Active Projects - Public Buildings (Historical)

List of currently active buildings projects including description and high level schedule and budget range.

Housing & Development Department of Design and Construction (DDC) Dataset g9ub-hrve 9 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
LRCA17SCH
Project Id: LRCA17SCH • Description: SCHOMBURG - Renovation Phase II Passthrough • Client Agency: LIBRARIES-NYPL
Project Id
LRCA17SCH
Description
SCHOMBURG - Renovation Phase II Passthrough
Client Agency
LIBRARIES-NYPL
Division
Public Buildings
Phase
Construction
Projected Construction Completion
2022-12-31T00:00:00.000
Scope
The project is providing additional program space and overall upgrades to the facility including rehabilitation of major research support and building infrastructure.
Dollar Amount
$10M to 30M
Status
Active
PW77DCALED
Project Id: PW77DCALED • Description: 245 MESEROLE ST. - DCA TEST STATION REHABILITATION • Client Agency: DCAS
Project Id
PW77DCALED
Description
245 MESEROLE ST. - DCA TEST STATION REHABILITATION
Client Agency
DCAS
Division
Public Buildings
Phase
Procurement
Projected Construction Completion
2020-05-29T00:00:00.000
Scope
245 MESEROLE ST. - DCA TEST STATION REHABILITATION
Dollar Amount
$3M to 10M
Status
Active
PW77LYA
Project Id: PW77LYA • Description: 253 BROADWAY- LPC MOVE TO 2nd, 11th, 12th, 13th FLS • Client Agency: DCAS
Project Id
PW77LYA
Description
253 BROADWAY- LPC MOVE TO 2nd, 11th, 12th, 13th FLS
Client Agency
DCAS
Division
Public Buildings
Phase
Construction
Projected Construction Completion
2021-05-14T00:00:00.000
Scope
Renovate 4 floors of the building including upgrading the existing utilities for Landmark Preservation Commission
Dollar Amount
$30M to 100M
Status
Active
PW80DYCD-FA
Project Id: PW80DYCD-FA • Description: 2 LAFAYETTE STREET- DYCD RELOCATION • Client Agency: DCAS
Project Id
PW80DYCD-FA
Description
2 LAFAYETTE STREET- DYCD RELOCATION
Client Agency
DCAS
Division
Public Buildings
Phase
Construction
Projected Construction Completion
2019-12-31T00:00:00.000
Scope
Replacement of building wide fire alarm system
Dollar Amount
$30M to 100M
Status
Active
NC-61
Project Id: NC-61 • Description: NEWTOWN CREEK NATURE WALK PHASES 2 & 3 • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
NC-61
Description
NEWTOWN CREEK NATURE WALK PHASES 2 & 3
Client Agency
ENVIRONMENTAL PROTECTION
Division
Public Buildings
Phase
Construction
Projected Construction Completion
2020-08-15T00:00:00.000
Scope
The project consists of a new over-water pedestrian connector along the west side of the Whale Creek Canal which is perpendicular to the Newtown Creek. Phase II construction will provide access from the currently installed Phase I Nature Walk waterfront park project which was completed by DEP. Phase II construction includes pile supported metal decking structures leading to a future park which will be constructed by DDC under Phase III.
Dollar Amount
$10M to 30M
Status
Active
NC-61A
Project Id: NC-61A • Description: NEWTON CREEK NATURE WALK - PHSE 3 • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
NC-61A
Description
NEWTON CREEK NATURE WALK - PHSE 3
Client Agency
ENVIRONMENTAL PROTECTION
Division
Public Buildings
Phase
Construction
Projected Construction Completion
2021-03-14T00:00:00.000
Scope
On the demapped portion of Kingsland Avenue east of Whale Creek, Brooklyn, the construction of a gated and fenced garden with various plantings, walkways , shade structures, lighting signage as phase III of the Newtown Creek Nature Walk. Phase II which shall be constructed in the Whale Creek to connect the existing Phase I with the future garden of Phase III shall be tracked in Project Info as NC-61.
Dollar Amount
$10M to 30M
Status
Active
P109STARA
Project Id: P109STARA • Description: STARLIGHT PARK COMFORT STATION X147-111M • Client Agency: PARKS & RECREATION
Project Id
P109STARA
Description
STARLIGHT PARK COMFORT STATION X147-111M
Client Agency
PARKS & RECREATION
Division
Public Buildings
Phase
Construction
Projected Construction Completion
2020-01-07T00:00:00.000
Scope
Construction of a new 1800 sf comfort station and maintenance garage in Starlight Park, Bronx.
Dollar Amount
$1M to 3M
Status
Active
P1YANK15A
Project Id: P1YANK15A • Description: Bronx Children's Museum • Client Agency: PARKS & RECREATION
Project Id
P1YANK15A
Description
Bronx Children's Museum
Client Agency
PARKS & RECREATION
Division
Public Buildings
Phase
Construction
Projected Construction Completion
2020-05-15T00:00:00.000
Scope
The Bronx Childrens Museum and the New York City Department of Parks and Recreation (NYCDRP) will renovate and fit-out the 11,000 Sq Ft second floor of Building J at the Bronx Terminal Market as the new home of Bronx Childrens Museum (BXCM). The intent is to create exhibit space, interactive program spaces, creative workshops, and a community room to involve parents and children in learning activities. All required amenities, structural, and MEP work shall be included in the proposed designs. The scope also includes exterior and interior signage and lighting. Any requirement for acoustic separation within the museum space and from the first floor office space shall be considered. This project shall achieve minimum LEED Silver rating.
Dollar Amount
$10M to 30M
Status
Active
P-407BHI3
Project Id: P-407BHI3 • Description: BOWNE HOUSE INTERIOR RESTORATIONS • Client Agency: PARKS & RECREATION
Project Id
P-407BHI3
Description
BOWNE HOUSE INTERIOR RESTORATIONS
Client Agency
PARKS & RECREATION
Division
Public Buildings
Phase
Design
Projected Construction Completion
2022-03-15T00:00:00.000
Scope
The goal of the interior restoration is to preserve the intact historic fabric, including the distinctive wood
paneling in the living room, as well as the historic plaster and casing work. The project will address all of
the interior spaces on the first and second floors, including the restoration of the kitchen - reinstallation of
the floor and installation of new plaster finishes.

The restoration will include the upgrading of all systems including the electrical and plumbing, as well as
the introduction of an HVAC system for improved climate control and greater public use/access of the
house.

Design will include investigation of structural issues (condition of the interior beams and framing) and
investigation of potential contaminated/hazardous materials including lead paint and asbestos.
Dollar Amount
$3M to 10M
Status
Active
P-407KIN2
Project Id: P-407KIN2 • Description: Kingsland Homestead Roof/Floor Renovations • Client Agency: PARKS & RECREATION
Project Id
P-407KIN2
Description
Kingsland Homestead Roof/Floor Renovations
Client Agency
PARKS & RECREATION
Division
Public Buildings
Phase
Construction
Projected Construction Completion
2020-02-21T00:00:00.000
Scope
Kingsland Homestead is a historic farmhouse typical of those built in the New York area in the 18th
century. It serves as a museum, with public exhibits and scholarly archives on site. This project will
replace the failing roof. Funding permitting, this project will also address other needed elements,
including new wood floors and new window shutters.
Dollar Amount
$1M or less
Status
Active
P-413QCF1
Project Id: P-413QCF1 • Description: QUEENS CTY FARM MUSEUM PHASE 2 FARMLAND RESTORATION • Client Agency: PARKS & RECREATION
Project Id
P-413QCF1
Description
QUEENS CTY FARM MUSEUM PHASE 2 FARMLAND RESTORATION
Client Agency
PARKS & RECREATION
Division
Public Buildings
Phase
Procurement
Projected Construction Completion
2020-11-30T00:00:00.000
Scope
The project consists of restoring the reconstructed barn and garage buildings at the Queens County Farm Museum currently used for administrative and public gathering purposes. The scope includes installing new HVAC systems, improving the building envelope, structural changes and stabilization, exterior replacement of faux garage doors and ADA access ramp.
Dollar Amount
$3M to 10M
Status
Active
PO002-116
Project Id: PO002-116 • Description: NEW 116TH PCT • Client Agency: POLICE
Project Id
PO002-116
Description
NEW 116TH PCT
Client Agency
POLICE
Division
Public Buildings
Phase
Procurement
Projected Construction Completion
2022-04-05T00:00:00.000
Scope
Construction of a new precinct station house facility and associated site work for the new 116th Precinct.
Dollar Amount
$30M to 100M
Status
Active
PO141-40P
Project Id: PO141-40P • Description: NEW 40TH PRECINCT • Client Agency: POLICE
Project Id
PO141-40P
Description
NEW 40TH PRECINCT
Client Agency
POLICE
Division
Public Buildings
Phase
Construction
Projected Construction Completion
2021-06-25T00:00:00.000
Scope
Design and build a new Police Precinct with full cellar totalling 49,000 sq. ft. on an existing City owned property in the Bronx.
Dollar Amount
$30M to 100M
Status
Active
PO79-77FA
Project Id: PO79-77FA • Description: 77TH PRECINCT FIRE ALARM SYSTEM • Client Agency: POLICE
Project Id
PO79-77FA
Description
77TH PRECINCT FIRE ALARM SYSTEM
Client Agency
POLICE
Division
Public Buildings
Phase
Design
Projected Construction Completion
2023-10-19T00:00:00.000
Scope
Provide new non-proprietary open Architecture Code compliant fire alarm
system
Provide for integration or the capacity for future integration into a building
BMS/ Life Safety (DDC) System
Dollar Amount
$1M to 3M
Status
Active
PO79BMAHQ
Project Id: PO79BMAHQ • Description: ONE POLICE PLAZA PAVING AND LANDSCAPING • Client Agency: POLICE
Project Id
PO79BMAHQ
Description
ONE POLICE PLAZA PAVING AND LANDSCAPING
Client Agency
POLICE
Division
Public Buildings
Phase
Design
Projected Construction Completion
2021-08-21T00:00:00.000
Scope
Restoration of Plaza at One Police Plaza. Plaza has heaving. Check for leaks in concrete slab. Replace expansion joints. Install waterproofing membrane. Reinstall pavers,
Dollar Amount
$1M to 3M
Status
Active
PO79BMAHW
Project Id: PO79BMAHW • Description: 114TH PCT PLUMBING SYSTEM REPLACEMENT • Client Agency: POLICE
Project Id
PO79BMAHW
Description
114TH PCT PLUMBING SYSTEM REPLACEMENT
Client Agency
POLICE
Division
Public Buildings
Phase
Closeout
Projected Construction Completion
2019-10-22T00:00:00.000
Scope
Project scope is remediation of sewer back-up contamination;separation of storm and sanitary outflow within upper floors of building leading to basement trap/outflow. In addition, ponding condition in parking lot will be corrected.
Dollar Amount
$1M to 3M
Status
Active
PO79BMAIU
Project Id: PO79BMAIU • Description: FRONT DESK RECONSTRUCTION AT 20TH, 25TH, 30TH, 34TH PCTS • Client Agency: POLICE
Project Id
PO79BMAIU
Description
FRONT DESK RECONSTRUCTION AT 20TH, 25TH, 30TH, 34TH PCTS
Client Agency
POLICE
Division
Public Buildings
Phase
NA
Projected Construction Completion
2024-05-01T00:00:00.000
Scope
FRONT DESK RECONSTRUCTION AT 20TH, 25TH, 30TH, 34TH PCTS
Dollar Amount
$1M or less
Status
Active
PO79BMAJU
Project Id: PO79BMAJU • Description: 26TH PRECINCT ROOF, WINDOWS & FACADE • Client Agency: POLICE
Project Id
PO79BMAJU
Description
26TH PRECINCT ROOF, WINDOWS & FACADE
Client Agency
POLICE
Division
Public Buildings
Phase
Design
Projected Construction Completion
2023-05-01T00:00:00.000
Scope
Removal and replacement of roofing, façade and windows, masonry and plumbing. Disconnect and reconnect any electric power conduits or appurtenances that may interfere with aforementioned job, data and telephone lines attached or associated to the existing roof.
Dollar Amount
$3M to 10M
Status
Active
PO79FDBNX
Project Id: PO79FDBNX • Description: BRONX FRONT DESK REPLACEMENT 42ND, 44TH, 52ND, 108TH • Client Agency: POLICE
Project Id
PO79FDBNX
Description
BRONX FRONT DESK REPLACEMENT 42ND, 44TH, 52ND, 108TH
Client Agency
POLICE
Division
Public Buildings
Phase
Procurement
Projected Construction Completion
2021-07-14T00:00:00.000
Scope
TO PROVIDE FOR THE FRONT DESK REPLACEMENT AT THE 42ND, 44TH, 52ND AND 108TH PCT IN THE BRONX
Dollar Amount
$1M to 3M
Status
Active
PWCOMPDAT
Project Id: PWCOMPDAT • Description: Comptroller's Office Data Center Replacement at 1 Centre St. • Client Agency: DCAS
Project Id
PWCOMPDAT
Description
Comptroller's Office Data Center Replacement at 1 Centre St.
Client Agency
DCAS
Division
Public Buildings
Phase
Design
Projected Construction Completion
2022-03-11T00:00:00.000
Scope
Replacement of outdated Data Center and HVAC
Dollar Amount
$1M or less
Status
Active
PO79FDCW1
Project Id: PO79FDCW1 • Description: Front Desk Renovations for 45th, 75th, 105th, 123rd PCTS • Client Agency: POLICE
Project Id
PO79FDCW1
Description
Front Desk Renovations for 45th, 75th, 105th, 123rd PCTS
Client Agency
POLICE
Division
Public Buildings
Phase
Design
Projected Construction Completion
2023-08-23T00:00:00.000
Scope
DDC shall furnish Contract documents, (drawings and specifications) labor, materials, equipment and appliances necessary and required to build and install a new front desk, and other miscellaneous work.
DDC should verify all existing conditions, existing utilities to be located and/or replaced.
Demolition and removal of existing front desk.
Removal/relocation of existing outlets, data and telephone lines.
e) New wood platform and clean/polish existing aluminum railing and gate.
Dollar Amount
$1M or less
Status
Active
PO79FDQNS
Project Id: PO79FDQNS • Description: QUEENS FRONT DESK REPLACEMENT 104TH, 109TH, 114TH, 115TH • Client Agency: POLICE
Project Id
PO79FDQNS
Description
QUEENS FRONT DESK REPLACEMENT 104TH, 109TH, 114TH, 115TH
Client Agency
POLICE
Division
Public Buildings
Phase
NA
Projected Construction Completion
2023-05-01T00:00:00.000
Scope
To Provide for the front desk (Sargent's Desk ) replacement AT 104th, 109th, 67th, 46th precincts located in Queens, Brooklyn and Bronx NY.
Dollar Amount
$1M or less
Status
Active
PO79GENER
Project Id: PO79GENER • Description: GENERATOR REPLACEMENT AT VARIOUS PRECINCTS • Client Agency: POLICE
Project Id
PO79GENER
Description
GENERATOR REPLACEMENT AT VARIOUS PRECINCTS
Client Agency
POLICE
Division
Public Buildings
Phase
Construction
Projected Construction Completion
2020-09-24T00:00:00.000
Scope
Removal and replacement of generators and associated accessories. The new generators will be permanently affixed to the Precincts.
Dollar Amount
$3M to 10M
Status
Active
PO79ROD
Project Id: PO79ROD • Description: NEW FIREARMS TRAINING FACILITY • Client Agency: POLICE
Project Id
PO79ROD
Description
NEW FIREARMS TRAINING FACILITY
Client Agency
POLICE
Division
Public Buildings
Phase
Design
Projected Construction Completion
2025-09-07T00:00:00.000
Scope
Provide design and construction administration services for a consolidated state of the art secure training facility and compound. The facility shall consist of new partially baffled outdoor ranges, a tactical training village, a training/administration building and associated security and infrastructure improvements.

To consolidate and provide a Firearms Training facility that meets modern Firearms and Tactical Training standards. To provide sheltered firearm ranges that will mitigate noise pollution for adjacent neighborhoods, reduce hazardous waste removals and provide appropriate infrastructure in a secure compound.
Dollar Amount
$100M to 500M
Status
Active
PO79SHOPR
Project Id: PO79SHOPR • Description: SERVICE SHOP #6 ROOF RENOVATION • Client Agency: POLICE
Project Id
PO79SHOPR
Description
SERVICE SHOP #6 ROOF RENOVATION
Client Agency
POLICE
Division
Public Buildings
Phase
Design
Projected Construction Completion
2023-04-30T00:00:00.000
Scope
TO PROVIDE LABOR AND MATERIALS FOR THE SERVICE SHOP #6 ROOF RENOVATION AND FACADE REHABILITATION, LOCATED 151 30TH STREET BROOKLYN NY
Dollar Amount
$3M to 10M
Status
Active
PO79WNDWS
Project Id: PO79WNDWS • Description: HWY UNIT 3, 67TH, 76TH, 111TH PCT WINDOW RPLCMNT • Client Agency: POLICE
Project Id
PO79WNDWS
Description
HWY UNIT 3, 67TH, 76TH, 111TH PCT WINDOW RPLCMNT
Client Agency
POLICE
Division
Public Buildings
Phase
Design
Projected Construction Completion
2024-05-07T00:00:00.000
Scope
Remove existing windows/replace with new at 4 precincts (67,76,111,Hwy 3.)
Dollar Amount
$3M to 10M
Status
Active
PROCONTRL
Project Id: PROCONTRL • Description: Project Controls Management Services • Client Agency: UNKNOWN
Project Id
PROCONTRL
Description
Project Controls Management Services
Client Agency
UNKNOWN
Division
Public Buildings
Phase
NA
Projected Construction Completion
2030-12-31T00:00:00.000
Scope
This is a project controls pilot program that engages consultants in support of project controls. The objective of the pilot program is to analyze project data to positively influence cost and schedule of the projects supported.
Dollar Amount
$1M to 3M
Status
Active
PV001SELM
Project Id: PV001SELM • Description: LAH - Louis Armstrong House - Administration Facility • Client Agency: CULTURAL AFFAIRS
Project Id
PV001SELM
Description
LAH - Louis Armstrong House - Administration Facility
Client Agency
CULTURAL AFFAIRS
Division
Public Buildings
Phase
Design
Projected Construction Completion
2022-07-18T00:00:00.000
Scope
Complete rehabilitation/restoration of the house at: 34-52 107th Street, (Admin. Facility)
from basement to roof (interior & exterior)
Non City owned
Dollar Amount
$1M to 3M
Status
Active
PV002CULT
Project Id: PV002CULT • Description: Culture Shed, Construction • Client Agency: CULTURAL AFFAIRS
Project Id
PV002CULT
Description
Culture Shed, Construction
Client Agency
CULTURAL AFFAIRS
Division
Public Buildings
Phase
Construction
Projected Construction Completion
2020-10-21T00:00:00.000
Scope
Tower D BIN: 1089411. CS Fixed Building will be an Alt 1 to Tower D, so should have the same BIN.

Site block/lot: Block 702, parts of Lots 4 and 10
Site address: 545 West 30th Street, NY NY 10001
Anticipated construction completion date for the fixed building, phase 1, is Oct 16, 2019.

The Culture Shed is a brand new cultural facility (“the Culture Shed facility”) of approximately 199,000 square feet that will be located on West 30th Street in the Eastern Rail Yards at the Hudson Yards. The facility will be a multi-purpose venue. Culture Shed will produce and present a full calendar of events in its architecturally dynamic spaces that include galleries as well as flexible spaces to accommodate a range of performance disciplines.

The Culture Shed facility includes a non-moving, fixed building (the “Culture Shed Building”) and a moving, retractable shed (the “Shed”) that may be deployed over the Culture Shed Plaza (“the Plaza”) to the east of the Culture Shed Building to provide additional indoor or covered outdoor space for exhibitions and other programming.

Phase 1, “The Project” (the Culture Shed Building) is the subject of this CCG application. Phases 2 and 3 are not the subject of this CCG application, but are described below to provide a full description of the entire Culture Shed facility and the context for Phase 1.

The overall Culture Shed facility will consist of the following phases:

• Phase 1: The Culture Shed Building: This portion of the facility is referred to as the “fixed building”. It is an 84,733 square foot, 107 foot tall, seven story structure containing museum-quality exhibition and performance galleries, a café, a roof gallery, circulation, and support spaces. It features expansive column-free floor plates that are suitable for the presentation of exhibitions and a wide range of performance productions and will include all the essential operating infrastructure to produce visual art exhibits, performances, and events. The Culture Shed will only initiate Phase 1 in concert with the building of the Tower D core and shell where the mechanical, electrical, plumbing, and life safety systems that serve the fixed building reside. These systems are included in the Phase 1 scope. Phase 1 is “The Project” that is the subject of this CCG application. Anticipated construction completion date is Oct 16, 2019

• Phase 2: The Shed and the Plaza: The Shed is a 125 foot tall movable structure comprised of 3 sides (north, east,south) and a roof. Its western side is open and is filled by the eastern face of the Culture Shed Building to which it is connected. In the nested position, the Shed covers the Culture Shed Building (north, east, south, overhead). In the deployed position, the Shed no longer covers the Culture Shed Building, but is still connected to it at the fixed building’s easternmost façade. The Plaza is an 18,000 square foot open space directly east of the Culture Shed Building. When deployed, the Shed covers the Plaza creating a large, tall, and flexible space for a multitude of programming. When the Shed is not deployed (ie it is nested over the Culture Shed Building), the Plaza will be completely open-air and used for a variety of cultural activities that will be open to the public. Phase 2 is part of the overall Culture Shed facility, but is not included in “The Project” that is the subject of this CCG application.

• Phase 3: Portions of Culture Shed in Tower D and the Podium: Portions of the Culture Shed facility, primarily back office, service facilities, and mechanical rooms will be located in the residential building currently known as Tower D to be developed by the Eastern Rail Yard (ERY) Developer, Related Properties. Tower D is located on the east side of Eleventh Avenue between West 30th and West 31st Streets, immediately west of and adjacent to the Culture Shed Building. The portions of the Culture Shed facility within Tower D are easily accessible from the Culture Shed Building as they are co-level, adjacent, and separated only by a structural construction joint.

Portions of the Culture Shed facility, primarily lobbies, restrooms, coffee bar, bookstore, back offices, catering kitchen, loading and service facilities, and mechanical rooms will also be located in the Podium. The Podium is defined as the area below plaza level, below the Culture Shed Building and the Plaza,that is to be developed by Related Properties. The portions of the Culture Shed facility within the Podium are easily accessible from the Culture Shed Building above via stairs and elevators.

Culture Shed Inc. is responsible for reimbursing Related Properties for the core and shell construction of the portions of Tower D and the Podium occupied by the Culture Shed facility (foundations, floor and roof structure, slabs,roofing, waterproofing, and curtainwall). Culture Shed Inc. is responsible for construction and payment for the fit-out of these spaces (interior partitions, finishes, vertical transporation, glazing, etc.) by its own construction manager. Phase 3 is part of the overall Culture Shed facility, but is not included in “The Project” that is the subject of this CCG application.
Dollar Amount
$30M to 100M
Status
Active
PV019-REN
Project Id: PV019-REN • Description: ALV - Alvin Ailey Dance Building Renovation/Addition • Client Agency: CULTURAL AFFAIRS
Project Id
PV019-REN
Description
ALV - Alvin Ailey Dance Building Renovation/Addition
Client Agency
CULTURAL AFFAIRS
Division
Public Buildings
Phase
Construction
Projected Construction Completion
2021-04-30T00:00:00.000
Scope
ALVIN AILEY DANCE FOUNDATION, INC: NEW BUILDING ADDITION AND RENOVATION; Program transferred 4/21/17.
Dollar Amount
$3M to 10M
Status
Active
PV028-ISS
Project Id: PV028-ISS • Description: Issue Project Room - interior fitout • Client Agency: CULTURAL AFFAIRS
Project Id
PV028-ISS
Description
Issue Project Room - interior fitout
Client Agency
CULTURAL AFFAIRS
Division
Public Buildings
Phase
Procurement
Projected Construction Completion
2022-02-21T00:00:00.000
Scope
A 4,600 sq. ft. theater renovation for multi disciplinary and new media arts performances.



Estimated Construction Cost: $2.5M

Approved Design CP Amount $596,668

Design CP Breakdown:
WORK AC $555,620
Commissioning allowance $40,000

Construction CP's:
PH1 JOCS - Acoustic wall $171,898.51
sibmitted on 5/15/14 to CBA
Dollar Amount
$3M to 10M
Status
Active
PV034NWCH
Project Id: PV034NWCH • Description: AMNH - Northwest Coast Hall Renovation • Client Agency: CULTURAL AFFAIRS
Project Id
PV034NWCH
Description
AMNH - Northwest Coast Hall Renovation
Client Agency
CULTURAL AFFAIRS
Division
Public Buildings
Phase
Design
Projected Construction Completion
2023-06-01T00:00:00.000
Scope
The work associated with the total proposed project includes the removal of HVAC in 1997 under City-funded Pass-Through PVC034-S. The project will not disturb or demolish any other City-funded improvements; the existing lighting that was previously funded by the PV034CPWR will remain intact. PV034-S is beyond the useful life of the registered Pass-Through and the bonds are expired.
Dollar Amount
$3M to 10M
Status
Active
PV040ELEV
Project Id: PV040ELEV • Description: FTH - Flushing Town Hall Elevator Replacement • Client Agency: CULTURAL AFFAIRS
Project Id
PV040ELEV
Description
FTH - Flushing Town Hall Elevator Replacement
Client Agency
CULTURAL AFFAIRS
Division
Public Buildings
Phase
Design
Projected Construction Completion
2022-12-30T00:00:00.000
Scope
Replacement of elevator hydraulics and related electrical work, carpentry work, and flooring replacement
Dollar Amount
$1M or less
Status
Active
PV072HVAC
Project Id: PV072HVAC • Description: BHS - Brooklyn Historic Society HVAC Replacement • Client Agency: CULTURAL AFFAIRS
Project Id
PV072HVAC
Description
BHS - Brooklyn Historic Society HVAC Replacement
Client Agency
CULTURAL AFFAIRS
Division
Public Buildings
Phase
Initiation
Projected Construction Completion
2023-02-17T00:00:00.000
Scope
BROOKLYN HISTORIC SOCIETY: Climate Control Upgrade: Chiller, cooling tower, air handling units
Dollar Amount
$3M to 10M
Status
Active
PV122-DTH
Project Id: PV122-DTH • Description: DTH - Dance Theater of Harlem - Boiler Replacement • Client Agency: CULTURAL AFFAIRS
Project Id
PV122-DTH
Description
DTH - Dance Theater of Harlem - Boiler Replacement
Client Agency
CULTURAL AFFAIRS
Division
Public Buildings
Phase
Procurement
Projected Construction Completion
2022-07-26T00:00:00.000
Scope
HVAC Replacement & Systems Upgrade
Dollar Amount
$10M to 30M
Status
Active
PV132DCTV
Project Id: PV132DCTV • Description: DCTV - DOWNTOWN COMMUNITY TELEVISION RENOVATION • Client Agency: CULTURAL AFFAIRS
Project Id
PV132DCTV
Description
DCTV - DOWNTOWN COMMUNITY TELEVISION RENOVATION
Client Agency
CULTURAL AFFAIRS
Division
Public Buildings
Phase
Construction
Projected Construction Completion
2021-06-29T00:00:00.000
Scope
Renovation of building to create independent media center in Lower Manhattan. $43K OV0N132 o/l 005 txf to 850 PV467DCTV to cover cons contract close out. per DCLA/AHB 2 26 16.
Dollar Amount
$1M to 3M
Status
Active
PV143INFR
Project Id: PV143INFR • Description: EKC - Elaine Kaufman Center - Infrastructure Phase One • Client Agency: CULTURAL AFFAIRS
Project Id
PV143INFR
Description
EKC - Elaine Kaufman Center - Infrastructure Phase One
Client Agency
CULTURAL AFFAIRS
Division
Public Buildings
Phase
NA
Projected Construction Completion
2022-09-26T00:00:00.000
Scope
EKC - Elaine Kaufman Center - Infrastructure Phase One
Dollar Amount
$1M or less
Status
Active
PV175ROOF
Project Id: PV175ROOF • Description: SIZ - Roof Replacement • Client Agency: CULTURAL AFFAIRS
Project Id
PV175ROOF
Description
SIZ - Roof Replacement
Client Agency
CULTURAL AFFAIRS
Division
Public Buildings
Phase
Construction
Projected Construction Completion
2021-05-05T00:00:00.000
Scope
Staten Island Zoo - 16,000 Roof and Canopy Restoration
Dollar Amount
$3M to 10M
Status
Active
PV176CESU
Project Id: PV176CESU • Description: WCS - Bronx Zoo - Con Ed Switchgear Upgrade • Client Agency: CULTURAL AFFAIRS
Project Id
PV176CESU
Description
WCS - Bronx Zoo - Con Ed Switchgear Upgrade
Client Agency
CULTURAL AFFAIRS
Division
Public Buildings
Phase
Procurement
Projected Construction Completion
2022-09-21T00:00:00.000
Scope
Upgrade of Bronx Zoo's electrical service and equipment to enable the facility to receive power back up from Con Edison.
Dollar Amount
$10M to 30M
Status
Active
PV204-LOB
Project Id: PV204-LOB • Description: JALC - Jazz at Lincoln Center Lobby Reconfiguration • Client Agency: CULTURAL AFFAIRS
Project Id
PV204-LOB
Description
JALC - Jazz at Lincoln Center Lobby Reconfiguration
Client Agency
CULTURAL AFFAIRS
Division
Public Buildings
Phase
Construction
Projected Construction Completion
2020-03-20T00:00:00.000
Scope
Jazz at Lincoln Center Lobby Reconfiguration
Dollar Amount
$3M to 10M
Status
Active
PV205CONS
Project Id: PV205CONS • Description: NYBG - NY Botanical Garden - Conservatory Dome/Boiler Rep. • Client Agency: CULTURAL AFFAIRS
Project Id
PV205CONS
Description
NYBG - NY Botanical Garden - Conservatory Dome/Boiler Rep.
Client Agency
CULTURAL AFFAIRS
Division
Public Buildings
Phase
Construction
Projected Construction Completion
2022-05-31T00:00:00.000
Scope
The Conservatory at the New York Botanical Garden is made up of 11 Greenhouses (Houses 1 through 11). This project will restore components of House 6 not restored in the 1990 restoration, which include but are not limited to: the compression ring; high performance coatings; the cupola; upgrades of the public restrooms; boiler, heating and distribution systems; exhibition and path lighting; roofing systems; exterior cast iron entablature and courtyard paving.
Dollar Amount
$10M to 30M
Status
Active
PV235ELEV
Project Id: PV235ELEV • Description: BMA - Brooklyn Museum - Bldg. Elevators/Electrical Upgrades • Client Agency: CULTURAL AFFAIRS
Project Id
PV235ELEV
Description
BMA - Brooklyn Museum - Bldg. Elevators/Electrical Upgrades
Client Agency
CULTURAL AFFAIRS
Division
Public Buildings
Phase
Construction
Projected Construction Completion
2022-12-30T00:00:00.000
Scope
For each of four elevators (one freight, one staff, and two public elevators) remove existing controllers, motors, deflector sheaves, hoist cables, rope brakes, governor cable, tracks, hangers, interlocks and closers, roller guides, intercom, cab controls, and floor controls and install new. For each of four elevators install new cab controls, lighting and ceilings and new wall and floor finishes over existing framing.
Dollar Amount
$1M to 3M
Status
Active
PV236SGD3
Project Id: PV236SGD3 • Description: BBG - Brooklyn Botanic Garden - South Garden Dev. Phase 3 • Client Agency: CULTURAL AFFAIRS
Project Id
PV236SGD3
Description
BBG - Brooklyn Botanic Garden - South Garden Dev. Phase 3
Client Agency
CULTURAL AFFAIRS
Division
Public Buildings
Phase
Construction
Projected Construction Completion
2021-01-29T00:00:00.000
Scope
The Rehabilitation of an approximately ten and a half acre portion of the Brooklyn Botanic Garden
Dollar Amount
$10M to 30M
Status
Active
PV241EXTR
Project Id: PV241EXTR • Description: MCNY - Exterior Facade Rehabilitation • Client Agency: CULTURAL AFFAIRS
Project Id
PV241EXTR
Description
MCNY - Exterior Facade Rehabilitation
Client Agency
CULTURAL AFFAIRS
Division
Public Buildings
Phase
Design
Projected Construction Completion
2022-02-03T00:00:00.000
Scope
Exterior Rehabilitation and Restoration
Dollar Amount
$3M to 10M
Status
Active
PV262-AUD
Project Id: PV262-AUD • Description: Brooklyn Children's Museum Auditorium • Client Agency: CULTURAL AFFAIRS
Project Id
PV262-AUD
Description
Brooklyn Children's Museum Auditorium
Client Agency
CULTURAL AFFAIRS
Division
Public Buildings
Phase
Construction
Projected Construction Completion
2021-07-23T00:00:00.000
Scope
Theatre Fit-out including seating, finishes and audio visual systems.
Dollar Amount
$3M to 10M
Status
Active
PV262-RTW
Project Id: PV262-RTW • Description: BCM - Brooklyn Children's Museum Retaining Wall • Client Agency: CULTURAL AFFAIRS
Project Id
PV262-RTW
Description
BCM - Brooklyn Children's Museum Retaining Wall
Client Agency
CULTURAL AFFAIRS
Division
Public Buildings
Phase
Design
Projected Construction Completion
2023-08-24T00:00:00.000
Scope
Retaining wall reconstruction and outdoor space improvements
Dollar Amount
$3M to 10M
Status
Active
PV266-EXT
Project Id: PV266-EXT • Description: MIN - Mind-Builders Exterior Renovation • Client Agency: CULTURAL AFFAIRS
Project Id
PV266-EXT
Description
MIN - Mind-Builders Exterior Renovation
Client Agency
CULTURAL AFFAIRS
Division
Public Buildings
Phase
Construction
Projected Construction Completion
2020-04-22T00:00:00.000
Scope
Exterior renovation:
Façade restoration, including brick repointing and replacement as req'd, and window replacement. Façade Area: approx. 12,000sf.
Dollar Amount
$1M to 3M
Status
Active
PV272EDUC
Project Id: PV272EDUC • Description: QBG - Queens Botanical Garden Educ Bldg Renovation • Client Agency: CULTURAL AFFAIRS
Project Id
PV272EDUC
Description
QBG - Queens Botanical Garden Educ Bldg Renovation
Client Agency
CULTURAL AFFAIRS
Division
Public Buildings
Phase
Design
Projected Construction Completion
2024-03-04T00:00:00.000
Scope
New education building at Queens Botanical Garden (QBG). Design and construction of a new 14,500 SF building to provide year-round programming and educational spaces to serve students, children, community gardeners, and others.
The New Education Building will add six new teaching spaces, including four classrooms, a teaching kitchen and a teaching greenhouse where educators will be able to grow and maintain plants for educational purposes. Ideally, the four regular classrooms will be able to opened up into one large space to accommodate larger training programs.
Dollar Amount
$10M to 30M
Status
Active
PV274CHLL
Project Id: PV274CHLL • Description: NYHOS - New York Hall of Science - Chiller Replacement • Client Agency: CULTURAL AFFAIRS
Project Id
PV274CHLL
Description
NYHOS - New York Hall of Science - Chiller Replacement
Client Agency
CULTURAL AFFAIRS
Division
Public Buildings
Phase
Procurement
Projected Construction Completion
2022-11-14T00:00:00.000
Scope
Existing chillers and pumps are approximately 25 years old and they are at the end of their life cycle.
They are no longer energy efficient and environmentally friendly. New chillers should provide energy
savings, reduce greenhouse gas emissions, and improve visitors experience due to better climate control
in the building.

Replacement of two obsolete chillers
• Replacement of three chilled water and three condensate water pumps associated with chillers
• Replacement of controls for chillers and pumps and connecting them to Building Management
Control System
Dollar Amount
$3M to 10M
Status
Active
PV274KITR
Project Id: PV274KITR • Description: NYHOS - NY Hall of Science,Great Hall, Kitchen & Restroom • Client Agency: CULTURAL AFFAIRS
Project Id
PV274KITR
Description
NYHOS - NY Hall of Science,Great Hall, Kitchen & Restroom
Client Agency
CULTURAL AFFAIRS
Division
Public Buildings
Phase
Procurement
Projected Construction Completion
2021-05-25T00:00:00.000
Scope
Existing kitchen and restrooms are approximately 25 years old. Kitchen equipment is outdated and of it is not in working condition. Reconstructed kitchen and restrooms will improve visitors experience by providing additional services to the public.

• Reconstruction of women’s and men’s restrooms
• Reconstruction and upgrade of existing kitchen
Dollar Amount
$1M to 3M
Status
Active