6576
Trackerid: 6576 • Fmsid: 846 P-6PDPLGC • Title: Citywide Pool Structural Systems Reconstruction (CNYG-1015M)
Trackerid
6576
Fmsid
846 P-6PDPLGC
Title
Citywide Pool Structural Systems Reconstruction (CNYG-1015M)
Summary
This project will reconstruct deteriorated structural systems at various pool facilities citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-07-01T00:00:00.000
Designprojectedcompletion
2014-07-01T00:00:00.000
Designadjustedcompletion
2015-01-01T00:00:00.000
Designactualcompletion
2014-12-01T00:00:00.000
Procurementstart
2014-12-01T00:00:00.000
Procurementprojectedcompletion
2015-09-01T00:00:00.000
Procurementadjustedcompletion
2016-07-01T00:00:00.000
Procurementactualcompletion
2016-06-01T00:00:00.000
Constructionstart
2016-10-01T00:00:00.000
Constructionprojectedcom
2019-09-01T00:00:00.000
Constructionactualcompletion
2019-06-01T00:00:00.000
Totalfunding
$778,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
East 76-East 78 Streets, Cherokee Place
Parkid
M045
Latitude
40.769468
Longitude
-73.948846
Borough
Staten IslandManhattanBronx
VIEW LOCATION
6576
Trackerid: 6576 • Fmsid: 846 P-6PDPLGC • Title: Citywide Pool Structural Systems Reconstruction (CNYG-1015M)
Trackerid
6576
Fmsid
846 P-6PDPLGC
Title
Citywide Pool Structural Systems Reconstruction (CNYG-1015M)
Summary
This project will reconstruct deteriorated structural systems at various pool facilities citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-07-01T00:00:00.000
Designprojectedcompletion
2014-07-01T00:00:00.000
Designadjustedcompletion
2015-01-01T00:00:00.000
Designactualcompletion
2014-12-01T00:00:00.000
Procurementstart
2014-12-01T00:00:00.000
Procurementprojectedcompletion
2015-09-01T00:00:00.000
Procurementadjustedcompletion
2016-07-01T00:00:00.000
Procurementactualcompletion
2016-06-01T00:00:00.000
Constructionstart
2016-10-01T00:00:00.000
Constructionprojectedcom
2019-09-01T00:00:00.000
Constructionactualcompletion
2019-06-01T00:00:00.000
Totalfunding
$778,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
E 180 St bet Prospect Av & Mapes Av
Parkid
X236
Latitude
40.846572
Longitude
-73.886092
Borough
Staten IslandManhattanBronx
VIEW LOCATION
6576
Trackerid: 6576 • Fmsid: 846 P-6PDPLGC • Title: Citywide Pool Structural Systems Reconstruction (CNYG-1015M)
Trackerid
6576
Fmsid
846 P-6PDPLGC
Title
Citywide Pool Structural Systems Reconstruction (CNYG-1015M)
Summary
This project will reconstruct deteriorated structural systems at various pool facilities citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-07-01T00:00:00.000
Designprojectedcompletion
2014-07-01T00:00:00.000
Designadjustedcompletion
2015-01-01T00:00:00.000
Designactualcompletion
2014-12-01T00:00:00.000
Procurementstart
2014-12-01T00:00:00.000
Procurementprojectedcompletion
2015-09-01T00:00:00.000
Procurementadjustedcompletion
2016-07-01T00:00:00.000
Procurementactualcompletion
2016-06-01T00:00:00.000
Constructionstart
2016-10-01T00:00:00.000
Constructionprojectedcom
2019-09-01T00:00:00.000
Constructionactualcompletion
2019-06-01T00:00:00.000
Totalfunding
$778,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Madison Avenue, East 120 Street to East 124 Street
Parkid
M058
Latitude
40.8052
Longitude
-73.943631
Borough
Staten IslandManhattanBronx
VIEW LOCATION
6576
Trackerid: 6576 • Fmsid: 846 P-6PDPLGC • Title: Citywide Pool Structural Systems Reconstruction (CNYG-1015M)
Trackerid
6576
Fmsid
846 P-6PDPLGC
Title
Citywide Pool Structural Systems Reconstruction (CNYG-1015M)
Summary
This project will reconstruct deteriorated structural systems at various pool facilities citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-07-01T00:00:00.000
Designprojectedcompletion
2014-07-01T00:00:00.000
Designadjustedcompletion
2015-01-01T00:00:00.000
Designactualcompletion
2014-12-01T00:00:00.000
Procurementstart
2014-12-01T00:00:00.000
Procurementprojectedcompletion
2015-09-01T00:00:00.000
Procurementadjustedcompletion
2016-07-01T00:00:00.000
Procurementactualcompletion
2016-06-01T00:00:00.000
Constructionstart
2016-10-01T00:00:00.000
Constructionprojectedcom
2019-09-01T00:00:00.000
Constructionactualcompletion
2019-06-01T00:00:00.000
Totalfunding
$778,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Jerome Av to River Av bet E 164 St & McClellan St at Cromwell Ave
Parkid
X034
Latitude
40.831896
Longitude
-73.92413
Borough
Staten IslandManhattanBronx
VIEW LOCATION
8671
Trackerid: 8671 • Fmsid: 846 SANDY5-45 • Title: MacArthur Park Multi-Purpose Ballfield and Basketball Court Reconstruction
Trackerid
8671
Fmsid
846 SANDY5-45
Title
MacArthur Park Multi-Purpose Ballfield and Basketball Court Reconstruction
Summary
This project will reconstruct the existing ballfields, basketball courts, and sports lighting, and improve the edges and entrances at MacArthur Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-10-01T00:00:00.000
Designprojectedcompletion
2017-10-01T00:00:00.000
Designadjustedcompletion
2018-01-01T00:00:00.000
Designactualcompletion
2018-02-01T00:00:00.000
Procurementstart
2018-02-01T00:00:00.000
Procurementprojectedcompletion
2018-11-01T00:00:00.000
Procurementadjustedcompletion
2019-03-01T00:00:00.000
Procurementactualcompletion
2019-03-01T00:00:00.000
Constructionstart
2019-04-01T00:00:00.000
Constructionprojectedcom
2020-10-01T00:00:00.000
Constructionadjustedcompletion
2021-04-01T00:00:00.000
Constructionactualcompletion
2021-05-01T00:00:00.000
Totalfunding
$8,972,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentFederalMayoral
Name
Jefferson Street between Dongan Hills Avenue and Seaver Avenue
Parkid
R067
Latitude
40.587243
Longitude
-74.100086
Borough
Staten Island
VIEW LOCATION
1392111
Trackerid: 1392111 • Fmsid: 846 P-4HARTRF • Title: General Hart Playground Public Restroom Reconstruction
Trackerid
1392111
Fmsid
846 P-4HARTRF
Title
General Hart Playground Public Restroom Reconstruction
Summary
This project will reconstruct the roof of the public restroom building in General Hart Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-08-01T00:00:00.000
Designprojectedcompletion
2022-09-01T00:00:00.000
Designactualcompletion
2022-07-01T00:00:00.000
Procurementstart
2021-12-01T00:00:00.000
Procurementprojectedcompletion
2022-05-01T00:00:00.000
Procurementactualcompletion
2022-06-01T00:00:00.000
Constructionstart
2022-12-01T00:00:00.000
Constructionprojectedcom
2023-04-01T00:00:00.000
Constructionactualcompletion
2023-01-01T00:00:00.000
Totalfunding
Less than $1 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
Q067A
Latitude
40.748855
Longitude
-73.897275
Borough
Queens
VIEW LOCATION
6907
Trackerid: 6907 • Fmsid: 846 P-402HART • Title: General Hart Playground Reconstruction
Trackerid
6907
Fmsid
846 P-402HART
Title
General Hart Playground Reconstruction
Summary
This project will reconstruct General Hart Playground, including play equipment, swings, spray shower, basketball courts, planting, pavement, fencing, and benches.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-03-01T00:00:00.000
Designprojectedcompletion
2018-03-01T00:00:00.000
Designactualcompletion
2018-11-01T00:00:00.000
Procurementstart
2018-11-01T00:00:00.000
Procurementprojectedcompletion
2019-08-01T00:00:00.000
Procurementadjustedcompletion
2019-10-01T00:00:00.000
Procurementactualcompletion
2019-10-01T00:00:00.000
Constructionstart
2020-01-01T00:00:00.000
Constructionprojectedcom
2021-01-01T00:00:00.000
Constructionadjustedcompletion
2021-03-01T00:00:00.000
Constructionactualcompletion
2020-11-01T00:00:00.000
Totalfunding
$2,972,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council
Name
37th Avenue, 65th Street, 69th Street, Broadway
Parkid
Q067A
Latitude
40.74875361
Longitude
-73.89732333
Borough
Queens
VIEW LOCATION
6206
Trackerid: 6206 • Fmsid: 846 P-503BFDS • Title: Schmul Park and Dugan Playground Ballfield Reconstruction
Trackerid
6206
Fmsid
846 P-503BFDS
Title
Schmul Park and Dugan Playground Ballfield Reconstruction
Summary
This project will reconstruct the ballfields in Dugan Playground and Schmul Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-11-01T00:00:00.000
Designprojectedcompletion
2014-05-01T00:00:00.000
Designadjustedcompletion
2014-07-01T00:00:00.000
Designactualcompletion
2014-07-01T00:00:00.000
Procurementstart
2014-07-01T00:00:00.000
Procurementprojectedcompletion
2015-04-01T00:00:00.000
Procurementadjustedcompletion
2016-02-01T00:00:00.000
Procurementactualcompletion
2016-01-01T00:00:00.000
Constructionstart
2016-03-01T00:00:00.000
Constructionprojectedcom
2017-09-01T00:00:00.000
Constructionactualcompletion
2017-06-01T00:00:00.000
Totalfunding
$1,522,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Mill Rd. to Weed Ave. between Tysens La. and Isernia Ave.
Parkid
R026
Latitude
40.561344
Longitude
-74.110697
Borough
Staten Island
VIEW LOCATION
6206
Trackerid: 6206 • Fmsid: 846 P-503BFDS • Title: Schmul Park and Dugan Playground Ballfield Reconstruction
Trackerid
6206
Fmsid
846 P-503BFDS
Title
Schmul Park and Dugan Playground Ballfield Reconstruction
Summary
This project will reconstruct the ballfields in Dugan Playground and Schmul Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-11-01T00:00:00.000
Designprojectedcompletion
2014-05-01T00:00:00.000
Designadjustedcompletion
2014-07-01T00:00:00.000
Designactualcompletion
2014-07-01T00:00:00.000
Procurementstart
2014-07-01T00:00:00.000
Procurementprojectedcompletion
2015-04-01T00:00:00.000
Procurementadjustedcompletion
2016-02-01T00:00:00.000
Procurementactualcompletion
2016-01-01T00:00:00.000
Constructionstart
2016-03-01T00:00:00.000
Constructionprojectedcom
2017-09-01T00:00:00.000
Constructionactualcompletion
2017-06-01T00:00:00.000
Totalfunding
$1,522,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Wild Ave., Pearson St., Melvin Ave.
Parkid
R045
Latitude
40.589097
Longitude
-74.186332
Borough
Staten Island
VIEW LOCATION
9185
Trackerid: 9185 • Fmsid: 846 P-503DUPL • Title: Gerard P. Dugan Playground Reconstruction
Trackerid
9185
Fmsid
846 P-503DUPL
Title
Gerard P. Dugan Playground Reconstruction
Summary
This project will reconstruct the play equipment, swings, spray shower, and seating area at Gerard P. Dugan Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-01-01T00:00:00.000
Designprojectedcompletion
2020-01-01T00:00:00.000
Designactualcompletion
2020-01-01T00:00:00.000
Procurementstart
2020-01-01T00:00:00.000
Procurementprojectedcompletion
2020-10-01T00:00:00.000
Procurementadjustedcompletion
2022-03-01T00:00:00.000
Procurementactualcompletion
2022-03-01T00:00:00.000
Constructionstart
2022-04-01T00:00:00.000
Constructionprojectedcom
2023-04-01T00:00:00.000
Constructionactualcompletion
2023-01-01T00:00:00.000
Totalfunding
$3,424,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Mill Road between Tysens Lane and Isernia Avenue
Parkid
R026
Latitude
40.56176706961
Longitude
-74.111526620783
Borough
Staten Island
VIEW LOCATION
1333111
Trackerid: 1333111 • Fmsid: 846 P-3GERCTE • Title: Gertrude Ederle Recreation Center Fitness Room Reconstruction
Trackerid
1333111
Fmsid
846 P-3GERCTE
Title
Gertrude Ederle Recreation Center Fitness Room Reconstruction
Summary
This project will reconstruct the fitness room at Gertrude Ederle Recreation Center.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-01-01T00:00:00.000
Designprojectedcompletion
2022-09-01T00:00:00.000
Designactualcompletion
2022-01-01T00:00:00.000
Procurementstart
2022-01-01T00:00:00.000
Procurementprojectedcompletion
2022-06-01T00:00:00.000
Procurementactualcompletion
2022-06-01T00:00:00.000
Constructionstart
2025-06-01T00:00:00.000
Constructionprojectedcom
2025-12-01T00:00:00.000
Constructionactualcompletion
2025-08-01T00:00:00.000
Totalfunding
$363,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Parkid
M063
Latitude
40.771309
Longitude
-73.988743
Borough
Manhattan
VIEW LOCATION
1035111
Trackerid: 1035111 • Fmsid: 846 P-3PL14A1 • Title: Gertrude Ederle Recreation Center Playground Reconstruction
Trackerid
1035111
Fmsid
846 P-3PL14A1
Title
Gertrude Ederle Recreation Center Playground Reconstruction
Summary
This project will install new play equipment at the playground of the Gertrude Ederle Recreation Center.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-10-01T00:00:00.000
Designprojectedcompletion
2013-11-01T00:00:00.000
Designactualcompletion
2015-10-01T00:00:00.000
Procurementstart
2015-10-01T00:00:00.000
Procurementprojectedcompletion
2016-03-01T00:00:00.000
Procurementactualcompletion
2015-10-01T00:00:00.000
Constructionstart
2016-05-01T00:00:00.000
Constructionprojectedcom
2016-07-01T00:00:00.000
Constructionadjustedcompletion
2016-08-01T00:00:00.000
Constructionactualcompletion
2016-09-01T00:00:00.000
Totalfunding
$803,000
Projectliaison
Steve Simon
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral, City Council
Parkid
M063
Latitude
40.771195
Longitude
-73.988779
Borough
Manhattan
VIEW LOCATION
11139
Trackerid: 11139 • Title: Gertrude Ederle Recreation Center Gym Floor Reconstruction • Currentphase: proposed
Trackerid
11139
Title
Gertrude Ederle Recreation Center Gym Floor Reconstruction
Summary
This project will reconstruct the gym floor in Gertrude Ederle Recreation Center.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Less than $1 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
232 W. 60th Street, New York, NY 10023
Parkid
M063
Latitude
40.77132269
Longitude
-73.98869154
Borough
Manhattan
VIEW LOCATION
10529
Trackerid: 10529 • Title: Gertrude Ederle Recreation Center Roof Reconstruction • Summary: This project will reconstruct the roof of the Gertrude Ederle Recreation Center.
Trackerid
10529
Title
Gertrude Ederle Recreation Center Roof Reconstruction
Summary
This project will reconstruct the roof of the Gertrude Ederle Recreation Center.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $1 million and $3 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
West 59 Street, West 60 Street between Amsterdam Avenue and West End Avenue
Parkid
M063
Latitude
40.77134132
Longitude
-73.98879811
Borough
Manhattan
VIEW LOCATION
10428
Trackerid: 10428 • Fmsid: 846 P-110GCWP • Title: Givans Creek Woods Park Pathway Construction
Trackerid
10428
Fmsid
846 P-110GCWP
Title
Givans Creek Woods Park Pathway Construction
Summary
This project will construct a pathway at Givans Creek Woods Park.
Currentphase
procurement
Designpercentcomplete
100.0
Procurementpercentcomplete
5.0
Constructionpercentcomplete
0.0
Designstart
2024-04-01T00:00:00.000
Designprojectedcompletion
2025-07-01T00:00:00.000
Designactualcompletion
2025-08-01T00:00:00.000
Procurementstart
2026-08-01T00:00:00.000
Procurementprojectedcompletion
2027-08-01T00:00:00.000
Totalfunding
Between $3 million and $5 million
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Co-op City Boulevard between Baychester Avenue and Dreiser Loop
Parkid
X268
Latitude
40.88026651
Longitude
-73.83033869
Borough
Bronx
VIEW LOCATION
7248
Trackerid: 7248 • Fmsid: 846 P-4GLNOAK • Currentphase: completed
Trackerid
7248
Fmsid
846 P-4GLNOAK
Title
Glen Oaks Oval Playground Reconstruction and Adult Fitness Equipment Construction
Summary
This project will reconstruct the playground and replace the basketball court with an adult fitness equipment area at Glen Oaks Oval.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-10-01T00:00:00.000
Designprojectedcompletion
2018-10-01T00:00:00.000
Designactualcompletion
2018-10-01T00:00:00.000
Procurementstart
2018-10-01T00:00:00.000
Procurementprojectedcompletion
2019-07-01T00:00:00.000
Procurementadjustedcompletion
2019-09-01T00:00:00.000
Procurementactualcompletion
2019-08-01T00:00:00.000
Constructionstart
2020-09-01T00:00:00.000
Constructionprojectedcom
2021-09-01T00:00:00.000
Constructionactualcompletion
2021-04-01T00:00:00.000
Totalfunding
$816,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President
Name
260th Street and 74th Avenue
Parkid
Q310
Latitude
40.749618
Longitude
-73.716134
Borough
Queens
VIEW LOCATION
6209
Trackerid: 6209 • Fmsid: 846 P-218GLEN • Title: Glenwood Playground Synthetic Turf Field Construction
Trackerid
6209
Fmsid
846 P-218GLEN
Title
Glenwood Playground Synthetic Turf Field Construction
Summary
This project will construct a multi-use synthetic turf field, adult fitness area, and sitting area, and reconstruct the handball courts and basketball courts at Glenwood Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2012-12-01T00:00:00.000
Designprojectedcompletion
2015-04-01T00:00:00.000
Designadjustedcompletion
2015-06-01T00:00:00.000
Designactualcompletion
2015-06-01T00:00:00.000
Procurementstart
2015-06-01T00:00:00.000
Procurementprojectedcompletion
2016-03-01T00:00:00.000
Procurementactualcompletion
2016-01-01T00:00:00.000
Constructionstart
2016-04-01T00:00:00.000
Constructionprojectedcom
2017-04-01T00:00:00.000
Constructionactualcompletion
2017-04-01T00:00:00.000
Totalfunding
$1,441,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council
Name
Farragut Road and Ralph Avenue
Parkid
B236
Latitude
40.63674083
Longitude
-73.91978778
Borough
Brooklyn
VIEW LOCATION
1034
Trackerid: 1034 • Fmsid: 846 P-2BKPL13 • Title: Wingate Park & Glenwood Playground Reconstruction
Trackerid
1034
Fmsid
846 P-2BKPL13
Title
Wingate Park & Glenwood Playground Reconstruction
Summary
This multisite contract will reconstruct a portion of the playground at Wingate Park and a portion of the playground at Glenwood Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2012-03-01T00:00:00.000
Designprojectedcompletion
2012-04-01T00:00:00.000
Designactualcompletion
2013-09-01T00:00:00.000
Procurementstart
2013-09-01T00:00:00.000
Procurementprojectedcompletion
2014-05-01T00:00:00.000
Procurementactualcompletion
2014-07-01T00:00:00.000
Constructionstart
2014-09-01T00:00:00.000
Constructionprojectedcom
2015-09-01T00:00:00.000
Constructionadjustedcompletion
2015-11-01T00:00:00.000
Constructionactualcompletion
2016-05-01T00:00:00.000
Totalfunding
$1,281,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Ralph Av and Farragut Rd
Parkid
B236
Latitude
40.636648
Longitude
-73.920278
Borough
Brooklyn
VIEW LOCATION
1034
Trackerid: 1034 • Fmsid: 846 P-2BKPL13 • Title: Wingate Park & Glenwood Playground Reconstruction
Trackerid
1034
Fmsid
846 P-2BKPL13
Title
Wingate Park & Glenwood Playground Reconstruction
Summary
This multisite contract will reconstruct a portion of the playground at Wingate Park and a portion of the playground at Glenwood Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2012-03-01T00:00:00.000
Designprojectedcompletion
2012-04-01T00:00:00.000
Designactualcompletion
2013-09-01T00:00:00.000
Procurementstart
2013-09-01T00:00:00.000
Procurementprojectedcompletion
2014-05-01T00:00:00.000
Procurementactualcompletion
2014-07-01T00:00:00.000
Constructionstart
2014-09-01T00:00:00.000
Constructionprojectedcom
2015-09-01T00:00:00.000
Constructionadjustedcompletion
2015-11-01T00:00:00.000
Constructionactualcompletion
2016-05-01T00:00:00.000
Totalfunding
$1,281,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
S E Corner Brooklyn Av and Rutl& Rd
Parkid
B254
Latitude
40.659213
Longitude
-73.9449
Borough
Brooklyn
VIEW LOCATION
9276
Trackerid: 9276 • Fmsid: 846 P-104GBLE • Title: Goble Playground Reconstruction
Trackerid
9276
Fmsid
846 P-104GBLE
Title
Goble Playground Reconstruction
Summary
This project will reconstruct Goble Playground, including the play equipment, swings, basketball and handball courts, drainage and water systems, landscaping and park security lighting.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-03-01T00:00:00.000
Designprojectedcompletion
2022-03-01T00:00:00.000
Designadjustedcompletion
2022-08-01T00:00:00.000
Designactualcompletion
2022-08-01T00:00:00.000
Procurementstart
2022-08-01T00:00:00.000
Procurementprojectedcompletion
2023-05-01T00:00:00.000
Procurementadjustedcompletion
2024-03-01T00:00:00.000
Procurementactualcompletion
2024-03-01T00:00:00.000
Constructionstart
2024-06-01T00:00:00.000
Constructionprojectedcom
2025-06-01T00:00:00.000
Constructionactualcompletion
2025-06-01T00:00:00.000
Totalfunding
$3,793,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Goble Place between Inwood Avenue and Macombs Road
Parkid
X114
Latitude
40.843809
Longitude
-73.91693
Borough
Bronx
VIEW LOCATION
10625
Trackerid: 10625 • Fmsid: 846 P-2CPIGPP • Title: Gonzalo Plasencia Playground Reconstruction
Trackerid
10625
Fmsid
846 P-2CPIGPP
Title
Gonzalo Plasencia Playground Reconstruction
Summary
This project will reconstruct the playground, natural turf field, basketball courts, handball courts, and sitting area in Gonzalo Plasencia Playground.
Currentphase
design
Designpercentcomplete
100.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2024-09-01T00:00:00.000
Designprojectedcompletion
2025-12-01T00:00:00.000
Designactualcompletion
2025-12-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
41st Street between 3rd and 4th Avenues
Parkid
B210I
Latitude
40.6522359
Longitude
-74.00810381
Borough
Brooklyn
VIEW LOCATION
9542
Trackerid: 9542 • Fmsid: 846 P-403GOR2 • Title: Gorman Playground Reconstruction
Trackerid
9542
Fmsid
846 P-403GOR2
Title
Gorman Playground Reconstruction
Summary
This project will reconstruct Gorman Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-10-01T00:00:00.000
Designprojectedcompletion
2020-10-01T00:00:00.000
Designadjustedcompletion
2020-12-01T00:00:00.000
Designactualcompletion
2020-12-01T00:00:00.000
Procurementstart
2020-12-01T00:00:00.000
Procurementprojectedcompletion
2021-08-01T00:00:00.000
Procurementadjustedcompletion
2022-12-01T00:00:00.000
Procurementactualcompletion
2022-12-01T00:00:00.000
Constructionstart
2023-02-01T00:00:00.000
Constructionprojectedcom
2024-02-01T00:00:00.000
Constructionactualcompletion
2023-11-01T00:00:00.000
Totalfunding
$2,937,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
84th Street, 85th Street, 25th Avenue, 30th Avenue
Parkid
Q085
Latitude
40.761706134937
Longitude
-73.884118804645
Borough
Queens
VIEW LOCATION
9283
Trackerid: 9283 • Fmsid: 846 P-205GRPG • Title: Grace Playground Reconstruction
Trackerid
9283
Fmsid
846 P-205GRPG
Title
Grace Playground Reconstruction
Summary
This project will reconstruct the playground area in Grace Playground, including the play equipment, safety surfacing, spray shower, fencing, and utilities.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-05-01T00:00:00.000
Designprojectedcompletion
2020-05-01T00:00:00.000
Designactualcompletion
2020-05-01T00:00:00.000
Procurementstart
2020-05-01T00:00:00.000
Procurementprojectedcompletion
2021-02-01T00:00:00.000
Procurementadjustedcompletion
2022-02-01T00:00:00.000
Procurementactualcompletion
2022-01-01T00:00:00.000
Constructionstart
2022-04-01T00:00:00.000
Constructionprojectedcom
2023-04-01T00:00:00.000
Constructionactualcompletion
2023-03-01T00:00:00.000
Totalfunding
$1,798,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Vermont Street between Pitkin Avenue and Belmont Avenue
Parkid
B078
Latitude
40.671767
Longitude
-73.894477
Borough
Brooklyn
VIEW LOCATION
1212
Trackerid: 1212 • Fmsid: 846 P-105GAPL • Title: Grand Playground Construction
Trackerid
1212
Fmsid
846 P-105GAPL
Title
Grand Playground Construction
Summary
This project will construct Grand Playground, including a new play area, sitting area, spray shower, and basketball court.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2011-05-01T00:00:00.000
Designprojectedcompletion
2014-05-01T00:00:00.000
Designadjustedcompletion
2015-04-01T00:00:00.000
Designactualcompletion
2015-04-01T00:00:00.000
Procurementstart
2015-04-01T00:00:00.000
Procurementprojectedcompletion
2016-01-01T00:00:00.000
Procurementadjustedcompletion
2016-05-01T00:00:00.000
Procurementactualcompletion
2016-05-01T00:00:00.000
Constructionstart
2016-05-01T00:00:00.000
Constructionprojectedcom
2017-08-01T00:00:00.000
Constructionactualcompletion
2017-06-01T00:00:00.000
Totalfunding
$2,349,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Grand Avenue and West 181st Street
Parkid
X244
Latitude
40.85603167
Longitude
-73.90722944
Borough
Bronx
VIEW LOCATION
10061
Trackerid: 10061 • Fmsid: 846 P-404GSPS • Title: Grand Slope Staircase Reconstruction
Trackerid
10061
Fmsid
846 P-404GSPS
Title
Grand Slope Staircase Reconstruction
Summary
This project will reconstruct the staircase at Grand Slope.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-11-01T00:00:00.000
Designprojectedcompletion
2022-11-01T00:00:00.000
Designactualcompletion
2022-11-01T00:00:00.000
Procurementstart
2022-11-01T00:00:00.000
Procurementprojectedcompletion
2023-08-01T00:00:00.000
Procurementadjustedcompletion
2024-06-01T00:00:00.000
Procurementactualcompletion
2024-08-01T00:00:00.000
Constructionstart
2024-09-01T00:00:00.000
Constructionprojectedcom
2025-09-01T00:00:00.000
Constructionactualcompletion
2025-02-01T00:00:00.000
Totalfunding
$347,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Grand Avenue and Kneeland Avenue at Haspel Street
Parkid
Q151
Latitude
40.734583
Longitude
-73.882779
Borough
Queens
VIEW LOCATION
1186
Trackerid: 1186 • Fmsid: 846 P-104GPPV • Title: Grant Park Playground and Basketball Court Reconstruction
Trackerid
1186
Fmsid
846 P-104GPPV
Title
Grant Park Playground and Basketball Court Reconstruction
Summary
This project will reconstruct the playground and basketball court at Grant Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-03-01T00:00:00.000
Designprojectedcompletion
2016-12-01T00:00:00.000
Designadjustedcompletion
2017-08-01T00:00:00.000
Designactualcompletion
2017-08-01T00:00:00.000
Procurementstart
2017-08-01T00:00:00.000
Procurementprojectedcompletion
2018-05-01T00:00:00.000
Procurementadjustedcompletion
2018-09-01T00:00:00.000
Procurementactualcompletion
2018-07-01T00:00:00.000
Constructionstart
2018-08-01T00:00:00.000
Constructionprojectedcom
2020-02-01T00:00:00.000
Constructionactualcompletion
2020-03-01T00:00:00.000
Totalfunding
$3,250,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Grant Avenue and East 169th Street
Parkid
X271
Latitude
40.8376625
Longitude
-73.91207028
Borough
Bronx
VIEW LOCATION
10805
Trackerid: 10805 • Title: Grant Park Public Restroom Building Construction • Currentphase: proposed
Trackerid
10805
Title
Grant Park Public Restroom Building Construction
Summary
This project will construct a prefabricated modular public restroom building in Grant Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $3 million and $5 million
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Grant Avenue between East 169th Street and East 170th Street
Parkid
X271
Latitude
40.83621151
Longitude
-73.91313394
Borough
Bronx
VIEW LOCATION
9153
Trackerid: 9153 • Fmsid: 846 NDF-GRANT • Title: Grant Park Construction
Trackerid
9153
Fmsid
846 NDF-GRANT
Title
Grant Park Construction
Summary
This project will construct Grant Park, including converting the roadbed to recreational space.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-05-01T00:00:00.000
Designprojectedcompletion
2020-11-01T00:00:00.000
Designadjustedcompletion
2021-03-01T00:00:00.000
Designactualcompletion
2021-03-01T00:00:00.000
Procurementstart
2021-03-01T00:00:00.000
Procurementprojectedcompletion
2021-12-01T00:00:00.000
Procurementadjustedcompletion
2023-10-01T00:00:00.000
Procurementactualcompletion
2023-09-01T00:00:00.000
Constructionstart
2023-10-01T00:00:00.000
Constructionprojectedcom
2025-10-01T00:00:00.000
Constructionadjustedcompletion
2026-02-01T00:00:00.000
Constructionactualcompletion
2026-03-01T00:00:00.000
Totalfunding
$17,001,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentMayoral
Name
Grant Avenue between East 169th Street and East 170th Street
Parkid
X271
Latitude
40.836755
Longitude
-73.913112
Borough
Bronx
VIEW LOCATION
7036
Trackerid: 7036 • Fmsid: 846 P-4CPIGRS • Title: Grassmere Playground Reconstruction
Trackerid
7036
Fmsid
846 P-4CPIGRS
Title
Grassmere Playground Reconstruction
Summary
This project will reconstruct the play equipment, swings, landscaping, and sitting areas in Grassmere Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-02-01T00:00:00.000
Designprojectedcompletion
2015-12-01T00:00:00.000
Designactualcompletion
2016-01-01T00:00:00.000
Procurementstart
2016-01-01T00:00:00.000
Procurementprojectedcompletion
2016-10-01T00:00:00.000
Procurementactualcompletion
2016-07-01T00:00:00.000
Constructionstart
2016-11-01T00:00:00.000
Constructionprojectedcom
2018-05-01T00:00:00.000
Constructionactualcompletion
2017-11-01T00:00:00.000
Totalfunding
$3,724,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Hanson Court between Grassmere Terrace and Briar Place
Parkid
Q353
Latitude
40.59927694
Longitude
-73.75891
Borough
Queens
VIEW LOCATION
9981
Trackerid: 9981 • Title: Harry Maze Playground Public Restroom Building Reconstruction • Currentphase: proposed
Trackerid
9981
Title
Harry Maze Playground Public Restroom Building Reconstruction
Summary
This project will reconstruct the public restroom building in Harry Maze Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Less than $1 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Parkid
B285
Latitude
40.64332873
Longitude
-73.92323819
Borough
Brooklyn
VIEW LOCATION
1721
Trackerid: 1721 • Fmsid: 846 P-212GRVD • Title: Gravesend Park Public Restroom Building Construction
Trackerid
1721
Fmsid
846 P-212GRVD
Title
Gravesend Park Public Restroom Building Construction
Summary
This project will construct a new public restroom building at Gravesend Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2012-01-01T00:00:00.000
Designprojectedcompletion
2013-07-01T00:00:00.000
Designadjustedcompletion
2014-09-01T00:00:00.000
Designactualcompletion
2014-09-01T00:00:00.000
Procurementstart
2014-09-01T00:00:00.000
Procurementprojectedcompletion
2015-06-01T00:00:00.000
Procurementadjustedcompletion
2015-08-01T00:00:00.000
Procurementactualcompletion
2015-08-01T00:00:00.000
Constructionstart
2015-11-01T00:00:00.000
Constructionprojectedcom
2017-04-01T00:00:00.000
Constructionadjustedcompletion
2017-06-01T00:00:00.000
Constructionactualcompletion
2017-06-01T00:00:00.000
Totalfunding
$1,855,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
18th Avenue between 56th Street and 57th Street
Parkid
B042
Latitude
40.624007
Longitude
-73.984896
Borough
Brooklyn
VIEW LOCATION
11384
Trackerid: 11384 • Title: Gravesend Park Playground Reconstruction • Summary: This project will reconstruct the playground at Gravesend Park.
Trackerid
11384
Title
Gravesend Park Playground Reconstruction
Summary
This project will reconstruct the playground at Gravesend Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Less than $1 million
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
18th Avenue, 19th Avenue, 55th Street, 58th Street
Parkid
B042
Latitude
40.6235732
Longitude
-73.9850353
Borough
Brooklyn
VIEW LOCATION
1615
Trackerid: 1615 • Fmsid: 846 P-212C17F • Title: Gravesend Park Playground and Court Area Reconstruction
Trackerid
1615
Fmsid
846 P-212C17F
Title
Gravesend Park Playground and Court Area Reconstruction
Summary
This project will demolish the hockey rink and expand the playground and reconstruct the court area and ballfields in Gravesend Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2009-09-01T00:00:00.000
Designprojectedcompletion
2012-11-01T00:00:00.000
Designadjustedcompletion
2013-04-01T00:00:00.000
Designactualcompletion
2014-04-01T00:00:00.000
Procurementstart
2014-04-01T00:00:00.000
Procurementprojectedcompletion
2015-01-01T00:00:00.000
Procurementactualcompletion
2014-12-01T00:00:00.000
Constructionstart
2015-05-01T00:00:00.000
Constructionprojectedcom
2016-11-01T00:00:00.000
Constructionadjustedcompletion
2017-03-01T00:00:00.000
Constructionactualcompletion
2016-10-01T00:00:00.000
Totalfunding
$5,176,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
18th Avenue, 55th Street, 19th Avenue, 58th Street
Parkid
B042
Latitude
40.623538
Longitude
-73.985007
Borough
Brooklyn
VIEW LOCATION
1062111
Trackerid: 1062111 • Fmsid: 846 EXPENSE • Title: New Dorp Beach Temporary Berm Reconstruction
Trackerid
1062111
Fmsid
846 EXPENSE
Title
New Dorp Beach Temporary Berm Reconstruction
Summary
This project will reconstruct and maintain temporary berms installed after Hurricane Sandy at New Dorp Beach in Staten Island.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-11-01T00:00:00.000
Designprojectedcompletion
2015-06-01T00:00:00.000
Designactualcompletion
2016-02-01T00:00:00.000
Procurementstart
2016-03-01T00:00:00.000
Procurementprojectedcompletion
2016-08-01T00:00:00.000
Procurementactualcompletion
2016-02-01T00:00:00.000
Constructionstart
2016-05-01T00:00:00.000
Constructionprojectedcom
2016-06-01T00:00:00.000
Constructionactualcompletion
2016-06-01T00:00:00.000
Totalfunding
$53,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
R016
Latitude
40.55554
Longitude
-74.109621
Borough
Staten Island
VIEW LOCATION
6318
Trackerid: 6318 • Fmsid: 846 SANDY5-23 • Title: New Dorp Center Interior Reconstruction (Hurricane Sandy)
Trackerid
6318
Fmsid
846 SANDY5-23
Title
New Dorp Center Interior Reconstruction (Hurricane Sandy)
Summary
This project will reconstruct the first floor of the New Dorp Center in Staten Island due to damage from Hurricane Sandy.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-04-01T00:00:00.000
Designprojectedcompletion
2014-11-01T00:00:00.000
Designadjustedcompletion
2015-09-01T00:00:00.000
Designactualcompletion
2016-07-01T00:00:00.000
Procurementstart
2016-07-01T00:00:00.000
Procurementprojectedcompletion
2017-04-01T00:00:00.000
Procurementadjustedcompletion
2017-11-01T00:00:00.000
Procurementactualcompletion
2017-11-01T00:00:00.000
Constructionstart
2018-03-01T00:00:00.000
Constructionprojectedcom
2019-09-01T00:00:00.000
Constructionactualcompletion
2019-08-01T00:00:00.000
Totalfunding
$2,435,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough PresidentCity CouncilFederalMayoral
Name
128 Cedar Grove Avenue
Parkid
R016
Latitude
40.561401413259
Longitude
-74.099997762258
Borough
Staten Island
VIEW LOCATION
5921
Trackerid: 5921 • Fmsid: 846 P-5OAKBRM • Title: Cedar Grove Beach Access Improvements
Trackerid
5921
Fmsid
846 P-5OAKBRM
Title
Cedar Grove Beach Access Improvements
Summary
This project will reconstruct the roads and paths at Cedar Grove Beach in Great Kills Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2011-10-01T00:00:00.000
Designprojectedcompletion
2012-06-01T00:00:00.000
Designactualcompletion
2012-09-01T00:00:00.000
Procurementstart
2012-09-01T00:00:00.000
Procurementprojectedcompletion
2013-06-01T00:00:00.000
Procurementactualcompletion
2013-05-01T00:00:00.000
Constructionstart
2014-06-01T00:00:00.000
Constructionprojectedcom
2015-06-01T00:00:00.000
Constructionactualcompletion
2015-05-01T00:00:00.000
Totalfunding
$343,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Cedar Grove Beach Place
Parkid
R016
Latitude
40.557379
Longitude
-74.101816
Borough
Staten Island
VIEW LOCATION
7066
Trackerid: 7066 • Fmsid: 846 SANDY5-30 • Title: New Dorp Beach Site Restoration in Great Kills Park (Hurricane Sandy)
Trackerid
7066
Fmsid
846 SANDY5-30
Title
New Dorp Beach Site Restoration in Great Kills Park (Hurricane Sandy)
Summary
This project will reconstruct Hurricane Sandy-damaged site amenities, a spray shower and paths at New Dorp Beach in Great Kills Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-04-01T00:00:00.000
Designprojectedcompletion
2016-05-01T00:00:00.000
Designadjustedcompletion
2017-02-01T00:00:00.000
Designactualcompletion
2017-02-01T00:00:00.000
Procurementstart
2017-02-01T00:00:00.000
Procurementprojectedcompletion
2017-11-01T00:00:00.000
Procurementadjustedcompletion
2018-03-01T00:00:00.000
Procurementactualcompletion
2018-03-01T00:00:00.000
Constructionstart
2018-04-01T00:00:00.000
Constructionprojectedcom
2019-04-01T00:00:00.000
Constructionactualcompletion
2019-02-01T00:00:00.000
Totalfunding
$371,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
FederalMayoral
Name
Ebbits Avenue and New Dorp Lane along Cedar Grove Avenue
Parkid
R016
Latitude
40.557726
Longitude
-74.101228
Borough
Staten Island
VIEW LOCATION
6205
Trackerid: 6205 • Fmsid: 846 P-501CEDG • Title: Cedar Grove Beach Freshwater Wetlands Reconstruction and Planting
Trackerid
6205
Fmsid
846 P-501CEDG
Title
Cedar Grove Beach Freshwater Wetlands Reconstruction and Planting
Summary
This project will reconstruct the freshwater wetlands, plantings and site work at Cedar Grove Beach in Great Kills Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-11-01T00:00:00.000
Designprojectedcompletion
2014-06-01T00:00:00.000
Designactualcompletion
2014-07-01T00:00:00.000
Procurementstart
2014-07-01T00:00:00.000
Procurementprojectedcompletion
2015-03-01T00:00:00.000
Procurementadjustedcompletion
2015-08-01T00:00:00.000
Procurementactualcompletion
2015-07-01T00:00:00.000
Constructionstart
2015-09-01T00:00:00.000
Constructionprojectedcom
2017-09-01T00:00:00.000
Constructionactualcompletion
2017-01-01T00:00:00.000
Totalfunding
$799,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Ebbitts Street and Cedar Grove Avenue
Parkid
R016
Latitude
40.550913
Longitude
-74.11102
Borough
Staten Island
VIEW LOCATION
7087
Trackerid: 7087 • Fmsid: 846 P-204GRCK • Title: Green Central Knoll Public Restroom Building Construction
Trackerid
7087
Fmsid
846 P-204GRCK
Title
Green Central Knoll Public Restroom Building Construction
Summary
This project will construct a new public restroom building and an accessible ramp in Green Central Knoll.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2014-09-01T00:00:00.000
Designprojectedcompletion
2015-10-01T00:00:00.000
Designactualcompletion
2016-09-01T00:00:00.000
Procurementstart
2016-09-01T00:00:00.000
Procurementprojectedcompletion
2017-06-01T00:00:00.000
Procurementactualcompletion
2017-05-01T00:00:00.000
Constructionstart
2017-06-01T00:00:00.000
Constructionprojectedcom
2018-06-01T00:00:00.000
Constructionadjustedcompletion
2019-07-01T00:00:00.000
Constructionactualcompletion
2019-08-01T00:00:00.000
Totalfunding
$3,793,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoralPrivate
Name
Evergreen Avenue, Noll Street, Central Avenue, Flushing Avenue
Parkid
B395
Latitude
40.70193361
Longitude
-73.93303472
Borough
Brooklyn
VIEW LOCATION
6277
Trackerid: 6277 • Fmsid: 846 P-503GCPL • Title: Greencroft Playground Public Restroom Building Construction
Trackerid
6277
Fmsid
846 P-503GCPL
Title
Greencroft Playground Public Restroom Building Construction
Summary
This project will demolish the existing public restroom building and construct a new public restroom building at Greencroft Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-05-01T00:00:00.000
Designprojectedcompletion
2016-06-01T00:00:00.000
Designadjustedcompletion
2017-07-01T00:00:00.000
Designactualcompletion
2017-07-01T00:00:00.000
Procurementstart
2017-07-01T00:00:00.000
Procurementprojectedcompletion
2018-04-01T00:00:00.000
Procurementadjustedcompletion
2019-10-01T00:00:00.000
Procurementactualcompletion
2019-10-01T00:00:00.000
Constructionstart
2019-12-01T00:00:00.000
Constructionprojectedcom
2021-06-01T00:00:00.000
Constructionadjustedcompletion
2022-08-01T00:00:00.000
Constructionactualcompletion
2022-10-01T00:00:00.000
Totalfunding
$3,301,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council
Name
Greencroft Avenue Between Redgrave Avenue and Ainsworth Avenue
Parkid
R089
Latitude
40.55177917
Longitude
-74.13643444
Borough
Staten Island
VIEW LOCATION
9970
Trackerid: 9970 • Fmsid: 846 P-503GCPG • Title: Greencroft Playground Reconstruction
Trackerid
9970
Fmsid
846 P-503GCPG
Title
Greencroft Playground Reconstruction
Summary
This project will reconstruct the playground area at Greencroft Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-11-01T00:00:00.000
Designprojectedcompletion
2022-11-01T00:00:00.000
Designadjustedcompletion
2023-10-01T00:00:00.000
Designactualcompletion
2023-09-01T00:00:00.000
Procurementstart
2023-09-01T00:00:00.000
Procurementprojectedcompletion
2024-09-01T00:00:00.000
Procurementadjustedcompletion
2025-04-01T00:00:00.000
Procurementactualcompletion
2025-04-01T00:00:00.000
Constructionstart
2025-06-01T00:00:00.000
Constructionprojectedcom
2026-06-01T00:00:00.000
Constructionactualcompletion
2026-06-01T00:00:00.000
Totalfunding
$8,262,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Redgrave Avenue and Greencroft Avenue
Parkid
R089
Latitude
40.55220317
Longitude
-74.13635566
Borough
Staten Island
VIEW LOCATION
9820
Trackerid: 9820 • Fmsid: 846 P-202GRPL • Title: Greene Playground Reconstruction
Trackerid
9820
Fmsid
846 P-202GRPL
Title
Greene Playground Reconstruction
Summary
This project will reconstruct the playground at Greene Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-01-01T00:00:00.000
Designprojectedcompletion
2022-01-01T00:00:00.000
Designadjustedcompletion
2022-05-01T00:00:00.000
Designactualcompletion
2022-05-01T00:00:00.000
Procurementstart
2022-05-01T00:00:00.000
Procurementprojectedcompletion
2023-02-01T00:00:00.000
Procurementadjustedcompletion
2023-12-01T00:00:00.000
Procurementactualcompletion
2023-12-01T00:00:00.000
Constructionstart
2024-04-01T00:00:00.000
Constructionprojectedcom
2025-04-01T00:00:00.000
Constructionadjustedcompletion
2025-06-01T00:00:00.000
Constructionactualcompletion
2025-06-01T00:00:00.000
Totalfunding
$3,000,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Greene & Washington Avenues
Parkid
B301
Latitude
40.686323
Longitude
-73.965791
Borough
Brooklyn
VIEW LOCATION
10082
Trackerid: 10082 • Title: Greene Playground Multipurpose Play Area and Sports Courts Reconstruction • Currentphase: proposed
Trackerid
10082
Title
Greene Playground Multipurpose Play Area and Sports Courts Reconstruction
Summary
This project will reconstruct the multipurpose play area, basketball courts, and handball courts at Greene Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $1 million and $3 million
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Greene Avenue & Waverly Avenue
Parkid
B301
Latitude
40.68640207
Longitude
-73.96593871
Borough
Brooklyn
VIEW LOCATION
11375
Trackerid: 11375 • Title: Greenpoint Playground Reconstruction • Summary: This project will reconstruct Greenpoint Playground.
Trackerid
11375
Title
Greenpoint Playground Reconstruction
Summary
This project will reconstruct Greenpoint Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $1 million and $3 million
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Borough President, City Council
Name
Franklin Street, Commerical Street, Dupont Street
Parkid
B043
Latitude
40.7357101
Longitude
-73.9587977
Borough
Brooklyn
VIEW LOCATION
10394
Trackerid: 10394 • Fmsid: 846 P-207GWHB • Currentphase: completed
Trackerid
10394
Fmsid
846 P-207GWHB
Title
Greenwood Playground Handball Courts Reconstruction and Pickleball Court Construction
Summary
This project will reconstruct the handball courts and construct pickleball courts at Greenwood Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-11-01T00:00:00.000
Designprojectedcompletion
2023-11-01T00:00:00.000
Designactualcompletion
2023-10-01T00:00:00.000
Procurementstart
2023-10-01T00:00:00.000
Procurementprojectedcompletion
2024-10-01T00:00:00.000
Procurementadjustedcompletion
2025-02-01T00:00:00.000
Procurementactualcompletion
2025-03-01T00:00:00.000
Constructionstart
2025-03-01T00:00:00.000
Constructionprojectedcom
2026-03-01T00:00:00.000
Constructionactualcompletion
2026-04-01T00:00:00.000
Totalfunding
$999,000
Projectliaison
James Morris
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
City Council
Name
Fort Hamilton Parkway, Greenwood Avenue, East 5th Street
Parkid
B130
Latitude
40.650354
Longitude
-73.976298
Borough
Brooklyn
VIEW LOCATION
1614111
Trackerid: 1614111 • Fmsid: 846 P-1PAVBRX • Title: Grove Hill Playground Multipurpose Play Area Pavement Reconstruction
Trackerid
1614111
Fmsid
846 P-1PAVBRX
Title
Grove Hill Playground Multipurpose Play Area Pavement Reconstruction
Summary
This project will reconstruct pavements at the multipurpose play area in Grove Hill Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2023-06-01T00:00:00.000
Designprojectedcompletion
2024-05-01T00:00:00.000
Designactualcompletion
2024-04-01T00:00:00.000
Procurementstart
2023-07-01T00:00:00.000
Procurementprojectedcompletion
2023-12-01T00:00:00.000
Procurementactualcompletion
2024-04-01T00:00:00.000
Constructionstart
2024-09-01T00:00:00.000
Constructionprojectedcom
2025-05-01T00:00:00.000
Constructionactualcompletion
2025-02-01T00:00:00.000
Totalfunding
$550,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Parkid
X235
Latitude
40.819897
Longitude
-73.908801
Borough
Bronx
VIEW LOCATION
8997
Trackerid: 8997 • Fmsid: 846 P-1GHPCSR • Title: Grove Hill Playground Public Restroom Building Reconstruction
Trackerid
8997
Fmsid
846 P-1GHPCSR
Title
Grove Hill Playground Public Restroom Building Reconstruction
Summary
This project will reconstruct the public restroom building in Grove Hill Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-01-01T00:00:00.000
Designprojectedcompletion
2019-01-01T00:00:00.000
Designactualcompletion
2019-01-01T00:00:00.000
Procurementstart
2019-01-01T00:00:00.000
Procurementprojectedcompletion
2019-10-01T00:00:00.000
Procurementadjustedcompletion
2020-04-01T00:00:00.000
Procurementactualcompletion
2020-03-01T00:00:00.000
Constructionstart
2020-10-01T00:00:00.000
Constructionprojectedcom
2022-04-01T00:00:00.000
Constructionactualcompletion
2023-04-01T00:00:00.000
Totalfunding
$1,366,000
Projectliaison
Katerine Borrome
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
East 158th Street between Eagle Avenue and Cauldwell Avenue
Parkid
X235
Latitude
40.819976
Longitude
-73.908997
Borough
Bronx
VIEW LOCATION
9345
Trackerid: 9345 • Fmsid: 846 P-4BWSTF1 • Title: Grover Cleveland Playground and Pals Oval Synthetic Turf Fields Reconstruction
Trackerid
9345
Fmsid
846 P-4BWSTF1
Title
Grover Cleveland Playground and Pals Oval Synthetic Turf Fields Reconstruction
Summary
This project will reconstruct the synthetic turf fields at Grover Cleveland Playground and Pals Oval.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-10-01T00:00:00.000
Designprojectedcompletion
2019-01-01T00:00:00.000
Designactualcompletion
2019-01-01T00:00:00.000
Procurementstart
2019-01-01T00:00:00.000
Procurementprojectedcompletion
2019-10-01T00:00:00.000
Procurementadjustedcompletion
2020-04-01T00:00:00.000
Procurementactualcompletion
2020-04-01T00:00:00.000
Constructionstart
2020-09-01T00:00:00.000
Constructionprojectedcom
2021-06-01T00:00:00.000
Constructionactualcompletion
2020-11-01T00:00:00.000
Totalfunding
$1,418,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
Rene Court, Grandview Avenue, Stanhope Street & Fairview Avenue
Parkid
Q002
Latitude
40.710285
Longitude
-73.911492
Borough
Queens
VIEW LOCATION
9345
Trackerid: 9345 • Fmsid: 846 P-4BWSTF1 • Title: Grover Cleveland Playground and Pals Oval Synthetic Turf Fields Reconstruction
Trackerid
9345
Fmsid
846 P-4BWSTF1
Title
Grover Cleveland Playground and Pals Oval Synthetic Turf Fields Reconstruction
Summary
This project will reconstruct the synthetic turf fields at Grover Cleveland Playground and Pals Oval.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-10-01T00:00:00.000
Designprojectedcompletion
2019-01-01T00:00:00.000
Designactualcompletion
2019-01-01T00:00:00.000
Procurementstart
2019-01-01T00:00:00.000
Procurementprojectedcompletion
2019-10-01T00:00:00.000
Procurementadjustedcompletion
2020-04-01T00:00:00.000
Procurementactualcompletion
2020-04-01T00:00:00.000
Constructionstart
2020-09-01T00:00:00.000
Constructionprojectedcom
2021-06-01T00:00:00.000
Constructionactualcompletion
2020-11-01T00:00:00.000
Totalfunding
$1,418,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
North Conduit Avenue, between 80 and 88 Streets, 133 Avenue
Parkid
Q094
Latitude
40.671696
Longitude
-73.848657
Borough
Queens
VIEW LOCATION
10078
Trackerid: 10078 • Fmsid: 846 P-4RRDPK • Title: Gwen Ifill Park and Public Restroom Building Construction
Trackerid
10078
Fmsid
846 P-4RRDPK
Title
Gwen Ifill Park and Public Restroom Building Construction
Summary
This project will construct a playground, basketball courts, adult fitness equipment, entry plazas, public restroom and pathways at Gwen Ifill Park.
Currentphase
design
Designpercentcomplete
100.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2021-09-01T00:00:00.000
Designprojectedcompletion
2023-09-01T00:00:00.000
Designadjustedcompletion
2025-12-01T00:00:00.000
Designactualcompletion
2025-12-01T00:00:00.000
Totalfunding
Greater than $10 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-02T00:00:00.000
Fundingsource
Mayoral
Name
129th Avenue between 172nd Street and 176th Street
Parkid
Q412
Latitude
40.67936275
Longitude
-73.76883853
Borough
Queens
VIEW LOCATION