The correlation coefficient of 0.9959 was achieved for the Nitrite method according to SM 4020. While the method requirements for the calibration coefficient were satisfied, the more stringent SOP requirements were not met.
System
Distribution
Borough
Manhattan
Description
SS - N/S E 87th St 2nd SS W/O 1st Ave IFO 309 E. 87th St 12""
Samples were added to run 1782 by KCHER on 3/2/2015 and sample was deleted due to user error in receiving room. Samples were added back on 3/3/2014 per QTray Log sheet.
System
Cat\Del
Location
Delaware Aqueduct
Facility
Hillview
Description
Hillview Reservoir Uptake No.2 - Feed from Delaware Aqueduct
Clicked Retest to import samples (no results yet) into a new run because there were issues with the turbidimeter sending results into Starlims due to manually changing the instrument time to account for daylight savings time. Had to revert to back to incorrect time in order to proceed with analysis. Actual time for all samples and QCs is one hour back. Actual start time: 4:49pm, end time:5:59pm.
System
Cat\Del
Location
Delaware Aqueduct
Facility
Hillview
Description
Hillview Reservoir Downtake No.2 - Feed to City Tunnel No.2 (prior to chlorination)