Installation of gas line, meter and piping, Operations Office, Sara D. Roosevelt Park, 263 Grand Street between Chrystie Street, Forsyth Street, and Delancey Street, Manhattan
Reconstruction of a plaza, performance space, pathways, and adjacent site work as Phase II of the reconstruction of St. Mary's Park, St. Ann’s Avenue, East 149th Street, Jackson Avenue, and St. Mary’s Street, Bronx
Construction of a performance space and shade structure, Rockaway Beach, Shore Front Parkway between Beach 94th Street and Beach 95th Street, Far Rockaway, Queens
Installation of signage (Universal Hip Hop Museum), Bronx Point, Major Deegan Expressway, 145th Street Bridge, East 150th Street, and the Harlem River, Bronx
Construction of an off-shore wind operations and maintenance building and adjacent sitework, South Brooklyn Marine Terminal, 2nd Avenue between 32nd Street and 34th Street, Brooklyn
Reconstruction of the Upper Vale, including construction of the Northeast Pavilion, Prospect Park, Flatbush Avenue between Grand Army Plaza and the Prospect Park Zoo, Brooklyn
Installation of signage at a ballpark (Staten Island University Hospital Northwell Health Community Park), 75 Richmond Terrace, north of the Staten Island Ferry Terminal, Staten Island
Installation of rooftop equipment, Sewage Treatment Worker Locker Room, Pump and Blower Building, Tallman Island Wastewater Resource Recovery Facility, 127th Street and Powell's Cove Boulevard, College Point, Queens
Minor modifications to the construction of a parking lot adjacent to Building 280, Flushing Avenue, North Oxford Street, Ordinance Avenue, and Fifth Street, Brooklyn Navy Yard Industrial Park, Brooklyn
Reconstruction of the Cumberland Street Gate and Clinton Avenue Gate, and adjacent site work, Flushing Avenue at Cumberland Street and Sixth Street, and at Clinton Avenue and Tenth Avenue, Brooklyn Navy Yard Industrial Park, Brooklyn
Minor modifications to the reconstruction of an asphalt plant, including construction of an interim administration building, and adjacent site work, Harper Street Yard, 30-01 Harper Street, Corona, Queens
Installation of vent stacks and an electrical meter, Canal Street Pump Station, Canal Street between Varick Street and the Avenue of the Americas, Manhattan
Minor modification to bollards as part of the construction of Plaza 33, including installation of a distinctive sidewalk, West 33rd Street at Seventh Avenue, Manhattan
Removal of a distinctive sidewalk, Metropolitan Recreation Center, 261 Bedford Avenue, Bedford Avenue between North 1st Street and Metropolitan Avenue, Brooklyn
Installation of a modular comfort station and adjacent site work, Discovery Playground, Fort Washington Park, Henry Hudson Parkway near West 163rd Street, Manhattan