Capital Projects Dashboard - Citywide Budget and Schedule

All major capital infrastructure projects with a committed budget. Financial information and agency schedule details for each project are joined via FMS ID. Only projects in the design phase or later have project schedules displayed. This dataset is part of the Capital Projects Dashboard.

Note: Each row is uniquely identified by its Financial Management Service (FMS) ID. FMS ID is the unique ID that OMB uses for the FMS (Financial Information System). This ID can be universally joined with any OMB dataset that has the same field. The Capital Projects Dashboard is the result of joining OMB’s fiscal data with the agency’s schedule data. FMS IDs and agency projects don't always have a one-to-one relationship (i.e., one project schedule may correlate to multiple FMS IDs, and one FMS may correct to multiple projects with different schedules).

City Government Mayor's Office of Operations (OPS) Dataset fb86-vt7u 27 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: ACEDCA241
Reporting Period
202305
Managing Agency
DCAS
Fms Id
ACEDCA241
Total Budget
1395000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
BBG Conservatory Boiler Renovation
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn 01
Budget Line
PU-0025
Ten Year Plan Category
BUILDING CONSTRUCTION, RECONSTRUCTION OR RETROFIT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: ACEDEP211
Reporting Period
202305
Managing Agency
DCAS
Fms Id
ACEDEP211
Total Budget
31625000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
DEP - Modifications at East Delaware Tunnel - Neversink
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
PU-0025
Ten Year Plan Category
BUILDING CONSTRUCTION, RECONSTRUCTION OR RETROFIT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: ACEDEP212
Reporting Period
202305
Managing Agency
DCAS
Fms Id
ACEDEP212
Total Budget
4777000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
DEP - Variable Frequency Drives on Owl's Head WRRF Pumps
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn 10
Budget Line
PU-0025
Ten Year Plan Category
BUILDING CONSTRUCTION, RECONSTRUCTION OR RETROFIT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: ACEDEP213
Reporting Period
202305
Managing Agency
DCAS
Fms Id
ACEDEP213
Total Budget
10000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
DEP - Membrane Style Gasholder at Newtown Creek WRRF
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn 01
Budget Line
PU-0025
Ten Year Plan Category
BUILDING CONSTRUCTION, RECONSTRUCTION OR RETROFIT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: ACEDEP231
Reporting Period
202305
Managing Agency
DCAS
Fms Id
ACEDEP231
Total Budget
14201000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Aeration Upgrades at Owls Head WRRF
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn 01
Budget Line
PU-0025
Ten Year Plan Category
BUILDING CONSTRUCTION, RECONSTRUCTION OR RETROFIT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: ACEDEP901
Reporting Period
202305
Managing Agency
DCAS
Fms Id
ACEDEP901
Total Budget
35500000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
DEP - Gravity Belt Thickener (GBT) at Newtown Creek WRRF
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn 01
Budget Line
PU-0025
Ten Year Plan Category
BUILDING CONSTRUCTION, RECONSTRUCTION OR RETROFIT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: ACEDOE211
Reporting Period
202305
Managing Agency
DCAS
Fms Id
ACEDOE211
Total Budget
5444000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
DOE- Building Management System Upgrade
Current Phase
(Pending)
Borough
Bronx
Community Board
Bronx 01
Budget Line
PU-0025
Ten Year Plan Category
MISCELLANEOUS ENERGY EFFICIENCY AND SUSTAINABILITY
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: ACEDOE213
Reporting Period
202305
Managing Agency
DCAS
Fms Id
ACEDOE213
Total Budget
779000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
DOE - K007 - Lighting, HVAC, and BMS upgrade
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn 05
Budget Line
PU-0025
Ten Year Plan Category
BUILDING CONSTRUCTION, RECONSTRUCTION OR RETROFIT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: ACEDOE214
Reporting Period
202305
Managing Agency
DCAS
Fms Id
ACEDOE214
Total Budget
1797000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
DOE - K066 EER ECMs
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn 18
Budget Line
PU-0025
Ten Year Plan Category
BUILDING CONSTRUCTION, RECONSTRUCTION OR RETROFIT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: ACEDOE215
Reporting Period
202305
Managing Agency
DCAS
Fms Id
ACEDOE215
Total Budget
2020000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
DOE - M088 EER ECMs
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan 10
Budget Line
PU-0025
Ten Year Plan Category
BUILDING CONSTRUCTION, RECONSTRUCTION OR RETROFIT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: ACEDOE216
Reporting Period
202305
Managing Agency
DCAS
Fms Id
ACEDOE216
Total Budget
1243000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
DOE - M189 EER ECMs
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan 12
Budget Line
PU-0025
Ten Year Plan Category
BUILDING CONSTRUCTION, RECONSTRUCTION OR RETROFIT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: ACEDOE217
Reporting Period
202305
Managing Agency
DCAS
Fms Id
ACEDOE217
Total Budget
78000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
DOE - M477 EER ECMs
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
PU-0025
Ten Year Plan Category
BUILDING CONSTRUCTION, RECONSTRUCTION OR RETROFIT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: ACEDOS201
Reporting Period
202305
Managing Agency
DCAS
Fms Id
ACEDOS201
Total Budget
4085000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
DSNY - Rapid Roll Up Doors
Current Phase
(Pending)
Borough
Queens
Community Board
Queens 13
Budget Line
PU-0025
Ten Year Plan Category
BUILDING CONSTRUCTION, RECONSTRUCTION OR RETROFIT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: ACEDOS211
Reporting Period
202305
Managing Agency
DCAS
Fms Id
ACEDOS211
Total Budget
0.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
DSNY CHILLERS - Brooklyn 1 and 4 Sanitation Garage
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn 01
Budget Line
PU-0025
Ten Year Plan Category
BUILDING CONSTRUCTION, RECONSTRUCTION OR RETROFIT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: ACEDOT211
Reporting Period
202305
Managing Agency
DCAS
Fms Id
ACEDOT211
Total Budget
9017000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
DOT- 32-11 Harper St Envelope Improvements and Solar PV
Current Phase
(Pending)
Borough
Queens
Community Board
Queens 01
Budget Line
PU-0025
Ten Year Plan Category
MISCELLANEOUS ENERGY EFFICIENCY AND SUSTAINABILITY
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: ACEDOT221
Reporting Period
202305
Managing Agency
DCAS
Fms Id
ACEDOT221
Total Budget
141000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
DOT - HVAC and Lighting Upgrades at Fleet Services
Current Phase
(Pending)
Borough
Bronx
Community Board
Bronx 01
Budget Line
PU-0025
Ten Year Plan Category
MISCELLANEOUS ENERGY EFFICIENCY AND SUSTAINABILITY
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: ACEDOT222
Reporting Period
202305
Managing Agency
DCAS
Fms Id
ACEDOT222
Total Budget
1213000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
HVAC Upgrades at Fleet Services Maintenance and Repair
Current Phase
(Pending)
Borough
Bronx
Community Board
Bronx 01
Budget Line
PU-0025
Ten Year Plan Category
BUILDING CONSTRUCTION, RECONSTRUCTION OR RETROFIT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: ACEDPR223
Reporting Period
202305
Managing Agency
DCAS
Fms Id
ACEDPR223
Total Budget
700000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
DPR - Al Smith Windows and AC Replacement
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
PU-0025
Ten Year Plan Category
MISCELLANEOUS ENERGY EFFICIENCY AND SUSTAINABILITY
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: ACEFDN212
Reporting Period
202305
Managing Agency
DCAS
Fms Id
ACEFDN212
Total Budget
2783000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
FDNY - Various energy conservation measures at 8 Fire Houses
Current Phase
(Pending)
Borough
Bronx
Community Board
Bronx 06
Budget Line
PU-0025
Ten Year Plan Category
BUILDING CONSTRUCTION, RECONSTRUCTION OR RETROFIT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: ACEFIT211
Reporting Period
202305
Managing Agency
DCAS
Fms Id
ACEFIT211
Total Budget
2952000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
FIT - Replacement of Air Handling Units with higher efficien
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
PU-0025
Ten Year Plan Category
MISCELLANEOUS ENERGY EFFICIENCY AND SUSTAINABILITY
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: ACEFIT212
Reporting Period
202305
Managing Agency
DCAS
Fms Id
ACEFIT212
Total Budget
918000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
FIT - Replace Air Handling Unit with high efficiency
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
PU-0025
Ten Year Plan Category
MISCELLANEOUS ENERGY EFFICIENCY AND SUSTAINABILITY
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: ACEFIT213
Reporting Period
202305
Managing Agency
DCAS
Fms Id
ACEFIT213
Total Budget
684000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
FIT - COED Residence Hall - New fan coil
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan 05
Budget Line
PU-0025
Ten Year Plan Category
BUILDING CONSTRUCTION, RECONSTRUCTION OR RETROFIT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: ACEFIT221
Reporting Period
202305
Managing Agency
DCAS
Fms Id
ACEFIT221
Total Budget
3311000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
CUNY - FIT AIR HANDLING UNITS WITH HEAT RECOVERY 245 W 27 ST
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
PU-0025
Ten Year Plan Category
MISCELLANEOUS ENERGY EFFICIENCY AND SUSTAINABILITY
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: ACEHRA211
Reporting Period
202305
Managing Agency
DCAS
Fms Id
ACEHRA211
Total Budget
7154000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
HRA - BEDFORD STUYVESANT COMPREHENSIVE UPGRADES
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn 01
Budget Line
PU-0025
Ten Year Plan Category
BUILDING CONSTRUCTION, RECONSTRUCTION OR RETROFIT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: ACENPL222
Reporting Period
202305
Managing Agency
DCAS
Fms Id
ACENPL222
Total Budget
4978000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Comprehensive Upgrades - Grand Concourse Branch Library
Current Phase
(Pending)
Borough
Bronx
Community Board
Bronx 01
Budget Line
PU-0025
Ten Year Plan Category
BUILDING CONSTRUCTION, RECONSTRUCTION OR RETROFIT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: AG01NELS
Reporting Period
202305
Managing Agency
DCAS
Fms Id
AG01NELS
Total Budget
1090000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
DFTA - 1181 NELSON AVE, BX LEASE RENEWAL
Current Phase
(Pending)
Borough
Bronx
Community Board
Bronx 01
Budget Line
AG-0001
Ten Year Plan Category
DEPARTMENT FOR THE AGING BUILDING RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: AGHQ
Reporting Period
202305
Managing Agency
DCAS
Fms Id
AGHQ
Total Budget
33300000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
DFTA- relocation from 2 Lafayette St
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
AG-0001
Ten Year Plan Category
DEPARTMENT FOR THE AGING BUILDING RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: AGTIMEPLZ
Reporting Period
202305
Managing Agency
DCAS
Fms Id
AGTIMEPLZ
Total Budget
935000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
RAICES TIMES PLAZA SENIOR CENER UPGRADE
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
AG-0001
Ten Year Plan Category
DEPARTMENT FOR THE AGING BUILDING RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: APIBXMSM1
Reporting Period
202305
Managing Agency
DCAS
Fms Id
APIBXMSM1
Total Budget
1582000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Bronx Museum Atrium Reconstruction
Current Phase
(Pending)
Borough
Bronx
Community Board
Bronx 01
Budget Line
PU-0025
Ten Year Plan Category
BUILDING CONSTRUCTION, RECONSTRUCTION OR RETROFIT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: APIDCAS02
Reporting Period
202305
Managing Agency
DCAS
Fms Id
APIDCAS02
Total Budget
7425000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
BROOKLYN APPELLATE COURT COMPREHENSIVE ELECTRIFICATION
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn 01
Budget Line
PU-0025
Ten Year Plan Category
MISCELLANEOUS ENERGY EFFICIENCY AND SUSTAINABILITY
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: APINYPD01
Reporting Period
202305
Managing Agency
DCAS
Fms Id
APINYPD01
Total Budget
2246000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
100th PRECINCT COMPREHENSIVE ELECTRIFICATION
Current Phase
(Pending)
Borough
Queens
Community Board
Queens 01
Budget Line
PU-0025
Ten Year Plan Category
MISCELLANEOUS ENERGY EFFICIENCY AND SUSTAINABILITY
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: C75BULOVA
Reporting Period
202305
Managing Agency
DCAS
Fms Id
C75BULOVA
Total Budget
1016000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Reconstruction of Bulova Building Suite 330
Current Phase
(Pending)
Borough
Queens
Community Board
Queens
Budget Line
C-0075
Ten Year Plan Category
SUPPORT SPACE
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: CO264CADA
Reporting Period
202305
Managing Agency
DCAS
Fms Id
CO264CADA
Total Budget
589000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
CITYWIDE COURTS ADA LUMP SUM
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
CO-0264
Ten Year Plan Category
RECONSTRUCTION/RENOVATION OF COURT FACILITIES
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: CO264DCAS
Reporting Period
202305
Managing Agency
DCAS
Fms Id
CO264DCAS
Total Budget
161604000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
REHABILITATION OF VARIOUS COURT FACILITES
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
CO-0264
Ten Year Plan Category
RECONSTRUCTION/RENOVATION OF COURT FACILITIES
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: CO264MN60
Reporting Period
202305
Managing Agency
DCAS
Fms Id
CO264MN60
Total Budget
390404000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
DASNY - 60 CENTRE ST RENOVATION
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan
Budget Line
CO-0264
Ten Year Plan Category
RECONSTRUCTION/RENOVATION OF COURT FACILITIES
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: CO264SIMP
Reporting Period
202305
Managing Agency
DCAS
Fms Id
CO264SIMP
Total Budget
216508000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
DASNY - STATEN ISLAND MASTER PLAN- PHASE 2
Current Phase
(Pending)
Borough
Staten Island
Community Board
Staten Island 01
Budget Line
CO-0264
Ten Year Plan Category
CONSTRUCTION OF NEW COURT FACILITIES
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: CO272BLR
Reporting Period
202305
Managing Agency
DCAS
Fms Id
CO272BLR
Total Budget
18300000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
45 MONROE PL - BOILER PLANT UPGRADE
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn 01
Budget Line
CO-0272
Ten Year Plan Category
RECONSTRUCTION/RENOVATION OF COURT FACILITIES
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: CO276EXT2
Reporting Period
202305
Managing Agency
DCAS
Fms Id
CO276EXT2
Total Budget
4414000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
100 RICHMOND TERR- FAMILY CT/EXTERIOR
Current Phase
(Pending)
Borough
Staten Island
Community Board
Staten Island 01
Budget Line
CO-0276
Ten Year Plan Category
RECONSTRUCTION/RENOVATION OF COURT FACILITIES
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: CO277ADA
Reporting Period
202305
Managing Agency
DCAS
Fms Id
CO277ADA
Total Budget
500000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
25-10 COURT SQUARE - ADA LIFT REPLACEMENT
Current Phase
(Pending)
Borough
Queens
Community Board
Queens 01
Budget Line
CO-0277
Ten Year Plan Category
RECONSTRUCTION/RENOVATION OF COURT FACILITIES
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: CO278ADA1
Reporting Period
202305
Managing Agency
DCAS
Fms Id
CO278ADA1
Total Budget
12034000.00
Spend To Date
530094.42
Spend To Date 1
0.044
Fms Project Name
360 ADAMS ST - ADA IMPROVEMENTS
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn 01
Budget Line
CO-0278
Ten Year Plan Category
RECONSTRUCTION/RENOVATION OF COURT FACILITIES
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: CO278ELV
Reporting Period
202305
Managing Agency
DCAS
Fms Id
CO278ELV
Total Budget
23963000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
360 ADAMS ST.- ELEVATOR MODERNIZATION
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn 02
Budget Line
CO-0278
Ten Year Plan Category
RECONSTRUCTION/RENOVATION OF COURT FACILITIES
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: CO278RF
Reporting Period
202305
Managing Agency
DCAS
Fms Id
CO278RF
Total Budget
8037000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
360 ADAMS STREET - ROOF
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn 01
Budget Line
CO-0278
Ten Year Plan Category
RECONSTRUCTION/RENOVATION OF COURT FACILITIES
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: CO278TOIL
Reporting Period
202305
Managing Agency
DCAS
Fms Id
CO278TOIL
Total Budget
3350000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
360 ADAMS ST. - CODE COMPLIANT TOILET UPGRADE
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn 02
Budget Line
CO-0278
Ten Year Plan Category
RECONSTRUCTION/RENOVATION OF COURT FACILITIES
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: CO281ADA
Reporting Period
202305
Managing Agency
DCAS
Fms Id
CO281ADA
Total Budget
500000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
120 SCHERMERHORN ST- ADA LIFT REPLACEMENT
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn 01
Budget Line
CO-0281
Ten Year Plan Category
RECONSTRUCTION/RENOVATION OF COURT FACILITIES
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: CO283DANY
Reporting Period
202305
Managing Agency
DCAS
Fms Id
CO283DANY
Total Budget
2000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
100 CENTRE- 1 HOGAN PL ENTRANCE - SECURITY ENHANCEMENTS
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
CO-0283
Ten Year Plan Category
RECONSTRUCTION/RENOVATION OF COURT FACILITIES
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: CO283FIRE
Reporting Period
202305
Managing Agency
DCAS
Fms Id
CO283FIRE
Total Budget
15098524.80
Spend To Date
8777399.17
Spend To Date 1
0.5813
Fms Project Name
100 CENTRE ST.- FIRE SAFETY
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
CO-0283, PW-0077
Ten Year Plan Category
REHABILITATION OF CITY-OWNED OFFICE SPACE
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: CO283MP1
Reporting Period
202305
Managing Agency
DCAS
Fms Id
CO283MP1
Total Budget
2505268.00
Spend To Date
1643722.86
Spend To Date 1
0.6561
Fms Project Name
100 CENTRE ST- RETUBE BOILER 3 AND 4
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
CO-0283
Ten Year Plan Category
RECONSTRUCTION/RENOVATION OF COURT FACILITIES
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: CO283RF
Reporting Period
202305
Managing Agency
DCAS
Fms Id
CO283RF
Total Budget
6867000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
100 CENTRE ST- ROOF REHAB
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
CO-0283
Ten Year Plan Category
RECONSTRUCTION/RENOVATION OF COURT FACILITIES
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: CO283ST
Reporting Period
202305
Managing Agency
DCAS
Fms Id
CO283ST
Total Budget
480000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
100 CENTRE ST.- SURGE TANK REPLACEMENT
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
CO-0283
Ten Year Plan Category
RECONSTRUCTION/RENOVATION OF COURT FACILITIES
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DCAS • Fms Id: CO287R-1
Reporting Period
202305
Managing Agency
DCAS
Fms Id
CO287R-1
Total Budget
7697134.50
Spend To Date
5726134.50
Spend To Date 1
0.7439
Fms Project Name
DASNY - NEW STATEN ISLAND SUPREME COURT
Current Phase
(Pending)
Borough
Staten Island
Community Board
Staten Island 01
Budget Line
CO-0287
Ten Year Plan Category
CONSTRUCTION OF NEW COURT FACILITIES
Fms Data Date
2023-05-11T00:00:00.000