City of New York Municipal Solar-Readiness Assessment (Local Law 24 of 2016) data

These data were prepared in compliance with the requirements of Local Law 24 of 2016 (LL24). Under LL24, the Department of Citywide Administrative Services (DCAS) is required to assess the solar photovoltaic (PV) potential of all City-owned buildings over 10,000 gross square feet once every two years. Special focus is given to identifying and quantifying potential capacity at solar-ready buildings, which are defined as buildings that have roofs that are no more than 10 years old and are in fair or good condition. The 2022 Solar-Readiness Assessment is the fourth biennial assessment pursuant to LL24. The full report is available at https://www1.nyc.gov/assets/dcas/downloads/pdf/energy/reportsandpublication/local24_2022.pdf

City Government Department of Citywide Administrative Services (DCAS) Dataset cfz5-6fvh 32 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
DOE
City Council District: 20 • Agency: DOE • Site: Q237 - Rachel Carson School
City Council District
20
Agency
DOE
Site
Q237 - Rachel Carson School
Address
46-21 Colden St
Borough
Queens
Disadvantaged Community
Yes
Installation Date
4/13/2016
Installed Or Estimated
247
Percentage Of Max Peak Demand
29%
Estimated Annual Production
289938
Percentage Of Annual
0.34
Estimated Annual Emissions
93
Estimated Social Cost Of
13211
Estimated Annual Energy
19941
Upfront Project Cost
$907,435
Financing Mechanism
Capital
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
11355
Latitude
40.749545
Longitude
-73.822073
Community Board
407
Census Tract
845
Bin
4116436
Bbl
4051470001
Nta
QN0705
VIEW LOCATION
DOE
City Council District: 28 • Agency: DOE • Site: Q226 - Virgil I. Grissom School
City Council District
28
Agency
DOE
Site
Q226 - Virgil I. Grissom School
Address
121-10 Rockaway Blvd
Borough
Queens
Disadvantaged Community
Yes
Installation Date
4/13/2016
Installed Or Estimated
135.85
Percentage Of Max Peak Demand
19%
Estimated Annual Production
159466
Percentage Of Annual
0.11
Estimated Annual Emissions
51
Estimated Social Cost Of
7266
Estimated Annual Energy
36528
Upfront Project Cost
$499,089
Financing Mechanism
Capital
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
11420
Latitude
40.675771
Longitude
-73.816938
Community Board
410
Census Tract
840
Bin
4253607
Bbl
4117140100
Nta
QN1001
VIEW LOCATION
DOE
City Council District: 28 • Agency: DOE • Site: Q072 - Catherine & Count Basie Middle School 72
City Council District
28
Agency
DOE
Site
Q072 - Catherine & Count Basie Middle School 72
Address
133-25 Guy R. Brewer Blvd
Borough
Queens
Disadvantaged Community
No
Installation Date
4/13/2016
Installed Or Estimated
248.85
Percentage Of Max Peak Demand
37%
Estimated Annual Production
292110
Percentage Of Annual
0.32
Estimated Annual Emissions
94
Estimated Social Cost Of
13310
Estimated Annual Energy
36256
Upfront Project Cost
$943,255
Financing Mechanism
Capital
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
11434
Latitude
40.673769
Longitude
-73.775951
Community Board
412
Census Tract
33403
Bin
4270059
Bbl
4124950270
Nta
QN1204
VIEW LOCATION
DOE
City Council District: 46 • Agency: DOE • Site: K515 - South Shore Educational Campus
City Council District
46
Agency
DOE
Site
K515 - South Shore Educational Campus
Address
6565 Flatlands Ave
Borough
Brooklyn
Disadvantaged Community
No
Installation Date
4/12/2016
Installed Or Estimated
590.2
Percentage Of Max Peak Demand
36%
Estimated Annual Production
692800
Percentage Of Annual
0.33
Estimated Annual Emissions
222
Estimated Social Cost Of
31566
Estimated Annual Energy
79876
Upfront Project Cost
$2,617,082
Financing Mechanism
Capital
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
11236
Latitude
40.633285
Longitude
-73.916735
Community Board
318
Census Tract
950
Bin
3224139
Bbl
3079980005
Nta
BK1803
VIEW LOCATION
DOE
City Council District: 46 • Agency: DOE • Site: K278 - Marine Park School
City Council District
46
Agency
DOE
Site
K278 - Marine Park School
Address
1925 Stuart St
Borough
Brooklyn
Disadvantaged Community
No
Installation Date
4/12/2016
Installed Or Estimated
120.78
Percentage Of Max Peak Demand
21%
Estimated Annual Production
141922
Percentage Of Annual
0.18
Estimated Annual Emissions
51
Estimated Social Cost Of
7273
Estimated Annual Energy
17747
Upfront Project Cost
$503,268
Financing Mechanism
Capital
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
11229
Latitude
40.60665
Longitude
-73.939176
Community Board
315
Census Tract
666
Bin
3239889
Bbl
3084960100
Nta
BK1891
VIEW LOCATION
DOE
City Council District: 13 • Agency: DOE • Site: X144 - Michelangelo School
City Council District
13
Agency
DOE
Site
X144 - Michelangelo School
Address
2545 Gunther Ave
Borough
Bronx
Disadvantaged Community
Yes
Installation Date
4/8/2016
Installed Or Estimated
192.15
Percentage Of Max Peak Demand
31%
Estimated Annual Production
225553
Percentage Of Annual
0.24
Estimated Annual Emissions
72
Estimated Social Cost Of
10277
Estimated Annual Energy
28205
Upfront Project Cost
$800,653
Financing Mechanism
Capital
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
10469
Latitude
40.863735
Longitude
-73.83607
Community Board
211
Census Tract
310
Bin
2053518
Bbl
2044930001
Nta
BX1103
VIEW LOCATION
DOE
City Council District: 17 • Agency: DOE • Site: X184 - South Bronx Academy for Applied Media
City Council District
17
Agency
DOE
Site
X184 - South Bronx Academy for Applied Media
Address
778 Forest Ave
Borough
Bronx
Disadvantaged Community
Yes
Installation Date
4/8/2016
Installed Or Estimated
248.85
Percentage Of Max Peak Demand
29%
Estimated Annual Production
292110
Percentage Of Annual
0.28
Estimated Annual Emissions
94
Estimated Social Cost Of
13310
Estimated Annual Energy
36528
Upfront Project Cost
$943,255
Financing Mechanism
Capital
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
10456
Latitude
40.819006
Longitude
-73.905869
Community Board
201
Census Tract
77
Bin
2004690
Bbl
2026550030
Nta
BX0102
VIEW LOCATION
DOE
City Council District: 24 • Agency: DOE • Site: Q505 - Hillcrest High School
City Council District
24
Agency
DOE
Site
Q505 - Hillcrest High School
Address
160-05 Highland Ave
Borough
Queens
Disadvantaged Community
No
Installation Date
4/6/2016
Installed Or Estimated
367.83
Percentage Of Max Peak Demand
26%
Estimated Annual Production
431774
Percentage Of Annual
0.19
Estimated Annual Emissions
139
Estimated Social Cost Of
19673
Estimated Annual Energy
51194
Upfront Project Cost
$1,589,608
Financing Mechanism
Capital
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
11432
Latitude
40.709079
Longitude
-73.801856
Community Board
408
Census Tract
448
Bin
4448767
Bbl
4097740001
Nta
QN0805
VIEW LOCATION
DOE
City Council District: 26 • Agency: DOE • Site: Q445 - William Cullen Bryant High School
City Council District
26
Agency
DOE
Site
Q445 - William Cullen Bryant High School
Address
48-10 31st Ave
Borough
Queens
Disadvantaged Community
Yes
Installation Date
4/6/2016
Installed Or Estimated
199.875
Percentage Of Max Peak Demand
27%
Estimated Annual Production
234621
Percentage Of Annual
0.18
Estimated Annual Emissions
75
Estimated Social Cost Of
10690
Estimated Annual Energy
29339
Upfront Project Cost
$792,584
Financing Mechanism
Capital
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
11103
Latitude
40.75823
Longitude
-73.910514
Community Board
401
Census Tract
163
Bin
4013655
Bbl
4007380002
Nta
QN0104
VIEW LOCATION
DOE
City Council District: 26 • Agency: DOE • Site: Q204 - Oliver W. Holmes School
City Council District
26
Agency
DOE
Site
Q204 - Oliver W. Holmes School
Address
36-41 28th St
Borough
Queens
Disadvantaged Community
Yes
Installation Date
4/6/2016
Installed Or Estimated
159.21
Percentage Of Max Peak Demand
33%
Estimated Annual Production
186887
Percentage Of Annual
0.28
Estimated Annual Emissions
60
Estimated Social Cost Of
8515
Estimated Annual Energy
23370
Upfront Project Cost
$663,398
Financing Mechanism
Capital
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
11106
Latitude
40.757065
Longitude
-73.932664
Community Board
401
Census Tract
51
Bin
4004156
Bbl
4003430001
Nta
QN0105
VIEW LOCATION
DOE
City Council District: 13 • Agency: DOE • Site: X192 - Piagentini and Jones School
City Council District
13
Agency
DOE
Site
X192 - Piagentini and Jones School
Address
650 Hollywood Ave
Borough
Bronx
Disadvantaged Community
Yes
Installation Date
3/15/2016
Installed Or Estimated
137.25
Percentage Of Max Peak Demand
25%
Estimated Annual Production
161110
Percentage Of Annual
0.19
Estimated Annual Emissions
52
Estimated Social Cost Of
7341
Estimated Annual Energy
29475
Upfront Project Cost
$571,895
Financing Mechanism
Capital
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
10465
Latitude
40.826526
Longitude
-73.818417
Community Board
210
Census Tract
158
Bin
2077130
Bbl
2054380001
Nta
BX1002
VIEW LOCATION
DOE
City Council District: 18 • Agency: DOE • Site: X131 - Albert Einstein School
City Council District
18
Agency
DOE
Site
X131 - Albert Einstein School
Address
885 Bolton Ave
Borough
Bronx
Disadvantaged Community
Yes
Installation Date
3/15/2016
Installed Or Estimated
200.08
Percentage Of Max Peak Demand
31%
Estimated Annual Production
235707
Percentage Of Annual
0.26
Estimated Annual Emissions
76
Estimated Social Cost Of
10740
Estimated Annual Energy
20147
Upfront Project Cost
$833,696
Financing Mechanism
Capital
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
10473
Latitude
40.82346
Longitude
-73.859647
Community Board
209
Census Tract
42
Bin
2103869
Bbl
2036440001
Nta
BX0902
VIEW LOCATION
DOE
City Council District: 33 • Agency: DOE • Site: K380 - John Wayne Elementary
City Council District
33
Agency
DOE
Site
K380 - John Wayne Elementary
Address
370 Marcy Ave
Borough
Brooklyn
Disadvantaged Community
Yes
Installation Date
3/12/2016
Installed Or Estimated
104.31
Percentage Of Max Peak Demand
17%
Estimated Annual Production
122443
Percentage Of Annual
0.16
Estimated Annual Emissions
39
Estimated Social Cost Of
5579
Estimated Annual Energy
15311
Upfront Project Cost
$434,640
Financing Mechanism
Capital
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
11206
Latitude
40.702427
Longitude
-73.952985
Community Board
301
Census Tract
53101
Bin
3061235
Bbl
3022360009
Nta
BK0103
VIEW LOCATION
DOE
City Council District: 12 • Agency: DOE • Site: X425 - Bronx Lab School
City Council District
12
Agency
DOE
Site
X425 - Bronx Lab School
Address
800 East Gun Hill Rd
Borough
Bronx
Disadvantaged Community
Yes
Installation Date
1/13/2016
Installed Or Estimated
131.76
Percentage Of Max Peak Demand
14%
Estimated Annual Production
154665
Percentage Of Annual
0.08
Estimated Annual Emissions
50
Estimated Social Cost Of
7047
Estimated Annual Energy
19341
Upfront Project Cost
$570,186
Financing Mechanism
Capital
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
10467
Latitude
40.875953
Longitude
-73.86197
Community Board
212
Census Tract
372
Bin
2057045
Bbl
2046330040
Nta
BX1201
VIEW LOCATION
SUNY
City Council District: 3 • Agency: SUNY • Site: FIT Campus: Building D Pomerantz Center
City Council District
3
Agency
SUNY
Site
FIT Campus: Building D Pomerantz Center
Address
300 7th Ave
Borough
Manhattan
Disadvantaged Community
No
Installation Date
10/30/2015
Installed Or Estimated
42
Percentage Of Max Peak Demand
159%
Estimated Annual Production
46200
Percentage Of Annual
0.37
Estimated Annual Emissions
15
Estimated Social Cost Of
2105
Estimated Annual Energy
6930
Upfront Project Cost
$420,000
Financing Mechanism
Capital
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
10001
Latitude
40.746715
Longitude
-73.993756
Community Board
105
Census Tract
95
Bin
1014252
Bbl
1007770037
Nta
MN0501
VIEW LOCATION
DOE
City Council District: 36 • Agency: DOE • Site: K455 - Boys and Girls High School
City Council District
36
Agency
DOE
Site
K455 - Boys and Girls High School
Address
1700 Fulton St
Borough
Brooklyn
Disadvantaged Community
Yes
Installation Date
10/23/2015
Installed Or Estimated
505.08
Percentage Of Max Peak Demand
31%
Estimated Annual Production
592883
Percentage Of Annual
0.17
Estimated Annual Emissions
190
Estimated Social Cost Of
27014
Estimated Annual Energy
68356
Upfront Project Cost
$2,114,467
Financing Mechanism
Capital
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
11213
Latitude
40.67944
Longitude
-73.932407
Community Board
303
Census Tract
271
Bin
3047996
Bbl
3017010001
Nta
BK0302
VIEW LOCATION
DOE
City Council District: 36 • Agency: DOE • Site: K324 - M.S. 267 Math, Science & Technology
City Council District
36
Agency
DOE
Site
K324 - M.S. 267 Math, Science & Technology
Address
800 Gates Ave
Borough
Brooklyn
Disadvantaged Community
Yes
Installation Date
9/24/2015
Installed Or Estimated
120.78
Percentage Of Max Peak Demand
14%
Estimated Annual Production
141922
Percentage Of Annual
0.08
Estimated Annual Emissions
50
Estimated Social Cost Of
7054
Estimated Annual Energy
15397
Upfront Project Cost
$545,104
Financing Mechanism
Capital
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
11221
Latitude
40.68832
Longitude
-73.932275
Community Board
303
Census Tract
293
Bin
3044657
Bbl
3016360001
Nta
BK0302
VIEW LOCATION
DOE
City Council District: 42 • Agency: DOE • Site: K224 - Hale A. Woodruff High School
City Council District
42
Agency
DOE
Site
K224 - Hale A. Woodruff High School
Address
757 Wortman Ave
Borough
Brooklyn
Disadvantaged Community
Yes
Installation Date
9/24/2015
Installed Or Estimated
98.82
Percentage Of Max Peak Demand
17%
Estimated Annual Production
116118
Percentage Of Annual
0.15
Estimated Annual Emissions
37
Estimated Social Cost Of
5291
Estimated Annual Energy
17747
Upfront Project Cost
$449,555
Financing Mechanism
Capital
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
11208
Latitude
40.664075
Longitude
-73.866092
Community Board
305
Census Tract
1220
Bin
3098980
Bbl
3045300001
Nta
BK0505
VIEW LOCATION
DOE
City Council District: 37 • Agency: DOE • Site: K302 - Rafael Cordero School
City Council District
37
Agency
DOE
Site
K302 - Rafael Cordero School
Address
350 Linwood St
Borough
Brooklyn
Disadvantaged Community
Yes
Installation Date
9/22/2015
Installed Or Estimated
137.25
Percentage Of Max Peak Demand
24%
Estimated Annual Production
161275
Percentage Of Annual
0.16
Estimated Annual Emissions
46
Estimated Social Cost Of
6466
Estimated Annual Energy
20167
Upfront Project Cost
$616,767
Financing Mechanism
Capital
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
11208
Latitude
40.677104
Longitude
-73.883433
Community Board
305
Census Tract
1170
Bin
3088357
Bbl
3039690001
Nta
BK0501
VIEW LOCATION
DOE
City Council District: 44 • Agency: DOE • Site: K505 - Franklin Delano Roosevelt High School
City Council District
44
Agency
DOE
Site
K505 - Franklin Delano Roosevelt High School
Address
5800 20th Ave
Borough
Brooklyn
Disadvantaged Community
No
Installation Date
9/18/2015
Installed Or Estimated
362.34
Percentage Of Max Peak Demand
37%
Estimated Annual Production
425329
Percentage Of Annual
0.31
Estimated Annual Emissions
136
Estimated Social Cost Of
19379
Estimated Annual Energy
50430
Upfront Project Cost
$1,516,875
Financing Mechanism
Capital
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
11204
Latitude
40.620446
Longitude
-73.981795
Community Board
312
Census Tract
468
Bin
3131537
Bbl
3055060006
Nta
BK1204
VIEW LOCATION
DOE
City Council District: 51 • Agency: DOE • Site: R062 - NET ZERO - Kathleen Grimm School
City Council District
51
Agency
DOE
Site
R062 - NET ZERO - Kathleen Grimm School
Address
644 Bloomingdale Rd
Borough
Staten Island
Disadvantaged Community
No
Installation Date
9/1/2015
Installed Or Estimated
618.7
Percentage Of Max Peak Demand
57%
Estimated Annual Production
704304
Percentage Of Annual
0.87
Estimated Annual Emissions
226
Estimated Social Cost Of
32090
Estimated Annual Energy
81202
Upfront Project Cost
$2,778,000
Financing Mechanism
Capital
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
10309
Latitude
40.541555
Longitude
-74.217932
Community Board
503
Census Tract
22601
Bin
5158758
Bbl
5070920039
Nta
SI0304
VIEW LOCATION
DPR
City Council District: 8 • Agency: DPR • Site: Five Borough Administrative Building
City Council District
8
Agency
DPR
Site
Five Borough Administrative Building
Address
20 Bronx Shore Rd
Borough
Manhattan
Disadvantaged Community
Yes
Installation Date
7/5/2015
Installed Or Estimated
87.8
Percentage Of Max Peak Demand
19%
Estimated Annual Production
96580
Percentage Of Annual
0.11
Estimated Annual Emissions
31
Estimated Social Cost Of
4401
Estimated Annual Energy
13429
Upfront Project Cost
$108,836
Financing Mechanism
Expense
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
10035
Latitude
40.79952
Longitude
-73.92227
Community Board
111
Census Tract
240
Bin
1085922
Bbl
1018190203
Nta
MN1191
VIEW LOCATION
DOE
City Council District: 51 • Agency: DOE • Site: R069 - Daniel D. Tompkins School
City Council District
51
Agency
DOE
Site
R069 - Daniel D. Tompkins School
Address
144 Keating Pl
Borough
Staten Island
Disadvantaged Community
No
Installation Date
4/20/2015
Installed Or Estimated
203.13
Percentage Of Max Peak Demand
29%
Estimated Annual Production
238442
Percentage Of Annual
0.36
Estimated Annual Emissions
76
Estimated Social Cost Of
10801
Estimated Annual Energy
29817
Upfront Project Cost
$905,386
Financing Mechanism
Capital
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
10314
Latitude
40.591468
Longitude
-74.156705
Community Board
502
Census Tract
27705
Bin
5037541
Bbl
5023660073
Nta
SI0204
VIEW LOCATION
DCAS
City Council District: 1 • Agency: DCAS • Site: City Hall Solar PV
City Council District
1
Agency
DCAS
Site
City Hall Solar PV
Address
City Hall Park
Borough
Manhattan
Disadvantaged Community
No
Installation Date
4/17/2015
Installed Or Estimated
10.45
Percentage Of Max Peak Demand
0%
Estimated Annual Production
11738
Percentage Of Annual
0
Estimated Annual Emissions
4
Estimated Social Cost Of
532
Estimated Annual Energy
1632
Upfront Project Cost
$1,297
Financing Mechanism
Capital
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
10007
Latitude
40.71254
Longitude
-74.006435
Community Board
101
Census Tract
31
Bin
1000000
Bbl
1001220001
Nta
MN0102
VIEW LOCATION
DPR
City Council District: 38 • Agency: DPR • Site: Red Hook Recreation Center
City Council District
38
Agency
DPR
Site
Red Hook Recreation Center
Address
155 Bay St
Borough
Brooklyn
Disadvantaged Community
Yes
Installation Date
3/16/2015
Installed Or Estimated
11.4
Percentage Of Max Peak Demand
5%
Estimated Annual Production
12540
Percentage Of Annual
0.02
Estimated Annual Emissions
4
Estimated Social Cost Of
568
Estimated Annual Energy
1744
Upfront Project Cost
$75,000
Financing Mechanism
Capital
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
11231
Latitude
40.671937
Longitude
-74.003515
Community Board
306
Census Tract
5302
Bin
3008670
Bbl
3005820001
Nta
BK0601
VIEW LOCATION
FDNY
City Council District: 33 • Agency: FDNY • Site: Marine Co. 6
City Council District
33
Agency
FDNY
Site
Marine Co. 6
Address
Brooklyn Navy Yard
Borough
Manhattan
Disadvantaged Community
Yes
Installation Date
2/21/2015
Installed Or Estimated
23.1
Percentage Of Max Peak Demand
7%
Estimated Annual Production
25410
Percentage Of Annual
0.02
Estimated Annual Emissions
8
Estimated Social Cost Of
1151
Estimated Annual Energy
873
Upfront Project Cost
$184,800
Financing Mechanism
Capital
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
DOE
City Council District: 10 • Agency: DOE • Site: X475 - John F Kennedy High School
City Council District
10
Agency
DOE
Site
X475 - John F Kennedy High School
Address
99 Terrace View Ave
Borough
Bronx
Disadvantaged Community
Yes
Installation Date
7/15/2014
Installed Or Estimated
117
Percentage Of Max Peak Demand
9%
Estimated Annual Production
137339
Percentage Of Annual
0.05
Estimated Annual Emissions
44
Estimated Social Cost Of
6221
Estimated Annual Energy
63019
Financing Mechanism
PPA
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
10463
Latitude
40.877105
Longitude
-73.912256
Community Board
208
Census Tract
309
Bin
1064532
Bbl
1022150080
Nta
BX0802
VIEW LOCATION
DOE
City Council District: 13 • Agency: DOE • Site: X405 - Herbert Lehman High School
City Council District
13
Agency
DOE
Site
X405 - Herbert Lehman High School
Address
3000 East Tremont Ave
Borough
Bronx
Disadvantaged Community
Yes
Installation Date
7/15/2014
Installed Or Estimated
245.64
Percentage Of Max Peak Demand
16%
Estimated Annual Production
289938
Percentage Of Annual
0.08
Estimated Annual Emissions
92
Estimated Social Cost Of
13134
Estimated Annual Energy
29851
Financing Mechanism
PPA
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
10461
Latitude
40.840733
Longitude
-73.838685
Community Board
210
Census Tract
194
Bin
2074045
Bbl
2053680001
Nta
BX1002
VIEW LOCATION
DOE
City Council District: 2 • Agency: DOE • Site: M022 - NEST
City Council District
2
Agency
DOE
Site
M022 - NEST
Address
111 Columbia St
Borough
Manhattan
Disadvantaged Community
Yes
Installation Date
7/1/2014
Installed Or Estimated
125.89
Percentage Of Max Peak Demand
20%
Estimated Annual Production
146730
Percentage Of Annual
0.17
Estimated Annual Emissions
47
Estimated Social Cost Of
6647
Estimated Annual Energy
18348
Upfront Project Cost
$905,386
Financing Mechanism
Capital
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
10002
Latitude
40.718895
Longitude
-73.979308
Community Board
103
Census Tract
2201
Bin
1004070
Bbl
1003350001
Nta
MN0302
VIEW LOCATION
DOT
City Council District: 49 • Agency: DOT • Site: SI Ferry Maintenance Facility - St. George Ferry Terminal
City Council District
49
Agency
DOT
Site
SI Ferry Maintenance Facility - St. George Ferry Terminal
Address
5 Bay St
Borough
Staten Island
Disadvantaged Community
Yes
Installation Date
6/30/2014
Installed Or Estimated
221
Percentage Of Max Peak Demand
15%
Estimated Annual Production
257540
Percentage Of Annual
0.04
Estimated Annual Emissions
84
Estimated Social Cost Of
11940
Estimated Annual Energy
55977
Financing Mechanism
PPA
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
10301
Latitude
40.641476
Longitude
-74.073976
Community Board
501
Census Tract
3
Bin
5131766
Bbl
5000010068
Nta
SI0101
VIEW LOCATION
DPR
City Council District: 50 • Agency: DPR • Site: Beach Struc14: Cedar Grove Beach - Package 1.14
City Council District
50
Agency
DPR
Site
Beach Struc14: Cedar Grove Beach - Package 1.14
Address
186 Cedar Grove Ave
Borough
Staten Island
Disadvantaged Community
No
Installation Date
6/20/2014
Installed Or Estimated
4
Percentage Of Max Peak Demand
19%
Estimated Annual Production
4400
Percentage Of Annual
0.26
Estimated Annual Emissions
1
Estimated Social Cost Of
204
Estimated Annual Energy
924
Upfront Project Cost
$-
Financing Mechanism
Agency Funded
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
10306
Latitude
40.560058
Longitude
-74.10159
Community Board
595
Census Tract
12804
Nta
SI0202
VIEW LOCATION
DPR
City Council District: 51 • Agency: DPR • Site: Beach Struc13: Wolfes Pond Beach - Package 1.13
City Council District
51
Agency
DPR
Site
Beach Struc13: Wolfes Pond Beach - Package 1.13
Address
460 Cornelia Ave
Borough
Staten Island
Disadvantaged Community
No
Installation Date
6/5/2014
Installed Or Estimated
7
Percentage Of Max Peak Demand
55%
Estimated Annual Production
7700
Percentage Of Annual
0.38
Estimated Annual Emissions
3
Estimated Social Cost Of
357
Estimated Annual Energy
33264
Upfront Project Cost
$-
Financing Mechanism
Agency Funded
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
10312
Latitude
40.51965
Longitude
-74.187825
Community Board
503
Census Tract
198
Bin
5000000
Bbl
5065960001
Nta
SI0304
VIEW LOCATION
DEP
City Council District: 49 • Agency: DEP • Site: Port Richmond WWTP
City Council District
49
Agency
DEP
Site
Port Richmond WWTP
Address
1801 Richmond Ter
Borough
Staten Island
Disadvantaged Community
Yes
Installation Date
6/1/2014
Installed Or Estimated
1267.5
Percentage Of Max Peak Demand
21%
Estimated Annual Production
1484027
Percentage Of Annual
0.05
Estimated Annual Emissions
485
Estimated Social Cost Of
68799
Estimated Annual Energy
328012
Financing Mechanism
PPA
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
10310
Latitude
40.637232
Longitude
-74.125556
Community Board
501
Census Tract
13302
Bin
5000000
Bbl
5001850400
Nta
SI0106
VIEW LOCATION
DPR
City Council District: 46 • Agency: DPR • Site: Paerdegat Basin Water Quality Facility
City Council District
46
Agency
DPR
Site
Paerdegat Basin Water Quality Facility
Address
1961 Bergen Ave
Borough
Brooklyn
Disadvantaged Community
No
Installation Date
5/1/2014
Installed Or Estimated
0.46
Percentage Of Max Peak Demand
157%
Estimated Annual Production
506
Percentage Of Annual
0.78
Estimated Annual Emissions
0
Estimated Social Cost Of
23
Estimated Annual Energy
76
Upfront Project Cost
$-
Financing Mechanism
Agency Funded
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
DOE
City Council District: 9 • Agency: DOE • Site: M154 School
City Council District
9
Agency
DOE
Site
M154 School
Address
250 West 127th St
Borough
Manhattan
Disadvantaged Community
Yes
Installation Date
4/28/2014
Installed Or Estimated
125.89
Percentage Of Max Peak Demand
30%
Estimated Annual Production
147775
Percentage Of Annual
0.26
Estimated Annual Emissions
48
Estimated Social Cost Of
6851
Estimated Annual Energy
18479
Upfront Project Cost
$578,750
Financing Mechanism
Capital
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
10027
Latitude
40.810928
Longitude
-73.948938
Community Board
110
Census Tract
224
Bin
1058671
Bbl
1019320010
Nta
MN1002
VIEW LOCATION
DPR
City Council District: 47 • Agency: DPR • Site: Beach Struc10: Brighton 2 St - Package 1.10
City Council District
47
Agency
DPR
Site
Beach Struc10: Brighton 2 St - Package 1.10
Address
The Boardwalk E/O Brighton 2nd St
Borough
Brooklyn
Disadvantaged Community
Yes
Installation Date
4/24/2014
Installed Or Estimated
3
Percentage Of Max Peak Demand
6%
Estimated Annual Production
3300
Percentage Of Annual
0.15
Estimated Annual Emissions
1
Estimated Social Cost Of
153
Estimated Annual Energy
495
Upfront Project Cost
$-
Financing Mechanism
Agency Funded
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
DPR
City Council District: 50 • Agency: DPR • Site: Beach Struc15: Midland Park Beach - Package 1.15
City Council District
50
Agency
DPR
Site
Beach Struc15: Midland Park Beach - Package 1.15
Address
Father Capodanno Blvd at Greeley Ave
Borough
Staten Island
Disadvantaged Community
Yes
Installation Date
4/24/2014
Installed Or Estimated
3
Percentage Of Max Peak Demand
11%
Estimated Annual Production
3300
Percentage Of Annual
0.06
Estimated Annual Emissions
1
Estimated Social Cost Of
153
Estimated Annual Energy
1881
Upfront Project Cost
$-
Financing Mechanism
Agency Funded
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
EDC
City Council District: 38 • Agency: EDC • Site: Brooklyn Army Terminal
City Council District
38
Agency
EDC
Site
Brooklyn Army Terminal
Address
140 58th St
Borough
Brooklyn
Disadvantaged Community
Yes
Installation Date
4/1/2014
Installed Or Estimated
100
Percentage Of Max Peak Demand
77%
Estimated Annual Production
117384
Percentage Of Annual
1
Estimated Annual Emissions
38
Estimated Social Cost Of
5442
Estimated Annual Energy
4035
Upfront Project Cost
$-
Financing Mechanism
Agency Funded
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
11220
Latitude
40.645338
Longitude
-74.022864
Community Board
307
Census Tract
1804
Bin
3414976
Bbl
3057780001
Nta
BK0702
VIEW LOCATION
DPR
City Council District: 26 • Agency: DPR • Site: Hunters Point South Waterfront Park
City Council District
26
Agency
DPR
Site
Hunters Point South Waterfront Park
Address
52-10 Center Blvd
Borough
Queens
Disadvantaged Community
No
Installation Date
1/1/2014
Installed Or Estimated
20.16
Percentage Of Max Peak Demand
61%
Estimated Annual Production
22176
Percentage Of Annual
0.22
Estimated Annual Emissions
7
Estimated Social Cost Of
1028
Estimated Annual Energy
792
Upfront Project Cost
$-
Financing Mechanism
Agency Funded
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
11101
Latitude
40.741897
Longitude
-73.960236
Community Board
402
Census Tract
101
Bin
4542932
Bbl
4000060001
Nta
QN0201
VIEW LOCATION
DPR
City Council District: 31 • Agency: DPR • Site: Beach Struc01: Beach 32 St - Package 1.01
City Council District
31
Agency
DPR
Site
Beach Struc01: Beach 32 St - Package 1.01
Address
Beach 32nd St
Borough
Queens
Disadvantaged Community
Yes
Installation Date
1/1/2014
Installed Or Estimated
3
Percentage Of Max Peak Demand
11%
Estimated Annual Production
3300
Percentage Of Annual
0.11
Estimated Annual Emissions
1
Estimated Social Cost Of
150
Estimated Annual Energy
1672
Upfront Project Cost
$-
Financing Mechanism
Agency Funded
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
DPR
City Council District: 31 • Agency: DPR • Site: Beach Struc02: Beach 59 St - Package 1.02
City Council District
31
Agency
DPR
Site
Beach Struc02: Beach 59 St - Package 1.02
Address
40 Beach 59th St
Borough
Queens
Disadvantaged Community
Yes
Installation Date
1/1/2014
Installed Or Estimated
3
Percentage Of Max Peak Demand
9%
Estimated Annual Production
3300
Percentage Of Annual
0.14
Estimated Annual Emissions
1
Estimated Social Cost Of
150
Estimated Annual Energy
726
Upfront Project Cost
$-
Financing Mechanism
Agency Funded
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
11692
Latitude
40.589698
Longitude
-73.788658
Community Board
414
Census Tract
97202
Bin
4549397
Bbl
4159260100
Nta
QN1402
VIEW LOCATION
DPR
City Council District: 31 • Agency: DPR • Site: Beach Struc03: Beach 66 St - Package 1.03
City Council District
31
Agency
DPR
Site
Beach Struc03: Beach 66 St - Package 1.03
Address
66-21 Beach Front Rd
Borough
Queens
Disadvantaged Community
Yes
Installation Date
1/1/2014
Installed Or Estimated
3
Percentage Of Max Peak Demand
16%
Estimated Annual Production
3300
Percentage Of Annual
0.07
Estimated Annual Emissions
1
Estimated Social Cost Of
150
Estimated Annual Energy
968
Upfront Project Cost
$-
Financing Mechanism
Agency Funded
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
11692
Latitude
40.587626
Longitude
-73.796672
Community Board
414
Census Tract
954
Bin
4000000
Bbl
4159390001
Nta
QN1402
VIEW LOCATION
DPR
City Council District: 31 • Agency: DPR • Site: Beach Struc04: Beach 73 St - Package 1.04
City Council District
31
Agency
DPR
Site
Beach Struc04: Beach 73 St - Package 1.04
Address
Beach Front Road at Beach 73rd St
Borough
Queens
Disadvantaged Community
Yes
Installation Date
1/1/2014
Installed Or Estimated
4
Percentage Of Max Peak Demand
17%
Estimated Annual Production
4400
Percentage Of Annual
0.16
Estimated Annual Emissions
1
Estimated Social Cost Of
199
Estimated Annual Energy
1056
Upfront Project Cost
$-
Financing Mechanism
Agency Funded
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
DPR
City Council District: 32 • Agency: DPR • Site: Beach Struc05: Beach 86 St - Package 1.05
City Council District
32
Agency
DPR
Site
Beach Struc05: Beach 86 St - Package 1.05
Address
Shore Front Pkwy bet 84th and 90th St
Borough
Queens
Disadvantaged Community
Yes
Installation Date
1/1/2014
Installed Or Estimated
4
Percentage Of Max Peak Demand
10%
Estimated Annual Production
4400
Percentage Of Annual
0.03
Estimated Annual Emissions
1
Estimated Social Cost Of
199
Estimated Annual Energy
1056
Upfront Project Cost
$-
Financing Mechanism
Agency Funded
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
DPR
City Council District: 32 • Agency: DPR • Site: Beach Struc08: Beach 117 St - Package 1.08
City Council District
32
Agency
DPR
Site
Beach Struc08: Beach 117 St - Package 1.08
Address
115-11 Ocean Promenade
Borough
Queens
Disadvantaged Community
Yes
Installation Date
1/1/2014
Installed Or Estimated
9.5
Percentage Of Max Peak Demand
41%
Estimated Annual Production
10450
Percentage Of Annual
0.12
Estimated Annual Emissions
3
Estimated Social Cost Of
473
Estimated Annual Energy
561
Upfront Project Cost
$-
Financing Mechanism
Agency Funded
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
11694
Latitude
40.578002
Longitude
-73.835317
Community Board
414
Census Tract
938
Nta
QN1403
VIEW LOCATION
DPR
City Council District: 32 • Agency: DPR • Site: Beach Struc06: Beach 97 St - Package 1.06
City Council District
32
Agency
DPR
Site
Beach Struc06: Beach 97 St - Package 1.06
Address
96-20 Shore Front Pkwy
Borough
Queens
Disadvantaged Community
Yes
Installation Date
1/1/2014
Installed Or Estimated
3
Percentage Of Max Peak Demand
4%
Estimated Annual Production
3300
Percentage Of Annual
0.03
Estimated Annual Emissions
1
Estimated Social Cost Of
150
Estimated Annual Energy
1100
Upfront Project Cost
$-
Financing Mechanism
Agency Funded
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
11693
Latitude
40.583302
Longitude
-73.817397
Community Board
414
Census Tract
94201
Bin
4542747
Bbl
4161690011
Nta
QN1402
VIEW LOCATION
DPR
City Council District: 32 • Agency: DPR • Site: Beach Struc07: Beach 106 St - Package 1.07
City Council District
32
Agency
DPR
Site
Beach Struc07: Beach 106 St - Package 1.07
Address
Beach 106th St at Shore Pkwy
Borough
Queens
Disadvantaged Community
Yes
Installation Date
1/1/2014
Installed Or Estimated
4
Percentage Of Max Peak Demand
21%
Estimated Annual Production
4400
Percentage Of Annual
0.2
Estimated Annual Emissions
1
Estimated Social Cost Of
199
Estimated Annual Energy
561
Upfront Project Cost
$-
Financing Mechanism
Agency Funded
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
DPR
City Council District: 47 • Agency: DPR • Site: Beach Struc11: West 2 St - Package 1.11
City Council District
47
Agency
DPR
Site
Beach Struc11: West 2 St - Package 1.11
Address
West 5th St
Borough
Brooklyn
Disadvantaged Community
Yes
Installation Date
1/1/2014
Installed Or Estimated
3
Percentage Of Max Peak Demand
12%
Estimated Annual Production
3300
Percentage Of Annual
0.09
Estimated Annual Emissions
1
Estimated Social Cost Of
150
Estimated Annual Energy
704
Upfront Project Cost
$-
Financing Mechanism
Agency Funded
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
DPR
City Council District: 47 • Agency: DPR • Site: Beach Struc12: West 8 St - Package 1.12
City Council District
47
Agency
DPR
Site
Beach Struc12: West 8 St - Package 1.12
Address
The Boardwalk at West 8th St
Borough
Brooklyn
Disadvantaged Community
Yes
Installation Date
1/1/2014
Installed Or Estimated
4
Percentage Of Max Peak Demand
30%
Estimated Annual Production
4400
Percentage Of Annual
0.22
Estimated Annual Emissions
1
Estimated Social Cost Of
199
Estimated Annual Energy
2661
Upfront Project Cost
$-
Financing Mechanism
Agency Funded
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
DPR
City Council District: 33 • Agency: DPR • Site: Bushwick Inlet Park
City Council District
33
Agency
DPR
Site
Bushwick Inlet Park
Address
86 Kent Ave
Borough
Brooklyn
Disadvantaged Community
Yes
Installation Date
10/1/2013
Installed Or Estimated
67.2
Percentage Of Max Peak Demand
32%
Estimated Annual Production
77650
Percentage Of Annual
0.25
Estimated Annual Emissions
25
Estimated Social Cost Of
3600
Estimated Annual Energy
10296
Upfront Project Cost
$264,600
Financing Mechanism
Capital
Status
Completed
Year Of Report
2024
Data Current As Of
2024-08-08T00:00:00.000
Postcode
11249
Latitude
40.721558
Longitude
-73.960406
Community Board
301
Census Tract
557
Bin
3061641
Bbl
3023010001
Nta
BK0102
VIEW LOCATION