ORR_points

Completed, ongoing, and planned recovery and resiliency projects throughout New York City.

City Government Mayor's Office of Climate and Environmental Justice (MOCEJ) Dataset dhcf-pcvf 14 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
Department of Parks and Recreation
Mang Agen: Department of Parks and Recreation • Orrid: DPR278 • One Nyc: Infrastructure
Mang Agen
Department of Parks and Recreation
The Geom
{"type":"Point","coordinates":[-73.745818678505,40.6597469451053]}
Proj Name
Reconstruction of Play Equipment, Safety Surfaces, and General Site Work at Various Parks in Queens [Multisite]
Orrid
DPR278
One Nyc
Infrastructure
Proj Val
5000000
Schedule
Completed
Comp Date
Q1 2015
Fnd Sourc
FEMA, City Funds
Borough
Queens
Coun Dist
19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 34
Comm Bord
QN-1, QN-2, QN-3, QN-5, QN-6, QN-7, QN-8, QN-9, QN-11, QN-12, QN-13, QN-14
More Info
Work includes reconstruction of play equipment, safety surfacing, handball and basketball courts, and general site work.
Link
http://www.nycgovparks.org/planning-and-building/planning/resiliency-plans
Department of Parks and Recreation
Mang Agen: Department of Parks and Recreation • Orrid: DPR278 • One Nyc: Infrastructure
Mang Agen
Department of Parks and Recreation
The Geom
{"type":"Point","coordinates":[-73.7622664194205,40.660103183905534]}
Proj Name
Reconstruction of Play Equipment, Safety Surfaces, and General Site Work at Various Parks in Queens [Multisite]
Orrid
DPR278
One Nyc
Infrastructure
Proj Val
5000000
Schedule
Completed
Comp Date
Q1 2015
Fnd Sourc
FEMA, City Funds
Borough
Queens
Coun Dist
19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 34
Comm Bord
QN-1, QN-2, QN-3, QN-5, QN-6, QN-7, QN-8, QN-9, QN-11, QN-12, QN-13, QN-14
More Info
Work includes reconstruction of play equipment, safety surfacing, handball and basketball courts, and general site work.
Link
http://www.nycgovparks.org/planning-and-building/planning/resiliency-plans
Department of Parks and Recreation
Mang Agen: Department of Parks and Recreation • Orrid: DPR278 • One Nyc: Infrastructure
Mang Agen
Department of Parks and Recreation
The Geom
{"type":"Point","coordinates":[-73.73895963151112,40.65840675748671]}
Proj Name
Reconstruction of Play Equipment, Safety Surfaces, and General Site Work at Various Parks in Queens [Multisite]
Orrid
DPR278
One Nyc
Infrastructure
Proj Val
5000000
Schedule
Completed
Comp Date
Q1 2015
Fnd Sourc
FEMA, City Funds
Borough
Queens
Coun Dist
19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 34
Comm Bord
QN-1, QN-2, QN-3, QN-5, QN-6, QN-7, QN-8, QN-9, QN-11, QN-12, QN-13, QN-14
More Info
Work includes reconstruction of play equipment, safety surfacing, handball and basketball courts, and general site work.
Link
http://www.nycgovparks.org/planning-and-building/planning/resiliency-plans
Department of Environmental Protection
Mang Agen: Department of Environmental Protection • Proj Name: Resiliency Work at Jamaica WWTP • Orrid: DEP044
Mang Agen
Department of Environmental Protection
The Geom
{"type":"Point","coordinates":[-73.80840763741834,40.662398436696925]}
Proj Name
Resiliency Work at Jamaica WWTP
Orrid
DEP044
One Nyc
Infrastructure
Proj Val
900000
Schedule
Planning
Comp Date
Q3 2021
Fnd Sourc
FEMA, City Funds
Borough
Queens
Coun Dist
28
Comm Bord
QN-10
More Info
Work includes floodproofing and elevating equipment.
Link
http://www1.nyc.gov/html/onenyc/visions/resilience.html
Department of Sanitation
Mang Agen: Department of Sanitation • Proj Name: Queens Sanitation Districts 8/10/12 Facility - Repair • Orrid: DSNY041
Mang Agen
Department of Sanitation
The Geom
{"type":"Point","coordinates":[-73.80991296298976,40.66518091493976]}
Proj Name
Queens Sanitation Districts 8/10/12 Facility - Repair
Orrid
DSNY041
One Nyc
Infrastructure
Proj Val
3000
Schedule
Completed
Fnd Sourc
FEMA, City Funds
Borough
Queens
Coun Dist
28
Comm Bord
QN-10
More Info
Work includes overhead door repairs.
Link
http://www1.nyc.gov/html/onenyc/visions/resilience.html
Department of Parks and Recreation
Mang Agen: Department of Parks and Recreation • Orrid: DPR278 • One Nyc: Infrastructure
Mang Agen
Department of Parks and Recreation
The Geom
{"type":"Point","coordinates":[-73.82211103150505,40.69381895747693]}
Proj Name
Reconstruction of Play Equipment, Safety Surfaces, and General Site Work at Various Parks in Queens [Multisite]
Orrid
DPR278
One Nyc
Infrastructure
Proj Val
5000000
Schedule
Completed
Comp Date
Q1 2015
Fnd Sourc
FEMA, City Funds
Borough
Queens
Coun Dist
19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 34
Comm Bord
QN-1, QN-2, QN-3, QN-5, QN-6, QN-7, QN-8, QN-9, QN-11, QN-12, QN-13, QN-14
More Info
Work includes reconstruction of play equipment, safety surfacing, handball and basketball courts, and general site work.
Link
http://www.nycgovparks.org/planning-and-building/planning/resiliency-plans
Department of Parks and Recreation
Mang Agen: Department of Parks and Recreation • Orrid: DPR278 • One Nyc: Infrastructure
Mang Agen
Department of Parks and Recreation
The Geom
{"type":"Point","coordinates":[-73.81994503150358,40.68939655747588]}
Proj Name
Reconstruction of Play Equipment, Safety Surfaces, and General Site Work at Various Parks in Queens [Multisite]
Orrid
DPR278
One Nyc
Infrastructure
Proj Val
5000000
Schedule
Completed
Comp Date
Q1 2015
Fnd Sourc
FEMA, City Funds
Borough
Queens
Coun Dist
19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 34
Comm Bord
QN-1, QN-2, QN-3, QN-5, QN-6, QN-7, QN-8, QN-9, QN-11, QN-12, QN-13, QN-14
More Info
Work includes reconstruction of play equipment, safety surfacing, handball and basketball courts, and general site work.
Link
http://www.nycgovparks.org/planning-and-building/planning/resiliency-plans
Fire Department of the City of New York
Mang Agen: Fire Department of the City of New York • Proj Name: Engine 331 - Repairs • Orrid: FDNY031
Mang Agen
Fire Department of the City of New York
The Geom
{"type":"Point","coordinates":[-73.83942906296795,40.65922891491922]}
Proj Name
Engine 331 - Repairs
Orrid
FDNY031
One Nyc
Buildings
Proj Val
140000
Schedule
Completed
Comp Date
Q2 2014
Fnd Sourc
FEMA, City Funds
Borough
Queens
Coun Dist
32
Comm Bord
QN-10
More Info
Work includes replacement of drywall, floor tiles, and minor electrical repair.
Link
http://www1.nyc.gov/html/onenyc/visions/resilience.html
Department of Citywide Administrative Services
Mang Agen: Department of Citywide Administrative Services • Orrid: DCAS003 • One Nyc: Buildings
Mang Agen
Department of Citywide Administrative Services
The Geom
{"type":"Point","coordinates":[-73.84520306299558,40.691893914939946]}
Proj Name
Various Repairs at Department of Citywide Administrative Services Properties [Multisite]
Orrid
DCAS003
One Nyc
Buildings
Proj Val
130000
Schedule
Completed
Comp Date
Q4 2014
Fnd Sourc
FEMA, City Funds
Borough
Citywide
Coun Dist
1, 8, 16, 19, 24, 30, 32, 33, 47, 49, 50
Comm Bord
MN-1, BX-4, BK-2, BK-13, QN-5, QN-7, QN-9, QN-10, QN-12, SI-1, SI-2
More Info
Work includes various repairs, replacement, tree removal, and site work at 13 sites citywide.
Link
http://www1.nyc.gov/html/onenyc/visions/resilience.html
Department of Parks and Recreation
Mang Agen: Department of Parks and Recreation • Orrid: DPR278 • One Nyc: Infrastructure
Mang Agen
Department of Parks and Recreation
The Geom
{"type":"Point","coordinates":[-73.8231556315192,40.724377157487794]}
Proj Name
Reconstruction of Play Equipment, Safety Surfaces, and General Site Work at Various Parks in Queens [Multisite]
Orrid
DPR278
One Nyc
Infrastructure
Proj Val
5000000
Schedule
Completed
Comp Date
Q1 2015
Fnd Sourc
FEMA, City Funds
Borough
Queens
Coun Dist
19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 34
Comm Bord
QN-1, QN-2, QN-3, QN-5, QN-6, QN-7, QN-8, QN-9, QN-11, QN-12, QN-13, QN-14
More Info
Work includes reconstruction of play equipment, safety surfacing, handball and basketball courts, and general site work.
Link
http://www.nycgovparks.org/planning-and-building/planning/resiliency-plans
Department of Education
Mang Agen: Department of Education • Proj Name: Emergency Power for 51 Critical Schools [Multisite] • Orrid: DOE005
Mang Agen
Department of Education
The Geom
{"type":"Point","coordinates":[-73.84399756303226,40.730003314968464]}
Proj Name
Emergency Power for 51 Critical Schools [Multisite]
Orrid
DOE005
One Nyc
Infrastructure
Proj Val
14000000
Schedule
Design
Comp Date
Q1 2020
Fnd Sourc
FEMA-HMGP, City Funds
Borough
Citywide
Coun Dist
1, 3, 5, 6, 8, 9, 10, 11, 12, 14, 16, 17, 18, 19, 20, 24, 25, 26, 29, 30, 32, 33, 35, 36, 37, 38, 39
Comm Bord
MN-3, MN-4, MN-7, MN-8, MN-10, MN-12, BX-1, BX-2, BX-3, BX-4, BX-5, BX-6, BX-8, BX-9, BX-12, BK-2, BK-3, BK-4, BK-5, BK-6, BK-7, BK-9, BK-10, BK-12, BK-14, BK-16, BK-17, QN-1, QN-4, QN-5, QN-6, QN-7, QN-8, QN-10, QN-11, SI-1, SI-2, SI-3
More Info
Work includes installing quick-connections at 51 schools to prevent service disruption.
Link
http://www1.nyc.gov/html/onenyc/visions/resilience.html
Department of Parks and Recreation
Mang Agen: Department of Parks and Recreation • Orrid: DPR278 • One Nyc: Infrastructure
Mang Agen
Department of Parks and Recreation
The Geom
{"type":"Point","coordinates":[-73.87932003150199,40.720601957471025]}
Proj Name
Reconstruction of Play Equipment, Safety Surfaces, and General Site Work at Various Parks in Queens [Multisite]
Orrid
DPR278
One Nyc
Infrastructure
Proj Val
5000000
Schedule
Completed
Comp Date
Q1 2015
Fnd Sourc
FEMA, City Funds
Borough
Queens
Coun Dist
19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 34
Comm Bord
QN-1, QN-2, QN-3, QN-5, QN-6, QN-7, QN-8, QN-9, QN-11, QN-12, QN-13, QN-14
More Info
Work includes reconstruction of play equipment, safety surfacing, handball and basketball courts, and general site work.
Link
http://www.nycgovparks.org/planning-and-building/planning/resiliency-plans
Department of Parks and Recreation
Mang Agen: Department of Parks and Recreation • Orrid: DPR278 • One Nyc: Infrastructure
Mang Agen
Department of Parks and Recreation
The Geom
{"type":"Point","coordinates":[-73.87385933150384,40.7213198574728]}
Proj Name
Reconstruction of Play Equipment, Safety Surfaces, and General Site Work at Various Parks in Queens [Multisite]
Orrid
DPR278
One Nyc
Infrastructure
Proj Val
5000000
Schedule
Completed
Comp Date
Q1 2015
Fnd Sourc
FEMA, City Funds
Borough
Queens
Coun Dist
19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 34
Comm Bord
QN-1, QN-2, QN-3, QN-5, QN-6, QN-7, QN-8, QN-9, QN-11, QN-12, QN-13, QN-14
More Info
Work includes reconstruction of play equipment, safety surfacing, handball and basketball courts, and general site work.
Link
http://www.nycgovparks.org/planning-and-building/planning/resiliency-plans
Department of Sanitation
Mang Agen: Department of Sanitation • Proj Name: Queens Central Repair Station and Sanitation Districts 2/3/4 Facility - Repair • Orrid: DSNY036
Mang Agen
Department of Sanitation
The Geom
{"type":"Point","coordinates":[-73.9095660630003,40.734350914935774]}
Proj Name
Queens Central Repair Station and Sanitation Districts 2/3/4 Facility - Repair
Orrid
DSNY036
One Nyc
Infrastructure
Proj Val
30000
Schedule
Completed
Fnd Sourc
FEMA, City Funds
Borough
Queens
Coun Dist
30
Comm Bord
QN-2
More Info
Work includes roof repairs.
Link
http://www1.nyc.gov/html/onenyc/visions/resilience.html
Department of Sanitation
Mang Agen: Department of Sanitation • Proj Name: Queens Sanitation District 6 Facility - Repair • Orrid: DSNY038
Mang Agen
Department of Sanitation
The Geom
{"type":"Point","coordinates":[-73.90660406300138,40.73378291493696]}
Proj Name
Queens Sanitation District 6 Facility - Repair
Orrid
DSNY038
One Nyc
Infrastructure
Proj Val
5000
Schedule
Completed
Fnd Sourc
FEMA, City Funds
Borough
Queens
Coun Dist
30
Comm Bord
QN-2
More Info
Work includes overhead door repairs.
Link
http://www1.nyc.gov/html/onenyc/visions/resilience.html
Department of Sanitation
Mang Agen: Department of Sanitation • Proj Name: Queens Borough Repair Shop - Repair • Orrid: DSNY043
Mang Agen
Department of Sanitation
The Geom
{"type":"Point","coordinates":[-73.9091163630013,40.73516741493669]}
Proj Name
Queens Borough Repair Shop - Repair
Orrid
DSNY043
One Nyc
Infrastructure
Proj Val
10000
Schedule
Completed
Fnd Sourc
FEMA, City Funds
Borough
Queens
Coun Dist
30
Comm Bord
QN-2
More Info
Work includes replacement of glass entry vestibule on roof.
Link
http://www1.nyc.gov/html/onenyc/visions/resilience.html
Department of Parks and Recreation
Mang Agen: Department of Parks and Recreation • Orrid: DPR278 • One Nyc: Infrastructure
Mang Agen
Department of Parks and Recreation
The Geom
{"type":"Point","coordinates":[-73.89827903149038,40.70707095746095]}
Proj Name
Reconstruction of Play Equipment, Safety Surfaces, and General Site Work at Various Parks in Queens [Multisite]
Orrid
DPR278
One Nyc
Infrastructure
Proj Val
5000000
Schedule
Completed
Comp Date
Q1 2015
Fnd Sourc
FEMA, City Funds
Borough
Queens
Coun Dist
19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 34
Comm Bord
QN-1, QN-2, QN-3, QN-5, QN-6, QN-7, QN-8, QN-9, QN-11, QN-12, QN-13, QN-14
More Info
Work includes reconstruction of play equipment, safety surfacing, handball and basketball courts, and general site work.
Link
http://www.nycgovparks.org/planning-and-building/planning/resiliency-plans
Department of Parks and Recreation
Mang Agen: Department of Parks and Recreation • Orrid: DPR278 • One Nyc: Infrastructure
Mang Agen
Department of Parks and Recreation
The Geom
{"type":"Point","coordinates":[-73.89739863149077,40.707425857461295]}
Proj Name
Reconstruction of Play Equipment, Safety Surfaces, and General Site Work at Various Parks in Queens [Multisite]
Orrid
DPR278
One Nyc
Infrastructure
Proj Val
5000000
Schedule
Completed
Comp Date
Q1 2015
Fnd Sourc
FEMA, City Funds
Borough
Queens
Coun Dist
19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 34
Comm Bord
QN-1, QN-2, QN-3, QN-5, QN-6, QN-7, QN-8, QN-9, QN-11, QN-12, QN-13, QN-14
More Info
Work includes reconstruction of play equipment, safety surfacing, handball and basketball courts, and general site work.
Link
http://www.nycgovparks.org/planning-and-building/planning/resiliency-plans
Department of Education
Mang Agen: Department of Education • Proj Name: Emergency Power for 51 Critical Schools [Multisite] • Orrid: DOE005
Mang Agen
Department of Education
The Geom
{"type":"Point","coordinates":[-73.90928166297918,40.71184531491952]}
Proj Name
Emergency Power for 51 Critical Schools [Multisite]
Orrid
DOE005
One Nyc
Infrastructure
Proj Val
14000000
Schedule
Design
Comp Date
Q1 2020
Fnd Sourc
FEMA-HMGP, City Funds
Borough
Citywide
Coun Dist
1, 3, 5, 6, 8, 9, 10, 11, 12, 14, 16, 17, 18, 19, 20, 24, 25, 26, 29, 30, 32, 33, 35, 36, 37, 38, 39
Comm Bord
MN-3, MN-4, MN-7, MN-8, MN-10, MN-12, BX-1, BX-2, BX-3, BX-4, BX-5, BX-6, BX-8, BX-9, BX-12, BK-2, BK-3, BK-4, BK-5, BK-6, BK-7, BK-9, BK-10, BK-12, BK-14, BK-16, BK-17, QN-1, QN-4, QN-5, QN-6, QN-7, QN-8, QN-10, QN-11, SI-1, SI-2, SI-3
More Info
Work includes installing quick-connections at 51 schools to prevent service disruption.
Link
http://www1.nyc.gov/html/onenyc/visions/resilience.html
Department of Citywide Administrative Services
Mang Agen: Department of Citywide Administrative Services • Orrid: DCAS003 • One Nyc: Buildings
Mang Agen
Department of Citywide Administrative Services
The Geom
{"type":"Point","coordinates":[-73.89077206298866,40.71110091492907]}
Proj Name
Various Repairs at Department of Citywide Administrative Services Properties [Multisite]
Orrid
DCAS003
One Nyc
Buildings
Proj Val
130000
Schedule
Completed
Comp Date
Q4 2014
Fnd Sourc
FEMA, City Funds
Borough
Citywide
Coun Dist
1, 8, 16, 19, 24, 30, 32, 33, 47, 49, 50
Comm Bord
MN-1, BX-4, BK-2, BK-13, QN-5, QN-7, QN-9, QN-10, QN-12, SI-1, SI-2
More Info
Work includes various repairs, replacement, tree removal, and site work at 13 sites citywide.
Link
http://www1.nyc.gov/html/onenyc/visions/resilience.html
Department of Parks and Recreation
Mang Agen: Department of Parks and Recreation • Orrid: DPR278 • One Nyc: Infrastructure
Mang Agen
Department of Parks and Recreation
The Geom
{"type":"Point","coordinates":[-73.8642490315061,40.72055395747517]}
Proj Name
Reconstruction of Play Equipment, Safety Surfaces, and General Site Work at Various Parks in Queens [Multisite]
Orrid
DPR278
One Nyc
Infrastructure
Proj Val
5000000
Schedule
Completed
Comp Date
Q1 2015
Fnd Sourc
FEMA, City Funds
Borough
Queens
Coun Dist
19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 34
Comm Bord
QN-1, QN-2, QN-3, QN-5, QN-6, QN-7, QN-8, QN-9, QN-11, QN-12, QN-13, QN-14
More Info
Work includes reconstruction of play equipment, safety surfacing, handball and basketball courts, and general site work.
Link
http://www.nycgovparks.org/planning-and-building/planning/resiliency-plans
Department of Citywide Administrative Services
Mang Agen: Department of Citywide Administrative Services • Orrid: DCAS003 • One Nyc: Buildings
Mang Agen
Department of Citywide Administrative Services
The Geom
{"type":"Point","coordinates":[-73.83011406297364,40.65984791492478]}
Proj Name
Various Repairs at Department of Citywide Administrative Services Properties [Multisite]
Orrid
DCAS003
One Nyc
Buildings
Proj Val
130000
Schedule
Completed
Comp Date
Q4 2014
Fnd Sourc
FEMA, City Funds
Borough
Citywide
Coun Dist
1, 8, 16, 19, 24, 30, 32, 33, 47, 49, 50
Comm Bord
MN-1, BX-4, BK-2, BK-13, QN-5, QN-7, QN-9, QN-10, QN-12, SI-1, SI-2
More Info
Work includes various repairs, replacement, tree removal, and site work at 13 sites citywide.
Link
http://www1.nyc.gov/html/onenyc/visions/resilience.html
Queens Borough Public Library
Mang Agen: Queens Borough Public Library • Proj Name: Queens Borough Public Library Repairs [Multisite] • Orrid: QPL003
Mang Agen
Queens Borough Public Library
The Geom
{"type":"Point","coordinates":[-73.84180226297099,40.663810214921234]}
Proj Name
Queens Borough Public Library Repairs [Multisite]
Orrid
QPL003
One Nyc
Buildings
Proj Val
3000000
Schedule
Completed
Fnd Sourc
FEMA, City Funds, Insurance Proceeds
Borough
Queens
Coun Dist
31, 32
Comm Bord
QN-10, QN-14
More Info
Work includes restoration of four (4) QPL locations impacted by Superstorm Sandy: Arverne, Broad Channel, Howard Beach, and Seaside.
Link
http://www1.nyc.gov/html/onenyc/visions/resilience.html
School Construction Authority
Mang Agen: School Construction Authority • Proj Name: School Recovery & Resiliency at Q146 • Orrid: SCA030
Mang Agen
School Construction Authority
The Geom
{"type":"Point","coordinates":[-73.83489696297167,40.660531414922616]}
Proj Name
School Recovery & Resiliency at Q146
Orrid
SCA030
One Nyc
Buildings
Proj Val
9000000
Schedule
Construction
Comp Date
Q3 2018
Fnd Sourc
FEMA, City Funds
Borough
Queens
Coun Dist
32
Comm Bord
QN-10
More Info
Work includes electrical, flood elimination, HVAC/ventilation, interior spaces, and playground safety surfacing.
Link
http://www1.nyc.gov/html/onenyc/visions/resilience.html
School Construction Authority
Mang Agen: School Construction Authority • Proj Name: School Recovery & Resiliency at Q207 • Orrid: SCA035
Mang Agen
School Construction Authority
The Geom
{"type":"Point","coordinates":[-73.8438854629641,40.65773061491573]}
Proj Name
School Recovery & Resiliency at Q207
Orrid
SCA035
One Nyc
Buildings
Proj Val
11000000
Schedule
Construction
Comp Date
Q3 2016
Fnd Sourc
FEMA, City Funds
Borough
Queens
Coun Dist
32
Comm Bord
QN-10
More Info
Work includes heating plant, site work, flood elimination, interior spaces, and PA system.
Link
http://www1.nyc.gov/html/onenyc/visions/resilience.html
Fire Department of the City of New York
Mang Agen: Fire Department of the City of New York • Proj Name: Engine 329 - Repairs • Orrid: FDNY015
Mang Agen
Fire Department of the City of New York
The Geom
{"type":"Point","coordinates":[-73.88151906285728,40.56606191482837]}
Proj Name
Engine 329 - Repairs
Orrid
FDNY015
One Nyc
Buildings
Proj Val
160000
Schedule
Completed
Comp Date
Q2 2013
Fnd Sourc
FEMA, City Funds
Borough
Queens
Coun Dist
32
Comm Bord
QN-14
More Info
Work includes replacement of drywall, floor tiles, and minor electrical repair.
Link
http://www1.nyc.gov/html/onenyc/visions/resilience.html
Fire Department of the City of New York
Mang Agen: Fire Department of the City of New York • Proj Name: Engine 329 - Mitigation • Orrid: FDNY041
Mang Agen
Fire Department of the City of New York
The Geom
{"type":"Point","coordinates":[-73.88162006285718,40.56599991482825]}
Proj Name
Engine 329 - Mitigation
Orrid
FDNY041
One Nyc
Buildings
Proj Val
530000
Schedule
Planning
Fnd Sourc
FEMA, City Funds
Borough
Queens
Coun Dist
32
Comm Bord
QN-14
More Info
Work includes raising all mechanical equipment.
Link
http://www1.nyc.gov/html/onenyc/visions/resilience.html
Department of Parks and Recreation
Mang Agen: Department of Parks and Recreation • Proj Name: Beachfront Parks Asset Repairs and Replacement [Multisite] • Orrid: DPR360
Mang Agen
Department of Parks and Recreation
The Geom
{"type":"Point","coordinates":[-73.76385606294589,40.59175391491124]}
Proj Name
Beachfront Parks Asset Repairs and Replacement [Multisite]
Orrid
DPR360
One Nyc
Infrastructure
Proj Val
12000000
Schedule
Construction
Comp Date
Q3 2017
Fnd Sourc
FEMA, City Funds
Borough
Citywide
Coun Dist
31, 32, 47, 48, 50, 51
Comm Bord
BK-13, QN-14, SI-2, SI-3
More Info
Work includes Construction Management services to provide properly executed construction work following good construction practices.
Link
http://www.nycgovparks.org/planning-and-building/planning/resiliency-plans
Department of Parks and Recreation
Mang Agen: Department of Parks and Recreation • Proj Name: Beachfront Parks Asset Repairs and Replacement [Multisite] • Orrid: DPR360
Mang Agen
Department of Parks and Recreation
The Geom
{"type":"Point","coordinates":[-73.78858806292966,40.58889291489567]}
Proj Name
Beachfront Parks Asset Repairs and Replacement [Multisite]
Orrid
DPR360
One Nyc
Infrastructure
Proj Val
12000000
Schedule
Construction
Comp Date
Q3 2017
Fnd Sourc
FEMA, City Funds
Borough
Citywide
Coun Dist
31, 32, 47, 48, 50, 51
Comm Bord
BK-13, QN-14, SI-2, SI-3
More Info
Work includes Construction Management services to provide properly executed construction work following good construction practices.
Link
http://www.nycgovparks.org/planning-and-building/planning/resiliency-plans
Department of Parks and Recreation
Mang Agen: Department of Parks and Recreation • Proj Name: Beachfront Parks Asset Repairs and Replacement [Multisite] • Orrid: DPR360
Mang Agen
Department of Parks and Recreation
The Geom
{"type":"Point","coordinates":[-73.79473206292496,40.58746891489125]}
Proj Name
Beachfront Parks Asset Repairs and Replacement [Multisite]
Orrid
DPR360
One Nyc
Infrastructure
Proj Val
12000000
Schedule
Construction
Comp Date
Q3 2017
Fnd Sourc
FEMA, City Funds
Borough
Citywide
Coun Dist
31, 32, 47, 48, 50, 51
Comm Bord
BK-13, QN-14, SI-2, SI-3
More Info
Work includes Construction Management services to provide properly executed construction work following good construction practices.
Link
http://www.nycgovparks.org/planning-and-building/planning/resiliency-plans
Department of Parks and Recreation
Mang Agen: Department of Parks and Recreation • Proj Name: Beachfront Parks Asset Repairs and Replacement [Multisite] • Orrid: DPR360
Mang Agen
Department of Parks and Recreation
The Geom
{"type":"Point","coordinates":[-73.80052206292075,40.5863649148873]}
Proj Name
Beachfront Parks Asset Repairs and Replacement [Multisite]
Orrid
DPR360
One Nyc
Infrastructure
Proj Val
12000000
Schedule
Construction
Comp Date
Q3 2017
Fnd Sourc
FEMA, City Funds
Borough
Citywide
Coun Dist
31, 32, 47, 48, 50, 51
Comm Bord
BK-13, QN-14, SI-2, SI-3
More Info
Work includes Construction Management services to provide properly executed construction work following good construction practices.
Link
http://www.nycgovparks.org/planning-and-building/planning/resiliency-plans
School Construction Authority
Mang Agen: School Construction Authority • Proj Name: School Recovery & Resiliency at Q106 • Orrid: SCA028
Mang Agen
School Construction Authority
The Geom
{"type":"Point","coordinates":[-73.76687876294707,40.59478001491184]}
Proj Name
School Recovery & Resiliency at Q106
Orrid
SCA028
One Nyc
Buildings
Proj Val
8000000
Schedule
Construction
Comp Date
Q3 2016
Fnd Sourc
FEMA, City Funds
Borough
Queens
Coun Dist
31
Comm Bord
QN-14
More Info
Work includes heating plant, flood elimination, and interior spaces.
Link
http://www1.nyc.gov/html/onenyc/visions/resilience.html
Department of Parks and Recreation
Mang Agen: Department of Parks and Recreation • Proj Name: Beach Open Up - Prefabricated Modular Building Units [Multisite] • Orrid: DPR363
Mang Agen
Department of Parks and Recreation
The Geom
{"type":"Point","coordinates":[-73.79984743761189,40.58666318126499]}
Proj Name
Beach Open Up - Prefabricated Modular Building Units [Multisite]
Orrid
DPR363
One Nyc
Coastal Defense
Proj Val
124000000
Schedule
Completed
Comp Date
Q1 2015
Fnd Sourc
FEMA, City Funds
Borough
Citywide
Coun Dist
31, 32, 47, 50, 51
Comm Bord
BK-13, QN-14, SI-2, SI-3
More Info
Work includes installation of 35 new pre-fabricated modular building units.
Link
http://www.nycgovparks.org/planning-and-building/planning/resiliency-plans
Department of Parks and Recreation
Mang Agen: Department of Parks and Recreation • Proj Name: Beach Open Up - Prefabricated Modular Building Units [Multisite] • Orrid: DPR363
Mang Agen
Department of Parks and Recreation
The Geom
{"type":"Point","coordinates":[-73.79444925282282,40.58768414543791]}
Proj Name
Beach Open Up - Prefabricated Modular Building Units [Multisite]
Orrid
DPR363
One Nyc
Coastal Defense
Proj Val
124000000
Schedule
Completed
Comp Date
Q1 2015
Fnd Sourc
FEMA, City Funds
Borough
Citywide
Coun Dist
31, 32, 47, 50, 51
Comm Bord
BK-13, QN-14, SI-2, SI-3
More Info
Work includes installation of 35 new pre-fabricated modular building units.
Link
http://www.nycgovparks.org/planning-and-building/planning/resiliency-plans
Department of Parks and Recreation
Mang Agen: Department of Parks and Recreation • Orrid: DPR278 • One Nyc: Infrastructure
Mang Agen
Department of Parks and Recreation
The Geom
{"type":"Point","coordinates":[-73.74543663148279,40.602017557464286]}
Proj Name
Reconstruction of Play Equipment, Safety Surfaces, and General Site Work at Various Parks in Queens [Multisite]
Orrid
DPR278
One Nyc
Infrastructure
Proj Val
5000000
Schedule
Completed
Comp Date
Q1 2015
Fnd Sourc
FEMA, City Funds
Borough
Queens
Coun Dist
19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 34
Comm Bord
QN-1, QN-2, QN-3, QN-5, QN-6, QN-7, QN-8, QN-9, QN-11, QN-12, QN-13, QN-14
More Info
Work includes reconstruction of play equipment, safety surfacing, handball and basketball courts, and general site work.
Link
http://www.nycgovparks.org/planning-and-building/planning/resiliency-plans
Department of Environmental Protection
Mang Agen: Department of Environmental Protection • Proj Name: Rockaway WWTP Feasibility Study • Orrid: DEP035
Mang Agen
Department of Environmental Protection
The Geom
{"type":"Point","coordinates":[-73.82954908942223,40.583442817404894]}
Proj Name
Rockaway WWTP Feasibility Study
Orrid
DEP035
One Nyc
Infrastructure
Proj Val
2000000
Schedule
Completed
Comp Date
Q2 2016
Fnd Sourc
City Funds
Borough
Queens
Coun Dist
32
Comm Bord
QN-14
More Info
Work includes conducting a feasibility study to consider converting the WWTP to a pumping station.
Link
http://www1.nyc.gov/html/onenyc/visions/resilience.html
Department of Environmental Protection
Mang Agen: Department of Environmental Protection • Proj Name: Resiliency Work at Rockaway WWTP • Orrid: DEP051
Mang Agen
Department of Environmental Protection
The Geom
{"type":"Point","coordinates":[-73.82981546880048,40.583744593838226]}
Proj Name
Resiliency Work at Rockaway WWTP
Orrid
DEP051
One Nyc
Infrastructure
Proj Val
20000000
Schedule
Planning
Comp Date
Q3 2021
Fnd Sourc
FEMA, City Funds
Borough
Queens
Coun Dist
32
Comm Bord
QN-14
More Info
Work includes floodproofing and elevating equipment.
Link
http://www1.nyc.gov/html/onenyc/visions/resilience.html
Mayor's Office of Recovery and Resiliency
Mang Agen: Mayor's Office of Recovery and Resiliency • Proj Name: Rockaway Ambulatory Surgical Center • Orrid: DOHMH001
Mang Agen
Mayor's Office of Recovery and Resiliency
The Geom
{"type":"Point","coordinates":[-73.8269917629031,40.58304521487041]}
Proj Name
Rockaway Ambulatory Surgical Center
Orrid
DOHMH001
One Nyc
Buildings
Proj Val
10000000
Schedule
Design
Fnd Sourc
Private
Borough
Queens
Coun Dist
32
Comm Bord
QN-14
More Info
Work includes conversion of Rockaway Courthouse into community medical center.
Link
http://www1.nyc.gov/html/onenyc/visions/resilience.html
Department of Parks and Recreation
Mang Agen: Department of Parks and Recreation • Proj Name: Department of Parks and Recreation Hurricane Sandy Emergency Work [Multisite] • Orrid: DPR418
Mang Agen
Department of Parks and Recreation
The Geom
{"type":"Point","coordinates":[-73.82906410072779,40.57909435992489]}
Proj Name
Department of Parks and Recreation Hurricane Sandy Emergency Work [Multisite]
Orrid
DPR418
One Nyc
Infrastructure
Proj Val
48000000
Schedule
Completed
Comp Date
Q4 2014
Fnd Sourc
FEMA, City Funds
Borough
Citywide
Coun Dist
13, 32, 47, 48, 50, 51
Comm Bord
BX-10, BK-13, BK-15, QN-14, SI-2, SI-3
More Info
Work includes emergency site work, demolition, debris removal, and public safety measures.
Link
http://www.nycgovparks.org/planning-and-building/planning/resiliency-plans
Department of Parks and Recreation
Mang Agen: Department of Parks and Recreation • Proj Name: Department of Parks and Recreation Hurricane Sandy Emergency Work [Multisite] • Orrid: DPR418
Mang Agen
Department of Parks and Recreation
The Geom
{"type":"Point","coordinates":[-73.83384844111906,40.57781475001361]}
Proj Name
Department of Parks and Recreation Hurricane Sandy Emergency Work [Multisite]
Orrid
DPR418
One Nyc
Infrastructure
Proj Val
48000000
Schedule
Completed
Comp Date
Q4 2014
Fnd Sourc
FEMA, City Funds
Borough
Citywide
Coun Dist
13, 32, 47, 48, 50, 51
Comm Bord
BX-10, BK-13, BK-15, QN-14, SI-2, SI-3
More Info
Work includes emergency site work, demolition, debris removal, and public safety measures.
Link
http://www.nycgovparks.org/planning-and-building/planning/resiliency-plans
Department of Parks and Recreation
Mang Agen: Department of Parks and Recreation • Proj Name: Emergency Protective Measures at Rockaway Beaches & Shore Parkway [Multisite] • Orrid: DPR329
Mang Agen
Department of Parks and Recreation
The Geom
{"type":"Point","coordinates":[-73.83652274023977,40.576782135615524]}
Proj Name
Emergency Protective Measures at Rockaway Beaches & Shore Parkway [Multisite]
Orrid
DPR329
One Nyc
Infrastructure
Proj Val
1000000
Schedule
Completed
Comp Date
Q4 2013
Fnd Sourc
FEMA, City Funds
Borough
Citywide
Coun Dist
32, 46
Comm Bord
BK-18, QN-14
More Info
Work includes emergency protective measures at FDR Beach and Boardwalk.
Link
http://www.nycgovparks.org/planning-and-building/planning/resiliency-plans
Department of Parks and Recreation
Mang Agen: Department of Parks and Recreation • Proj Name: Beachfront Parks Asset Repairs and Replacement [Multisite] • Orrid: DPR360
Mang Agen
Department of Parks and Recreation
The Geom
{"type":"Point","coordinates":[-73.8098960629143,40.5849779148812]}
Proj Name
Beachfront Parks Asset Repairs and Replacement [Multisite]
Orrid
DPR360
One Nyc
Infrastructure
Proj Val
12000000
Schedule
Construction
Comp Date
Q3 2017
Fnd Sourc
FEMA, City Funds
Borough
Citywide
Coun Dist
31, 32, 47, 48, 50, 51
Comm Bord
BK-13, QN-14, SI-2, SI-3
More Info
Work includes Construction Management services to provide properly executed construction work following good construction practices.
Link
http://www.nycgovparks.org/planning-and-building/planning/resiliency-plans
Department of Parks and Recreation
Mang Agen: Department of Parks and Recreation • Proj Name: Beachfront Parks Asset Repairs and Replacement [Multisite] • Orrid: DPR360
Mang Agen
Department of Parks and Recreation
The Geom
{"type":"Point","coordinates":[-73.81753206290807,40.58277891487537]}
Proj Name
Beachfront Parks Asset Repairs and Replacement [Multisite]
Orrid
DPR360
One Nyc
Infrastructure
Proj Val
12000000
Schedule
Construction
Comp Date
Q3 2017
Fnd Sourc
FEMA, City Funds
Borough
Citywide
Coun Dist
31, 32, 47, 48, 50, 51
Comm Bord
BK-13, QN-14, SI-2, SI-3
More Info
Work includes Construction Management services to provide properly executed construction work following good construction practices.
Link
http://www.nycgovparks.org/planning-and-building/planning/resiliency-plans
Department of Parks and Recreation
Mang Agen: Department of Parks and Recreation • Proj Name: Beachfront Parks Asset Repairs and Replacement [Multisite] • Orrid: DPR360
Mang Agen
Department of Parks and Recreation
The Geom
{"type":"Point","coordinates":[-73.82652906290076,40.580286914868665]}
Proj Name
Beachfront Parks Asset Repairs and Replacement [Multisite]
Orrid
DPR360
One Nyc
Infrastructure
Proj Val
12000000
Schedule
Construction
Comp Date
Q3 2017
Fnd Sourc
FEMA, City Funds
Borough
Citywide
Coun Dist
31, 32, 47, 48, 50, 51
Comm Bord
BK-13, QN-14, SI-2, SI-3
More Info
Work includes Construction Management services to provide properly executed construction work following good construction practices.
Link
http://www.nycgovparks.org/planning-and-building/planning/resiliency-plans
Department of Parks and Recreation
Mang Agen: Department of Parks and Recreation • Proj Name: Beachfront Parks Asset Repairs and Replacement [Multisite] • Orrid: DPR360
Mang Agen
Department of Parks and Recreation
The Geom
{"type":"Point","coordinates":[-73.83661706289273,40.577581914861184]}
Proj Name
Beachfront Parks Asset Repairs and Replacement [Multisite]
Orrid
DPR360
One Nyc
Infrastructure
Proj Val
12000000
Schedule
Construction
Comp Date
Q3 2017
Fnd Sourc
FEMA, City Funds
Borough
Citywide
Coun Dist
31, 32, 47, 48, 50, 51
Comm Bord
BK-13, QN-14, SI-2, SI-3
More Info
Work includes Construction Management services to provide properly executed construction work following good construction practices.
Link
http://www.nycgovparks.org/planning-and-building/planning/resiliency-plans
Department of Parks and Recreation
Mang Agen: Department of Parks and Recreation • Proj Name: Beach Open Up - Rockaway Entry Islands [Multisite] • Orrid: DPR361
Mang Agen
Department of Parks and Recreation
The Geom
{"type":"Point","coordinates":[-73.81761457186346,40.582979891506106]}
Proj Name
Beach Open Up - Rockaway Entry Islands [Multisite]
Orrid
DPR361
One Nyc
Buildings
Proj Val
54000000
Schedule
Completed
Comp Date
Q2 2013
Fnd Sourc
FEMA, City Funds
Borough
Queens
Coun Dist
32
Comm Bord
QN-14
More Info
Work includes new building systems, roofing, and exterior repairs.
Link
http://www.nycgovparks.org/planning-and-building/planning/resiliency-plans
Department of Parks and Recreation
Mang Agen: Department of Parks and Recreation • Proj Name: Beach Open Up - Rockaway Entry Islands [Multisite] • Orrid: DPR361
Mang Agen
Department of Parks and Recreation
The Geom
{"type":"Point","coordinates":[-73.80996806291421,40.5849179148811]}
Proj Name
Beach Open Up - Rockaway Entry Islands [Multisite]
Orrid
DPR361
One Nyc
Buildings
Proj Val
54000000
Schedule
Completed
Comp Date
Q2 2013
Fnd Sourc
FEMA, City Funds
Borough
Queens
Coun Dist
32
Comm Bord
QN-14
More Info
Work includes new building systems, roofing, and exterior repairs.
Link
http://www.nycgovparks.org/planning-and-building/planning/resiliency-plans
Department of Parks and Recreation
Mang Agen: Department of Parks and Recreation • Proj Name: Beach Open Up - Rockaway Entry Islands [Multisite] • Orrid: DPR361
Mang Agen
Department of Parks and Recreation
The Geom
{"type":"Point","coordinates":[-73.82602906127575,40.58057691447251]}
Proj Name
Beach Open Up - Rockaway Entry Islands [Multisite]
Orrid
DPR361
One Nyc
Buildings
Proj Val
54000000
Schedule
Completed
Comp Date
Q2 2013
Fnd Sourc
FEMA, City Funds
Borough
Queens
Coun Dist
32
Comm Bord
QN-14
More Info
Work includes new building systems, roofing, and exterior repairs.
Link
http://www.nycgovparks.org/planning-and-building/planning/resiliency-plans
Department of Parks and Recreation
Mang Agen: Department of Parks and Recreation • Proj Name: Sunset Cove Edge Protection - Phase 2 • Orrid: DPR382
Mang Agen
Department of Parks and Recreation
The Geom
{"type":"Point","coordinates":[-73.82358371115674,40.59841663201287]}
Proj Name
Sunset Cove Edge Protection - Phase 2
Orrid
DPR382
One Nyc
Coastal Defense
Proj Val
500000
Schedule
Design
Fnd Sourc
NY Rising
Borough
Queens
Coun Dist
32
Comm Bord
QN-14
More Info
Work includes restoration of up to five acres of salt marsh and seven acres of coastal upland at Sunset Cove in Broad Channel.
Link
http://www.nycgovparks.org/planning-and-building/planning/resiliency-plans
Fire Department of the City of New York
Mang Agen: Fire Department of the City of New York • Proj Name: Engine 268 - Repairs • Orrid: FDNY013
Mang Agen
Fire Department of the City of New York
The Geom
{"type":"Point","coordinates":[-73.83819106289494,40.58087791486275]}
Proj Name
Engine 268 - Repairs
Orrid
FDNY013
One Nyc
Buildings
Proj Val
390000
Schedule
Completed
Comp Date
Q3 2013
Fnd Sourc
FEMA, City Funds
Borough
Queens
Coun Dist
32
Comm Bord
QN-14
More Info
Work includes replacement of drywall, floor tiles, and minor electrical repair.
Link
http://www1.nyc.gov/html/onenyc/visions/resilience.html