Contractor / Sub Contractor Change Order Report

The Contractor / Sub Contractor Change Order Report is a monthly Multi-Project SCA Change Management Report that lists who is currently responsible for Change Management Issues and the last stage/document of the Change Process.

Housing & Development School Construction Authority (SCA) Dataset gzvm-na49 14 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014737 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014737
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBAHK01
Change Management Number
00019
Change Order Document Date
2019-08-26
Change Order Project Ball In Court Code
NEHAL
Change Order Project Title
Bklyn Academy HS(K) CofO Work
Change Order Document Type
EST
Change Order Project Stage Date
2019-08-26
Change Order Number
00019
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014737 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014737
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBAHK01
Change Management Number
00034
Change Order Document Date
2020-04-01
Change Order Project Ball In Court Code
NEHAL
Change Order Project Title
Bklyn Academy HS(K) CofO Work
Change Order Document Type
EST
Change Order Project Stage Date
2020-04-01
Change Order Number
00034
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014737 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014737
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBAHK01
Change Management Number
00004
Change Order Document Date
2018-08-28
Change Order Project Ball In Court Code
NEHAL
Change Order Project Title
Bklyn Academy HS(K) CofO Work
Change Order Document Type
EST
Change Order Project Stage Date
2018-08-28
Change Order Number
00004
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014737 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014737
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBAHK01
Change Management Number
00032
Change Order Document Date
2020-01-30
Change Order Project Ball In Court Code
NEHAL
Change Order Project Title
Bklyn Academy HS(K) CofO Work
Change Order Document Type
EST
Change Order Project Stage Date
2020-01-30
Change Order Number
00032
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014737 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014737
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBAHK01
Change Management Number
00021
Change Order Document Date
2019-08-26
Change Order Project Ball In Court Code
NEHAL
Change Order Project Title
Bklyn Academy HS(K) CofO Work
Change Order Document Type
FRE
Change Order Project Stage Date
2021-05-06
Change Order Number
00021
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014737 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014737
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBAHK01
Change Management Number
00021
Change Order Document Date
2019-08-26
Change Order Project Ball In Court Code
NEHAL
Change Order Project Title
Bklyn Academy HS(K) CofO Work
Change Order Document Type
PCO
Change Order Project Stage Date
2020-12-18
Change Order Number
00021
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014737 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014737
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBAHK01
Change Management Number
00035
Change Order Document Date
2020-04-06
Change Order Project Ball In Court Code
NEHAL
Change Order Project Title
Bklyn Academy HS(K) CofO Work
Change Order Document Type
EST
Change Order Project Stage Date
2020-04-06
Change Order Number
00035
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014737 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014737
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBAHK01
Change Management Number
00016
Change Order Document Date
2019-05-16
Change Order Project Ball In Court Code
NEHAL
Change Order Project Title
Bklyn Academy HS(K) CofO Work
Change Order Document Type
EST
Change Order Project Stage Date
2019-05-16
Change Order Number
00016
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014737 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014737
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBAHK01
Change Management Number
00004
Change Order Document Date
2018-08-28
Change Order Project Ball In Court Code
NEHAL
Change Order Project Title
Bklyn Academy HS(K) CofO Work
Change Order Document Type
FRE
Change Order Project Stage Date
2019-05-17
Change Order Number
00004
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014666 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014666
Change Order Boro Identifier
K
Change Order Project District Identifier
18
Change Order Project Identifier
HSBGSK01
Change Management Number
00001
Change Order Document Date
2018-08-23
Change Order Project Ball In Court Code
SAFECON
Change Order Project Title
Bklyn Gen Sch@SH HS(K) Athletic Fld
Change Order Document Type
EST
Change Order Project Stage Date
2018-08-23
Change Order Number
00001
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014666 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014666
Change Order Boro Identifier
K
Change Order Project District Identifier
18
Change Order Project Identifier
HSBGSK01
Change Management Number
00003
Change Order Document Date
2020-04-13
Change Order Project Ball In Court Code
SAFECON
Change Order Project Title
Bklyn Gen Sch@SH HS(K) Athletic Fld
Change Order Document Type
EST
Change Order Project Stage Date
2020-04-13
Change Order Number
00003
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014938 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014938
Change Order Boro Identifier
K
Change Order Project District Identifier
15
Change Order Project Identifier
HSARTK04
Change Management Number
00001
Change Order Document Date
2019-05-23
Change Order Project Ball In Court Code
IND.TEMP
Change Order Project Title
Bklyn HS of Arts(K) Boiler, Climate
Change Order Document Type
PCO
Change Order Project Stage Date
2020-09-16
Change Order Number
00001
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014938 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014938
Change Order Boro Identifier
K
Change Order Project District Identifier
15
Change Order Project Identifier
HSARTK04
Change Management Number
00011
Change Order Document Date
2021-04-16
Change Order Project Ball In Court Code
IND.TEMP
Change Order Project Title
Bklyn HS of Arts(K) Boiler, Climate
Change Order Document Type
EST
Change Order Project Stage Date
2021-04-16
Change Order Number
00011
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014938 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014938
Change Order Boro Identifier
K
Change Order Project District Identifier
15
Change Order Project Identifier
HSARTK04
Change Management Number
00014
Change Order Document Date
2021-07-02
Change Order Project Ball In Court Code
IND.TEMP
Change Order Project Title
Bklyn HS of Arts(K) Boiler, Climate
Change Order Document Type
EST
Change Order Project Stage Date
2021-07-02
Change Order Number
00014
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014938 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014938
Change Order Boro Identifier
K
Change Order Project District Identifier
15
Change Order Project Identifier
HSARTK04
Change Management Number
00001
Change Order Document Date
2019-05-23
Change Order Project Ball In Court Code
IND.TEMP
Change Order Project Title
Bklyn HS of Arts(K) Boiler, Climate
Change Order Document Type
EST
Change Order Project Stage Date
2019-05-23
Change Order Number
00001
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014938 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014938
Change Order Boro Identifier
K
Change Order Project District Identifier
15
Change Order Project Identifier
HSARTK04
Change Management Number
00010
Change Order Document Date
2020-04-30
Change Order Project Ball In Court Code
IND.TEMP
Change Order Project Title
Bklyn HS of Arts(K) Boiler, Climate
Change Order Document Type
EST
Change Order Project Stage Date
2020-04-30
Change Order Number
00010
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014938 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014938
Change Order Boro Identifier
K
Change Order Project District Identifier
15
Change Order Project Identifier
HSARTK04
Change Management Number
00006S1
Change Order Document Date
2020-07-14
Change Order Project Ball In Court Code
IND.TEMP
Change Order Project Title
Bklyn HS of Arts(K) Boiler, Climate
Change Order Document Type
EST
Change Order Project Stage Date
2020-07-14
Change Order Number
00006S1
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014938 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014938
Change Order Boro Identifier
K
Change Order Project District Identifier
15
Change Order Project Identifier
HSARTK04
Change Management Number
00007
Change Order Document Date
2020-04-01
Change Order Project Ball In Court Code
IND.TEMP
Change Order Project Title
Bklyn HS of Arts(K) Boiler, Climate
Change Order Document Type
EST
Change Order Project Stage Date
2020-04-01
Change Order Number
00007
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014034 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014034
Change Order Boro Identifier
K
Change Order Project District Identifier
15
Change Order Project Identifier
HSARTK03
Change Management Number
00034
Change Order Document Date
2020-12-28
Change Order Project Ball In Court Code
ARK
Change Order Project Title
Bklyn HS of Arts(K) FA, Sprnk, Vent
Change Order Document Type
EST
Change Order Project Stage Date
2020-12-28
Change Order Number
00034
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014034 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014034
Change Order Boro Identifier
K
Change Order Project District Identifier
15
Change Order Project Identifier
HSARTK03
Change Management Number
00013
Change Order Document Date
2018-05-01
Change Order Project Ball In Court Code
ARK
Change Order Project Title
Bklyn HS of Arts(K) FA, Sprnk, Vent
Change Order Document Type
EST
Change Order Project Stage Date
2018-05-01
Change Order Number
00013
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014866 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014866
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK13
Change Management Number
00014
Change Order Document Date
2021-04-05
Change Order Project Ball In Court Code
NESCO
Change Order Project Title
Bklyn Tech(K) Athletic Fld Upgr
Change Order Document Type
EST
Change Order Project Stage Date
2021-04-05
Change Order Number
00014
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014866 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014866
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK13
Change Management Number
00011
Change Order Document Date
2021-01-27
Change Order Project Ball In Court Code
NESCO
Change Order Project Title
Bklyn Tech(K) Athletic Fld Upgr
Change Order Document Type
EST
Change Order Project Stage Date
2021-01-27
Change Order Number
00011
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014866 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014866
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK13
Change Management Number
00019
Change Order Document Date
2021-08-09
Change Order Project Ball In Court Code
NESCO
Change Order Project Title
Bklyn Tech(K) Athletic Fld Upgr
Change Order Document Type
EST
Change Order Project Stage Date
2021-08-09
Change Order Number
00019
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014866 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014866
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK13
Change Management Number
00021
Change Order Document Date
2021-10-15
Change Order Project Ball In Court Code
NESCO
Change Order Project Title
Bklyn Tech(K) Athletic Fld Upgr
Change Order Document Type
EST
Change Order Project Stage Date
2021-10-15
Change Order Number
00021
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014866 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014866
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK13
Change Management Number
00006
Change Order Document Date
2020-03-02
Change Order Project Ball In Court Code
NESCO
Change Order Project Title
Bklyn Tech(K) Athletic Fld Upgr
Change Order Document Type
PCO
Change Order Project Stage Date
2021-03-16
Change Order Number
00006
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014866 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014866
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK13
Change Management Number
00006
Change Order Document Date
2020-03-02
Change Order Project Ball In Court Code
NESCO
Change Order Project Title
Bklyn Tech(K) Athletic Fld Upgr
Change Order Document Type
FRE
Change Order Project Stage Date
2021-05-13
Change Order Number
00006
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014866 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014866
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK13
Change Management Number
00004
Change Order Document Date
2019-11-05
Change Order Project Ball In Court Code
NESCO
Change Order Project Title
Bklyn Tech(K) Athletic Fld Upgr
Change Order Document Type
CO
Change Order Project Stage Date
2019-11-07
Change Order Number
00004W
Change Order Project To Status Name
APP
Change Order Project To Vendor
NESCO
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014866 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014866
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK13
Change Management Number
00006
Change Order Document Date
2020-03-02
Change Order Project Ball In Court Code
NESCO
Change Order Project Title
Bklyn Tech(K) Athletic Fld Upgr
Change Order Document Type
CO
Change Order Project Stage Date
2021-06-14
Change Order Number
00006U
Change Order Project To Status Name
APP
Change Order Project To Vendor
NESCO
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014866 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014866
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK13
Change Management Number
00006
Change Order Document Date
2020-03-02
Change Order Project Ball In Court Code
NESCO
Change Order Project Title
Bklyn Tech(K) Athletic Fld Upgr
Change Order Document Type
EST
Change Order Project Stage Date
2020-03-02
Change Order Number
00006
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014866 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014866
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK13
Change Management Number
00004
Change Order Document Date
2019-11-05
Change Order Project Ball In Court Code
NESCO
Change Order Project Title
Bklyn Tech(K) Athletic Fld Upgr
Change Order Document Type
EST
Change Order Project Stage Date
2019-11-05
Change Order Number
00004
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014866 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014866
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK13
Change Management Number
00017
Change Order Document Date
2021-07-27
Change Order Project Ball In Court Code
NESCO
Change Order Project Title
Bklyn Tech(K) Athletic Fld Upgr
Change Order Document Type
EST
Change Order Project Stage Date
2021-07-27
Change Order Number
00017
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014866 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014866
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK13
Change Management Number
00010
Change Order Document Date
2021-01-11
Change Order Project Ball In Court Code
NESCO
Change Order Project Title
Bklyn Tech(K) Athletic Fld Upgr
Change Order Document Type
EST
Change Order Project Stage Date
2021-01-11
Change Order Number
00010
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014866 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014866
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK13
Change Management Number
00010
Change Order Document Date
2021-01-11
Change Order Project Ball In Court Code
NESCO
Change Order Project Title
Bklyn Tech(K) Athletic Fld Upgr
Change Order Document Type
CO
Change Order Project Stage Date
2021-07-22
Change Order Number
00010
Change Order Project To Status Name
NEW
Change Order Project To Vendor
NESCO
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014866 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014866
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK13
Change Management Number
00010
Change Order Document Date
2021-01-11
Change Order Project Ball In Court Code
NESCO
Change Order Project Title
Bklyn Tech(K) Athletic Fld Upgr
Change Order Document Type
FRE
Change Order Project Stage Date
2021-07-22
Change Order Number
00010
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014866 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014866
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK13
Change Management Number
00003
Change Order Document Date
2019-08-06
Change Order Project Ball In Court Code
NESCO
Change Order Project Title
Bklyn Tech(K) Athletic Fld Upgr
Change Order Document Type
PCO
Change Order Project Stage Date
2020-10-07
Change Order Number
00003
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014866 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014866
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK13
Change Management Number
00015
Change Order Document Date
2021-06-15
Change Order Project Ball In Court Code
NESCO
Change Order Project Title
Bklyn Tech(K) Athletic Fld Upgr
Change Order Document Type
EST
Change Order Project Stage Date
2021-06-15
Change Order Number
00015
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014866 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014866
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK13
Change Management Number
00010
Change Order Document Date
2021-01-11
Change Order Project Ball In Court Code
NESCO
Change Order Project Title
Bklyn Tech(K) Athletic Fld Upgr
Change Order Document Type
PCO
Change Order Project Stage Date
2021-07-22
Change Order Number
00010
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014866 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014866
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK13
Change Management Number
00016
Change Order Document Date
2021-07-02
Change Order Project Ball In Court Code
NESCO
Change Order Project Title
Bklyn Tech(K) Athletic Fld Upgr
Change Order Document Type
EST
Change Order Project Stage Date
2021-07-02
Change Order Number
00016
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014866 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014866
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK13
Change Management Number
00018
Change Order Document Date
2021-07-29
Change Order Project Ball In Court Code
NESCO
Change Order Project Title
Bklyn Tech(K) Athletic Fld Upgr
Change Order Document Type
PCO
Change Order Project Stage Date
2021-08-04
Change Order Number
00018
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014866 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014866
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK13
Change Management Number
00018
Change Order Document Date
2021-07-29
Change Order Project Ball In Court Code
NESCO
Change Order Project Title
Bklyn Tech(K) Athletic Fld Upgr
Change Order Document Type
EST
Change Order Project Stage Date
2021-07-29
Change Order Number
00018
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014866 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014866
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK13
Change Management Number
00003
Change Order Document Date
2019-08-06
Change Order Project Ball In Court Code
NESCO
Change Order Project Title
Bklyn Tech(K) Athletic Fld Upgr
Change Order Document Type
CO
Change Order Project Stage Date
2021-04-06
Change Order Number
00003U
Change Order Project To Status Name
APP
Change Order Project To Vendor
NESCO
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014866 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014866
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK13
Change Management Number
00007
Change Order Document Date
2020-04-09
Change Order Project Ball In Court Code
NESCO
Change Order Project Title
Bklyn Tech(K) Athletic Fld Upgr
Change Order Document Type
EST
Change Order Project Stage Date
2020-04-09
Change Order Number
00007
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014866 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014866
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK13
Change Management Number
00020
Change Order Document Date
2021-09-29
Change Order Project Ball In Court Code
NESCO
Change Order Project Title
Bklyn Tech(K) Athletic Fld Upgr
Change Order Document Type
EST
Change Order Project Stage Date
2021-09-29
Change Order Number
00020
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014866 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014866
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK13
Change Management Number
00003
Change Order Document Date
2019-08-06
Change Order Project Ball In Court Code
NESCO
Change Order Project Title
Bklyn Tech(K) Athletic Fld Upgr
Change Order Document Type
EST
Change Order Project Stage Date
2019-08-06
Change Order Number
00003
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014866 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014866
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK13
Change Management Number
00003
Change Order Document Date
2019-08-06
Change Order Project Ball In Court Code
NESCO
Change Order Project Title
Bklyn Tech(K) Athletic Fld Upgr
Change Order Document Type
FRE
Change Order Project Stage Date
2021-01-14
Change Order Number
00003
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015521 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015521
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK19
Change Management Number
00005
Change Order Document Date
2021-01-20
Change Order Project Ball In Court Code
IND.TEMP
Change Order Project Title
Bklyn Tech(K) Boiler, Climate Cntrl
Change Order Document Type
CO
Change Order Project Stage Date
2021-04-19
Change Order Number
00005WA
Change Order Project To Status Name
APP
Change Order Project To Vendor
IND.TEMP
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015521 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015521
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK19
Change Management Number
00005
Change Order Document Date
2021-01-20
Change Order Project Ball In Court Code
IND.TEMP
Change Order Project Title
Bklyn Tech(K) Boiler, Climate Cntrl
Change Order Document Type
CO
Change Order Project Stage Date
2021-01-20
Change Order Number
00005W
Change Order Project To Status Name
APP
Change Order Project To Vendor
IND.TEMP
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015521 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015521
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK19
Change Management Number
00002
Change Order Document Date
2020-04-28
Change Order Project Ball In Court Code
IND.TEMP
Change Order Project Title
Bklyn Tech(K) Boiler, Climate Cntrl
Change Order Document Type
EST
Change Order Project Stage Date
2020-04-28
Change Order Number
00002
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015521 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015521
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK19
Change Management Number
00005
Change Order Document Date
2021-01-20
Change Order Project Ball In Court Code
IND.TEMP
Change Order Project Title
Bklyn Tech(K) Boiler, Climate Cntrl
Change Order Document Type
EST
Change Order Project Stage Date
2021-01-20
Change Order Number
00005
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015521 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015521
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK19
Change Management Number
00003
Change Order Document Date
2020-12-03
Change Order Project Ball In Court Code
IND.TEMP
Change Order Project Title
Bklyn Tech(K) Boiler, Climate Cntrl
Change Order Document Type
EST
Change Order Project Stage Date
2020-12-03
Change Order Number
00003
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM