Installation of an elevator and entrance, Clemente Soto Velez Cultural and Educational Center (formerly Public School 160), 107 Suffolk Street, Manhattan
Construction of Admiral's Row Plaza, including the construction of two retail buildings and a mixed-use building, the rehabilitation of Building B and the Timber Shed, and adjacent site work, Brooklyn Navy Yard Industrial Park, Navy Street, Flushing Avenue, Brooklyn
Construction of Admiral's Row Plaza, including the construction of two retail buildings and a mixed-use building, the rehabilitation of Building B and the Timber Shed, and adjacent site work, Brooklyn Navy Yard Industrial Park, Navy Street, Flushing Avenue, Brooklyn
Construction of a mixed-use development, including a hotel tower and residential tower, 495 11th Avenue, 11th Avenue between 39th Street and 40th Street, Manhattan
Reconstruction of Fairview Park, Phase II, including the construction of a prototypical comfort station, Fairview Park, Englewood Avenue, Arthur Kill Road, Veterans Road West, and Bricktown Way, Staten Island
Reconstruction of the roof and installation of mechanical equipment, guardrails, and window sills, Throgs Neck Branch Library, 3025 Cross Bronx Expressway Extension, Bronx
Reconstruction of a swimming pool and skating rink (Lasker Rink) and adjacent site work, between East Drive and the Harlem Meer, Central Park, Manhattan
Design of a flood-protection master plan (South Battery Park City Resiliency), The Battery, Battery Place and the Hudson River between 1st Place and Greenwich Street, Manhattan
Construction of Buildings 2A and 2B and a central plaza as Phase II of the construction of four mixed-use residential towers, a light manufacturing facility, a central plaza open space, and adjacent site work (The Peninsula), Tiffany Street, Spofford Avenue, and Manida Street, Bronx
Restoration of Neon for West 59th Street Marine Transfer Station artwork by Stephen Antonakos, 59th Street Marine Transfer Station, Pier 99, at West 59th Street between 12th Avenue and the Hudson River, Manhattan
Rehabilitation of five pre-houses, Primary Settling Tanks, 3rd Drive between B Road and H Road, Wards Island Wastewater Resource Recovery Facility, Wards Island, Manhattan
Construction of a pier and a maintenance and operations building, Tompkinsville Pier, Murray Hulbert Avenue south of Hannah Street at the Stapleton Waterfront, Staten Island
Construction of the North Tower and reconstruction of open spaces, East River Science Park (Alexandria Center for Life Science), 500 East 30th Street between First Avenue, the FDR Drive, East 28th Street, and East 30th Street, Manhattan