meadows Corona Park Meadow Lake Habitat Restoration
Summary
This project will restore the habitat and construct stormwater treatment and sitework elements at Meadow Lake in Flushing Meadows Corona Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2011-04-01T00:00:00.000
Designprojectedcompletion
2014-01-01T00:00:00.000
Designactualcompletion
2013-12-01T00:00:00.000
Procurementstart
2013-12-01T00:00:00.000
Procurementprojectedcompletion
2014-09-01T00:00:00.000
Procurementadjustedcompletion
2014-11-01T00:00:00.000
Procurementactualcompletion
2014-11-01T00:00:00.000
Constructionstart
2015-01-01T00:00:00.000
Constructionprojectedcom
2016-01-01T00:00:00.000
Constructionadjustedcompletion
2016-05-01T00:00:00.000
Constructionactualcompletion
2016-05-01T00:00:00.000
Totalfunding
$2,422,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoralState
Name
South shoreline of Meadow Lake, and north of Jurassic Playground
Parkid
Q099
Latitude
40.739085
Longitude
-73.843537
Borough
Queens
VIEW LOCATION
10350
Trackerid: 10350 • Fmsid: 846 P-4DSTG02 • Currentphase: design
Trackerid
10350
Fmsid
846 P-4DSTG02
Title
Flushing Meadows Corona Park Destination Greenways Meadow Lake Segment Construction
Summary
This project will construct a greenway at Flushing Meadows Corona Park by Meadow Lake Creek.
Currentphase
design
Designpercentcomplete
100.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2023-11-01T00:00:00.000
Designprojectedcompletion
2025-01-01T00:00:00.000
Designadjustedcompletion
2026-02-01T00:00:00.000
Designactualcompletion
2026-02-01T00:00:00.000
Totalfunding
Between $3 million and $5 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
The pathway along Meadow Lake Road West and Meadow Lake Promenade in Flushing Meadows Corona Park between Meridian Road and Boathouse Bridge
Parkid
Q099
Latitude
40.74029578
Longitude
-73.83916586
Borough
Queens
VIEW LOCATION
8746
Trackerid: 8746 • Fmsid: 846 P-415LWCS • Currentphase: completed
Trackerid
8746
Fmsid
846 P-415LWCS
Title
Flushing Meadows Corona Park Lawrence Playground Public Restroom Building Reconstruction
Summary
This project will reconstruct the Public Restroom Building at Lawrence Playground in Flushing Meadows Corona Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-01-01T00:00:00.000
Designprojectedcompletion
2017-05-01T00:00:00.000
Designactualcompletion
2018-04-01T00:00:00.000
Procurementstart
2018-04-01T00:00:00.000
Procurementprojectedcompletion
2018-12-01T00:00:00.000
Procurementadjustedcompletion
2019-06-01T00:00:00.000
Procurementactualcompletion
2019-04-01T00:00:00.000
Constructionstart
2019-09-01T00:00:00.000
Constructionprojectedcom
2021-03-01T00:00:00.000
Constructionadjustedcompletion
2021-05-01T00:00:00.000
Constructionactualcompletion
2021-05-01T00:00:00.000
Totalfunding
$831,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Van Wyck Expressway, Botanical Garden Bridge, College Point Boulevard
Parkid
Q099
Latitude
40.748456
Longitude
-73.833707
Borough
Queens
VIEW LOCATION
8747
Trackerid: 8747 • Fmsid: 846 P-415LWP2 • Title: Flushing Meadows Corona Park Lawrence Playground Reconstruction
Trackerid
8747
Fmsid
846 P-415LWP2
Title
Flushing Meadows Corona Park Lawrence Playground Reconstruction
Summary
This project will reconstruct Lawrence Playground in Flushing Meadows Corona Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-01-01T00:00:00.000
Designprojectedcompletion
2017-05-01T00:00:00.000
Designactualcompletion
2017-06-01T00:00:00.000
Procurementstart
2017-06-01T00:00:00.000
Procurementprojectedcompletion
2018-02-01T00:00:00.000
Procurementadjustedcompletion
2018-06-01T00:00:00.000
Procurementactualcompletion
2018-05-01T00:00:00.000
Constructionstart
2018-06-01T00:00:00.000
Constructionprojectedcom
2019-06-01T00:00:00.000
Constructionactualcompletion
2019-05-01T00:00:00.000
Totalfunding
$3,870,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Van Wyck Expressway, Botanical Garden Bridge, College Point Boulevard
Parkid
Q099
Latitude
40.750595
Longitude
-73.837624
Borough
Queens
VIEW LOCATION
1005111
Trackerid: 1005111 • Fmsid: 846 P-4PL15A3 • Title: Oakridge Turn/Forest Park Drive Reconstruction
Trackerid
1005111
Fmsid
846 P-4PL15A3
Title
Oakridge Turn/Forest Park Drive Reconstruction
Summary
This project will reconstruct the sidewalks, guardrails, curbs and crosswalks at Oakridge Turn in Forest Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-05-01T00:00:00.000
Designprojectedcompletion
2015-08-01T00:00:00.000
Designactualcompletion
2015-10-01T00:00:00.000
Procurementstart
2016-04-01T00:00:00.000
Procurementprojectedcompletion
2016-09-01T00:00:00.000
Procurementactualcompletion
2016-09-01T00:00:00.000
Constructionstart
2017-04-01T00:00:00.000
Constructionprojectedcom
2017-08-01T00:00:00.000
Constructionactualcompletion
2017-09-01T00:00:00.000
Totalfunding
$39,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
Q015
Latitude
40.698903
Longitude
-73.86151
Borough
Queens
VIEW LOCATION
1087111
Trackerid: 1087111 • Fmsid: 846 P-6BLGC15 • Title: Forest Park Sobelsohn Playground Public Restroom Building Reconstruction
Trackerid
1087111
Fmsid
846 P-6BLGC15
Title
Forest Park Sobelsohn Playground Public Restroom Building Reconstruction
Summary
This project will reconstruct the public restroom building in Sobelsohn Playground in Forest Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-11-01T00:00:00.000
Designprojectedcompletion
2017-05-01T00:00:00.000
Designactualcompletion
2017-11-01T00:00:00.000
Procurementstart
2017-08-01T00:00:00.000
Procurementprojectedcompletion
2018-01-01T00:00:00.000
Procurementactualcompletion
2017-10-01T00:00:00.000
Constructionstart
2019-09-01T00:00:00.000
Constructionprojectedcom
2020-06-01T00:00:00.000
Constructionadjustedcompletion
2020-09-01T00:00:00.000
Constructionactualcompletion
2020-09-01T00:00:00.000
Totalfunding
$415,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral, City Council
Parkid
Q015
Latitude
40.709852
Longitude
-73.835461
Borough
Queens
VIEW LOCATION
1089111
Trackerid: 1089111 • Fmsid: 846 P-6PBBP15 • Currentphase: completed
Trackerid
1089111
Fmsid
846 P-6PBBP15
Title
Forest Park Sobelsohn Playground Public Restroom Building Plumbing System Reconstruction
Summary
This project will reconstruct the plumbing system of the public restroom building in Sobelsohn Playground in Forest Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-11-01T00:00:00.000
Designprojectedcompletion
2017-05-01T00:00:00.000
Designactualcompletion
2017-11-01T00:00:00.000
Procurementstart
2017-08-01T00:00:00.000
Procurementprojectedcompletion
2018-01-01T00:00:00.000
Procurementactualcompletion
2017-10-01T00:00:00.000
Constructionstart
2019-09-01T00:00:00.000
Constructionprojectedcom
2020-06-01T00:00:00.000
Constructionadjustedcompletion
2020-09-01T00:00:00.000
Constructionactualcompletion
2020-09-01T00:00:00.000
Totalfunding
$148,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral, City Council
Parkid
Q015
Latitude
40.709852
Longitude
-73.835461
Borough
Queens
VIEW LOCATION
1091111
Trackerid: 1091111 • Fmsid: 846 P-6ELBR15 • Currentphase: completed
Trackerid
1091111
Fmsid
846 P-6ELBR15
Title
Forest Park Sobelsohn Playground Public Restroom Building Electrical System Reconstruction
Summary
This project will reconstruct the electrical system of the public restroom building in Sobelsohn Playground in Forest Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-11-01T00:00:00.000
Designprojectedcompletion
2017-05-01T00:00:00.000
Designactualcompletion
2017-11-01T00:00:00.000
Procurementstart
2017-08-01T00:00:00.000
Procurementprojectedcompletion
2018-01-01T00:00:00.000
Procurementactualcompletion
2017-10-01T00:00:00.000
Constructionstart
2019-09-01T00:00:00.000
Constructionprojectedcom
2020-06-01T00:00:00.000
Constructionadjustedcompletion
2020-09-01T00:00:00.000
Constructionactualcompletion
2020-09-01T00:00:00.000
Totalfunding
$56,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Parkid
Q015
Latitude
40.709852
Longitude
-73.835461
Borough
Queens
VIEW LOCATION
1723111
Trackerid: 1723111 • Fmsid: 846 P-409FPAP • Title: Forest Park Path Reconstruction Phase 2
Trackerid
1723111
Fmsid
846 P-409FPAP
Title
Forest Park Path Reconstruction Phase 2
Summary
This project will reconstruct paths in Forest Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2024-03-01T00:00:00.000
Designprojectedcompletion
2024-09-01T00:00:00.000
Designactualcompletion
2024-08-01T00:00:00.000
Procurementstart
2024-04-01T00:00:00.000
Procurementprojectedcompletion
2024-09-01T00:00:00.000
Procurementactualcompletion
2024-08-01T00:00:00.000
Constructionstart
2026-05-01T00:00:00.000
Constructionprojectedcom
2026-07-01T00:00:00.000
Constructionactualcompletion
2026-06-01T00:00:00.000
Totalfunding
$1,320,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
Q015
Latitude
40.704654
Longitude
-73.846664
Borough
Queens
VIEW LOCATION
1731111
Trackerid: 1731111 • Fmsid: 846 P-6CWSTF2 • Title: Forest Park Victory Field Synthetic Turf Baseball Field Reconstruction
Trackerid
1731111
Fmsid
846 P-6CWSTF2
Title
Forest Park Victory Field Synthetic Turf Baseball Field Reconstruction
Summary
This project will reconstruct the synthetic turf baseball field at Victory Field in Forest Park.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
0.0
Designstart
2024-04-01T00:00:00.000
Designprojectedcompletion
2025-11-01T00:00:00.000
Designactualcompletion
2025-10-01T00:00:00.000
Procurementstart
2024-06-01T00:00:00.000
Procurementprojectedcompletion
2024-11-01T00:00:00.000
Procurementactualcompletion
2025-10-01T00:00:00.000
Constructionstart
2025-11-01T00:00:00.000
Constructionprojectedcom
2026-05-01T00:00:00.000
Totalfunding
$1,330,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
Q015
Latitude
40.702010472754
Longitude
-73.854455341065
Borough
Queens
VIEW LOCATION
1807111
Trackerid: 1807111 • Fmsid: 846 P-4OVERLO • Title: Forest Park Overlook Building Roof Reconstruction
Trackerid
1807111
Fmsid
846 P-4OVERLO
Title
Forest Park Overlook Building Roof Reconstruction
Summary
This project will reconstruct the Forest Park Overlook Building Roof.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2025-01-01T00:00:00.000
Designprojectedcompletion
2025-10-01T00:00:00.000
Designactualcompletion
2025-12-01T00:00:00.000
Procurementstart
2025-06-01T00:00:00.000
Procurementprojectedcompletion
2025-11-01T00:00:00.000
Procurementactualcompletion
2025-09-01T00:00:00.000
Constructionstart
2025-11-01T00:00:00.000
Constructionprojectedcom
2026-11-01T00:00:00.000
Constructionactualcompletion
2026-03-01T00:00:00.000
Totalfunding
$1,140,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
Q015
Latitude
40.7018943
Longitude
-73.8531644
Borough
Queens
VIEW LOCATION
1962111
Trackerid: 1962111 • Fmsid: 846 P-405DHPG • Title: Dry Harbor Playground Plumbing Reconstruction
Trackerid
1962111
Fmsid
846 P-405DHPG
Title
Dry Harbor Playground Plumbing Reconstruction
Summary
This project reconstructs the plumbing connections at Dry Harbor Playground.
Currentphase
design-procurement
Designpercentcomplete
30.0
Procurementpercentcomplete
5.0
Constructionpercentcomplete
0.0
Designstart
2026-06-01T00:00:00.000
Designprojectedcompletion
2026-11-01T00:00:00.000
Procurementstart
2026-06-01T00:00:00.000
Procurementprojectedcompletion
2026-11-01T00:00:00.000
Totalfunding
Less than $1 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
Q015
Latitude
40.7013708
Longitude
-73.8521776
Borough
Queens
VIEW LOCATION
1991111
Trackerid: 1991111 • Title: Forest Park - Victory Field Synthetic Turf and Track Reconstruction • Summary: This project will reconstruct the track and synthetic turf field.
Trackerid
1991111
Title
Forest Park - Victory Field Synthetic Turf and Track Reconstruction
Summary
This project will reconstruct the track and synthetic turf field.
Currentphase
proposed
Designpercentcomplete
5.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2027-03-01T00:00:00.000
Designprojectedcompletion
2027-12-01T00:00:00.000
Totalfunding
Between $3 million and $5 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
Q015
Latitude
40.7012168
Longitude
-73.8524841
Borough
Queens
VIEW LOCATION
1375111
Trackerid: 1375111 • Fmsid: 846 P-409FPAP • Title: Forest Park Paths and Sidewalk Reconstruction
Trackerid
1375111
Fmsid
846 P-409FPAP
Title
Forest Park Paths and Sidewalk Reconstruction
Summary
This project will reconstruct pathways and sidewalks at Forest Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-12-01T00:00:00.000
Designprojectedcompletion
2023-06-01T00:00:00.000
Designactualcompletion
2023-03-01T00:00:00.000
Procurementstart
2023-01-01T00:00:00.000
Procurementprojectedcompletion
2023-07-01T00:00:00.000
Procurementactualcompletion
2023-02-01T00:00:00.000
Constructionstart
2023-12-01T00:00:00.000
Constructionprojectedcom
2024-12-01T00:00:00.000
Constructionactualcompletion
2024-12-01T00:00:00.000
Totalfunding
$2,800,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral, City Council
Parkid
Q015
Latitude
40.70526285644
Longitude
-73.846015664914
Borough
Queens
VIEW LOCATION
5979
Trackerid: 5979 • Fmsid: 846 P-409WHAL • Title: Mary Whalen Playground Reconstruction
Trackerid
5979
Fmsid
846 P-409WHAL
Title
Mary Whalen Playground Reconstruction
Summary
This project will reconstruct Mary Whalen Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-03-01T00:00:00.000
Designprojectedcompletion
2013-08-01T00:00:00.000
Designadjustedcompletion
2014-08-01T00:00:00.000
Designactualcompletion
2014-07-01T00:00:00.000
Procurementstart
2014-07-01T00:00:00.000
Procurementprojectedcompletion
2015-04-01T00:00:00.000
Procurementadjustedcompletion
2015-06-01T00:00:00.000
Procurementactualcompletion
2015-06-01T00:00:00.000
Constructionstart
2015-07-01T00:00:00.000
Constructionprojectedcom
2016-07-01T00:00:00.000
Constructionactualcompletion
2016-05-01T00:00:00.000
Totalfunding
$1,349,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
79th Street and Park Lane South, Queens
Parkid
Q015
Latitude
40.698033
Longitude
-73.853637
Borough
Queens
VIEW LOCATION
9787
Trackerid: 9787 • Fmsid: 846 P-409DEMO • Title: Forest Park LIRR Towers Removal
Trackerid
9787
Fmsid
846 P-409DEMO
Title
Forest Park LIRR Towers Removal
Summary
This project will demolish the Long Island Rail Road towers in Forest Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2020-09-01T00:00:00.000
Designprojectedcompletion
2021-01-01T00:00:00.000
Designactualcompletion
2021-01-01T00:00:00.000
Procurementstart
2021-01-01T00:00:00.000
Procurementprojectedcompletion
2021-10-01T00:00:00.000
Procurementactualcompletion
2021-11-01T00:00:00.000
Constructionstart
2021-05-01T00:00:00.000
Constructionprojectedcom
2022-02-01T00:00:00.000
Constructionactualcompletion
2021-10-01T00:00:00.000
Totalfunding
$542,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Along the LIRR tracks between Union Turnpike and Park Lane South
Parkid
Q015
Latitude
40.701888154266
Longitude
-73.851504364803
Borough
Queens
VIEW LOCATION
7267
Trackerid: 7267 • Fmsid: 846 P-409MARD • Title: Forest Park Glendale Entrance Construction
Trackerid
7267
Fmsid
846 P-409MARD
Title
Forest Park Glendale Entrance Construction
Summary
This project will construct a new multi-use bicycle and pedestrian pathway into Forest Park from Myrtle Avenue, including streetscape and park pathway improvements.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-04-01T00:00:00.000
Designprojectedcompletion
2018-04-01T00:00:00.000
Designadjustedcompletion
2019-09-01T00:00:00.000
Designactualcompletion
2019-07-01T00:00:00.000
Procurementstart
2019-07-01T00:00:00.000
Procurementprojectedcompletion
2020-04-01T00:00:00.000
Procurementadjustedcompletion
2021-04-01T00:00:00.000
Procurementactualcompletion
2021-08-01T00:00:00.000
Constructionstart
2021-09-01T00:00:00.000
Constructionprojectedcom
2022-09-01T00:00:00.000
Constructionactualcompletion
2022-06-01T00:00:00.000
Totalfunding
$3,409,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Forest Park Drive and Myrtle Avenue
Parkid
Q015
Latitude
40.700461
Longitude
-73.857631
Borough
Queens
VIEW LOCATION
6307
Trackerid: 6307 • Fmsid: 846 P-6GRCW15 • Title: Citywide Steel Guiderails, Timber Rails and Fencing Installation (CNYG-1414M)
Trackerid
6307
Fmsid
846 P-6GRCW15
Title
Citywide Steel Guiderails, Timber Rails and Fencing Installation (CNYG-1414M)
Summary
This project will install steel-beam guiderails, timber barrier rails, and fencing at various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-04-01T00:00:00.000
Designprojectedcompletion
2014-05-01T00:00:00.000
Designactualcompletion
2014-07-01T00:00:00.000
Procurementstart
2014-07-01T00:00:00.000
Procurementprojectedcompletion
2015-04-01T00:00:00.000
Procurementadjustedcompletion
2016-01-01T00:00:00.000
Procurementactualcompletion
2015-12-01T00:00:00.000
Constructionstart
2016-03-01T00:00:00.000
Constructionprojectedcom
2019-03-01T00:00:00.000
Constructionactualcompletion
2018-10-01T00:00:00.000
Totalfunding
$975,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Myrtle Ave., Union Turnpike, Park Lane South bet. Brooklyn-Queens County Line and Park Lane
Parkid
Q015
Latitude
40.700592
Longitude
-73.855206
Borough
Queens, Brooklyn
VIEW LOCATION
6307
Trackerid: 6307 • Fmsid: 846 P-6GRCW15 • Title: Citywide Steel Guiderails, Timber Rails and Fencing Installation (CNYG-1414M)
Trackerid
6307
Fmsid
846 P-6GRCW15
Title
Citywide Steel Guiderails, Timber Rails and Fencing Installation (CNYG-1414M)
Summary
This project will install steel-beam guiderails, timber barrier rails, and fencing at various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-04-01T00:00:00.000
Designprojectedcompletion
2014-05-01T00:00:00.000
Designactualcompletion
2014-07-01T00:00:00.000
Procurementstart
2014-07-01T00:00:00.000
Procurementprojectedcompletion
2015-04-01T00:00:00.000
Procurementadjustedcompletion
2016-01-01T00:00:00.000
Procurementactualcompletion
2015-12-01T00:00:00.000
Constructionstart
2016-03-01T00:00:00.000
Constructionprojectedcom
2019-03-01T00:00:00.000
Constructionactualcompletion
2018-10-01T00:00:00.000
Totalfunding
$975,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Jacke Robinson Parkway to Highland Boulevard / West of Vermont Place / East of Red Brick Structure and Natural Area
Parkid
Q020
Latitude
40.690145
Longitude
-73.883702
Borough
Queens, Brooklyn
VIEW LOCATION
6307
Trackerid: 6307 • Fmsid: 846 P-6GRCW15 • Title: Citywide Steel Guiderails, Timber Rails and Fencing Installation (CNYG-1414M)
Trackerid
6307
Fmsid
846 P-6GRCW15
Title
Citywide Steel Guiderails, Timber Rails and Fencing Installation (CNYG-1414M)
Summary
This project will install steel-beam guiderails, timber barrier rails, and fencing at various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-04-01T00:00:00.000
Designprojectedcompletion
2014-05-01T00:00:00.000
Designactualcompletion
2014-07-01T00:00:00.000
Procurementstart
2014-07-01T00:00:00.000
Procurementprojectedcompletion
2015-04-01T00:00:00.000
Procurementadjustedcompletion
2016-01-01T00:00:00.000
Procurementactualcompletion
2015-12-01T00:00:00.000
Constructionstart
2016-03-01T00:00:00.000
Constructionprojectedcom
2019-03-01T00:00:00.000
Constructionactualcompletion
2018-10-01T00:00:00.000
Totalfunding
$975,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Booth Memorial Avenue between Kissena Boulevard & 162nd Street including Velodrome and Parking Lot
Parkid
Q024
Latitude
40.746214
Longitude
-73.808288
Borough
Queens, Brooklyn
VIEW LOCATION
6307
Trackerid: 6307 • Fmsid: 846 P-6GRCW15 • Title: Citywide Steel Guiderails, Timber Rails and Fencing Installation (CNYG-1414M)
Trackerid
6307
Fmsid
846 P-6GRCW15
Title
Citywide Steel Guiderails, Timber Rails and Fencing Installation (CNYG-1414M)
Summary
This project will install steel-beam guiderails, timber barrier rails, and fencing at various parks citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-04-01T00:00:00.000
Designprojectedcompletion
2014-05-01T00:00:00.000
Designactualcompletion
2014-07-01T00:00:00.000
Procurementstart
2014-07-01T00:00:00.000
Procurementprojectedcompletion
2015-04-01T00:00:00.000
Procurementadjustedcompletion
2016-01-01T00:00:00.000
Procurementactualcompletion
2015-12-01T00:00:00.000
Constructionstart
2016-03-01T00:00:00.000
Constructionprojectedcom
2019-03-01T00:00:00.000
Constructionactualcompletion
2018-10-01T00:00:00.000
Totalfunding
$975,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Fountain Ave., 75 St. bet. Belt Pkwy., Flatlands Ave.,
Parkid
B165
Latitude
40.659576
Longitude
-73.862315
Borough
Queens, Brooklyn
VIEW LOCATION
11105
Trackerid: 11105 • Title: Forest Park Dry Harbor Playground Reconstruction • Summary: This project will reconstruct Dry Harbor Playground in Forest Park.
Trackerid
11105
Title
Forest Park Dry Harbor Playground Reconstruction
Summary
This project will reconstruct Dry Harbor Playground in Forest Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $1 million and $3 million
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Myrtle Avenue between 80th Street and 81st Street
Parkid
Q015
Latitude
40.70193031
Longitude
-73.85338376
Borough
Queens
VIEW LOCATION
8559
Trackerid: 8559 • Fmsid: 846 P-4BWIDEP • Title: Queens General Site Work (QG-217M)
Trackerid
8559
Fmsid
846 P-4BWIDEP
Title
Queens General Site Work (QG-217M)
Summary
This project will reconstruct Lt. Clinton L. Whiting Square, the sidewalk and guide rail along the west side of Harvey Park, and the pathway between Park Lane South at 86th Street and the bandshell in Forest Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-03-01T00:00:00.000
Designprojectedcompletion
2018-03-01T00:00:00.000
Designactualcompletion
2018-02-01T00:00:00.000
Procurementstart
2018-02-01T00:00:00.000
Procurementprojectedcompletion
2018-11-01T00:00:00.000
Procurementadjustedcompletion
2019-10-01T00:00:00.000
Procurementactualcompletion
2019-08-01T00:00:00.000
Constructionstart
2019-09-01T00:00:00.000
Constructionprojectedcom
2021-03-01T00:00:00.000
Constructionadjustedcompletion
2021-06-01T00:00:00.000
Constructionactualcompletion
2021-07-01T00:00:00.000
Totalfunding
$1,813,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Myrtle Avenue, Union Turnpike, Park Lane South
Parkid
Q015
Latitude
40.711128
Longitude
-73.835811
Borough
Queens
VIEW LOCATION
8559
Trackerid: 8559 • Fmsid: 846 P-4BWIDEP • Title: Queens General Site Work (QG-217M)
Trackerid
8559
Fmsid
846 P-4BWIDEP
Title
Queens General Site Work (QG-217M)
Summary
This project will reconstruct Lt. Clinton L. Whiting Square, the sidewalk and guide rail along the west side of Harvey Park, and the pathway between Park Lane South at 86th Street and the bandshell in Forest Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-03-01T00:00:00.000
Designprojectedcompletion
2018-03-01T00:00:00.000
Designactualcompletion
2018-02-01T00:00:00.000
Procurementstart
2018-02-01T00:00:00.000
Procurementprojectedcompletion
2018-11-01T00:00:00.000
Procurementadjustedcompletion
2019-10-01T00:00:00.000
Procurementactualcompletion
2019-08-01T00:00:00.000
Constructionstart
2019-09-01T00:00:00.000
Constructionprojectedcom
2021-03-01T00:00:00.000
Constructionadjustedcompletion
2021-06-01T00:00:00.000
Constructionactualcompletion
2021-07-01T00:00:00.000
Totalfunding
$1,813,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
15 to 20 Avenues, East of Whitestone Expressway
Parkid
Q089B
Latitude
40.782623
Longitude
-73.823696
Borough
Queens
VIEW LOCATION
8559
Trackerid: 8559 • Fmsid: 846 P-4BWIDEP • Title: Queens General Site Work (QG-217M)
Trackerid
8559
Fmsid
846 P-4BWIDEP
Title
Queens General Site Work (QG-217M)
Summary
This project will reconstruct Lt. Clinton L. Whiting Square, the sidewalk and guide rail along the west side of Harvey Park, and the pathway between Park Lane South at 86th Street and the bandshell in Forest Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-03-01T00:00:00.000
Designprojectedcompletion
2018-03-01T00:00:00.000
Designactualcompletion
2018-02-01T00:00:00.000
Procurementstart
2018-02-01T00:00:00.000
Procurementprojectedcompletion
2018-11-01T00:00:00.000
Procurementadjustedcompletion
2019-10-01T00:00:00.000
Procurementactualcompletion
2019-08-01T00:00:00.000
Constructionstart
2019-09-01T00:00:00.000
Constructionprojectedcom
2021-03-01T00:00:00.000
Constructionadjustedcompletion
2021-06-01T00:00:00.000
Constructionactualcompletion
2021-07-01T00:00:00.000
Totalfunding
$1,813,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
84 Street, 90 Road & 91 Avenue
Parkid
Q257
Latitude
40.687264
Longitude
-73.858238
Borough
Queens
VIEW LOCATION
7056
Trackerid: 7056 • Fmsid: 846 P-4PLG15H • Title: Queens General Site Work (QG-915M)
Trackerid
7056
Fmsid
846 P-4PLG15H
Title
Queens General Site Work (QG-915M)
Summary
This project will reconstruct pavements, fencing and drainage systems at various parks in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-09-01T00:00:00.000
Designprojectedcompletion
2015-03-01T00:00:00.000
Designadjustedcompletion
2015-08-01T00:00:00.000
Designactualcompletion
2015-07-01T00:00:00.000
Procurementstart
2015-07-01T00:00:00.000
Procurementprojectedcompletion
2016-04-01T00:00:00.000
Procurementadjustedcompletion
2016-07-01T00:00:00.000
Procurementactualcompletion
2016-06-01T00:00:00.000
Constructionstart
2016-06-01T00:00:00.000
Constructionprojectedcom
2018-06-01T00:00:00.000
Constructionactualcompletion
2016-11-01T00:00:00.000
Totalfunding
$1,965,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Myrtle Avenue, Union Turnpike, Park Lane South
Parkid
Q015
Latitude
40.704551
Longitude
-73.847289
Borough
Queens
VIEW LOCATION
7056
Trackerid: 7056 • Fmsid: 846 P-4PLG15H • Title: Queens General Site Work (QG-915M)
Trackerid
7056
Fmsid
846 P-4PLG15H
Title
Queens General Site Work (QG-915M)
Summary
This project will reconstruct pavements, fencing and drainage systems at various parks in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-09-01T00:00:00.000
Designprojectedcompletion
2015-03-01T00:00:00.000
Designadjustedcompletion
2015-08-01T00:00:00.000
Designactualcompletion
2015-07-01T00:00:00.000
Procurementstart
2015-07-01T00:00:00.000
Procurementprojectedcompletion
2016-04-01T00:00:00.000
Procurementadjustedcompletion
2016-07-01T00:00:00.000
Procurementactualcompletion
2016-06-01T00:00:00.000
Constructionstart
2016-06-01T00:00:00.000
Constructionprojectedcom
2018-06-01T00:00:00.000
Constructionactualcompletion
2016-11-01T00:00:00.000
Totalfunding
$1,965,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Fort Totten, Cross Island Parkway, Totten Road to 15 Road
Parkid
Q458
Latitude
40.792391
Longitude
-73.777419
Borough
Queens
VIEW LOCATION
7056
Trackerid: 7056 • Fmsid: 846 P-4PLG15H • Title: Queens General Site Work (QG-915M)
Trackerid
7056
Fmsid
846 P-4PLG15H
Title
Queens General Site Work (QG-915M)
Summary
This project will reconstruct pavements, fencing and drainage systems at various parks in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-09-01T00:00:00.000
Designprojectedcompletion
2015-03-01T00:00:00.000
Designadjustedcompletion
2015-08-01T00:00:00.000
Designactualcompletion
2015-07-01T00:00:00.000
Procurementstart
2015-07-01T00:00:00.000
Procurementprojectedcompletion
2016-04-01T00:00:00.000
Procurementadjustedcompletion
2016-07-01T00:00:00.000
Procurementactualcompletion
2016-06-01T00:00:00.000
Constructionstart
2016-06-01T00:00:00.000
Constructionprojectedcom
2018-06-01T00:00:00.000
Constructionactualcompletion
2016-11-01T00:00:00.000
Totalfunding
$1,965,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Poppenhusen Ave. bet. 115 St. and College Pl.
Parkid
Q009
Latitude
40.792728
Longitude
-73.848912
Borough
Queens
VIEW LOCATION
7056
Trackerid: 7056 • Fmsid: 846 P-4PLG15H • Title: Queens General Site Work (QG-915M)
Trackerid
7056
Fmsid
846 P-4PLG15H
Title
Queens General Site Work (QG-915M)
Summary
This project will reconstruct pavements, fencing and drainage systems at various parks in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-09-01T00:00:00.000
Designprojectedcompletion
2015-03-01T00:00:00.000
Designadjustedcompletion
2015-08-01T00:00:00.000
Designactualcompletion
2015-07-01T00:00:00.000
Procurementstart
2015-07-01T00:00:00.000
Procurementprojectedcompletion
2016-04-01T00:00:00.000
Procurementadjustedcompletion
2016-07-01T00:00:00.000
Procurementactualcompletion
2016-06-01T00:00:00.000
Constructionstart
2016-06-01T00:00:00.000
Constructionprojectedcom
2018-06-01T00:00:00.000
Constructionactualcompletion
2016-11-01T00:00:00.000
Totalfunding
$1,965,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Conch, Sommerville & Norton Basins, Almeda Avenue
Parkid
Q371
Latitude
40.594546
Longitude
-73.788478
Borough
Queens
VIEW LOCATION
7056
Trackerid: 7056 • Fmsid: 846 P-4PLG15H • Title: Queens General Site Work (QG-915M)
Trackerid
7056
Fmsid
846 P-4PLG15H
Title
Queens General Site Work (QG-915M)
Summary
This project will reconstruct pavements, fencing and drainage systems at various parks in Queens.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-09-01T00:00:00.000
Designprojectedcompletion
2015-03-01T00:00:00.000
Designadjustedcompletion
2015-08-01T00:00:00.000
Designactualcompletion
2015-07-01T00:00:00.000
Procurementstart
2015-07-01T00:00:00.000
Procurementprojectedcompletion
2016-04-01T00:00:00.000
Procurementadjustedcompletion
2016-07-01T00:00:00.000
Procurementactualcompletion
2016-06-01T00:00:00.000
Constructionstart
2016-06-01T00:00:00.000
Constructionprojectedcom
2018-06-01T00:00:00.000
Constructionactualcompletion
2016-11-01T00:00:00.000
Totalfunding
$1,965,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Beach 108th Street to Mott Avenue, 83rd Street
Parkid
Q219
Latitude
40.591189
Longitude
-73.808861
Borough
Queens
VIEW LOCATION
8983
Trackerid: 8983 • Fmsid: 846 P-6ROOFQN • Title: Forest Park Garage and Oak Ridge Roof Reconstruction
Trackerid
8983
Fmsid
846 P-6ROOFQN
Title
Forest Park Garage and Oak Ridge Roof Reconstruction
Summary
This project will reconstruct roofs at Forest Park Garage and Oak Ridge in Forest Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-12-01T00:00:00.000
Designprojectedcompletion
2018-07-01T00:00:00.000
Designactualcompletion
2018-07-01T00:00:00.000
Procurementstart
2018-07-01T00:00:00.000
Procurementprojectedcompletion
2019-03-01T00:00:00.000
Procurementadjustedcompletion
2019-08-01T00:00:00.000
Procurementactualcompletion
2019-07-01T00:00:00.000
Constructionstart
2019-08-01T00:00:00.000
Constructionprojectedcom
2021-08-01T00:00:00.000
Constructionactualcompletion
2021-08-01T00:00:00.000
Totalfunding
$1,875,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Myrtle Avenue, Union Turnpike, Park Lane South
Parkid
Q015
Latitude
40.699274
Longitude
-73.855018
Borough
Queens
VIEW LOCATION
8853
Trackerid: 8853 • Fmsid: 846 P-4BWIDES • Title: Underbridge Dog Run and Forest Park Overlook Dog Run Fencing Reconstruction
Trackerid
8853
Fmsid
846 P-4BWIDES
Title
Underbridge Dog Run and Forest Park Overlook Dog Run Fencing Reconstruction
Summary
This project will reconstruct the fencing at Underbridge Dog Run and Forest Park Overlook Dog Run.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-10-01T00:00:00.000
Designprojectedcompletion
2018-10-01T00:00:00.000
Designactualcompletion
2018-10-01T00:00:00.000
Procurementstart
2018-10-01T00:00:00.000
Procurementprojectedcompletion
2019-07-01T00:00:00.000
Procurementactualcompletion
2019-06-01T00:00:00.000
Constructionstart
2019-11-01T00:00:00.000
Constructionprojectedcom
2020-11-01T00:00:00.000
Constructionactualcompletion
2020-10-01T00:00:00.000
Totalfunding
$727,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Park Lane (to East & South) to (West) Metropolitan Avenue
Parkid
Q015
Latitude
40.71058
Longitude
-73.836364
Borough
Queens
VIEW LOCATION
8853
Trackerid: 8853 • Fmsid: 846 P-4BWIDES • Title: Underbridge Dog Run and Forest Park Overlook Dog Run Fencing Reconstruction
Trackerid
8853
Fmsid
846 P-4BWIDES
Title
Underbridge Dog Run and Forest Park Overlook Dog Run Fencing Reconstruction
Summary
This project will reconstruct the fencing at Underbridge Dog Run and Forest Park Overlook Dog Run.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-10-01T00:00:00.000
Designprojectedcompletion
2018-10-01T00:00:00.000
Designactualcompletion
2018-10-01T00:00:00.000
Procurementstart
2018-10-01T00:00:00.000
Procurementprojectedcompletion
2019-07-01T00:00:00.000
Procurementactualcompletion
2019-06-01T00:00:00.000
Constructionstart
2019-11-01T00:00:00.000
Constructionprojectedcom
2020-11-01T00:00:00.000
Constructionactualcompletion
2020-10-01T00:00:00.000
Totalfunding
$727,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
West of Grand Central Parkway, 112 Street between 64 Avenue & 64 Road
Parkid
Q451
Latitude
40.733909
Longitude
-73.845203
Borough
Queens
VIEW LOCATION
10872
Trackerid: 10872 • Fmsid: 846 P-409FPAR • Title: Forest Park Entrances Reconstruction
Trackerid
10872
Fmsid
846 P-409FPAR
Title
Forest Park Entrances Reconstruction
Summary
This project will reconstruct the entrances and construct ramps along Park Lane near the Overlook at Forest Park.
Currentphase
design
Designpercentcomplete
5.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2026-04-01T00:00:00.000
Designprojectedcompletion
2027-04-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Park Lane between Forest Park Lane and Park Lane South
Parkid
Q015
Latitude
40.70128524
Longitude
-73.84199081
Borough
Queens
VIEW LOCATION