Installation of streetscape improvements, Phase II, Tillary Street between Clinton Street and Prince Street, and Cadman Plaza East between Red Cross Place and Tillary Street, Brooklyn
Reconstruction of Out Building 22 as part of the United States Tennis Association's Billie Jean King National Tennis Center strategic vision plan, Flushing Meadows Corona Park, Queens
Construction of Admiral's Row Plaza, including the construction of two retail buildings and a mixed-use building, the rehabilitation of Building B and the Timber Shed, and adjacent site work, Brooklyn Navy Yard Industrial Park, Navy Street, Flushing Avenue
Installation of a greenhouse, Newtown Creek Water Pollution Control Plant, 329 Greenpoint Avenue, Provost Street between Kent Street and Greenpoint Avenue, Brooklyn
Reconstruction of the perimeter streetscape and park entrance, including the installation of a bike lane, Prospect Park, Ocean Avenue between Flatbush and Parkside Avenue, and Parkside Avenue between Ocean Avenue and Parade Place, Brooklyn
Installation of signage, Building 303 (formerly Building 399), Sands Street between Navy Street, Third Street, and Chauncey Avenue, Brooklyn Navy Yard Industrial Park, Brooklyn
Construction of a mixed-use development and waterfront esplanade (Bronx Point), Major Deegan Expressway, 145th Street Bridge, East 150th Street, and the Harlem River, Bronx
Construction of a cafe addition, storage building, and adjacent site work, McCarren Park House, McCarren Park, between Lorimer Street, Bedford Avenue, and Driggs Avenue, Brooklyn
Installation of rooftop mechanical equipment and a door, Building 12B, 2nd Street between Morris Avenue and Chauncey Avenue, Brooklyn Navy Yard Industrial Park, Brooklyn
Design of the North Tower and campus master plan, East River Science Park (Alexandria Center for Life Science), 500 East 30th Street, First Avenue, the FDR Drive, East 28th Street and East 30th Street, Manhattan
Reconstruction of a plaza (Canal Street Triangle) as part of the Gateways to Chinatown program, Walker Street, Baxter Street, and Canal Street, Manhattan
Construction of a maintenance building, a comfort station, and adjacent site work, as Phase II and Phase III of the construction of a waterfront park and streetscape improvements, Thompson Street, Wave Street and Bay Street, Stapleton, Staten Island
Installation of louvers and rooftop mechanical equipment, Building 22 and Building 127 Annex, 3rd Street, McDonough Avenue, 4th Street, and Warrington Avenue, Brooklyn Navy Yard Industrial Park, Brooklyn
Construction of a labyrinth plaza, paths, and lawn areas, Rockaway Beach, Shore Front Parkway between Beach 92nd Street and Beach 94th Street, Far Rockaway, Queens
Construction of an entrance, outlook, and adjacent site work, Snug Harbor Cultural Center & Botanical Garden, Kissel Avenue at Linden Street, Staten Island
Installation of flood protection measures as part of the DEP Wastewater Resiliency Program, Hunt’s Point Wastewater Resource Recovery Facility, Ryawa Avenue, Halleck Street, and Barretto Street, Bronx
Installation of flood protection measures as part of the DEP Wastewater Resiliency Program, Newtown Creek Wastewater Resource Recovery Facility, Provost Street, Greenpoint Avenue, and Kingsland Avenue, Brooklyn
Construction of a utility enclosure for electric vehicle charging equipment, Gowanus Municipal Parking Field, Third Avenue between 35th Street and 37th Street, Brooklyn
Construction of a utility enclosure for electric vehicle charging equipment, Queens Village Municipal Parking Field, 218-02 Jamaica Avenue, Queens Village, Queens
Installation of a shade structure, Rockaway Beach, Shore Front Parkway between Beach 101st Street and Beach 102nd Street, Arverne and Rockaway Park, Queens