Installation of an artwork by Mark Reigelman, Charleston Branch Library of the New York Public Library, Tyrellan Avenue and Bricktown Way, Staten Island
Reconstruction of a memorial, Olde Towne of Flushing Burial Ground (formerly Martins Field), 46th Avenue between 164th Street and 165th Street, Flushing, Queens
Construction of a prototypical comfort station, Police Officer Edward Byrne Park, 135th Avenue, 134th Street, North Conduit Avenue, and 130th Place, South Ozone Park, Queens
Construction of the East Midtown Greenway, including reconstruction of Sutton Place Park and construction of a pedestrian bridge at East 54th Street, East River between East 53rd Street and East 61st Street, Manhattan
Installation of manholes, vent pipe, and safety signage, Brooklyn War Memorial, Cadman Plaza, Tillary Street, Fulton Street, Prospect Street, and Washington Street, Brooklyn
Rehabilitation of the Boiler Building (formerly the Heating Plant), East Road between 1st Drive and 2nd Drive, Wards Island Wastewater Treatment Plant, Manhattan
Construction of a performance space and shade structure, Rockaway Beach, Shore Front Parkway between Beach 94th Street and Beach 95th Street, Far Rockaway, Queens
Reconstruction of two entrances to the Riegelmann Boardwalk and adjacent site work (Ocean Dreams), West 35th Street and West 36th Street, Coney Island Beach, Brooklyn
Reconstruction of the Crossroads and Rail Track Walk, High Line Park (formerly elevated rail line), West 30th Street between 10th Avenue and 11th Avenue, Manhattan
Construction of Building 1A and 1B as Phase I of the construction of four mixed-use residential towers, a light manufacturing facility, a central plaza open space, and adjacent site work (The Peninsula), Tiffany Street, Spofford Avenue, and Manida Street, Bronx
Installation of caissons and deck structure as part of the construction of the East Midtown Greenway, East River between East 53rd Street and East 61st Street, Manhattan
Construction of a portion of Bushwick Inlet Park as part of the Greenpoint and Williamsburg waterfront master plan, including a lawn area and adjacent site work, Kent Avenue between North 11th Street and North 12th Street, Brooklyn
Reconstruction of streetscapes and installation of amusement rides (Coney East), West 16th Street, West 15th Street, Stillwell Avenue, West 12th Street, Surf Avenue, and the Riegelmann Boardwalk, Brooklyn
Construction of a combined sewer overflow (CSO) facility and adjacent open space, Gowanus Canal, Butler Street, Nevins Street, and Degraw Street, Brooklyn
Borough
Brooklyn
Lead Agency
DEP
Secondary Agency
DPR
Public Private
Public
Project Type
Architecture
Construction Type
Construction
Result
Approved with conditions
Review Cycles
1
2018-11-14T00:00:00.000
Meeting Date: 2018-11-14T00:00:00.000 • Project Id: 20854 • Title: Installation of a distinctive sidewalk, 149 York Avenue, Staten Island
Meeting Date
2018-11-14T00:00:00.000
Project Id
20854
Title
Installation of a distinctive sidewalk, 149 York Avenue, Staten Island