Capital Project Tracker

A listing of all capital projects managed by NYC Parks, and a timeline for their completion.

Supporting documentation can be found at the following link (http://www.nycgovparks.org/bigapps/desc/DPR_CapitalProjectTracker_001.txt).

See JSON and XML feeds here https://data.cityofnewyork.us/Recreation/Capital-Project-Tracker/qiwj-i2jk

Recreation Department of Parks and Recreation (DPR) Dataset 4hcv-tc5r 29 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
6311
Trackerid: 6311 • Fmsid: 846 P-6GASBSI • Title: Citywide Facility Electrification Conversion
Trackerid
6311
Fmsid
846 P-6GASBSI
Title
Citywide Facility Electrification Conversion
Summary
This project will convert facilities to electric systems at various parks facilities citywide.
Currentphase
design
Designpercentcomplete
5.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2026-12-01T00:00:00.000
Designprojectedcompletion
2027-02-01T00:00:00.000
Totalfunding
Between $3 million and $5 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Underhill, Oak, Rose, Booth Memorial Avenues, Kissena Boulevard, Fresh Meadow Lane
Parkid
Q024
Latitude
40.749149372766
Longitude
-73.803828084454
Borough
QueensBronxManhattan
VIEW LOCATION
6311
Trackerid: 6311 • Fmsid: 846 P-6GASBSI • Title: Citywide Facility Electrification Conversion
Trackerid
6311
Fmsid
846 P-6GASBSI
Title
Citywide Facility Electrification Conversion
Summary
This project will convert facilities to electric systems at various parks facilities citywide.
Currentphase
design
Designpercentcomplete
5.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2026-12-01T00:00:00.000
Designprojectedcompletion
2027-02-01T00:00:00.000
Totalfunding
Between $3 million and $5 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Vernon Boulevard, 33 Road, 34 Avenue, East River
Parkid
Q048
Latitude
40.765340416326
Longitude
-73.941043393573
Borough
QueensBronxManhattan
VIEW LOCATION
6311
Trackerid: 6311 • Fmsid: 846 P-6GASBSI • Title: Citywide Facility Electrification Conversion
Trackerid
6311
Fmsid
846 P-6GASBSI
Title
Citywide Facility Electrification Conversion
Summary
This project will convert facilities to electric systems at various parks facilities citywide.
Currentphase
design
Designpercentcomplete
5.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2026-12-01T00:00:00.000
Designprojectedcompletion
2027-02-01T00:00:00.000
Totalfunding
Between $3 million and $5 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
East Houston Street to Canal Street
Parkid
M105
Latitude
40.716757177924
Longitude
-73.994104760114
Borough
QueensBronxManhattan
VIEW LOCATION
6311
Trackerid: 6311 • Fmsid: 846 P-6GASBSI • Title: Citywide Facility Electrification Conversion
Trackerid
6311
Fmsid
846 P-6GASBSI
Title
Citywide Facility Electrification Conversion
Summary
This project will convert facilities to electric systems at various parks facilities citywide.
Currentphase
design
Designpercentcomplete
5.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2026-12-01T00:00:00.000
Designprojectedcompletion
2027-02-01T00:00:00.000
Totalfunding
Between $3 million and $5 million
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Broadway, Jerome Avenue, City Line, Van Cortlandt Park South
Parkid
X092
Latitude
40.888282946493
Longitude
-73.898133984614
Borough
QueensBronxManhattan
VIEW LOCATION
8965
Trackerid: 8965 • Fmsid: 846 P-4ANCH03 • Title: Astoria Park Charybdis Playground Reconstruction and Spray Shower Construction
Trackerid
8965
Fmsid
846 P-4ANCH03
Title
Astoria Park Charybdis Playground Reconstruction and Spray Shower Construction
Summary
This project will reconstruct Charybdis Playground and construct a spray shower in Astoria Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-05-01T00:00:00.000
Designprojectedcompletion
2018-05-01T00:00:00.000
Designactualcompletion
2018-06-01T00:00:00.000
Procurementstart
2018-06-01T00:00:00.000
Procurementprojectedcompletion
2019-03-01T00:00:00.000
Procurementadjustedcompletion
2019-07-01T00:00:00.000
Procurementactualcompletion
2019-07-01T00:00:00.000
Constructionstart
2019-09-01T00:00:00.000
Constructionprojectedcom
2021-03-01T00:00:00.000
Constructionadjustedcompletion
2021-07-01T00:00:00.000
Constructionactualcompletion
2021-07-01T00:00:00.000
Totalfunding
$11,561,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Between Shore Boulevard and 19th Street at 23rd Road
Parkid
Q004
Latitude
40.779697
Longitude
-73.92228
Borough
Queens
VIEW LOCATION
8987
Trackerid: 8987 • Fmsid: 846 P-4ANCH04 • Title: Astoria Park Charybdis Playground Public Restroom Building Reconstruction
Trackerid
8987
Fmsid
846 P-4ANCH04
Title
Astoria Park Charybdis Playground Public Restroom Building Reconstruction
Summary
This project will reconstruct the Public Restroom Building at Charybdis Playground in Astoria Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-05-01T00:00:00.000
Designprojectedcompletion
2018-05-01T00:00:00.000
Designactualcompletion
2018-06-01T00:00:00.000
Procurementstart
2018-06-01T00:00:00.000
Procurementprojectedcompletion
2019-03-01T00:00:00.000
Procurementadjustedcompletion
2019-09-01T00:00:00.000
Procurementactualcompletion
2019-09-01T00:00:00.000
Constructionstart
2020-02-01T00:00:00.000
Constructionprojectedcom
2021-08-01T00:00:00.000
Constructionadjustedcompletion
2021-11-01T00:00:00.000
Constructionactualcompletion
2021-11-01T00:00:00.000
Totalfunding
$1,255,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Between Shore Boulevard and 19th Street at 23rd Road
Parkid
Q004
Latitude
40.779699
Longitude
-73.922757
Borough
Queens
VIEW LOCATION
9592
Trackerid: 9592 • Fmsid: 846 P-4ANCH05 • Title: Astoria Park Great Lawn Pathways Reconstruction
Trackerid
9592
Fmsid
846 P-4ANCH05
Title
Astoria Park Great Lawn Pathways Reconstruction
Summary
This project will reconstruct the landscape in Astoria Park north of the pool.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2021-06-01T00:00:00.000
Designprojectedcompletion
2022-06-01T00:00:00.000
Designadjustedcompletion
2022-09-01T00:00:00.000
Designactualcompletion
2022-09-01T00:00:00.000
Procurementstart
2022-09-01T00:00:00.000
Procurementprojectedcompletion
2023-06-01T00:00:00.000
Procurementadjustedcompletion
2024-08-01T00:00:00.000
Procurementactualcompletion
2024-09-01T00:00:00.000
Constructionstart
2024-09-01T00:00:00.000
Constructionprojectedcom
2025-12-01T00:00:00.000
Constructionactualcompletion
2025-10-01T00:00:00.000
Totalfunding
$3,695,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoralPrivate
Name
Shore Boulevard, 19th Street, 22nd Drive, 23rd Road
Parkid
Q004
Latitude
40.78065896735
Longitude
-73.920362910531
Borough
Queens
VIEW LOCATION
8892
Trackerid: 8892 • Fmsid: 846 P-4ANCH02 • Title: Astoria Park Track and Field Reconstruction
Trackerid
8892
Fmsid
846 P-4ANCH02
Title
Astoria Park Track and Field Reconstruction
Summary
This project will reconstruct the track and field in Astoria Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-11-01T00:00:00.000
Designprojectedcompletion
2017-12-01T00:00:00.000
Designactualcompletion
2017-12-01T00:00:00.000
Procurementstart
2017-12-01T00:00:00.000
Procurementprojectedcompletion
2018-09-01T00:00:00.000
Procurementactualcompletion
2018-09-01T00:00:00.000
Constructionstart
2018-11-01T00:00:00.000
Constructionprojectedcom
2020-05-01T00:00:00.000
Constructionactualcompletion
2019-10-01T00:00:00.000
Totalfunding
$12,854,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Shore Boulevard, RFK Bridge, 18th Street, Astoria Park South
Parkid
Q004
Latitude
40.77906
Longitude
-73.921718
Borough
Queens
VIEW LOCATION
2923
Trackerid: 2923 • Fmsid: 846 P-401ATH2 • Title: Athens Square Playground Plaza Reconstruction
Trackerid
2923
Fmsid
846 P-401ATH2
Title
Athens Square Playground Plaza Reconstruction
Summary
This project will reconstruct the plaza and adjacent seating area in Athens Square Playground. The cheek walls on either side of the two ramps will be reconstructed and a new ramp will be constructed between the seating area and the plaza. New handrails will be installed, 2 1/2 foot fencing will be placed around plant beds, plant material will be replaced as needed, and a trench drain will be installed near the spray shower to keep water from flowing onto the safety surface.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2011-03-01T00:00:00.000
Designactualcompletion
2012-01-01T00:00:00.000
Procurementstart
2012-01-01T00:00:00.000
Procurementprojectedcompletion
2012-10-01T00:00:00.000
Procurementactualcompletion
2012-11-01T00:00:00.000
Constructionstart
2013-07-01T00:00:00.000
Constructionprojectedcom
2014-07-01T00:00:00.000
Constructionadjustedcompletion
2014-08-01T00:00:00.000
Constructionactualcompletion
2014-08-01T00:00:00.000
Totalfunding
$553,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President
Name
30th Street and 30th Avenue, Queens
Parkid
Q436
Latitude
40.76791028
Longitude
-73.92207972
Borough
Queens
VIEW LOCATION
8808
Trackerid: 8808 • Fmsid: 846 P-3CPI3AC • Title: Audubon Playground Public Restroom Building Reconstruction
Trackerid
8808
Fmsid
846 P-3CPI3AC
Title
Audubon Playground Public Restroom Building Reconstruction
Summary
This project will reconstruct the public restroom building at Audubon Playground and make it ADA accessible.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-11-01T00:00:00.000
Designprojectedcompletion
2017-11-01T00:00:00.000
Designactualcompletion
2018-09-01T00:00:00.000
Procurementstart
2018-09-01T00:00:00.000
Procurementprojectedcompletion
2019-06-01T00:00:00.000
Procurementadjustedcompletion
2019-11-01T00:00:00.000
Procurementactualcompletion
2019-10-01T00:00:00.000
Constructionstart
2020-01-01T00:00:00.000
Constructionprojectedcom
2021-04-01T00:00:00.000
Constructionadjustedcompletion
2022-03-01T00:00:00.000
Constructionactualcompletion
2022-05-01T00:00:00.000
Totalfunding
$1,021,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Audubon Avenue between West 169th Street and West 170th Street
Parkid
M240
Latitude
40.841695
Longitude
-73.93823
Borough
Manhattan
VIEW LOCATION
8817
Trackerid: 8817 • Fmsid: 846 P-3CPI3AP • Title: Audubon Playground Reconstruction
Trackerid
8817
Fmsid
846 P-3CPI3AP
Title
Audubon Playground Reconstruction
Summary
This project will reconstruct Audubon Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-11-01T00:00:00.000
Designprojectedcompletion
2017-11-01T00:00:00.000
Designactualcompletion
2017-12-01T00:00:00.000
Procurementstart
2017-12-01T00:00:00.000
Procurementprojectedcompletion
2018-08-01T00:00:00.000
Procurementadjustedcompletion
2018-09-01T00:00:00.000
Procurementactualcompletion
2018-09-01T00:00:00.000
Constructionstart
2018-10-01T00:00:00.000
Constructionprojectedcom
2020-04-01T00:00:00.000
Constructionadjustedcompletion
2020-08-01T00:00:00.000
Constructionactualcompletion
2020-09-01T00:00:00.000
Totalfunding
$5,890,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Audubon Avenue between West 169th Street and West 170th Street
Parkid
M240
Latitude
40.84171
Longitude
-73.938043
Borough
Manhattan
VIEW LOCATION
10450
Trackerid: 10450 • Fmsid: 846 P-306ASGP • Title: Augustus Saint Gaudens Playground Reconstruction
Trackerid
10450
Fmsid
846 P-306ASGP
Title
Augustus Saint Gaudens Playground Reconstruction
Summary
This project will reconstruct Augustus Saint Gaudens Playground.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
0.0
Designstart
2023-02-01T00:00:00.000
Designprojectedcompletion
2024-02-01T00:00:00.000
Designadjustedcompletion
2024-06-01T00:00:00.000
Designactualcompletion
2024-06-01T00:00:00.000
Procurementstart
2026-01-01T00:00:00.000
Procurementprojectedcompletion
2027-01-01T00:00:00.000
Procurementactualcompletion
2026-09-01T00:00:00.000
Constructionstart
2027-03-01T00:00:00.000
Constructionprojectedcom
2028-02-01T00:00:00.000
Totalfunding
$3,651,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
2nd Avenue between East 19th Street and East 20th Street
Parkid
M226
Latitude
40.73559952
Longitude
-73.982132
Borough
Manhattan
VIEW LOCATION
7423
Trackerid: 7423 • Fmsid: 846 P-5CPIB12 • Currentphase: completed
Trackerid
7423
Fmsid
846 P-5CPIB12
Title
Levy Playground, McDonald Park and DeMatti Playground Public Restroom Building Reconstruction
Summary
This project will reconstruct three public restroom buildings at various locations in Staten Island.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-02-01T00:00:00.000
Designprojectedcompletion
2016-02-01T00:00:00.000
Designactualcompletion
2016-07-01T00:00:00.000
Procurementstart
2016-07-01T00:00:00.000
Procurementprojectedcompletion
2017-04-01T00:00:00.000
Procurementadjustedcompletion
2017-07-01T00:00:00.000
Procurementactualcompletion
2017-06-01T00:00:00.000
Constructionstart
2017-07-01T00:00:00.000
Constructionprojectedcom
2018-10-01T00:00:00.000
Constructionadjustedcompletion
2020-09-01T00:00:00.000
Constructionactualcompletion
2020-08-01T00:00:00.000
Totalfunding
$7,981,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Forest Avenue, Myrtle Avenue between Broadway & Burgher
Parkid
R034
Latitude
40.629653
Longitude
-74.115285
Borough
Staten Island
VIEW LOCATION
7423
Trackerid: 7423 • Fmsid: 846 P-5CPIB12 • Currentphase: completed
Trackerid
7423
Fmsid
846 P-5CPIB12
Title
Levy Playground, McDonald Park and DeMatti Playground Public Restroom Building Reconstruction
Summary
This project will reconstruct three public restroom buildings at various locations in Staten Island.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-02-01T00:00:00.000
Designprojectedcompletion
2016-02-01T00:00:00.000
Designactualcompletion
2016-07-01T00:00:00.000
Procurementstart
2016-07-01T00:00:00.000
Procurementprojectedcompletion
2017-04-01T00:00:00.000
Procurementadjustedcompletion
2017-07-01T00:00:00.000
Procurementactualcompletion
2017-06-01T00:00:00.000
Constructionstart
2017-07-01T00:00:00.000
Constructionprojectedcom
2018-10-01T00:00:00.000
Constructionadjustedcompletion
2020-09-01T00:00:00.000
Constructionactualcompletion
2020-08-01T00:00:00.000
Totalfunding
$7,981,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Tompkins Avenue, Chestnut Avenue
Parkid
R035
Latitude
40.614544
Longitude
-74.074243
Borough
Staten Island
VIEW LOCATION
7423
Trackerid: 7423 • Fmsid: 846 P-5CPIB12 • Currentphase: completed
Trackerid
7423
Fmsid
846 P-5CPIB12
Title
Levy Playground, McDonald Park and DeMatti Playground Public Restroom Building Reconstruction
Summary
This project will reconstruct three public restroom buildings at various locations in Staten Island.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-02-01T00:00:00.000
Designprojectedcompletion
2016-02-01T00:00:00.000
Designactualcompletion
2016-07-01T00:00:00.000
Procurementstart
2016-07-01T00:00:00.000
Procurementprojectedcompletion
2017-04-01T00:00:00.000
Procurementadjustedcompletion
2017-07-01T00:00:00.000
Procurementactualcompletion
2017-06-01T00:00:00.000
Constructionstart
2017-07-01T00:00:00.000
Constructionprojectedcom
2018-10-01T00:00:00.000
Constructionadjustedcompletion
2020-09-01T00:00:00.000
Constructionactualcompletion
2020-08-01T00:00:00.000
Totalfunding
$7,981,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Jewett & Castleton Avenues
Parkid
R033
Latitude
40.633931
Longitude
-74.128922
Borough
Staten Island
VIEW LOCATION
7054
Trackerid: 7054 • Fmsid: 846 P-5CPIMDP • Title: Austin J. McDonald Park Playground and Multi-Use Area Reconstruction (R034-115M)
Trackerid
7054
Fmsid
846 P-5CPIMDP
Title
Austin J. McDonald Park Playground and Multi-Use Area Reconstruction (R034-115M)
Summary
This project will reconstruct the playground and multi-use area at McDonald Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-01-01T00:00:00.000
Designprojectedcompletion
2016-01-01T00:00:00.000
Designactualcompletion
2016-01-01T00:00:00.000
Procurementstart
2016-01-01T00:00:00.000
Procurementprojectedcompletion
2016-10-01T00:00:00.000
Procurementactualcompletion
2016-09-01T00:00:00.000
Constructionstart
2016-10-01T00:00:00.000
Constructionprojectedcom
2018-04-01T00:00:00.000
Constructionadjustedcompletion
2018-04-01T00:00:00.000
Constructionactualcompletion
2018-05-01T00:00:00.000
Totalfunding
$5,230,000
Projectliaison
Katrina Toal
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Forest Avenue, Myrtle Avenue, Broadway, North Burgher Avenue.
Parkid
R034
Latitude
40.6296775
Longitude
-74.11531306
Borough
Staten Island
VIEW LOCATION
8847
Trackerid: 8847 • Fmsid: 846 P-213BABI • Title: Babi Yar Triangle Playground Reconstruction
Trackerid
8847
Fmsid
846 P-213BABI
Title
Babi Yar Triangle Playground Reconstruction
Summary
This project will reconstruct the playground and seating area at Babi Yar Triangle.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-11-01T00:00:00.000
Designprojectedcompletion
2018-11-01T00:00:00.000
Designadjustedcompletion
2019-11-01T00:00:00.000
Designactualcompletion
2019-11-01T00:00:00.000
Procurementstart
2019-11-01T00:00:00.000
Procurementprojectedcompletion
2020-08-01T00:00:00.000
Procurementadjustedcompletion
2021-06-01T00:00:00.000
Procurementactualcompletion
2021-04-01T00:00:00.000
Constructionstart
2021-05-01T00:00:00.000
Constructionprojectedcom
2022-05-01T00:00:00.000
Constructionactualcompletion
2022-05-01T00:00:00.000
Totalfunding
$1,281,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Brighton 14th Street, Oceanview Avenue, and Corbin Place
Parkid
BZ10
Latitude
40.579371
Longitude
-73.954649
Borough
Brooklyn
VIEW LOCATION
1546111
Trackerid: 1546111 • Fmsid: 846 P-1BILYRF • Title: Bailey Playground Public Restroom Building Roof Reconstruction
Trackerid
1546111
Fmsid
846 P-1BILYRF
Title
Bailey Playground Public Restroom Building Roof Reconstruction
Summary
This project will reconstruct the roof of the public restroom building in Bailey Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-07-01T00:00:00.000
Designprojectedcompletion
2023-10-01T00:00:00.000
Designactualcompletion
2023-11-01T00:00:00.000
Procurementstart
2023-01-01T00:00:00.000
Procurementprojectedcompletion
2023-06-01T00:00:00.000
Procurementactualcompletion
2023-09-01T00:00:00.000
Constructionstart
2023-12-01T00:00:00.000
Constructionprojectedcom
2024-03-01T00:00:00.000
Constructionactualcompletion
2024-01-01T00:00:00.000
Totalfunding
$140,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
X150J
Latitude
40.881159
Longitude
-73.900741
Borough
Bronx
VIEW LOCATION
1563111
Trackerid: 1563111 • Fmsid: 846 P-108TBTF • Title: Bailey Playground Fence Installation
Trackerid
1563111
Fmsid
846 P-108TBTF
Title
Bailey Playground Fence Installation
Summary
This project will install a fence at Bailey Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2024-05-01T00:00:00.000
Designprojectedcompletion
2024-12-01T00:00:00.000
Designactualcompletion
2024-10-01T00:00:00.000
Procurementstart
2024-07-01T00:00:00.000
Procurementprojectedcompletion
2024-12-01T00:00:00.000
Procurementactualcompletion
2024-10-01T00:00:00.000
Constructionstart
2024-12-01T00:00:00.000
Constructionprojectedcom
2025-03-01T00:00:00.000
Constructionactualcompletion
2025-02-01T00:00:00.000
Totalfunding
$1,374,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
MayoralStateCity Council
Parkid
X150J
Latitude
40.881006
Longitude
-73.900911
Borough
Bronx
VIEW LOCATION
1654111
Trackerid: 1654111 • Fmsid: 846 P-412BPTH • Title: Baisley Pond Park Path Reconstruction
Trackerid
1654111
Fmsid
846 P-412BPTH
Title
Baisley Pond Park Path Reconstruction
Summary
This project will reconstruct paths in Baisley Pond Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2023-12-01T00:00:00.000
Designprojectedcompletion
2024-11-01T00:00:00.000
Designactualcompletion
2024-10-01T00:00:00.000
Procurementstart
2024-03-01T00:00:00.000
Procurementprojectedcompletion
2024-08-01T00:00:00.000
Procurementactualcompletion
2024-10-01T00:00:00.000
Constructionstart
2025-11-01T00:00:00.000
Constructionprojectedcom
2026-05-01T00:00:00.000
Constructionactualcompletion
2026-01-01T00:00:00.000
Totalfunding
$450,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Parkid
Q005
Latitude
40.673799
Longitude
-73.78627
Borough
Queens
VIEW LOCATION
1744111
Trackerid: 1744111 • Fmsid: 846 P-412P157 • Title: Baisley Pond Park 157th Street Playground Multipurpose Play Area Reconstruction
Trackerid
1744111
Fmsid
846 P-412P157
Title
Baisley Pond Park 157th Street Playground Multipurpose Play Area Reconstruction
Summary
This project will reconstruct the multipurpose play area at 157th Street Playground in Baisley Pond Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2024-10-01T00:00:00.000
Designprojectedcompletion
2025-01-01T00:00:00.000
Designactualcompletion
2025-08-01T00:00:00.000
Procurementstart
2024-11-01T00:00:00.000
Procurementprojectedcompletion
2025-04-01T00:00:00.000
Procurementactualcompletion
2025-08-01T00:00:00.000
Constructionstart
2025-11-01T00:00:00.000
Constructionprojectedcom
2026-03-01T00:00:00.000
Constructionactualcompletion
2026-03-01T00:00:00.000
Totalfunding
$680,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
Q005
Latitude
40.6759979
Longitude
-73.7864795
Borough
Queens
VIEW LOCATION
1933111
Trackerid: 1933111 • Fmsid: 846 P-412P157 • Title: Baisley Pond Park 157th Street Playground Multipurpose Play Area Reconstruction
Trackerid
1933111
Fmsid
846 P-412P157
Title
Baisley Pond Park 157th Street Playground Multipurpose Play Area Reconstruction
Summary
This project will reconstruct the multipurpose play area at 157th Street Playground in Baisley Pond Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2025-11-01T00:00:00.000
Designprojectedcompletion
2026-03-01T00:00:00.000
Designactualcompletion
2026-04-01T00:00:00.000
Procurementstart
2025-11-01T00:00:00.000
Procurementprojectedcompletion
2026-04-01T00:00:00.000
Procurementactualcompletion
2026-02-01T00:00:00.000
Constructionstart
2025-11-01T00:00:00.000
Constructionprojectedcom
2026-03-01T00:00:00.000
Constructionactualcompletion
2026-03-01T00:00:00.000
Totalfunding
$120,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
Q005
Latitude
40.6741464
Longitude
-73.7863219
Borough
Queens
VIEW LOCATION
5976
Trackerid: 5976 • Fmsid: 846 P-412BPP3 • Title: Baisley Pond Park Pathway Reconstruction
Trackerid
5976
Fmsid
846 P-412BPP3
Title
Baisley Pond Park Pathway Reconstruction
Summary
This project will reconstruct paths in Baisley Pond Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-05-01T00:00:00.000
Designprojectedcompletion
2014-06-01T00:00:00.000
Designadjustedcompletion
2014-07-01T00:00:00.000
Designactualcompletion
2014-08-01T00:00:00.000
Procurementstart
2014-08-01T00:00:00.000
Procurementprojectedcompletion
2015-05-01T00:00:00.000
Procurementactualcompletion
2015-04-01T00:00:00.000
Constructionstart
2015-05-01T00:00:00.000
Constructionprojectedcom
2016-05-01T00:00:00.000
Constructionactualcompletion
2016-05-01T00:00:00.000
Totalfunding
$1,198,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
119th Avenue and Lake View Boulevard East to 155th Street and 122nd Avenue, Queens
Parkid
Q005
Latitude
40.674855
Longitude
-73.786487
Borough
Queens
VIEW LOCATION
10873
Trackerid: 10873 • Currentphase: proposed • Designpercentcomplete: 0.0
Trackerid
10873
Title
Baisley Pond Park 157th Street Playground and Public Restroom Building Reconstruction
Summary
This project will reconstruct the Baisley Pond Park 157th Street Playground and Public Restroom Building.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $5 million and $10 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough President
Name
157th Street and 116th Avenue
Parkid
Q005
Latitude
40.67776398
Longitude
-73.78254778
Borough
Queens
VIEW LOCATION
9191
Trackerid: 9191 • Fmsid: 846 P-412BAI2 • Currentphase: design
Trackerid
9191
Fmsid
846 P-412BAI2
Title
Baisley Pond Park Track Reconstruction and Synthetic Turf Field and Sports Lighting Construction
Summary
This project will reconstruct the track and convert the natural turf field to synthetic turf and construct sports lighting at Baisley Pond Park.
Currentphase
design
Designpercentcomplete
100.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2024-01-01T00:00:00.000
Designprojectedcompletion
2025-06-01T00:00:00.000
Designactualcompletion
2025-07-01T00:00:00.000
Totalfunding
Greater than $10 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
N. Conduit Avenue, 150th Street, Rockaway Blvd. and Baisley Blvd. South
Parkid
Q005
Latitude
40.66915151
Longitude
-73.78737508
Borough
Queens
VIEW LOCATION
11082
Trackerid: 11082 • Title: Baisley Pond Park Sutphin Playground Reconstruction • Summary: This project will reconstruct Sutphin Playground at Baisley Pond Park.
Trackerid
11082
Title
Baisley Pond Park Sutphin Playground Reconstruction
Summary
This project will reconstruct Sutphin Playground at Baisley Pond Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $5 million and $10 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Sutphin Boulevard and 125th Avenue
Parkid
Q005
Latitude
40.6762312
Longitude
-73.786465
Borough
Queens
VIEW LOCATION
1057111
Trackerid: 1057111 • Fmsid: 846 P-6ROOF15 • Title: Banneker Playground Public Restroom Building Roof Reconstruction
Trackerid
1057111
Fmsid
846 P-6ROOF15
Title
Banneker Playground Public Restroom Building Roof Reconstruction
Summary
This project will reconstruct the roof of the public restroom building in Banneker Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2016-05-01T00:00:00.000
Designprojectedcompletion
2016-07-01T00:00:00.000
Designactualcompletion
2016-11-01T00:00:00.000
Procurementstart
2016-08-01T00:00:00.000
Procurementprojectedcompletion
2017-01-01T00:00:00.000
Procurementactualcompletion
2016-10-01T00:00:00.000
Constructionstart
2016-12-01T00:00:00.000
Constructionprojectedcom
2017-07-01T00:00:00.000
Constructionactualcompletion
2018-05-01T00:00:00.000
Totalfunding
$68,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Parkid
B140
Latitude
40.690634
Longitude
-73.948624
Borough
Brooklyn
VIEW LOCATION
11380
Trackerid: 11380 • Title: Banneker Playground Basketball Courts Reconstruction • Summary: This project will reconstruct the basketball courts at Banneker Playground.
Trackerid
11380
Title
Banneker Playground Basketball Courts Reconstruction
Summary
This project will reconstruct the basketball courts at Banneker Playground.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Less than $1 million
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Marcy Avenue and Lafayette Avenue
Parkid
B140
Latitude
40.6903335
Longitude
-73.9494492
Borough
Brooklyn
VIEW LOCATION
11379
Trackerid: 11379 • Title: Bloomingdale Park Baseball Field Reconstruction • Summary: This project will reconstruct the baseball field in Bloomingdale Park.
Trackerid
11379
Title
Bloomingdale Park Baseball Field Reconstruction
Summary
This project will reconstruct the baseball field in Bloomingdale Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Between $5 million and $10 million
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Maguire Avenue between Ramona Avenue and Drumgoole Road West
Parkid
R106
Latitude
40.5338189
Longitude
-74.2093523
Borough
Staten Island
VIEW LOCATION
2014
Trackerid: 2014 • Fmsid: 846 P-2BWCC04 • Currentphase: completed
Trackerid
2014
Fmsid
846 P-2BWCC04
Title
Banneker Playground and Tilden Playground Public Restroom Building Reconstruction
Summary
This project will reconstruct the Public Restroom Buildings at Banneker Playground and Tilden Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-10-01T00:00:00.000
Designprojectedcompletion
2019-01-01T00:00:00.000
Designactualcompletion
2019-02-01T00:00:00.000
Procurementstart
2019-02-01T00:00:00.000
Procurementprojectedcompletion
2019-11-01T00:00:00.000
Procurementadjustedcompletion
2020-12-01T00:00:00.000
Procurementactualcompletion
2021-03-01T00:00:00.000
Constructionstart
2021-04-01T00:00:00.000
Constructionprojectedcom
2023-04-01T00:00:00.000
Constructionactualcompletion
2023-01-01T00:00:00.000
Totalfunding
$1,634,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Marcy Avenue, Kosciuszko Street
Parkid
B140
Latitude
40.690685985765
Longitude
-73.948797689615
Borough
Brooklyn
VIEW LOCATION
2014
Trackerid: 2014 • Fmsid: 846 P-2BWCC04 • Currentphase: completed
Trackerid
2014
Fmsid
846 P-2BWCC04
Title
Banneker Playground and Tilden Playground Public Restroom Building Reconstruction
Summary
This project will reconstruct the Public Restroom Buildings at Banneker Playground and Tilden Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-10-01T00:00:00.000
Designprojectedcompletion
2019-01-01T00:00:00.000
Designactualcompletion
2019-02-01T00:00:00.000
Procurementstart
2019-02-01T00:00:00.000
Procurementprojectedcompletion
2019-11-01T00:00:00.000
Procurementadjustedcompletion
2020-12-01T00:00:00.000
Procurementactualcompletion
2021-03-01T00:00:00.000
Constructionstart
2021-04-01T00:00:00.000
Constructionprojectedcom
2023-04-01T00:00:00.000
Constructionactualcompletion
2023-01-01T00:00:00.000
Totalfunding
$1,634,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Tilden Av, E 48 To E 49 Sts
Parkid
B234
Latitude
40.647909678601
Longitude
-73.931387971361
Borough
Brooklyn
VIEW LOCATION
10475
Trackerid: 10475 • Fmsid: 846 HPF-BPPK • Title: Barretto Point Park Shoreline Restoration
Trackerid
10475
Fmsid
846 HPF-BPPK
Title
Barretto Point Park Shoreline Restoration
Summary
This project will restore and plant shoreline in Barretto Point Park.
Currentphase
design
Designpercentcomplete
30.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2025-05-01T00:00:00.000
Designprojectedcompletion
2026-11-01T00:00:00.000
Totalfunding
Greater than $10 million
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Between Viele Avenue and Ryawa Avenue on East River
Parkid
X307
Latitude
40.80504912
Longitude
-73.88815354
Borough
Bronx
VIEW LOCATION
8921
Trackerid: 8921 • Fmsid: 846 P-2CPIBPG • Title: Bartlett Playground Reconstruction
Trackerid
8921
Fmsid
846 P-2CPIBPG
Title
Bartlett Playground Reconstruction
Summary
This project will reconstruct Bartlett Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2017-10-01T00:00:00.000
Designprojectedcompletion
2018-10-01T00:00:00.000
Designadjustedcompletion
2018-12-01T00:00:00.000
Designactualcompletion
2018-12-01T00:00:00.000
Procurementstart
2018-12-01T00:00:00.000
Procurementprojectedcompletion
2019-09-01T00:00:00.000
Procurementadjustedcompletion
2020-05-01T00:00:00.000
Procurementactualcompletion
2020-04-01T00:00:00.000
Constructionstart
2020-10-01T00:00:00.000
Constructionprojectedcom
2022-04-01T00:00:00.000
Constructionadjustedcompletion
2022-07-01T00:00:00.000
Constructionactualcompletion
2022-07-01T00:00:00.000
Totalfunding
$5,938,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Bartlett Street and Whipple Street between Throop Avenue and Harrison Avenue
Parkid
B286
Latitude
40.700732
Longitude
-73.945989
Borough
Brooklyn
VIEW LOCATION
6389
Trackerid: 6389 • Fmsid: 846 P-303BPCS • Title: Baruch Playground Public Restroom Building Reconstruction
Trackerid
6389
Fmsid
846 P-303BPCS
Title
Baruch Playground Public Restroom Building Reconstruction
Summary
This project will reconstruct the public restroom building at Baruch Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-12-01T00:00:00.000
Designprojectedcompletion
2017-01-01T00:00:00.000
Designactualcompletion
2017-01-01T00:00:00.000
Procurementstart
2017-01-01T00:00:00.000
Procurementprojectedcompletion
2017-10-01T00:00:00.000
Procurementadjustedcompletion
2018-05-01T00:00:00.000
Procurementactualcompletion
2018-05-01T00:00:00.000
Constructionstart
2018-08-01T00:00:00.000
Constructionprojectedcom
2020-01-01T00:00:00.000
Constructionadjustedcompletion
2021-10-01T00:00:00.000
Constructionactualcompletion
2021-12-01T00:00:00.000
Totalfunding
$1,909,000
Projectliaison
Steve Simon
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Baruch Place and Rivington Street
Parkid
M165
Latitude
40.717224959291
Longitude
-73.976925237358
Borough
Manhattan
VIEW LOCATION
9171
Trackerid: 9171 • Fmsid: 846 P-6STURF1 • Title: Manhattan Synthetic Turf Field Reconstruction
Trackerid
9171
Fmsid
846 P-6STURF1
Title
Manhattan Synthetic Turf Field Reconstruction
Summary
This project will reconstruct synthetic turf fields at various locations in Manhattan.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-04-01T00:00:00.000
Designprojectedcompletion
2018-05-01T00:00:00.000
Designactualcompletion
2018-06-01T00:00:00.000
Procurementstart
2018-06-01T00:00:00.000
Procurementprojectedcompletion
2019-03-01T00:00:00.000
Procurementactualcompletion
2019-03-01T00:00:00.000
Constructionstart
2019-04-01T00:00:00.000
Constructionprojectedcom
2020-04-01T00:00:00.000
Constructionactualcompletion
2019-07-01T00:00:00.000
Totalfunding
$1,781,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Stanton, Margin Streets & Baruch Place
Parkid
M165
Latitude
40.717608
Longitude
-73.976684
Borough
Manhattan
VIEW LOCATION
9171
Trackerid: 9171 • Fmsid: 846 P-6STURF1 • Title: Manhattan Synthetic Turf Field Reconstruction
Trackerid
9171
Fmsid
846 P-6STURF1
Title
Manhattan Synthetic Turf Field Reconstruction
Summary
This project will reconstruct synthetic turf fields at various locations in Manhattan.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-04-01T00:00:00.000
Designprojectedcompletion
2018-05-01T00:00:00.000
Designactualcompletion
2018-06-01T00:00:00.000
Procurementstart
2018-06-01T00:00:00.000
Procurementprojectedcompletion
2019-03-01T00:00:00.000
Procurementactualcompletion
2019-03-01T00:00:00.000
Constructionstart
2019-04-01T00:00:00.000
Constructionprojectedcom
2020-04-01T00:00:00.000
Constructionactualcompletion
2019-07-01T00:00:00.000
Totalfunding
$1,781,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
West 52 Street to West 54 Street, 11 Avenue to 12 Avenues
Parkid
M022
Latitude
40.76815
Longitude
-73.994007
Borough
Manhattan
VIEW LOCATION
9171
Trackerid: 9171 • Fmsid: 846 P-6STURF1 • Title: Manhattan Synthetic Turf Field Reconstruction
Trackerid
9171
Fmsid
846 P-6STURF1
Title
Manhattan Synthetic Turf Field Reconstruction
Summary
This project will reconstruct synthetic turf fields at various locations in Manhattan.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-04-01T00:00:00.000
Designprojectedcompletion
2018-05-01T00:00:00.000
Designactualcompletion
2018-06-01T00:00:00.000
Procurementstart
2018-06-01T00:00:00.000
Procurementprojectedcompletion
2019-03-01T00:00:00.000
Procurementactualcompletion
2019-03-01T00:00:00.000
Constructionstart
2019-04-01T00:00:00.000
Constructionprojectedcom
2020-04-01T00:00:00.000
Constructionactualcompletion
2019-07-01T00:00:00.000
Totalfunding
$1,781,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
West 100-101 Street, Amsterdam Avenue
Parkid
M220
Latitude
40.797345
Longitude
-73.967358
Borough
Manhattan
VIEW LOCATION
8863
Trackerid: 8863 • Fmsid: 846 P-211BBCH • Title: Bath Beach Park Playground Reconstruction
Trackerid
8863
Fmsid
846 P-211BBCH
Title
Bath Beach Park Playground Reconstruction
Summary
This project will reconstruct and expand the playground, including new play equipment, new pavements, safety surfacing, site furnishings, drainage, and water supply; demolish the bocce courts and multipurpose play area and construct sitting and adult fitness areas; and reconstruct the central path in Bath Beach Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2019-02-01T00:00:00.000
Designprojectedcompletion
2020-02-01T00:00:00.000
Designactualcompletion
2020-02-01T00:00:00.000
Procurementstart
2020-02-01T00:00:00.000
Procurementprojectedcompletion
2020-11-01T00:00:00.000
Procurementadjustedcompletion
2022-02-01T00:00:00.000
Procurementactualcompletion
2022-03-01T00:00:00.000
Constructionstart
2022-03-01T00:00:00.000
Constructionprojectedcom
2023-03-01T00:00:00.000
Constructionactualcompletion
2023-02-01T00:00:00.000
Totalfunding
$4,899,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Shore Parkway between Bay 14th Street and Bay 16th Street
Parkid
B164
Latitude
40.602447
Longitude
-74.011101
Borough
Brooklyn
VIEW LOCATION
10462
Trackerid: 10462 • Fmsid: 846 P-211BBST • Title: Bath Beach Park Synthetic Turf Field Construction
Trackerid
10462
Fmsid
846 P-211BBST
Title
Bath Beach Park Synthetic Turf Field Construction
Summary
This project will construct the synthetic turf field at Bath Beach Park.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
31.0
Designstart
2023-05-01T00:00:00.000
Designprojectedcompletion
2024-09-01T00:00:00.000
Designactualcompletion
2024-08-01T00:00:00.000
Procurementstart
2025-08-01T00:00:00.000
Procurementprojectedcompletion
2026-08-01T00:00:00.000
Procurementactualcompletion
2026-05-01T00:00:00.000
Constructionstart
2026-07-01T00:00:00.000
Constructionprojectedcom
2027-07-01T00:00:00.000
Totalfunding
$6,055,000
Projectliaison
James Morris
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Name
Shore Parkway to Bay 16th Street
Parkid
B164
Latitude
40.60221843
Longitude
-74.01116252
Borough
Brooklyn
VIEW LOCATION
10790
Trackerid: 10790 • Title: Bathgate Playground Reconstruction and Public Restroom Building Construction • Currentphase: proposed
Trackerid
10790
Title
Bathgate Playground Reconstruction and Public Restroom Building Construction
Summary
This project will reconstruct the playground and construct a public restroom building at Bathgate Park.
Currentphase
proposed
Designpercentcomplete
0.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Totalfunding
Greater than $10 million
Projectliaison
Katerine Borrome
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilMayoral
Name
Washington Avenue and Bathgate Avenue between East 182nd Street and 181st Street.
Parkid
X252
Latitude
40.84097791
Longitude
-73.89746547
Borough
Bronx
VIEW LOCATION
8970
Trackerid: 8970 • Fmsid: 846 SANDY4-37 • Title: Bay Breeze Park Construction
Trackerid
8970
Fmsid
846 SANDY4-37
Title
Bay Breeze Park Construction
Summary
This project will construct Bay Breeze Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-04-01T00:00:00.000
Designprojectedcompletion
2019-10-01T00:00:00.000
Designadjustedcompletion
2021-04-01T00:00:00.000
Designactualcompletion
2021-04-01T00:00:00.000
Procurementstart
2021-04-01T00:00:00.000
Procurementprojectedcompletion
2022-01-01T00:00:00.000
Procurementadjustedcompletion
2023-07-01T00:00:00.000
Procurementactualcompletion
2023-07-01T00:00:00.000
Constructionstart
2023-10-01T00:00:00.000
Constructionprojectedcom
2024-10-01T00:00:00.000
Constructionadjustedcompletion
2026-06-01T00:00:00.000
Constructionactualcompletion
2026-07-01T00:00:00.000
Totalfunding
$9,576,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilFederalMayoral
Name
Beach 88th Street and Beach Channel Drive
Parkid
Q499
Latitude
40.590357
Longitude
-73.814309
Borough
Queens
VIEW LOCATION
8663
Trackerid: 8663 • Fmsid: 846 P-407BTPL • Title: Bay Terrace Playground Reconstruction
Trackerid
8663
Fmsid
846 P-407BTPL
Title
Bay Terrace Playground Reconstruction
Summary
This project will reconstruct the lower entrance, handball court, basketball court, and multipurpose play area at Bay Terrace Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-04-01T00:00:00.000
Designprojectedcompletion
2019-04-01T00:00:00.000
Designactualcompletion
2019-04-01T00:00:00.000
Procurementstart
2019-04-01T00:00:00.000
Procurementprojectedcompletion
2020-01-01T00:00:00.000
Procurementadjustedcompletion
2021-03-01T00:00:00.000
Procurementactualcompletion
2021-05-01T00:00:00.000
Constructionstart
2021-10-01T00:00:00.000
Constructionprojectedcom
2022-10-01T00:00:00.000
Constructionadjustedcompletion
2023-08-01T00:00:00.000
Constructionactualcompletion
2023-06-01T00:00:00.000
Totalfunding
$3,270,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
23rd Avenue between Bell Boulevard and 212th Street
Parkid
Q399
Latitude
40.782378
Longitude
-73.777593
Borough
Queens
VIEW LOCATION
9000
Trackerid: 9000 • Fmsid: 846 P-4BASDCS • Title: Bayside Playground Public Restroom Building Reconstruction
Trackerid
9000
Fmsid
846 P-4BASDCS
Title
Bayside Playground Public Restroom Building Reconstruction
Summary
This project will reconstruct the public restroom building in Bayside Playground.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2018-06-01T00:00:00.000
Designprojectedcompletion
2019-06-01T00:00:00.000
Designactualcompletion
2019-07-01T00:00:00.000
Procurementstart
2019-07-01T00:00:00.000
Procurementprojectedcompletion
2020-04-01T00:00:00.000
Procurementadjustedcompletion
2022-02-01T00:00:00.000
Procurementactualcompletion
2022-02-01T00:00:00.000
Constructionstart
2022-06-01T00:00:00.000
Constructionprojectedcom
2023-12-01T00:00:00.000
Constructionactualcompletion
2024-03-01T00:00:00.000
Totalfunding
$1,645,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
Beach Channel Drive and Seaside Avenue
Parkid
Q389
Latitude
40.58486
Longitude
-73.824883
Borough
Queens
VIEW LOCATION
9638
Trackerid: 9638 • Fmsid: 846 SANDY4-49 • Title: Michaelis-Bayswater Park Maintenance and Operations Building Construction
Trackerid
9638
Fmsid
846 SANDY4-49
Title
Michaelis-Bayswater Park Maintenance and Operations Building Construction
Summary
This project will construct a maintenance and operations building in Michaelis-Bayswater Park.
Currentphase
design
Designpercentcomplete
100.0
Procurementpercentcomplete
0.0
Constructionpercentcomplete
0.0
Designstart
2018-10-01T00:00:00.000
Designprojectedcompletion
2020-04-01T00:00:00.000
Designadjustedcompletion
2025-05-01T00:00:00.000
Designactualcompletion
2025-10-01T00:00:00.000
Procurementstart
2022-03-01T00:00:00.000
Procurementprojectedcompletion
2022-12-01T00:00:00.000
Procurementadjustedcompletion
2024-10-01T00:00:00.000
Totalfunding
Between $5 million and $10 million
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
FederalMayoral
Name
Bay 32nd Street and Dwight Avenue
Parkid
Q007
Latitude
40.600901256802
Longitude
-73.768674569022
Borough
Queens
VIEW LOCATION
6468
Trackerid: 6468 • Fmsid: 846 P-413LPL3 • Currentphase: completed
Trackerid
6468
Fmsid
846 P-413LPL3
Title
Laurelton Playground and Bayswater Park Skate Elements and Seating Areas Construction
Summary
This project will provide skate park elements and related site amenities at Laurelton Playground and Bayswater Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-09-01T00:00:00.000
Designprojectedcompletion
2016-07-01T00:00:00.000
Designadjustedcompletion
2017-01-01T00:00:00.000
Designactualcompletion
2017-02-01T00:00:00.000
Procurementstart
2017-02-01T00:00:00.000
Procurementprojectedcompletion
2017-10-01T00:00:00.000
Procurementactualcompletion
2017-10-01T00:00:00.000
Constructionstart
2017-10-01T00:00:00.000
Constructionprojectedcom
2019-04-01T00:00:00.000
Constructionactualcompletion
2018-11-01T00:00:00.000
Totalfunding
$2,759,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Beach 32 Street & Beach Channel Drive
Parkid
Q007
Latitude
40.600041
Longitude
-73.767868
Borough
Queens
VIEW LOCATION
1513111
Trackerid: 1513111 • Fmsid: 846 P-5CLVLKP • Title: Clove Lakes Park Pathways Reconstruction Phase 1
Trackerid
1513111
Fmsid
846 P-5CLVLKP
Title
Clove Lakes Park Pathways Reconstruction Phase 1
Summary
This project will reconstruct pathways at Clove Lakes Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2022-08-01T00:00:00.000
Designprojectedcompletion
2023-06-01T00:00:00.000
Designactualcompletion
2022-12-01T00:00:00.000
Procurementstart
2022-10-01T00:00:00.000
Procurementprojectedcompletion
2023-03-01T00:00:00.000
Procurementactualcompletion
2022-11-01T00:00:00.000
Constructionstart
2023-03-01T00:00:00.000
Constructionprojectedcom
2023-09-01T00:00:00.000
Constructionactualcompletion
2023-09-01T00:00:00.000
Totalfunding
$1,800,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City Council
Parkid
R005
Latitude
40.618148
Longitude
-74.112309
Borough
Staten Island
VIEW LOCATION
6468
Trackerid: 6468 • Fmsid: 846 P-413LPL3 • Currentphase: completed
Trackerid
6468
Fmsid
846 P-413LPL3
Title
Laurelton Playground and Bayswater Park Skate Elements and Seating Areas Construction
Summary
This project will provide skate park elements and related site amenities at Laurelton Playground and Bayswater Park.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2015-09-01T00:00:00.000
Designprojectedcompletion
2016-07-01T00:00:00.000
Designadjustedcompletion
2017-01-01T00:00:00.000
Designactualcompletion
2017-02-01T00:00:00.000
Procurementstart
2017-02-01T00:00:00.000
Procurementprojectedcompletion
2017-10-01T00:00:00.000
Procurementactualcompletion
2017-10-01T00:00:00.000
Constructionstart
2017-10-01T00:00:00.000
Constructionprojectedcom
2019-04-01T00:00:00.000
Constructionactualcompletion
2018-11-01T00:00:00.000
Totalfunding
$2,759,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Borough PresidentCity CouncilMayoral
Name
Brookville Blvd. bet. 136 Ave. 137 Ave.
Parkid
Q108
Latitude
40.670214
Longitude
-73.736331
Borough
Queens
VIEW LOCATION
9669
Trackerid: 9669 • Fmsid: 846 SANDY4-51 • Title: Michaelis-Bayswater Park Public Restroom Building Construction
Trackerid
9669
Fmsid
846 SANDY4-51
Title
Michaelis-Bayswater Park Public Restroom Building Construction
Summary
This project will construct a public restroom building in Michaelis-Bayswater Park.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
2.9
Designstart
2018-10-01T00:00:00.000
Designprojectedcompletion
2020-04-01T00:00:00.000
Designadjustedcompletion
2022-03-01T00:00:00.000
Designactualcompletion
2022-03-01T00:00:00.000
Procurementstart
2022-03-01T00:00:00.000
Procurementprojectedcompletion
2022-12-01T00:00:00.000
Procurementadjustedcompletion
2025-09-01T00:00:00.000
Procurementactualcompletion
2025-09-01T00:00:00.000
Constructionstart
2026-08-01T00:00:00.000
Constructionprojectedcom
2028-01-01T00:00:00.000
Totalfunding
$3,701,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
FederalMayoral
Name
Beach Channel Drive and Bay 32nd Street
Parkid
Q007
Latitude
40.598621065687
Longitude
-73.767017064087
Borough
Queens
VIEW LOCATION
9637
Trackerid: 9637 • Fmsid: 846 SANDY4-48 • Title: Michaelis-Bayswater Park Reconstruction
Trackerid
9637
Fmsid
846 SANDY4-48
Title
Michaelis-Bayswater Park Reconstruction
Summary
This project will reconstruct Michaelis-Bayswater Park.
Currentphase
construction
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
25.1
Designstart
2018-10-01T00:00:00.000
Designprojectedcompletion
2020-04-01T00:00:00.000
Designadjustedcompletion
2022-10-01T00:00:00.000
Designactualcompletion
2022-10-01T00:00:00.000
Procurementstart
2022-10-01T00:00:00.000
Procurementprojectedcompletion
2023-07-01T00:00:00.000
Procurementadjustedcompletion
2025-04-01T00:00:00.000
Procurementactualcompletion
2025-04-01T00:00:00.000
Constructionstart
2025-07-01T00:00:00.000
Constructionprojectedcom
2027-07-01T00:00:00.000
Totalfunding
$37,458,000
Projectliaison
Meira Berkower
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
City CouncilFederalMayoral
Name
Beach Channel Drive, Bay 32nd Street, Norton Avenue
Parkid
Q007
Latitude
40.599792
Longitude
-73.768562
Borough
Queens
VIEW LOCATION
6242
Trackerid: 6242 • Fmsid: 846 P-6BLPB14 • Currentphase: completed
Trackerid
6242
Fmsid
846 P-6BLPB14
Title
Citywide Public Restroom Building and Facility Plumbing & HVAC Reconstruction (CNYG-1014M)
Summary
This project will reconstruct plumbing and HVAC systems at public restroom buildings and facilities at various parks and recreation locations citywide.
Currentphase
completed
Designpercentcomplete
100.0
Procurementpercentcomplete
100.0
Constructionpercentcomplete
100.0
Designstart
2013-12-01T00:00:00.000
Designprojectedcompletion
2014-01-01T00:00:00.000
Designactualcompletion
2014-02-01T00:00:00.000
Procurementstart
2014-02-01T00:00:00.000
Procurementprojectedcompletion
2014-11-01T00:00:00.000
Procurementadjustedcompletion
2015-04-01T00:00:00.000
Procurementactualcompletion
2015-02-01T00:00:00.000
Constructionstart
2016-03-01T00:00:00.000
Constructionprojectedcom
2019-03-01T00:00:00.000
Constructionactualcompletion
2019-03-01T00:00:00.000
Totalfunding
$219,000
Projectliaison
Cristin Leoutsakos
Lastupdated
2026-10-01T00:00:00.000
Fundingsource
Mayoral
Name
S/s Seaview Av Opp E 99 St
Parkid
B274
Latitude
40.63498
Longitude
-73.887254
Borough
Brooklyn, Bronx
VIEW LOCATION