Street Construction Permits - Stipulations (2020 - Present)

DOT issues over 150 different types of sidewalk and roadway construction permits to utilities, contractors, government agencies and homeowners. Permits cover activities such as street openings, sidewalk construction and installing canopies over sidewalks.
Stipulations are rules that apply to a permit. One permit may have multiple stipulations.

For the list of permit stipulations for the 2013-2019, please refer to this link.

Transportation Department of Transportation (DOT) Dataset gsgx-6efw 4 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
B022020002A39
Permitnumber: B022020002A39 • Stipulationid: 107 • Createdon: 2020-01-02T08:53:02.000
Permitnumber
B022020002A39
Stipulationid
107
Stipulationfulltext
LOADING AND UNLOADING, STANDING OR PARKING IN A LANE ADJACENT TO THE WORK ZONE IN THE ROADWAY IS PROHIBITED. THIS APPLIES TO PERMITTEES AND ALL OF THEIR SUBCONTRACTORS.
Createdon
2020-01-02T08:53:02.000
B022020002A39
Permitnumber: B022020002A39 • Stipulationid: 204 • Createdon: 2020-01-02T08:53:02.000
Permitnumber
B022020002A39
Stipulationid
204
Stipulationfulltext
THIS PERMIT INCLUDES AUTHORIZATION FOR THE STORAGE OF EQUIPMENT (OTHER THAN CRANES) AND MATERIALS ON THE JOB SITE ONLY, INCLUDING JERSEY BARRIERS IF APPLICABLE. OFF-SITE STORAGE MUST BE PERMITTED SEPARATELY.
Createdon
2020-01-02T08:53:02.000
B022020002A39
Permitnumber: B022020002A39 • Stipulationid: NOISE1 • Createdon: 2020-01-02T08:53:02.000
Permitnumber
B022020002A39
Stipulationid
NOISE1
Stipulationfulltext
BY SUBMITTING THIS APPLICATION AND/OR RENEWAL REQUEST, THE PERMITTEE CERTIFIES ITS COMPLIANCE WITH ALL APPLICABLE CITYWIDE CONSTRUCTION NOISE MITIGATION REQUIREMENTS INCLUDING, BUT NOT LIMITED TO THE DEVELOPMENT OF A COMPLIANT NOISE MITIGATION OR ALTERNATIVE NOISE MITIGATION PLAN. PLEASE CONTACT THE NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION (WWW.NYC.GOV/HTML/DEP/HTML/NOISE/CONSTRUCTION-NOISE.SHTML) FOR FURTHER INFORMATION.
Createdon
2020-01-02T08:53:02.000
B022020002A39
Permitnumber: B022020002A39 • Stipulationid: SCHOOL • Createdon: 2020-01-02T08:53:02.000
Permitnumber
B022020002A39
Stipulationid
SCHOOL
Stipulationfulltext
NO WORK TO BE PERFORMED WITHIN BLOCK FRONTING SCHOOL INCLUDING INTERSECTIONS FOR ONE HOUR PRIOR TO SCHOOL START TIME THROUGH ONE HOUR AFTER END OF SCHOOL TIME. PERMITTEE MUST NOTIFY SCHOOL PRINCIPAL IN WRITING 48 HOURS PRIOR TO BEGINNING ANY WORK. THIS STIP VOIDS ANY/ ALL OTHER CONFLICTING STIPS ON THIS PERMIT UNLESS ACCOMPANIED WITH VARIANCE STIP VAR001.
Createdon
2020-01-02T08:53:02.000
B022020002A39
Permitnumber: B022020002A39 • Stipulationid: TMC001 • Createdon: 2020-01-02T08:53:02.000
Permitnumber
B022020002A39
Stipulationid
TMC001
Stipulationfulltext
CONTRACTORS WHO AT ANY TIME DURING THEIR PERMITTED WORK ENCOUNTER TRAFFIC SURVEILLANCE CAMERAS, DETECTION EQUIP OR ANY TYPE OF COMMUNICATION EQUIPMENT (WIRELESS OR HARD-WIRED) ON ANY NYCDOT FACILITY, THAT IS NOT INCLUDED ON THE DESIGN/BUILD DWGS, SHALL IMMEDIATELY NOTIFY NYCDOT TRAFFIC MANAGEMENT AT TMC@DOT.NYC.GOV & 718-433-3390/40 AND AWAIT DIRECTION PRIOR TO CONTINUING WORK
Createdon
2020-01-02T08:53:02.000
B022020002A40
Permitnumber: B022020002A40 • Stipulationid: 038 • Createdon: 2020-01-02T08:53:03.000
Permitnumber
B022020002A40
Stipulationid
038
Stipulationfulltext
ALL TEMPORARY TRAFFIC CONTROL DEVICES, INCLUDING BUT NOT LIMITED TO SIGNS, CHANNELIZING DEVICES, FENCING AND MARKINGS SHALL BE PROVIDED, INSTALLED, MAINTAINED AND REMOVED BY THE PERMITTEE IN ACCORDANCE WITH THE MOST RECENT VERSION OF PART 6 OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS (MUTCD). OBTAIN THE MUTCD AT HTTP://MUTCD.FHWA.DOT.GOV .
Createdon
2020-01-02T08:53:03.000
B022020002A40
Permitnumber: B022020002A40 • Stipulationid: 039 • Stipulationfulltext: OCCUPY 8 FOOT WIDTH OF ROADWAY ADJACENT TO CURB
Permitnumber
B022020002A40
Stipulationid
039
Stipulationfulltext
OCCUPY 8 FOOT WIDTH OF ROADWAY ADJACENT TO CURB
Createdon
2020-01-02T08:53:03.000
B022020002A40
Permitnumber: B022020002A40 • Stipulationid: 066 • Createdon: 2020-01-02T08:53:03.000
Permitnumber
B022020002A40
Stipulationid
066
Stipulationfulltext
DO NOT PLACE MATERIALS, TRAILERS,CRANES, CONTAINERS, OR EQUIPMENT IN FRONT OF DRIVEWAYS, BUS STOPS, WITHIN FIFTEEN FEET OF A FIRE HYDRANT, IN AUTHORIZED PARKING ZONES OR BLOCKING ACCESS TO DEP WATER TESTING BOXES. IF WORK IS DIRECTLY IN ABOVE AREAS, MAY BE IN VICINITY DURING STIPULATED WORK HOURS BUT NOT WHEN SITE IS UNATTENDED.
Createdon
2020-01-02T08:53:03.000
B022020002A40
Permitnumber: B022020002A40 • Stipulationid: 091 • Createdon: 2020-01-02T08:53:03.000
Permitnumber
B022020002A40
Stipulationid
091
Stipulationfulltext
THIS PERMIT ACTIVITY MAY NOT START UNTIL THE PERMITTEE COORDINATES ALL WORK WITH ANY ONGOING CONSTRUCTION AND WITH THE PROJECT/RESIDENT ENGINEER FOR ANY ONGOING CAPITAL PROJECTS.
Createdon
2020-01-02T08:53:03.000
B022020002A40
Permitnumber: B022020002A40 • Stipulationid: 103 • Createdon: 2020-01-02T08:53:03.000
Permitnumber
B022020002A40
Stipulationid
103
Stipulationfulltext
PARKING OF NON-COMMERCIAL VEHICLES ON THE STREET (ROADWAY AND SIDEWALK) WITHIN WORK ZONES IS PROHIBITED.
Createdon
2020-01-02T08:53:03.000
B022020002A40
Permitnumber: B022020002A40 • Stipulationid: 107 • Createdon: 2020-01-02T08:53:03.000
Permitnumber
B022020002A40
Stipulationid
107
Stipulationfulltext
LOADING AND UNLOADING, STANDING OR PARKING IN A LANE ADJACENT TO THE WORK ZONE IN THE ROADWAY IS PROHIBITED. THIS APPLIES TO PERMITTEES AND ALL OF THEIR SUBCONTRACTORS.
Createdon
2020-01-02T08:53:03.000
B022020002A40
Permitnumber: B022020002A40 • Stipulationid: BIKESH • Createdon: 2020-01-02T08:53:03.000
Permitnumber
B022020002A40
Stipulationid
BIKESH
Stipulationfulltext
A BIKE SHARE STATION IS/WILL BE LOCATED ON THIS STREET. PERMITTEE SHALL NOT MOVE, DAMAGE OR DISRUPT THE OPERATION OF THE STATION. IF WORK IMPACTS THE STATION, THE PERMITTEE MUST CONTACT NYC BIKE SHARE AT 855-245-3311 FOR THEIR REQUIREMENTS PRIOR TO WORK. THE PERMITTEE MAY BE REQUIRED TO PAY STATION DEACTIVIATION AND/OR REMOVAL CHARGES.
Createdon
2020-01-02T08:53:03.000
B022020002A40
Permitnumber: B022020002A40 • Stipulationid: NOISE1 • Createdon: 2020-01-02T08:53:03.000
Permitnumber
B022020002A40
Stipulationid
NOISE1
Stipulationfulltext
BY SUBMITTING THIS APPLICATION AND/OR RENEWAL REQUEST, THE PERMITTEE CERTIFIES ITS COMPLIANCE WITH ALL APPLICABLE CITYWIDE CONSTRUCTION NOISE MITIGATION REQUIREMENTS INCLUDING, BUT NOT LIMITED TO THE DEVELOPMENT OF A COMPLIANT NOISE MITIGATION OR ALTERNATIVE NOISE MITIGATION PLAN. PLEASE CONTACT THE NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION (WWW.NYC.GOV/HTML/DEP/HTML/NOISE/CONSTRUCTION-NOISE.SHTML) FOR FURTHER INFORMATION.
Createdon
2020-01-02T08:53:03.000
B022020002A40
Permitnumber: B022020002A40 • Stipulationid: SCHOOL • Createdon: 2020-01-02T08:53:03.000
Permitnumber
B022020002A40
Stipulationid
SCHOOL
Stipulationfulltext
NO WORK TO BE PERFORMED WITHIN BLOCK FRONTING SCHOOL INCLUDING INTERSECTIONS FOR ONE HOUR PRIOR TO SCHOOL START TIME THROUGH ONE HOUR AFTER END OF SCHOOL TIME. PERMITTEE MUST NOTIFY SCHOOL PRINCIPAL IN WRITING 48 HOURS PRIOR TO BEGINNING ANY WORK. THIS STIP VOIDS ANY/ ALL OTHER CONFLICTING STIPS ON THIS PERMIT UNLESS ACCOMPANIED WITH VARIANCE STIP VAR001.
Createdon
2020-01-02T08:53:03.000
B022020002A40
Permitnumber: B022020002A40 • Stipulationid: TMC001 • Createdon: 2020-01-02T08:53:03.000
Permitnumber
B022020002A40
Stipulationid
TMC001
Stipulationfulltext
CONTRACTORS WHO AT ANY TIME DURING THEIR PERMITTED WORK ENCOUNTER TRAFFIC SURVEILLANCE CAMERAS, DETECTION EQUIP OR ANY TYPE OF COMMUNICATION EQUIPMENT (WIRELESS OR HARD-WIRED) ON ANY NYCDOT FACILITY, THAT IS NOT INCLUDED ON THE DESIGN/BUILD DWGS, SHALL IMMEDIATELY NOTIFY NYCDOT TRAFFIC MANAGEMENT AT TMC@DOT.NYC.GOV & 718-433-3390/40 AND AWAIT DIRECTION PRIOR TO CONTINUING WORK
Createdon
2020-01-02T08:53:03.000
B022020002A41
Permitnumber: B022020002A41 • Stipulationid: 038 • Createdon: 2020-01-02T08:53:03.000
Permitnumber
B022020002A41
Stipulationid
038
Stipulationfulltext
ALL TEMPORARY TRAFFIC CONTROL DEVICES, INCLUDING BUT NOT LIMITED TO SIGNS, CHANNELIZING DEVICES, FENCING AND MARKINGS SHALL BE PROVIDED, INSTALLED, MAINTAINED AND REMOVED BY THE PERMITTEE IN ACCORDANCE WITH THE MOST RECENT VERSION OF PART 6 OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS (MUTCD). OBTAIN THE MUTCD AT HTTP://MUTCD.FHWA.DOT.GOV .
Createdon
2020-01-02T08:53:03.000
B022020002A41
Permitnumber: B022020002A41 • Stipulationid: 039 • Stipulationfulltext: OCCUPY 8 FOOT WIDTH OF ROADWAY ADJACENT TO CURB
Permitnumber
B022020002A41
Stipulationid
039
Stipulationfulltext
OCCUPY 8 FOOT WIDTH OF ROADWAY ADJACENT TO CURB
Createdon
2020-01-02T08:53:03.000
B022020002A41
Permitnumber: B022020002A41 • Stipulationid: 066 • Createdon: 2020-01-02T08:53:03.000
Permitnumber
B022020002A41
Stipulationid
066
Stipulationfulltext
DO NOT PLACE MATERIALS, TRAILERS,CRANES, CONTAINERS, OR EQUIPMENT IN FRONT OF DRIVEWAYS, BUS STOPS, WITHIN FIFTEEN FEET OF A FIRE HYDRANT, IN AUTHORIZED PARKING ZONES OR BLOCKING ACCESS TO DEP WATER TESTING BOXES. IF WORK IS DIRECTLY IN ABOVE AREAS, MAY BE IN VICINITY DURING STIPULATED WORK HOURS BUT NOT WHEN SITE IS UNATTENDED.
Createdon
2020-01-02T08:53:03.000
B022020002A41
Permitnumber: B022020002A41 • Stipulationid: 091 • Createdon: 2020-01-02T08:53:03.000
Permitnumber
B022020002A41
Stipulationid
091
Stipulationfulltext
THIS PERMIT ACTIVITY MAY NOT START UNTIL THE PERMITTEE COORDINATES ALL WORK WITH ANY ONGOING CONSTRUCTION AND WITH THE PROJECT/RESIDENT ENGINEER FOR ANY ONGOING CAPITAL PROJECTS.
Createdon
2020-01-02T08:53:03.000
B022020002A41
Permitnumber: B022020002A41 • Stipulationid: 103 • Createdon: 2020-01-02T08:53:03.000
Permitnumber
B022020002A41
Stipulationid
103
Stipulationfulltext
PARKING OF NON-COMMERCIAL VEHICLES ON THE STREET (ROADWAY AND SIDEWALK) WITHIN WORK ZONES IS PROHIBITED.
Createdon
2020-01-02T08:53:03.000
B022020002A41
Permitnumber: B022020002A41 • Stipulationid: 107 • Createdon: 2020-01-02T08:53:03.000
Permitnumber
B022020002A41
Stipulationid
107
Stipulationfulltext
LOADING AND UNLOADING, STANDING OR PARKING IN A LANE ADJACENT TO THE WORK ZONE IN THE ROADWAY IS PROHIBITED. THIS APPLIES TO PERMITTEES AND ALL OF THEIR SUBCONTRACTORS.
Createdon
2020-01-02T08:53:03.000
B022020002A41
Permitnumber: B022020002A41 • Stipulationid: 204 • Createdon: 2020-01-02T08:53:03.000
Permitnumber
B022020002A41
Stipulationid
204
Stipulationfulltext
THIS PERMIT INCLUDES AUTHORIZATION FOR THE STORAGE OF EQUIPMENT (OTHER THAN CRANES) AND MATERIALS ON THE JOB SITE ONLY, INCLUDING JERSEY BARRIERS IF APPLICABLE. OFF-SITE STORAGE MUST BE PERMITTED SEPARATELY.
Createdon
2020-01-02T08:53:03.000
B022020002A41
Permitnumber: B022020002A41 • Stipulationid: BIKE02 • Createdon: 2020-01-02T08:53:03.000
Permitnumber
B022020002A41
Stipulationid
BIKE02
Stipulationfulltext
THE PERMITTEE MUST CREATE A TEMPORARY BIKEWAY AROUND THE WORK ZONE DELINEATED BY CONES OR SIMILAR VERTICAL TRAFFIC DEVICES IF THE WORK IMPACTS A BICYCLE LANE. THE MINIMUM WIDTH FOR A ONE-WAY BIKEWAY MUST BE 5 FEET AND 8 FEET FOR A TWO-WAY BIKEWAY. WHERE A TWO-WAY BICYCLE LANE EXISTS ON A ONE-WAY STREET, THE BICYCLE LANE IN THE OPPOSITE DIRECTION OF TRAFFIC SHOULD ALWAYS BE ACCOMMODATED BY A TEMPORARY FIVE-FOOT BIKEWAY AND DELINEATED BY CONES. THE MOVING LANE MUST BECOME A TEMPORARY SHARED VEHICLE AND BICYCLE LANE. NO REDUCTION OF MOVING LANES IS PERMITTED UNLESS STIPULATED ON THIS PERMIT. PARKING RESTRICTIONS MAY APPLY. WHEN A ONE-WAY TEMPORARY BIKEWAY CANNOT BE CREATED, THE NEAREST MOVING LANE MUST BECOME A SHARED VEHICLE AND BICYCLE LANE. PERMITTEE MUST COMPLY WITH THE BIKE MPT DESIGN GUIDELINES, WHICH ARE AVAILABLE AT https://www1.nyc.gov/html/dot/downloads/pdf/bike-mpt-guidelines.pdf
Createdon
2020-01-02T08:53:03.000
B022020002A41
Permitnumber: B022020002A41 • Stipulationid: NOISE1 • Createdon: 2020-01-02T08:53:03.000
Permitnumber
B022020002A41
Stipulationid
NOISE1
Stipulationfulltext
BY SUBMITTING THIS APPLICATION AND/OR RENEWAL REQUEST, THE PERMITTEE CERTIFIES ITS COMPLIANCE WITH ALL APPLICABLE CITYWIDE CONSTRUCTION NOISE MITIGATION REQUIREMENTS INCLUDING, BUT NOT LIMITED TO THE DEVELOPMENT OF A COMPLIANT NOISE MITIGATION OR ALTERNATIVE NOISE MITIGATION PLAN. PLEASE CONTACT THE NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION (WWW.NYC.GOV/HTML/DEP/HTML/NOISE/CONSTRUCTION-NOISE.SHTML) FOR FURTHER INFORMATION.
Createdon
2020-01-02T08:53:03.000
B022020002A41
Permitnumber: B022020002A41 • Stipulationid: SCHOOL • Createdon: 2020-01-02T08:53:03.000
Permitnumber
B022020002A41
Stipulationid
SCHOOL
Stipulationfulltext
NO WORK TO BE PERFORMED WITHIN BLOCK FRONTING SCHOOL INCLUDING INTERSECTIONS FOR ONE HOUR PRIOR TO SCHOOL START TIME THROUGH ONE HOUR AFTER END OF SCHOOL TIME. PERMITTEE MUST NOTIFY SCHOOL PRINCIPAL IN WRITING 48 HOURS PRIOR TO BEGINNING ANY WORK. THIS STIP VOIDS ANY/ ALL OTHER CONFLICTING STIPS ON THIS PERMIT UNLESS ACCOMPANIED WITH VARIANCE STIP VAR001.
Createdon
2020-01-02T08:53:03.000
B022020002A41
Permitnumber: B022020002A41 • Stipulationid: TMC001 • Createdon: 2020-01-02T08:53:03.000
Permitnumber
B022020002A41
Stipulationid
TMC001
Stipulationfulltext
CONTRACTORS WHO AT ANY TIME DURING THEIR PERMITTED WORK ENCOUNTER TRAFFIC SURVEILLANCE CAMERAS, DETECTION EQUIP OR ANY TYPE OF COMMUNICATION EQUIPMENT (WIRELESS OR HARD-WIRED) ON ANY NYCDOT FACILITY, THAT IS NOT INCLUDED ON THE DESIGN/BUILD DWGS, SHALL IMMEDIATELY NOTIFY NYCDOT TRAFFIC MANAGEMENT AT TMC@DOT.NYC.GOV & 718-433-3390/40 AND AWAIT DIRECTION PRIOR TO CONTINUING WORK
Createdon
2020-01-02T08:53:03.000
Q022020002A03
Permitnumber: Q022020002A03 • Stipulationid: 015 • Stipulationfulltext: MAINTAIN A MINIMUM 8 FOOT CLEAR PEDESTRIAN WALK ON SIDEWALK.
Permitnumber
Q022020002A03
Stipulationid
015
Stipulationfulltext
MAINTAIN A MINIMUM 8 FOOT CLEAR PEDESTRIAN WALK ON SIDEWALK.
Createdon
2020-01-02T08:53:19.000
Q022020002A03
Permitnumber: Q022020002A03 • Stipulationid: 038 • Createdon: 2020-01-02T08:53:19.000
Permitnumber
Q022020002A03
Stipulationid
038
Stipulationfulltext
ALL TEMPORARY TRAFFIC CONTROL DEVICES, INCLUDING BUT NOT LIMITED TO SIGNS, CHANNELIZING DEVICES, FENCING AND MARKINGS SHALL BE PROVIDED, INSTALLED, MAINTAINED AND REMOVED BY THE PERMITTEE IN ACCORDANCE WITH THE MOST RECENT VERSION OF PART 6 OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS (MUTCD). OBTAIN THE MUTCD AT HTTP://MUTCD.FHWA.DOT.GOV .
Createdon
2020-01-02T08:53:19.000
Q022020002A03
Permitnumber: Q022020002A03 • Stipulationid: 066 • Createdon: 2020-01-02T08:53:19.000
Permitnumber
Q022020002A03
Stipulationid
066
Stipulationfulltext
DO NOT PLACE MATERIALS, TRAILERS,CRANES, CONTAINERS, OR EQUIPMENT IN FRONT OF DRIVEWAYS, BUS STOPS, WITHIN FIFTEEN FEET OF A FIRE HYDRANT, IN AUTHORIZED PARKING ZONES OR BLOCKING ACCESS TO DEP WATER TESTING BOXES. IF WORK IS DIRECTLY IN ABOVE AREAS, MAY BE IN VICINITY DURING STIPULATED WORK HOURS BUT NOT WHEN SITE IS UNATTENDED.
Createdon
2020-01-02T08:53:19.000
Q022020002A03
Permitnumber: Q022020002A03 • Stipulationid: 091 • Createdon: 2020-01-02T08:53:19.000
Permitnumber
Q022020002A03
Stipulationid
091
Stipulationfulltext
THIS PERMIT ACTIVITY MAY NOT START UNTIL THE PERMITTEE COORDINATES ALL WORK WITH ANY ONGOING CONSTRUCTION AND WITH THE PROJECT/RESIDENT ENGINEER FOR ANY ONGOING CAPITAL PROJECTS.
Createdon
2020-01-02T08:53:19.000
Q022020002A03
Permitnumber: Q022020002A03 • Stipulationid: BIKE02 • Createdon: 2020-01-02T08:53:19.000
Permitnumber
Q022020002A03
Stipulationid
BIKE02
Stipulationfulltext
THE PERMITTEE MUST CREATE A TEMPORARY BIKEWAY AROUND THE WORK ZONE DELINEATED BY CONES OR SIMILAR VERTICAL TRAFFIC DEVICES IF THE WORK IMPACTS A BICYCLE LANE. THE MINIMUM WIDTH FOR A ONE-WAY BIKEWAY MUST BE 5 FEET AND 8 FEET FOR A TWO-WAY BIKEWAY. WHERE A TWO-WAY BICYCLE LANE EXISTS ON A ONE-WAY STREET, THE BICYCLE LANE IN THE OPPOSITE DIRECTION OF TRAFFIC SHOULD ALWAYS BE ACCOMMODATED BY A TEMPORARY FIVE-FOOT BIKEWAY AND DELINEATED BY CONES. THE MOVING LANE MUST BECOME A TEMPORARY SHARED VEHICLE AND BICYCLE LANE. NO REDUCTION OF MOVING LANES IS PERMITTED UNLESS STIPULATED ON THIS PERMIT. PARKING RESTRICTIONS MAY APPLY. WHEN A ONE-WAY TEMPORARY BIKEWAY CANNOT BE CREATED, THE NEAREST MOVING LANE MUST BECOME A SHARED VEHICLE AND BICYCLE LANE. PERMITTEE MUST COMPLY WITH THE BIKE MPT DESIGN GUIDELINES, WHICH ARE AVAILABLE AT https://www1.nyc.gov/html/dot/downloads/pdf/bike-mpt-guidelines.pdf
Createdon
2020-01-02T08:53:19.000
Q022020002A03
Permitnumber: Q022020002A03 • Stipulationid: NOISE1 • Createdon: 2020-01-02T08:53:19.000
Permitnumber
Q022020002A03
Stipulationid
NOISE1
Stipulationfulltext
BY SUBMITTING THIS APPLICATION AND/OR RENEWAL REQUEST, THE PERMITTEE CERTIFIES ITS COMPLIANCE WITH ALL APPLICABLE CITYWIDE CONSTRUCTION NOISE MITIGATION REQUIREMENTS INCLUDING, BUT NOT LIMITED TO THE DEVELOPMENT OF A COMPLIANT NOISE MITIGATION OR ALTERNATIVE NOISE MITIGATION PLAN. PLEASE CONTACT THE NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION (WWW.NYC.GOV/HTML/DEP/HTML/NOISE/CONSTRUCTION-NOISE.SHTML) FOR FURTHER INFORMATION.
Createdon
2020-01-02T08:53:19.000
Q022020002A03
Permitnumber: Q022020002A03 • Stipulationid: SCHOOL • Createdon: 2020-01-02T08:53:19.000
Permitnumber
Q022020002A03
Stipulationid
SCHOOL
Stipulationfulltext
NO WORK TO BE PERFORMED WITHIN BLOCK FRONTING SCHOOL INCLUDING INTERSECTIONS FOR ONE HOUR PRIOR TO SCHOOL START TIME THROUGH ONE HOUR AFTER END OF SCHOOL TIME. PERMITTEE MUST NOTIFY SCHOOL PRINCIPAL IN WRITING 48 HOURS PRIOR TO BEGINNING ANY WORK. THIS STIP VOIDS ANY/ ALL OTHER CONFLICTING STIPS ON THIS PERMIT UNLESS ACCOMPANIED WITH VARIANCE STIP VAR001.
Createdon
2020-01-02T08:53:19.000
Q022020002A03
Permitnumber: Q022020002A03 • Stipulationid: TMC001 • Createdon: 2020-01-02T08:53:19.000
Permitnumber
Q022020002A03
Stipulationid
TMC001
Stipulationfulltext
CONTRACTORS WHO AT ANY TIME DURING THEIR PERMITTED WORK ENCOUNTER TRAFFIC SURVEILLANCE CAMERAS, DETECTION EQUIP OR ANY TYPE OF COMMUNICATION EQUIPMENT (WIRELESS OR HARD-WIRED) ON ANY NYCDOT FACILITY, THAT IS NOT INCLUDED ON THE DESIGN/BUILD DWGS, SHALL IMMEDIATELY NOTIFY NYCDOT TRAFFIC MANAGEMENT AT TMC@DOT.NYC.GOV & 718-433-3390/40 AND AWAIT DIRECTION PRIOR TO CONTINUING WORK
Createdon
2020-01-02T08:53:19.000
Q022020002A04
Permitnumber: Q022020002A04 • Stipulationid: 015 • Stipulationfulltext: MAINTAIN A MINIMUM 8 FOOT CLEAR PEDESTRIAN WALK ON SIDEWALK.
Permitnumber
Q022020002A04
Stipulationid
015
Stipulationfulltext
MAINTAIN A MINIMUM 8 FOOT CLEAR PEDESTRIAN WALK ON SIDEWALK.
Createdon
2020-01-02T08:53:19.000
Q022020002A04
Permitnumber: Q022020002A04 • Stipulationid: 038 • Createdon: 2020-01-02T08:53:19.000
Permitnumber
Q022020002A04
Stipulationid
038
Stipulationfulltext
ALL TEMPORARY TRAFFIC CONTROL DEVICES, INCLUDING BUT NOT LIMITED TO SIGNS, CHANNELIZING DEVICES, FENCING AND MARKINGS SHALL BE PROVIDED, INSTALLED, MAINTAINED AND REMOVED BY THE PERMITTEE IN ACCORDANCE WITH THE MOST RECENT VERSION OF PART 6 OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS (MUTCD). OBTAIN THE MUTCD AT HTTP://MUTCD.FHWA.DOT.GOV .
Createdon
2020-01-02T08:53:19.000
Q022020002A04
Permitnumber: Q022020002A04 • Stipulationid: 066 • Createdon: 2020-01-02T08:53:19.000
Permitnumber
Q022020002A04
Stipulationid
066
Stipulationfulltext
DO NOT PLACE MATERIALS, TRAILERS,CRANES, CONTAINERS, OR EQUIPMENT IN FRONT OF DRIVEWAYS, BUS STOPS, WITHIN FIFTEEN FEET OF A FIRE HYDRANT, IN AUTHORIZED PARKING ZONES OR BLOCKING ACCESS TO DEP WATER TESTING BOXES. IF WORK IS DIRECTLY IN ABOVE AREAS, MAY BE IN VICINITY DURING STIPULATED WORK HOURS BUT NOT WHEN SITE IS UNATTENDED.
Createdon
2020-01-02T08:53:19.000
Q022020002A04
Permitnumber: Q022020002A04 • Stipulationid: 091 • Createdon: 2020-01-02T08:53:19.000
Permitnumber
Q022020002A04
Stipulationid
091
Stipulationfulltext
THIS PERMIT ACTIVITY MAY NOT START UNTIL THE PERMITTEE COORDINATES ALL WORK WITH ANY ONGOING CONSTRUCTION AND WITH THE PROJECT/RESIDENT ENGINEER FOR ANY ONGOING CAPITAL PROJECTS.
Createdon
2020-01-02T08:53:19.000
Q022020002A04
Permitnumber: Q022020002A04 • Stipulationid: 103 • Createdon: 2020-01-02T08:53:19.000
Permitnumber
Q022020002A04
Stipulationid
103
Stipulationfulltext
PARKING OF NON-COMMERCIAL VEHICLES ON THE STREET (ROADWAY AND SIDEWALK) WITHIN WORK ZONES IS PROHIBITED.
Createdon
2020-01-02T08:53:19.000
Q022020002A04
Permitnumber: Q022020002A04 • Stipulationid: BIKE02 • Createdon: 2020-01-02T08:53:19.000
Permitnumber
Q022020002A04
Stipulationid
BIKE02
Stipulationfulltext
THE PERMITTEE MUST CREATE A TEMPORARY BIKEWAY AROUND THE WORK ZONE DELINEATED BY CONES OR SIMILAR VERTICAL TRAFFIC DEVICES IF THE WORK IMPACTS A BICYCLE LANE. THE MINIMUM WIDTH FOR A ONE-WAY BIKEWAY MUST BE 5 FEET AND 8 FEET FOR A TWO-WAY BIKEWAY. WHERE A TWO-WAY BICYCLE LANE EXISTS ON A ONE-WAY STREET, THE BICYCLE LANE IN THE OPPOSITE DIRECTION OF TRAFFIC SHOULD ALWAYS BE ACCOMMODATED BY A TEMPORARY FIVE-FOOT BIKEWAY AND DELINEATED BY CONES. THE MOVING LANE MUST BECOME A TEMPORARY SHARED VEHICLE AND BICYCLE LANE. NO REDUCTION OF MOVING LANES IS PERMITTED UNLESS STIPULATED ON THIS PERMIT. PARKING RESTRICTIONS MAY APPLY. WHEN A ONE-WAY TEMPORARY BIKEWAY CANNOT BE CREATED, THE NEAREST MOVING LANE MUST BECOME A SHARED VEHICLE AND BICYCLE LANE. PERMITTEE MUST COMPLY WITH THE BIKE MPT DESIGN GUIDELINES, WHICH ARE AVAILABLE AT https://www1.nyc.gov/html/dot/downloads/pdf/bike-mpt-guidelines.pdf
Createdon
2020-01-02T08:53:19.000
Q022020002A04
Permitnumber: Q022020002A04 • Stipulationid: BIKESH • Createdon: 2020-01-02T08:53:19.000
Permitnumber
Q022020002A04
Stipulationid
BIKESH
Stipulationfulltext
A BIKE SHARE STATION IS/WILL BE LOCATED ON THIS STREET. PERMITTEE SHALL NOT MOVE, DAMAGE OR DISRUPT THE OPERATION OF THE STATION. IF WORK IMPACTS THE STATION, THE PERMITTEE MUST CONTACT NYC BIKE SHARE AT 855-245-3311 FOR THEIR REQUIREMENTS PRIOR TO WORK. THE PERMITTEE MAY BE REQUIRED TO PAY STATION DEACTIVIATION AND/OR REMOVAL CHARGES.
Createdon
2020-01-02T08:53:19.000
Q022020002A04
Permitnumber: Q022020002A04 • Stipulationid: NOISE1 • Createdon: 2020-01-02T08:53:19.000
Permitnumber
Q022020002A04
Stipulationid
NOISE1
Stipulationfulltext
BY SUBMITTING THIS APPLICATION AND/OR RENEWAL REQUEST, THE PERMITTEE CERTIFIES ITS COMPLIANCE WITH ALL APPLICABLE CITYWIDE CONSTRUCTION NOISE MITIGATION REQUIREMENTS INCLUDING, BUT NOT LIMITED TO THE DEVELOPMENT OF A COMPLIANT NOISE MITIGATION OR ALTERNATIVE NOISE MITIGATION PLAN. PLEASE CONTACT THE NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION (WWW.NYC.GOV/HTML/DEP/HTML/NOISE/CONSTRUCTION-NOISE.SHTML) FOR FURTHER INFORMATION.
Createdon
2020-01-02T08:53:19.000
Q022020002A04
Permitnumber: Q022020002A04 • Stipulationid: SCHOOL • Createdon: 2020-01-02T08:53:19.000
Permitnumber
Q022020002A04
Stipulationid
SCHOOL
Stipulationfulltext
NO WORK TO BE PERFORMED WITHIN BLOCK FRONTING SCHOOL INCLUDING INTERSECTIONS FOR ONE HOUR PRIOR TO SCHOOL START TIME THROUGH ONE HOUR AFTER END OF SCHOOL TIME. PERMITTEE MUST NOTIFY SCHOOL PRINCIPAL IN WRITING 48 HOURS PRIOR TO BEGINNING ANY WORK. THIS STIP VOIDS ANY/ ALL OTHER CONFLICTING STIPS ON THIS PERMIT UNLESS ACCOMPANIED WITH VARIANCE STIP VAR001.
Createdon
2020-01-02T08:53:19.000
Q022020002A04
Permitnumber: Q022020002A04 • Stipulationid: STFURN • Createdon: 2020-01-02T08:53:19.000
Permitnumber
Q022020002A04
Stipulationid
STFURN
Stipulationfulltext
THERE IS EXISTING NYC DOT STREET FURNITURE LOCATED ON THIS STREET. THE PERMITTEE SHALL NOT MOVE, DAMAGE, OR DISRUPT ANY CITYBENCHES, BIKE RACKS, LEANING BARS OR STREET SEATS. IF THE FURNITURE IMPACTS THE WORK, THE PERMITTEE MUST CONTACT NYC DOT AT 212-839-6569 OR VIA EMAIL AT CITYBENCH@DOT.NYC.GOV PRIOR TO WORK. THE PERMITTEE IS RESPONSIBLE FOR THE REPLACEMENT OF DAMAGED STREET FURNITURE.
Createdon
2020-01-02T08:53:19.000
Q022020002A04
Permitnumber: Q022020002A04 • Stipulationid: TMC001 • Createdon: 2020-01-02T08:53:19.000
Permitnumber
Q022020002A04
Stipulationid
TMC001
Stipulationfulltext
CONTRACTORS WHO AT ANY TIME DURING THEIR PERMITTED WORK ENCOUNTER TRAFFIC SURVEILLANCE CAMERAS, DETECTION EQUIP OR ANY TYPE OF COMMUNICATION EQUIPMENT (WIRELESS OR HARD-WIRED) ON ANY NYCDOT FACILITY, THAT IS NOT INCLUDED ON THE DESIGN/BUILD DWGS, SHALL IMMEDIATELY NOTIFY NYCDOT TRAFFIC MANAGEMENT AT TMC@DOT.NYC.GOV & 718-433-3390/40 AND AWAIT DIRECTION PRIOR TO CONTINUING WORK
Createdon
2020-01-02T08:53:19.000
B012020002A59
Permitnumber: B012020002A59 • Stipulationid: 013 • Stipulationfulltext: MAINTAIN A MINIMUM 5 FOOT CLEAR PEDESTRIAN WALK ON THE SIDEWALK
Permitnumber
B012020002A59
Stipulationid
013
Stipulationfulltext
MAINTAIN A MINIMUM 5 FOOT CLEAR PEDESTRIAN WALK ON THE SIDEWALK
Createdon
2020-01-02T08:53:38.000
B022020002A45
Permitnumber: B022020002A45 • Stipulationid: 107 • Createdon: 2020-01-02T08:55:52.000
Permitnumber
B022020002A45
Stipulationid
107
Stipulationfulltext
LOADING AND UNLOADING, STANDING OR PARKING IN A LANE ADJACENT TO THE WORK ZONE IN THE ROADWAY IS PROHIBITED. THIS APPLIES TO PERMITTEES AND ALL OF THEIR SUBCONTRACTORS.
Createdon
2020-01-02T08:55:52.000
B012020002A59
Permitnumber: B012020002A59 • Stipulationid: 016 • Createdon: 2020-01-02T08:53:38.000
Permitnumber
B012020002A59
Stipulationid
016
Stipulationfulltext
FULL WIDTH OF SIDEWALK SHALL BE OPENED TO PEDESTRIANS WHEN SITE IS UNATTENDED EXCEPT FOR CONCRETE CURING WHEN THAT PORTION OF THE SIDEWALK MAY REMAIN CLOSED PROVIDED ALL OTHER STIPULATIONS ON THIS PERMIT ARE COMPLIED WITH. THIS EXCEPTION DOES NOT APPLY IF STIPULATION 014 IS ALSO APPLIED TO THIS PERMIT.
Createdon
2020-01-02T08:53:38.000
B012020002A59
Permitnumber: B012020002A59 • Stipulationid: 019 • Stipulationfulltext: WORK 7AM - 6PM, MONDAY THROUGH FRIDAY
Permitnumber
B012020002A59
Stipulationid
019
Stipulationfulltext
WORK 7AM - 6PM, MONDAY THROUGH FRIDAY
Createdon
2020-01-02T08:53:38.000
B012020002A59
Permitnumber: B012020002A59 • Stipulationid: 020 • Createdon: 2020-01-02T08:53:38.000
Permitnumber
B012020002A59
Stipulationid
020
Stipulationfulltext
RESTORE ALL TRAVEL LANES TO TRAFFIC. CONTRACTOR MAY CONTAIN A MAXIMUM OF 25 LINEAR FEET, 8 FEET ADJACENT TO THE CURB DURING NON-WORK HOURS. CONTAINMENT ONLY TO RESTRICT PARKING AND FOR STORAGE OF EXCAVATED MATERIAL/FILL. USE OF METERED, AUTHORIZED PARKING AND NO STANDING ZONES IS PROHIBITED.
Createdon
2020-01-02T08:53:38.000