Street Construction Permits - Stipulations (2020 - Present)

DOT issues over 150 different types of sidewalk and roadway construction permits to utilities, contractors, government agencies and homeowners. Permits cover activities such as street openings, sidewalk construction and installing canopies over sidewalks.
Stipulations are rules that apply to a permit. One permit may have multiple stipulations.

For the list of permit stipulations for the 2013-2019, please refer to this link.

Transportation Department of Transportation (DOT) Dataset gsgx-6efw 4 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
M022026281C89
Permitnumber: M022026281C89 • Stipulationid: BRIDGE • Createdon: 2026-10-08T16:17:08.000
Permitnumber
M022026281C89
Stipulationid
BRIDGE
Stipulationfulltext
THE SITE OF YOUR PROPOSED WORK MAY BE WITHIN 100FT OF A BRIDGE STRUCTURE. YOU MUST SURVEY THE SITE. IF WORK IS WITHIN 100FT OF A BRIDGE STRUCTURE, YOU MUST SUBMIT A SCALED DRAWING SHOWING THE WORK AND EXACT LOCATION. IF WORK IS MORE THAN 100FT AWAY, YOU MUST FORWARD CERTIFICATION. SEND RESPONSES TO NYCDOT DIV. OF BRIDGES: BRIDGESHOLD@DOT.NYC.GOV OR CALL 212-839-9222/9223 PRIOR TO WORK.
Createdon
2026-10-08T16:17:08.000
M022026281C89
Permitnumber: M022026281C89 • Stipulationid: BSHLTR • Createdon: 2026-10-08T16:17:08.000
Permitnumber
M022026281C89
Stipulationid
BSHLTR
Stipulationfulltext
THE PERMITTEE SHALL NOT MOVE, DAMAGE, OR DISRUPT THE SURROUNDING SIDEWALK OF ANY BUS SHELTER, BIKE SHELTER, OR NEWSSTAND. FURTHERMORE, THE PERMITTEE MUST MAINTAIN A MINIMUM 5-FOOT WIDE CLEAR PATH FOR PEDESTRIAN WALKWAY BEHIND THE SHELTER, UNLESS PEDESTRIAN CLEAR PATH IS OTHERWISE STIPULATED. THE PERMITTEE MUST NOTIFY NYC DOT VIA EMAIL AT CSFFPERMITS@DOT.NYC.GOV BEFORE COMMENCING ANY WORK. NYC DOT WILL DETERMINE IF THE SHELTER IS TO BE TEMPORARILY REMOVED. THE PERMITTEE WILL BE HELD RESPONSIBLE FOR ANY DAMAGE TO STRUCTURES AND ELECTRICAL CONDUITS.
Createdon
2026-10-08T16:17:08.000
M022026281C89
Permitnumber: M022026281C89 • Stipulationid: MTRPRK • Createdon: 2026-10-08T16:17:08.000
Permitnumber
M022026281C89
Stipulationid
MTRPRK
Stipulationfulltext
If metered parking regulations are within your project area, either on the sidewalk or in the roadway, DOT Parking Unit must be notified before work begins to determine if meters need to be removed, relocated and to identify metered space loss. The contractor shall not relocate, remove, enclose, or attempt to barricade the meters. DOT Parking Unit must be notified upon work completion to restore metered parking. Please complete the DOT Parking Meter Construction Impact Webform to initiate the process: https://nyc.gov/meterconstruction. For more information call (212) 839-3230.
Createdon
2026-10-08T16:17:08.000
M022026281C89
Permitnumber: M022026281C89 • Stipulationid: NOISE1 • Createdon: 2026-10-08T16:17:08.000
Permitnumber
M022026281C89
Stipulationid
NOISE1
Stipulationfulltext
BY SUBMITTING THIS APPLICATION AND/OR RENEWAL REQUEST, THE PERMITTEE CERTIFIES ITS COMPLIANCE WITH ALL APPLICABLE CITYWIDE CONSTRUCTION NOISE MITIGATION REQUIREMENTS INCLUDING, BUT NOT LIMITED TO THE DEVELOPMENT OF A COMPLIANT NOISE MITIGATION OR ALTERNATIVE NOISE MITIGATION PLAN. UPON COMPLETION, PLEASE UPLOAD/FILE YOUR PLANS ONTO THE DEPARTMENT OF ENVIRONMENTAL PROTECTION WEBSITE. HERE IS THE LINK FOR FURTHER DETAILS AND TO UPLOAD THE FORMS: https://www1.nyc.gov/site/dep/environment/construction-noise-mitigation.page
Createdon
2026-10-08T16:17:08.000
M022026281C89
Permitnumber: M022026281C89 • Stipulationid: OCMC20 • Createdon: 2026-10-08T16:17:08.000
Permitnumber
M022026281C89
Stipulationid
OCMC20
Stipulationfulltext
WORK IN ACCORDANCE WITH OCMC STIP SHEET AND ALL VALID AMENDMENTS WHICH MUST BE ATTACHED TO THIS PERMIT AND ON SITE.
Createdon
2026-10-08T16:17:08.000
M022026281C89
Permitnumber: M022026281C89 • Stipulationid: OCMC76 • Createdon: 2026-10-08T16:17:08.000
Permitnumber
M022026281C89
Stipulationid
OCMC76
Stipulationfulltext
Parking meters shall not be removed or relocated by the contractor. If the project requires the removal or relocation of parking meters, temporary or permanent, or if adjustments are made to available metered parking spaces, please contact the “Parking Studies & Implementation” division through email at ParkingMeters@dot.nyc.gov. For information call (212) 839-3230.
Createdon
2026-10-08T16:17:08.000
M022026281C89
Permitnumber: M022026281C89 • Stipulationid: PLZ001 • Createdon: 2026-10-08T16:17:08.000
Permitnumber
M022026281C89
Stipulationid
PLZ001
Stipulationfulltext
THE SITE OF YOUR PROPOSED WORK FALLS WITHININ THE VICINITY OF A NYC DOT PEDESTRIAN PLAZA. TO DETERMINE IMPACT, YOU MUST SUBMIT A SCALED DRAWING, SHOWING THE EXTENTS OF THE PROPOSED WORK, TO THE NYC DOT PUBLIC REALM UNIT AT PLAZAS@DOT.NYC.GOV PRIOR TO ISSUANCE OF YOUR PERMIT. THE PERMITTEE IS RESPONSIBLE TO REPLACE ALL MATERIALS IN KIND.
Createdon
2026-10-08T16:17:08.000
M022026281C89
Permitnumber: M022026281C89 • Stipulationid: SCHOOL • Createdon: 2026-10-08T16:17:08.000
Permitnumber
M022026281C89
Stipulationid
SCHOOL
Stipulationfulltext
NO WORK SHALL BE PERFORMED WITHIN A BLOCK FRONTING A SCHOOL, INCLUDING INTERSECTIONS, FOR ONE HOUR PRIOR TO SCHOOL START TIME THROUGH ONE HOUR AFTER END OF SCHOOL TIME. THE PERMITTEE MUST NOTIFY THE SCHOOL PRINCIPAL IN WRITING 48 HOURS PRIOR TO BEGINNING ANY WORK. THIS STIPULATION VOIDS ANY/ ALL OTHER CONFLICTING STIPULATIONS ON THIS PERMIT UNLESS ACCOMPANIED WITH THE VARIANCE STIPULATION VAR001.
Createdon
2026-10-08T16:17:08.000
M022026281C89
Permitnumber: M022026281C89 • Stipulationid: STFURN • Createdon: 2026-10-08T16:17:08.000
Permitnumber
M022026281C89
Stipulationid
STFURN
Stipulationfulltext
PERMITTEE SHALL NOT REMOVE, DAMAGE OR OBSTRUCT ACCESS TO ANY NYC DOT-OWNED BIKE RACKS, BENCHES, LEANING BARS, BLOCKS, PLANTERS, OR WALKNYC WAYFINDING SIGNS ON THE SIDEWALK OR ROADWAY, INCLUDING SURROUNDING SIDEWALK, STREET, SUBSURFACE FOUNDATIONS, OR SUBSURFACE ELECTRICAL CONDUIT. PERMITTEE MUST ALWAYS PROVIDE 3 FT ACCESS TO ASSET. PERMITTEE MUST CONTACT NYC DOT VIA EMAIL AT STREETFURNITUREUNIT@DOT.NYC.GOV TO COORDINATE REMOVALS A MINIMUM TWO (2) WEEKS PRIOR TO THE START OF WORK. PERMITTEE IS RESPONSIBLE FOR REPLACEMENT OF DAMAGED STREET FURNITURE ELEMENTS.
Createdon
2026-10-08T16:17:08.000
M022026281C89
Permitnumber: M022026281C89 • Stipulationid: TFHV24 • Createdon: 2026-10-08T16:17:08.000
Permitnumber
M022026281C89
Stipulationid
TFHV24
Stipulationfulltext
TAXI/FHV STAND(S) ARE LOCATED ON THIS STREET. PERMITTEE SHALL NOT DISRUPT THE OPERATION OF TAXI/FHV STAND(S). IF WORK IMPACTS THE TAXI/FHV STAND(S), THE PERMITTEE MUST EMAIL NYC DOT AT TAXIFHV@DOT.NYC.GOV FOR THEIR REQUIREMENTS PRIOR TO WORK. THE PERMITTEE IS RESPONSIBLE FOR RESTORATION OF SIGNAGE AS DIRECTED BY NYC DOT.
Createdon
2026-10-08T16:17:08.000
M022026281C89
Permitnumber: M022026281C89 • Stipulationid: TMC001 • Createdon: 2026-10-08T16:17:08.000
Permitnumber
M022026281C89
Stipulationid
TMC001
Stipulationfulltext
CONTRACTORS WHO AT ANY TIME DURING THEIR PERMITTED WORK ENCOUNTER TRAFFIC SURVEILLANCE CAMERAS, DETECTION EQUIP OR ANY TYPE OF COMMUNICATION EQUIPMENT (WIRELESS OR HARD-WIRED) ON ANY NYCDOT FACILITY, THAT IS NOT INCLUDED ON THE DESIGN/BUILD DWGS, SHALL IMMEDIATELY NOTIFY NYCDOT TRAFFIC MANAGEMENT AT TMCDOT@DOT.NYC.GOV & 718-433-3390/40 AND AWAIT DIRECTION PRIOR TO CONTINUING WORK
Createdon
2026-10-08T16:17:08.000
M022026281C90
Permitnumber: M022026281C90 • Stipulationid: 038 • Createdon: 2026-10-08T16:17:08.000
Permitnumber
M022026281C90
Stipulationid
038
Stipulationfulltext
ALL TEMPORARY TRAFFIC CONTROL DEVICES, INCLUDING BUT NOT LIMITED TO SIGNS, CHANNELIZING DEVICES, FENCING AND MARKINGS SHALL BE PROVIDED, INSTALLED, MAINTAINED AND REMOVED BY THE PERMITTEE IN ACCORDANCE WITH THE MOST RECENT VERSION OF PART 6 OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS (MUTCD). OBTAIN THE MUTCD AT HTTP://MUTCD.FHWA.DOT.GOV .
Createdon
2026-10-08T16:17:08.000
M022026281C90
Permitnumber: M022026281C90 • Stipulationid: 066 • Createdon: 2026-10-08T16:17:08.000
Permitnumber
M022026281C90
Stipulationid
066
Stipulationfulltext
DO NOT PLACE MATERIALS, TRAILERS, CRANES, DEBRIS CONTAINERS, OR OTHER EQUIPMENT IN FRONT OF DRIVEWAYS, BUS STOPS, WITHIN FIFTEEN FEET OF A FIRE HYDRANT, IN AUTHORIZED PARKING ZONES OR IN ANY WAY WHICH BLOCKS ACCESS TO NYC DEP WATER TESTING BOXES. IF WORK MUST OCCUR DIRECTLY IN THESE AREAS, ANY OBSTRUCTION MAY ONLY BE DURING THE STIPULATED WORKING HOURS, AND NOT WHEN SITE IS UNATTENDED. ADDITIONAL COORDINATION MAY BE REQUIRED.
Createdon
2026-10-08T16:17:08.000
M022026281C90
Permitnumber: M022026281C90 • Stipulationid: 091 • Createdon: 2026-10-08T16:17:08.000
Permitnumber
M022026281C90
Stipulationid
091
Stipulationfulltext
THIS PERMIT ACTIVITY MAY NOT START UNTIL THE PERMITTEE COORDINATES ALL WORK WITH ANY ONGOING CONSTRUCTION AND/OR WITH THE PROJECT/RESIDENT ENGINEER FOR ANY ONGOING CAPITAL PROJECTS OCCURRING WITHIN AND/OR ADJACENT TO THE STREET SEGMENT/INTERSECTION.
Createdon
2026-10-08T16:17:08.000
M022026281C90
Permitnumber: M022026281C90 • Stipulationid: 103 • Createdon: 2026-10-08T16:17:08.000
Permitnumber
M022026281C90
Stipulationid
103
Stipulationfulltext
LOADING AND UNLOADING, STANDING OR PARKING IN A LANE ADJACENT TO THE WORK ZONE IN THE ROADWAY, AND PARKING OF NON-COMMERCIAL VEHICLES ON THE STREET (ROADWAY AND/OR SIDEWALK) WITHIN WORK ZONES IS PROHIBITED UNLESS OTHERWISE STIPULATED ON THE PERMIT. THIS APPLIES TO PERMITTEES AND ALL THEIR SUBCONTRACTORS.
Createdon
2026-10-08T16:17:08.000
M022026281C90
Permitnumber: M022026281C90 • Stipulationid: BIKESH • Createdon: 2026-10-08T16:17:08.000
Permitnumber
M022026281C90
Stipulationid
BIKESH
Stipulationfulltext
A BIKE SHARE STATION IS/WILL BE LOCATED ON THIS STREET. PERMITTEE SHALL NOT MOVE, DAMAGE OR DISRUPT THE OPERATION OF THE STATION. IF WORK IMPACTS THE STATION, THE PERMITTEE MUST CONTACT NYC BIKE SHARE AT 855-245-3311 FOR THEIR REQUIREMENTS PRIOR TO WORK. THE PERMITTEE MAY BE REQUIRED TO PAY STATION DEACTIVATION AND/OR REMOVAL CHARGES.
Createdon
2026-10-08T16:17:08.000
M022026281C90
Permitnumber: M022026281C90 • Stipulationid: BRIDGE • Createdon: 2026-10-08T16:17:08.000
Permitnumber
M022026281C90
Stipulationid
BRIDGE
Stipulationfulltext
THE SITE OF YOUR PROPOSED WORK MAY BE WITHIN 100FT OF A BRIDGE STRUCTURE. YOU MUST SURVEY THE SITE. IF WORK IS WITHIN 100FT OF A BRIDGE STRUCTURE, YOU MUST SUBMIT A SCALED DRAWING SHOWING THE WORK AND EXACT LOCATION. IF WORK IS MORE THAN 100FT AWAY, YOU MUST FORWARD CERTIFICATION. SEND RESPONSES TO NYCDOT DIV. OF BRIDGES: BRIDGESHOLD@DOT.NYC.GOV OR CALL 212-839-9222/9223 PRIOR TO WORK.
Createdon
2026-10-08T16:17:08.000
M022026281C90
Permitnumber: M022026281C90 • Stipulationid: BSHLTR • Createdon: 2026-10-08T16:17:08.000
Permitnumber
M022026281C90
Stipulationid
BSHLTR
Stipulationfulltext
THE PERMITTEE SHALL NOT MOVE, DAMAGE, OR DISRUPT THE SURROUNDING SIDEWALK OF ANY BUS SHELTER, BIKE SHELTER, OR NEWSSTAND. FURTHERMORE, THE PERMITTEE MUST MAINTAIN A MINIMUM 5-FOOT WIDE CLEAR PATH FOR PEDESTRIAN WALKWAY BEHIND THE SHELTER, UNLESS PEDESTRIAN CLEAR PATH IS OTHERWISE STIPULATED. THE PERMITTEE MUST NOTIFY NYC DOT VIA EMAIL AT CSFFPERMITS@DOT.NYC.GOV BEFORE COMMENCING ANY WORK. NYC DOT WILL DETERMINE IF THE SHELTER IS TO BE TEMPORARILY REMOVED. THE PERMITTEE WILL BE HELD RESPONSIBLE FOR ANY DAMAGE TO STRUCTURES AND ELECTRICAL CONDUITS.
Createdon
2026-10-08T16:17:08.000
M022026281C90
Permitnumber: M022026281C90 • Stipulationid: MTRPRK • Createdon: 2026-10-08T16:17:08.000
Permitnumber
M022026281C90
Stipulationid
MTRPRK
Stipulationfulltext
If metered parking regulations are within your project area, either on the sidewalk or in the roadway, DOT Parking Unit must be notified before work begins to determine if meters need to be removed, relocated and to identify metered space loss. The contractor shall not relocate, remove, enclose, or attempt to barricade the meters. DOT Parking Unit must be notified upon work completion to restore metered parking. Please complete the DOT Parking Meter Construction Impact Webform to initiate the process: https://nyc.gov/meterconstruction. For more information call (212) 839-3230.
Createdon
2026-10-08T16:17:08.000
M022026281C90
Permitnumber: M022026281C90 • Stipulationid: NOISE1 • Createdon: 2026-10-08T16:17:08.000
Permitnumber
M022026281C90
Stipulationid
NOISE1
Stipulationfulltext
BY SUBMITTING THIS APPLICATION AND/OR RENEWAL REQUEST, THE PERMITTEE CERTIFIES ITS COMPLIANCE WITH ALL APPLICABLE CITYWIDE CONSTRUCTION NOISE MITIGATION REQUIREMENTS INCLUDING, BUT NOT LIMITED TO THE DEVELOPMENT OF A COMPLIANT NOISE MITIGATION OR ALTERNATIVE NOISE MITIGATION PLAN. UPON COMPLETION, PLEASE UPLOAD/FILE YOUR PLANS ONTO THE DEPARTMENT OF ENVIRONMENTAL PROTECTION WEBSITE. HERE IS THE LINK FOR FURTHER DETAILS AND TO UPLOAD THE FORMS: https://www1.nyc.gov/site/dep/environment/construction-noise-mitigation.page
Createdon
2026-10-08T16:17:08.000
M022026281C90
Permitnumber: M022026281C90 • Stipulationid: OCMC20 • Createdon: 2026-10-08T16:17:08.000
Permitnumber
M022026281C90
Stipulationid
OCMC20
Stipulationfulltext
WORK IN ACCORDANCE WITH OCMC STIP SHEET AND ALL VALID AMENDMENTS WHICH MUST BE ATTACHED TO THIS PERMIT AND ON SITE.
Createdon
2026-10-08T16:17:08.000
M022026281C90
Permitnumber: M022026281C90 • Stipulationid: OCMC76 • Createdon: 2026-10-08T16:17:08.000
Permitnumber
M022026281C90
Stipulationid
OCMC76
Stipulationfulltext
Parking meters shall not be removed or relocated by the contractor. If the project requires the removal or relocation of parking meters, temporary or permanent, or if adjustments are made to available metered parking spaces, please contact the “Parking Studies & Implementation” division through email at ParkingMeters@dot.nyc.gov. For information call (212) 839-3230.
Createdon
2026-10-08T16:17:08.000
M022026281C90
Permitnumber: M022026281C90 • Stipulationid: PLZ001 • Createdon: 2026-10-08T16:17:08.000
Permitnumber
M022026281C90
Stipulationid
PLZ001
Stipulationfulltext
THE SITE OF YOUR PROPOSED WORK FALLS WITHININ THE VICINITY OF A NYC DOT PEDESTRIAN PLAZA. TO DETERMINE IMPACT, YOU MUST SUBMIT A SCALED DRAWING, SHOWING THE EXTENTS OF THE PROPOSED WORK, TO THE NYC DOT PUBLIC REALM UNIT AT PLAZAS@DOT.NYC.GOV PRIOR TO ISSUANCE OF YOUR PERMIT. THE PERMITTEE IS RESPONSIBLE TO REPLACE ALL MATERIALS IN KIND.
Createdon
2026-10-08T16:17:08.000
M022026281C90
Permitnumber: M022026281C90 • Stipulationid: SCHOOL • Createdon: 2026-10-08T16:17:08.000
Permitnumber
M022026281C90
Stipulationid
SCHOOL
Stipulationfulltext
NO WORK SHALL BE PERFORMED WITHIN A BLOCK FRONTING A SCHOOL, INCLUDING INTERSECTIONS, FOR ONE HOUR PRIOR TO SCHOOL START TIME THROUGH ONE HOUR AFTER END OF SCHOOL TIME. THE PERMITTEE MUST NOTIFY THE SCHOOL PRINCIPAL IN WRITING 48 HOURS PRIOR TO BEGINNING ANY WORK. THIS STIPULATION VOIDS ANY/ ALL OTHER CONFLICTING STIPULATIONS ON THIS PERMIT UNLESS ACCOMPANIED WITH THE VARIANCE STIPULATION VAR001.
Createdon
2026-10-08T16:17:08.000
M022026281C90
Permitnumber: M022026281C90 • Stipulationid: STFURN • Createdon: 2026-10-08T16:17:08.000
Permitnumber
M022026281C90
Stipulationid
STFURN
Stipulationfulltext
PERMITTEE SHALL NOT REMOVE, DAMAGE OR OBSTRUCT ACCESS TO ANY NYC DOT-OWNED BIKE RACKS, BENCHES, LEANING BARS, BLOCKS, PLANTERS, OR WALKNYC WAYFINDING SIGNS ON THE SIDEWALK OR ROADWAY, INCLUDING SURROUNDING SIDEWALK, STREET, SUBSURFACE FOUNDATIONS, OR SUBSURFACE ELECTRICAL CONDUIT. PERMITTEE MUST ALWAYS PROVIDE 3 FT ACCESS TO ASSET. PERMITTEE MUST CONTACT NYC DOT VIA EMAIL AT STREETFURNITUREUNIT@DOT.NYC.GOV TO COORDINATE REMOVALS A MINIMUM TWO (2) WEEKS PRIOR TO THE START OF WORK. PERMITTEE IS RESPONSIBLE FOR REPLACEMENT OF DAMAGED STREET FURNITURE ELEMENTS.
Createdon
2026-10-08T16:17:08.000
M022026281C90
Permitnumber: M022026281C90 • Stipulationid: TFHV24 • Createdon: 2026-10-08T16:17:08.000
Permitnumber
M022026281C90
Stipulationid
TFHV24
Stipulationfulltext
TAXI/FHV STAND(S) ARE LOCATED ON THIS STREET. PERMITTEE SHALL NOT DISRUPT THE OPERATION OF TAXI/FHV STAND(S). IF WORK IMPACTS THE TAXI/FHV STAND(S), THE PERMITTEE MUST EMAIL NYC DOT AT TAXIFHV@DOT.NYC.GOV FOR THEIR REQUIREMENTS PRIOR TO WORK. THE PERMITTEE IS RESPONSIBLE FOR RESTORATION OF SIGNAGE AS DIRECTED BY NYC DOT.
Createdon
2026-10-08T16:17:08.000
M022026281C90
Permitnumber: M022026281C90 • Stipulationid: TMC001 • Createdon: 2026-10-08T16:17:08.000
Permitnumber
M022026281C90
Stipulationid
TMC001
Stipulationfulltext
CONTRACTORS WHO AT ANY TIME DURING THEIR PERMITTED WORK ENCOUNTER TRAFFIC SURVEILLANCE CAMERAS, DETECTION EQUIP OR ANY TYPE OF COMMUNICATION EQUIPMENT (WIRELESS OR HARD-WIRED) ON ANY NYCDOT FACILITY, THAT IS NOT INCLUDED ON THE DESIGN/BUILD DWGS, SHALL IMMEDIATELY NOTIFY NYCDOT TRAFFIC MANAGEMENT AT TMCDOT@DOT.NYC.GOV & 718-433-3390/40 AND AWAIT DIRECTION PRIOR TO CONTINUING WORK
Createdon
2026-10-08T16:17:08.000
M022026281C91
Permitnumber: M022026281C91 • Stipulationid: 038 • Createdon: 2026-10-08T16:17:09.000
Permitnumber
M022026281C91
Stipulationid
038
Stipulationfulltext
ALL TEMPORARY TRAFFIC CONTROL DEVICES, INCLUDING BUT NOT LIMITED TO SIGNS, CHANNELIZING DEVICES, FENCING AND MARKINGS SHALL BE PROVIDED, INSTALLED, MAINTAINED AND REMOVED BY THE PERMITTEE IN ACCORDANCE WITH THE MOST RECENT VERSION OF PART 6 OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS (MUTCD). OBTAIN THE MUTCD AT HTTP://MUTCD.FHWA.DOT.GOV .
Createdon
2026-10-08T16:17:09.000
M022026281C91
Permitnumber: M022026281C91 • Stipulationid: 066 • Createdon: 2026-10-08T16:17:09.000
Permitnumber
M022026281C91
Stipulationid
066
Stipulationfulltext
DO NOT PLACE MATERIALS, TRAILERS, CRANES, DEBRIS CONTAINERS, OR OTHER EQUIPMENT IN FRONT OF DRIVEWAYS, BUS STOPS, WITHIN FIFTEEN FEET OF A FIRE HYDRANT, IN AUTHORIZED PARKING ZONES OR IN ANY WAY WHICH BLOCKS ACCESS TO NYC DEP WATER TESTING BOXES. IF WORK MUST OCCUR DIRECTLY IN THESE AREAS, ANY OBSTRUCTION MAY ONLY BE DURING THE STIPULATED WORKING HOURS, AND NOT WHEN SITE IS UNATTENDED. ADDITIONAL COORDINATION MAY BE REQUIRED.
Createdon
2026-10-08T16:17:09.000
M022026281C91
Permitnumber: M022026281C91 • Stipulationid: 091 • Createdon: 2026-10-08T16:17:09.000
Permitnumber
M022026281C91
Stipulationid
091
Stipulationfulltext
THIS PERMIT ACTIVITY MAY NOT START UNTIL THE PERMITTEE COORDINATES ALL WORK WITH ANY ONGOING CONSTRUCTION AND/OR WITH THE PROJECT/RESIDENT ENGINEER FOR ANY ONGOING CAPITAL PROJECTS OCCURRING WITHIN AND/OR ADJACENT TO THE STREET SEGMENT/INTERSECTION.
Createdon
2026-10-08T16:17:09.000
M022026281C91
Permitnumber: M022026281C91 • Stipulationid: 103 • Createdon: 2026-10-08T16:17:09.000
Permitnumber
M022026281C91
Stipulationid
103
Stipulationfulltext
LOADING AND UNLOADING, STANDING OR PARKING IN A LANE ADJACENT TO THE WORK ZONE IN THE ROADWAY, AND PARKING OF NON-COMMERCIAL VEHICLES ON THE STREET (ROADWAY AND/OR SIDEWALK) WITHIN WORK ZONES IS PROHIBITED UNLESS OTHERWISE STIPULATED ON THE PERMIT. THIS APPLIES TO PERMITTEES AND ALL THEIR SUBCONTRACTORS.
Createdon
2026-10-08T16:17:09.000
M022026281C91
Permitnumber: M022026281C91 • Stipulationid: BIKESH • Createdon: 2026-10-08T16:17:09.000
Permitnumber
M022026281C91
Stipulationid
BIKESH
Stipulationfulltext
A BIKE SHARE STATION IS/WILL BE LOCATED ON THIS STREET. PERMITTEE SHALL NOT MOVE, DAMAGE OR DISRUPT THE OPERATION OF THE STATION. IF WORK IMPACTS THE STATION, THE PERMITTEE MUST CONTACT NYC BIKE SHARE AT 855-245-3311 FOR THEIR REQUIREMENTS PRIOR TO WORK. THE PERMITTEE MAY BE REQUIRED TO PAY STATION DEACTIVATION AND/OR REMOVAL CHARGES.
Createdon
2026-10-08T16:17:09.000
M022026281C91
Permitnumber: M022026281C91 • Stipulationid: BRIDGE • Createdon: 2026-10-08T16:17:09.000
Permitnumber
M022026281C91
Stipulationid
BRIDGE
Stipulationfulltext
THE SITE OF YOUR PROPOSED WORK MAY BE WITHIN 100FT OF A BRIDGE STRUCTURE. YOU MUST SURVEY THE SITE. IF WORK IS WITHIN 100FT OF A BRIDGE STRUCTURE, YOU MUST SUBMIT A SCALED DRAWING SHOWING THE WORK AND EXACT LOCATION. IF WORK IS MORE THAN 100FT AWAY, YOU MUST FORWARD CERTIFICATION. SEND RESPONSES TO NYCDOT DIV. OF BRIDGES: BRIDGESHOLD@DOT.NYC.GOV OR CALL 212-839-9222/9223 PRIOR TO WORK.
Createdon
2026-10-08T16:17:09.000
M022026281C91
Permitnumber: M022026281C91 • Stipulationid: BSHLTR • Createdon: 2026-10-08T16:17:09.000
Permitnumber
M022026281C91
Stipulationid
BSHLTR
Stipulationfulltext
THE PERMITTEE SHALL NOT MOVE, DAMAGE, OR DISRUPT THE SURROUNDING SIDEWALK OF ANY BUS SHELTER, BIKE SHELTER, OR NEWSSTAND. FURTHERMORE, THE PERMITTEE MUST MAINTAIN A MINIMUM 5-FOOT WIDE CLEAR PATH FOR PEDESTRIAN WALKWAY BEHIND THE SHELTER, UNLESS PEDESTRIAN CLEAR PATH IS OTHERWISE STIPULATED. THE PERMITTEE MUST NOTIFY NYC DOT VIA EMAIL AT CSFFPERMITS@DOT.NYC.GOV BEFORE COMMENCING ANY WORK. NYC DOT WILL DETERMINE IF THE SHELTER IS TO BE TEMPORARILY REMOVED. THE PERMITTEE WILL BE HELD RESPONSIBLE FOR ANY DAMAGE TO STRUCTURES AND ELECTRICAL CONDUITS.
Createdon
2026-10-08T16:17:09.000
M022026281C91
Permitnumber: M022026281C91 • Stipulationid: MTRPRK • Createdon: 2026-10-08T16:17:09.000
Permitnumber
M022026281C91
Stipulationid
MTRPRK
Stipulationfulltext
If metered parking regulations are within your project area, either on the sidewalk or in the roadway, DOT Parking Unit must be notified before work begins to determine if meters need to be removed, relocated and to identify metered space loss. The contractor shall not relocate, remove, enclose, or attempt to barricade the meters. DOT Parking Unit must be notified upon work completion to restore metered parking. Please complete the DOT Parking Meter Construction Impact Webform to initiate the process: https://nyc.gov/meterconstruction. For more information call (212) 839-3230.
Createdon
2026-10-08T16:17:09.000
M022026281C91
Permitnumber: M022026281C91 • Stipulationid: NOISE1 • Createdon: 2026-10-08T16:17:09.000
Permitnumber
M022026281C91
Stipulationid
NOISE1
Stipulationfulltext
BY SUBMITTING THIS APPLICATION AND/OR RENEWAL REQUEST, THE PERMITTEE CERTIFIES ITS COMPLIANCE WITH ALL APPLICABLE CITYWIDE CONSTRUCTION NOISE MITIGATION REQUIREMENTS INCLUDING, BUT NOT LIMITED TO THE DEVELOPMENT OF A COMPLIANT NOISE MITIGATION OR ALTERNATIVE NOISE MITIGATION PLAN. UPON COMPLETION, PLEASE UPLOAD/FILE YOUR PLANS ONTO THE DEPARTMENT OF ENVIRONMENTAL PROTECTION WEBSITE. HERE IS THE LINK FOR FURTHER DETAILS AND TO UPLOAD THE FORMS: https://www1.nyc.gov/site/dep/environment/construction-noise-mitigation.page
Createdon
2026-10-08T16:17:09.000
M022026281C91
Permitnumber: M022026281C91 • Stipulationid: OCMC20 • Createdon: 2026-10-08T16:17:09.000
Permitnumber
M022026281C91
Stipulationid
OCMC20
Stipulationfulltext
WORK IN ACCORDANCE WITH OCMC STIP SHEET AND ALL VALID AMENDMENTS WHICH MUST BE ATTACHED TO THIS PERMIT AND ON SITE.
Createdon
2026-10-08T16:17:09.000
M022026281C91
Permitnumber: M022026281C91 • Stipulationid: OCMC76 • Createdon: 2026-10-08T16:17:09.000
Permitnumber
M022026281C91
Stipulationid
OCMC76
Stipulationfulltext
Parking meters shall not be removed or relocated by the contractor. If the project requires the removal or relocation of parking meters, temporary or permanent, or if adjustments are made to available metered parking spaces, please contact the “Parking Studies & Implementation” division through email at ParkingMeters@dot.nyc.gov. For information call (212) 839-3230.
Createdon
2026-10-08T16:17:09.000
M022026281C91
Permitnumber: M022026281C91 • Stipulationid: PLZ001 • Createdon: 2026-10-08T16:17:09.000
Permitnumber
M022026281C91
Stipulationid
PLZ001
Stipulationfulltext
THE SITE OF YOUR PROPOSED WORK FALLS WITHININ THE VICINITY OF A NYC DOT PEDESTRIAN PLAZA. TO DETERMINE IMPACT, YOU MUST SUBMIT A SCALED DRAWING, SHOWING THE EXTENTS OF THE PROPOSED WORK, TO THE NYC DOT PUBLIC REALM UNIT AT PLAZAS@DOT.NYC.GOV PRIOR TO ISSUANCE OF YOUR PERMIT. THE PERMITTEE IS RESPONSIBLE TO REPLACE ALL MATERIALS IN KIND.
Createdon
2026-10-08T16:17:09.000
M022026281C91
Permitnumber: M022026281C91 • Stipulationid: SCHOOL • Createdon: 2026-10-08T16:17:09.000
Permitnumber
M022026281C91
Stipulationid
SCHOOL
Stipulationfulltext
NO WORK SHALL BE PERFORMED WITHIN A BLOCK FRONTING A SCHOOL, INCLUDING INTERSECTIONS, FOR ONE HOUR PRIOR TO SCHOOL START TIME THROUGH ONE HOUR AFTER END OF SCHOOL TIME. THE PERMITTEE MUST NOTIFY THE SCHOOL PRINCIPAL IN WRITING 48 HOURS PRIOR TO BEGINNING ANY WORK. THIS STIPULATION VOIDS ANY/ ALL OTHER CONFLICTING STIPULATIONS ON THIS PERMIT UNLESS ACCOMPANIED WITH THE VARIANCE STIPULATION VAR001.
Createdon
2026-10-08T16:17:09.000
M022026281C91
Permitnumber: M022026281C91 • Stipulationid: STFURN • Createdon: 2026-10-08T16:17:09.000
Permitnumber
M022026281C91
Stipulationid
STFURN
Stipulationfulltext
PERMITTEE SHALL NOT REMOVE, DAMAGE OR OBSTRUCT ACCESS TO ANY NYC DOT-OWNED BIKE RACKS, BENCHES, LEANING BARS, BLOCKS, PLANTERS, OR WALKNYC WAYFINDING SIGNS ON THE SIDEWALK OR ROADWAY, INCLUDING SURROUNDING SIDEWALK, STREET, SUBSURFACE FOUNDATIONS, OR SUBSURFACE ELECTRICAL CONDUIT. PERMITTEE MUST ALWAYS PROVIDE 3 FT ACCESS TO ASSET. PERMITTEE MUST CONTACT NYC DOT VIA EMAIL AT STREETFURNITUREUNIT@DOT.NYC.GOV TO COORDINATE REMOVALS A MINIMUM TWO (2) WEEKS PRIOR TO THE START OF WORK. PERMITTEE IS RESPONSIBLE FOR REPLACEMENT OF DAMAGED STREET FURNITURE ELEMENTS.
Createdon
2026-10-08T16:17:09.000
M022026281C91
Permitnumber: M022026281C91 • Stipulationid: TFHV24 • Createdon: 2026-10-08T16:17:09.000
Permitnumber
M022026281C91
Stipulationid
TFHV24
Stipulationfulltext
TAXI/FHV STAND(S) ARE LOCATED ON THIS STREET. PERMITTEE SHALL NOT DISRUPT THE OPERATION OF TAXI/FHV STAND(S). IF WORK IMPACTS THE TAXI/FHV STAND(S), THE PERMITTEE MUST EMAIL NYC DOT AT TAXIFHV@DOT.NYC.GOV FOR THEIR REQUIREMENTS PRIOR TO WORK. THE PERMITTEE IS RESPONSIBLE FOR RESTORATION OF SIGNAGE AS DIRECTED BY NYC DOT.
Createdon
2026-10-08T16:17:09.000
M022026281C91
Permitnumber: M022026281C91 • Stipulationid: TMC001 • Createdon: 2026-10-08T16:17:09.000
Permitnumber
M022026281C91
Stipulationid
TMC001
Stipulationfulltext
CONTRACTORS WHO AT ANY TIME DURING THEIR PERMITTED WORK ENCOUNTER TRAFFIC SURVEILLANCE CAMERAS, DETECTION EQUIP OR ANY TYPE OF COMMUNICATION EQUIPMENT (WIRELESS OR HARD-WIRED) ON ANY NYCDOT FACILITY, THAT IS NOT INCLUDED ON THE DESIGN/BUILD DWGS, SHALL IMMEDIATELY NOTIFY NYCDOT TRAFFIC MANAGEMENT AT TMCDOT@DOT.NYC.GOV & 718-433-3390/40 AND AWAIT DIRECTION PRIOR TO CONTINUING WORK
Createdon
2026-10-08T16:17:09.000
M022026281C92
Permitnumber: M022026281C92 • Stipulationid: 038 • Createdon: 2026-10-08T16:17:09.000
Permitnumber
M022026281C92
Stipulationid
038
Stipulationfulltext
ALL TEMPORARY TRAFFIC CONTROL DEVICES, INCLUDING BUT NOT LIMITED TO SIGNS, CHANNELIZING DEVICES, FENCING AND MARKINGS SHALL BE PROVIDED, INSTALLED, MAINTAINED AND REMOVED BY THE PERMITTEE IN ACCORDANCE WITH THE MOST RECENT VERSION OF PART 6 OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS (MUTCD). OBTAIN THE MUTCD AT HTTP://MUTCD.FHWA.DOT.GOV .
Createdon
2026-10-08T16:17:09.000
M022026281C92
Permitnumber: M022026281C92 • Stipulationid: 066 • Createdon: 2026-10-08T16:17:09.000
Permitnumber
M022026281C92
Stipulationid
066
Stipulationfulltext
DO NOT PLACE MATERIALS, TRAILERS, CRANES, DEBRIS CONTAINERS, OR OTHER EQUIPMENT IN FRONT OF DRIVEWAYS, BUS STOPS, WITHIN FIFTEEN FEET OF A FIRE HYDRANT, IN AUTHORIZED PARKING ZONES OR IN ANY WAY WHICH BLOCKS ACCESS TO NYC DEP WATER TESTING BOXES. IF WORK MUST OCCUR DIRECTLY IN THESE AREAS, ANY OBSTRUCTION MAY ONLY BE DURING THE STIPULATED WORKING HOURS, AND NOT WHEN SITE IS UNATTENDED. ADDITIONAL COORDINATION MAY BE REQUIRED.
Createdon
2026-10-08T16:17:09.000
M022026281C92
Permitnumber: M022026281C92 • Stipulationid: 091 • Createdon: 2026-10-08T16:17:09.000
Permitnumber
M022026281C92
Stipulationid
091
Stipulationfulltext
THIS PERMIT ACTIVITY MAY NOT START UNTIL THE PERMITTEE COORDINATES ALL WORK WITH ANY ONGOING CONSTRUCTION AND/OR WITH THE PROJECT/RESIDENT ENGINEER FOR ANY ONGOING CAPITAL PROJECTS OCCURRING WITHIN AND/OR ADJACENT TO THE STREET SEGMENT/INTERSECTION.
Createdon
2026-10-08T16:17:09.000
M022026281C92
Permitnumber: M022026281C92 • Stipulationid: 103 • Createdon: 2026-10-08T16:17:09.000
Permitnumber
M022026281C92
Stipulationid
103
Stipulationfulltext
LOADING AND UNLOADING, STANDING OR PARKING IN A LANE ADJACENT TO THE WORK ZONE IN THE ROADWAY, AND PARKING OF NON-COMMERCIAL VEHICLES ON THE STREET (ROADWAY AND/OR SIDEWALK) WITHIN WORK ZONES IS PROHIBITED UNLESS OTHERWISE STIPULATED ON THE PERMIT. THIS APPLIES TO PERMITTEES AND ALL THEIR SUBCONTRACTORS.
Createdon
2026-10-08T16:17:09.000
M022026281C92
Permitnumber: M022026281C92 • Stipulationid: BIKESH • Createdon: 2026-10-08T16:17:09.000
Permitnumber
M022026281C92
Stipulationid
BIKESH
Stipulationfulltext
A BIKE SHARE STATION IS/WILL BE LOCATED ON THIS STREET. PERMITTEE SHALL NOT MOVE, DAMAGE OR DISRUPT THE OPERATION OF THE STATION. IF WORK IMPACTS THE STATION, THE PERMITTEE MUST CONTACT NYC BIKE SHARE AT 855-245-3311 FOR THEIR REQUIREMENTS PRIOR TO WORK. THE PERMITTEE MAY BE REQUIRED TO PAY STATION DEACTIVATION AND/OR REMOVAL CHARGES.
Createdon
2026-10-08T16:17:09.000
M022026281C92
Permitnumber: M022026281C92 • Stipulationid: BRIDGE • Createdon: 2026-10-08T16:17:09.000
Permitnumber
M022026281C92
Stipulationid
BRIDGE
Stipulationfulltext
THE SITE OF YOUR PROPOSED WORK MAY BE WITHIN 100FT OF A BRIDGE STRUCTURE. YOU MUST SURVEY THE SITE. IF WORK IS WITHIN 100FT OF A BRIDGE STRUCTURE, YOU MUST SUBMIT A SCALED DRAWING SHOWING THE WORK AND EXACT LOCATION. IF WORK IS MORE THAN 100FT AWAY, YOU MUST FORWARD CERTIFICATION. SEND RESPONSES TO NYCDOT DIV. OF BRIDGES: BRIDGESHOLD@DOT.NYC.GOV OR CALL 212-839-9222/9223 PRIOR TO WORK.
Createdon
2026-10-08T16:17:09.000
M022026281C92
Permitnumber: M022026281C92 • Stipulationid: BSHLTR • Createdon: 2026-10-08T16:17:09.000
Permitnumber
M022026281C92
Stipulationid
BSHLTR
Stipulationfulltext
THE PERMITTEE SHALL NOT MOVE, DAMAGE, OR DISRUPT THE SURROUNDING SIDEWALK OF ANY BUS SHELTER, BIKE SHELTER, OR NEWSSTAND. FURTHERMORE, THE PERMITTEE MUST MAINTAIN A MINIMUM 5-FOOT WIDE CLEAR PATH FOR PEDESTRIAN WALKWAY BEHIND THE SHELTER, UNLESS PEDESTRIAN CLEAR PATH IS OTHERWISE STIPULATED. THE PERMITTEE MUST NOTIFY NYC DOT VIA EMAIL AT CSFFPERMITS@DOT.NYC.GOV BEFORE COMMENCING ANY WORK. NYC DOT WILL DETERMINE IF THE SHELTER IS TO BE TEMPORARILY REMOVED. THE PERMITTEE WILL BE HELD RESPONSIBLE FOR ANY DAMAGE TO STRUCTURES AND ELECTRICAL CONDUITS.
Createdon
2026-10-08T16:17:09.000