PW357ELEV
Project Id: PW357ELEV • Description: 253 BROADWAY- ELEVATOR MODERNIZATION • Client Agency: DCAS
Project Id
PW357ELEV
Description
253 BROADWAY- ELEVATOR MODERNIZATION
Client Agency
DCAS
Division
Public Buildings
Phase
Construction
Projected Construction Completion
2020-04-22T00:00:00.000
Scope
The scope of work includes replacement of 5 existing elevators with new passenger cars and installation of new main machine and controls. proper efficient operation and to meet the current Federal ADA requirements, ASME A17.7 Safety code of elevators and local building codes. The machine room is to be renovated with new air conditioning system.
Dollar Amount
$3M to 10M
Status
Active
PW357FIRE
Project Id: PW357FIRE • Description: 253 BROADWAY- FIRE ALARM REPLACEMENT • Client Agency: DCAS
Project Id
PW357FIRE
Description
253 BROADWAY- FIRE ALARM REPLACEMENT
Client Agency
DCAS
Division
Public Buildings
Phase
Design
Projected Construction Completion
2022-03-04T00:00:00.000
Scope
Installation of new building wide fire alarm, sprinkler distribution and BMS system throughout building
Dollar Amount
$10M to 30M
Status
Active
PW77102S3
Project Id: PW77102S3 • Description: CITY HALL STEPS RECONSTRUCTION • Client Agency: DCAS
Project Id
PW77102S3
Description
CITY HALL STEPS RECONSTRUCTION
Client Agency
DCAS
Division
Public Buildings
Phase
Design
Projected Construction Completion
2021-07-21T00:00:00.000
Scope
City Hall Park - Steps Reconstruction: Replace deteriorating steps, and stop leakage into basement.
Dollar Amount
$3M to 10M
Status
Active
PW77417DA
Project Id: PW77417DA • Description: 120-55 QUEENS BLVD.- QUEENS DA TRAINING ROOM • Client Agency: DCAS
Project Id
PW77417DA
Description
120-55 QUEENS BLVD.- QUEENS DA TRAINING ROOM
Client Agency
DCAS
Division
Public Buildings
Phase
Procurement
Projected Construction Completion
2021-05-05T00:00:00.000
Scope
Ineterior renovation of vacated marriage bureau space on basement and first floor levels, including installation of new partitions, electrical, lighting and HVAC system that supports high occupancy areas such as classrooms and waiting room areas.
Dollar Amount
$1M to 3M
Status
Active
PW77417P2
Project Id: PW77417P2 • Description: 120-55 QUEENS BLVD - PLAZA, STEPS AND ENTRANCE • Client Agency: DCAS
Project Id
PW77417P2
Description
120-55 QUEENS BLVD - PLAZA, STEPS AND ENTRANCE
Client Agency
DCAS
Division
Public Buildings
Phase
Procurement
Projected Construction Completion
2021-06-15T00:00:00.000
Scope
Repair of all displaced stair treads. level pavement to provide a safe and healthy
working environment.

Building plaza steps. and entry 's should be code/ADA compliant to prohibit
discrimination and ensure equal opportunity (or persons with disabilities.
Dollar Amount
$3M to 10M
Status
Active
REMPIV
Project Id: REMPIV • Description: Remsen Yard Reconstruction Phase IV • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
REMPIV
Description
Remsen Yard Reconstruction Phase IV
Client Agency
ENVIRONMENTAL PROTECTION
Division
Public Buildings
Phase
Procurement
Projected Construction Completion
2021-01-29T00:00:00.000
Scope
Modifications to the existing building to achieve OSHA compliance and provide operational improvements to reduce resource consumption by operation staff maintaining the building.
Dollar Amount
$1M to 3M
Status
Active
S136-367
Project Id: S136-367 • Description: Staten Island 1 and 3 Garage Construction + SOLARGR10 • Client Agency: SANITATION
Project Id
S136-367
Description
Staten Island 1 and 3 Garage Construction + SOLARGR10
Client Agency
SANITATION
Division
Public Buildings
Phase
Procurement
Projected Construction Completion
2022-12-31T00:00:00.000
Scope
Construction of new garage to serve Staten Island Districts 1 and 3. Relocate Staten Island District 1 and 3 Garage operations to the newly constructed garage. The existing building containing the Staten Island 3 Garage and Richmond Borough Repair Shop will be rehabilitated, maintaining and expanding the building's use for the Borough Repair Shop and accommodating District 1 and 3 Garage Vehicular Storage Facility for weather sensitive vehicles. Develop site facilities including a 2,000 ton capacity salt shed, a free-standing fueling facility, open-air household waste drop-off area, outdoor DSNY truck and personnel parking and a potential new force main sanitary line to connect to the NYC DEP system.
Dollar Amount
$100M to 500M
Status
Active
S136-383N
Project Id: S136-383N • Description: Brooklyn 17/18 HVAC and Roof Replacement • Client Agency: SANITATION
Project Id
S136-383N
Description
Brooklyn 17/18 HVAC and Roof Replacement
Client Agency
SANITATION
Division
Public Buildings
Phase
Design
Projected Construction Completion
2022-06-30T00:00:00.000
Scope
Roof and HVAC Replacement + Solar
Dollar Amount
$10M to 30M
Status
Active
S136-383S
Project Id: S136-383S • Description: STATEN ISLAND 3 GARAGE HVAC • Client Agency: SANITATION
Project Id
S136-383S
Description
STATEN ISLAND 3 GARAGE HVAC
Client Agency
SANITATION
Division
Public Buildings
Phase
Procurement
Projected Construction Completion
2021-03-30T00:00:00.000
Scope
Replacement of roof system and all HVAC equipment with all of mechanical and electrical work associated. Design a new rooftop solar PV (Photovoltaic) system. Provide a new Building Management System. Provide a new Fire Alarm System.
Dollar Amount
$10M to 30M
Status
Active
S136-419L
Project Id: S136-419L • Description: OAU Offices Expansion at CRS • Client Agency: SANITATION
Project Id
S136-419L
Description
OAU Offices Expansion at CRS
Client Agency
SANITATION
Division
Public Buildings
Phase
Procurement
Projected Construction Completion
2021-06-11T00:00:00.000
Scope
This project consists of interior renovation in multiple locations within DSNY Central Repair Shop (CRS). Work in the Fourth Floor includes modifications to the existing Air handling Unit "AC-2" and duct system that serves the project area, and interior finish work required in conjunction with the ductwork modification. Work on the Fifth Floor consists of a full renovation of the DSNY Operations Assistance Unit (OAU) Office suite including office space, toilet rooms, and an employee breakroom. Work on the Sixth Floor includes a full renovation of the OAU Satellite Office and work in the separate DSNY Queens West Borough Operations Office related to the upgrade of AC-2. Roof level work includes the installation of a new rooftop package unit that will serve the sixth floor OAU Satellite Office and the installation of an exhaust duct termination to serve the fifth floor OAU office breakroom.
Dollar Amount
$1M to 3M
Status
Active
S136-423
Project Id: S136-423 • Description: Queens 11/13 FLOOR SLAB REPLACEMENT • Client Agency: SANITATION
Project Id
S136-423
Description
Queens 11/13 FLOOR SLAB REPLACEMENT
Client Agency
SANITATION
Division
Public Buildings
Phase
Design
Projected Construction Completion
2023-07-31T00:00:00.000
Scope
A Condition Assessment Report dated September 4, 2014 and a Rehabilitation Analysis and Recommendations report dated December 8, 2014 were prepared by The Burns Group and Greeley & Hansen. Also DDC issued a Field Inspection Report dated March 3, 2014. All reports should be reviewed and used as a basis to prepare preliminary and final design. The selected consultant shall utilize the structural scheme partially developed in the December 8, 2014 Greeley & Hansen report which is to provide intermediate columns and footings to reduce the span of the existing W36 members currently spanning over 100 feet. The selected consultant will be required to evaluate/analyze structural elements in accordance with the requirements of the latest DNSY Garage Design Standards for the heaviest fully loaded salt spreader trucks. The building is to be rehabilitated including extensive structural work (demolition and replacement of cellar-level slab and entrance ramp slab, demolition, and replacement of first floor slab, adding intermediate columns and footings, etc.). Total replacement of building systems (electrical, fire protection, plumbing, HVAC including building management system) and architectural renovation of the entire building is required. Remedial options /scopes of work and cost estimates shall be submitted to DSNY for review prior to starting design. After first floor slab and ramp demolition, the existing exposed structural steel shall be inspected, evaluated and repaired/reinforced as required.
Dollar Amount
$30M to 100M
Status
Active
S136-436
Project Id: S136-436 • Description: Brooklyn 6 Garage Rehabilitation • Client Agency: SANITATION
Project Id
S136-436
Description
Brooklyn 6 Garage Rehabilitation
Client Agency
SANITATION
Division
Public Buildings
Phase
Design
Projected Construction Completion
2022-10-31T00:00:00.000
Scope
This subject building is a single-story masonry garage with structural steel frame measuring approximately 155’ x 200’. The original facility was built in the 1920’s as a single-story 100’ x 200’ garage with a smaller 25’x 65’ two level area in the NW corner designated for offices and locker rooms. In the 1950’s the two-story portion was reduced to a single-story and incorporated into the garage, and a new 55’x 75’ single story annex was added on the NE corner of the lot for offices and locker rooms.
The new construction was steel framed with CMU infill. A second single-story annex approximately 55’x125’ was added in the 1970’s on the SE corner of the lot and constructed to match the first annex.
The project is being done to extend the useful life of this facility. The concrete floor slab is deteriorated and damaged and is a hazard for personnel, vehicles and equipment. Significant issues affect the oldest of the three components of the facility. The building systems and personnel areas are deteriorated and frequently non-functional.

SCOPE OF WORK, and to meet LEED requirements.
1. Pneumatic Tool Air Compressor
2. Mechanics Toilet Room
3. Locker Replacement
4. Ceiling Replacement - garage
5. Toilet/Shower Partitions
6. Locker Room/Offices - Cooling
7. Replace Garage H&V Systems
8. Fire Protection System (sprinkler)
9. New Engineering Office
10. Garage Slab Replacement
11. New Boiler
12. Drainage pipe replacement with new Oil/ Water Separator
Dollar Amount
$10M to 30M
Status
Active
S136-438
Project Id: S136-438 • Description: QUEENS 7 GARAGE REHABILITATION • Client Agency: SANITATION
Project Id
S136-438
Description
QUEENS 7 GARAGE REHABILITATION
Client Agency
SANITATION
Division
Public Buildings
Phase
NA
Projected Construction Completion
2022-10-27T00:00:00.000
Scope
The project is being done to extend the useful life of this facility. The concrete floor
slab is damaged at some locations and may be a hazard for personnel, vehicles and
equipment. The building systems and personnel areas are deteriorated and frequently
non-functional.
Dollar Amount
$10M to 30M
Status
Active
S216-415A2
Project Id: S216-415A2 • Description: WEST 59th STREET MTS • Client Agency: SANITATION
Project Id
S216-415A2
Description
WEST 59th STREET MTS
Client Agency
SANITATION
Division
Public Buildings
Phase
Construction
Projected Construction Completion
2020-08-27T00:00:00.000
Scope
Project 2 Scope: Refurbishment of the existing pier buildling including: repair of existing pier structure including pile caps and fendering; construction of new emergency generator, electrical, mechanical, fire pump and fire valve rooms; new exit passageway construction and existing exit passageway refurbishment; re-arrangement and refurbishment of the Operations Building interiors; replacement of fire suppression system throughout the entire pier structure; mechanical, electrical and plumbing system upgrades; refurbishment and painting the existing pier interior steel framing and wall/roof surfaces; recoating the structure's exterior cladding systems including metal wall and roof panel system and translucent panel wall cladding system.
Dollar Amount
$30M to 100M
Status
Active
SANDCONDC
Project Id: SANDCONDC • Description: Sandy Conduit Replacement - Citywide • Client Agency: TRANSPORTATION
Project Id
SANDCONDC
Description
Sandy Conduit Replacement - Citywide
Client Agency
TRANSPORTATION
Division
Public Buildings
Phase
Initiation
Projected Construction Completion
2023-03-15T00:00:00.000
Scope
The work involves the replacement or repair of saltwater inundated electrical
conduit and wiring in eleven facilities that experienced flooding during
Hurricane Sandy.
Dollar Amount
$3M to 10M
Status
Active
SANDELEC4
Project Id: SANDELEC4 • Description: 60TH PRECINCT ELECTRICAL SYSTEM REPLACEMENT( SANDY) • Client Agency: POLICE
Project Id
SANDELEC4
Description
60TH PRECINCT ELECTRICAL SYSTEM REPLACEMENT( SANDY)
Client Agency
POLICE
Division
Public Buildings
Phase
Construction
Projected Construction Completion
2020-08-24T00:00:00.000
Scope
Replacement of electrical system and generator at Coney Island Precinct that was flooded during Superstorm Sandy. Work includes providing temporary power to precinct while permanent system is being designed and installed. This work will be done via an emergency declaration.
Dollar Amount
$3M to 10M
Status
Active
SANDELEC5
Project Id: SANDELEC5 • Description: 100 the precint electrical system replacement, Sandy • Client Agency: POLICE
Project Id
SANDELEC5
Description
100 the precint electrical system replacement, Sandy
Client Agency
POLICE
Division
Public Buildings
Phase
Construction
Projected Construction Completion
2020-07-14T00:00:00.000
Scope
Replacement of electrical system and generator at Rockaway Queens Precinct that was flooded during Superstorm Sandy. Work includes providing temporary power to precinct while permanent system is being designed and installed. This work will be done via an emergency declaration.
Dollar Amount
$3M to 10M
Status
Active
SANDELEC8
Project Id: SANDELEC8 • Description: ERIE BASIN TOW POUND ELECTRICAL (SANDY) • Client Agency: POLICE
Project Id
SANDELEC8
Description
ERIE BASIN TOW POUND ELECTRICAL (SANDY)
Client Agency
POLICE
Division
Public Buildings
Phase
Procurement
Projected Construction Completion
2020-02-25T00:00:00.000
Scope
Restoration and installation of the new electrical power at NYPD's tow pound facility in Red Hook due to flooding during Sandy.
Dollar Amount
$1M to 3M
Status
Active
SANDSLIP
Project Id: SANDSLIP • Description: 100 OLD SLIP RESTORATION & SYSTEMS REPLACEMENT • Client Agency: POLICE
Project Id
SANDSLIP
Description
100 OLD SLIP RESTORATION & SYSTEMS REPLACEMENT
Client Agency
POLICE
Division
Public Buildings
Phase
Design
Projected Construction Completion
2023-09-01T00:00:00.000
Scope
To restore damage from Storm Sandy:
o Replace MEP and building systems equipment in basement and ground floor, including chillers, boilers, hot water heater, electrical, etc.
o Restore floor on ground floor and basement
o Restore walls on ground floor and basement
o Restore ceiling on basement
o Restore or replace all exterior doors
o Replace ADA lift

To mitigate future disaster damage:
o Use water resistant material on floor and walls on ground floor and basement and on ceiling in basement
o Relocate electrical service, mechanical and other building systems to higher floor
o Identify and install mitigation measures for similar future flood events

To provide functional spaces for the NYPD:
o Provide materials and appurtenances at first floor to create space for public functions.
o Provide office space at upper floors.

Provide temporary heat / AC to allow for construction and fire alarm/sprinkler function.

Coordinate with NYPD and comply with FEMA requirements for reimbursement of City funds, including review and approval of scope of work, requisition/payments, etc.
Dollar Amount
$10M to 30M
Status
Active
TLCWOOD
Project Id: TLCWOOD • Description: TLC - NEW OFFICE FACILITY - 24-55 BQE WEST • Client Agency: DCAS
Project Id
TLCWOOD
Description
TLC - NEW OFFICE FACILITY - 24-55 BQE WEST
Client Agency
DCAS
Division
Public Buildings
Phase
Procurement
Projected Construction Completion
2024-02-19T00:00:00.000
Scope
Design and construction of new adminstration wing to replace existing administration wing, new parking, provide new inspection lane within the inspection facility.
Dollar Amount
$30M to 100M
Status
Active