Contractor / Sub Contractor Change Order Report

The Contractor / Sub Contractor Change Order Report is a monthly Multi-Project SCA Change Management Report that lists who is currently responsible for Change Management Issues and the last stage/document of the Change Process.

Housing & Development School Construction Authority (SCA) Dataset gzvm-na49 14 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015521 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015521
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK19
Change Management Number
00005
Change Order Document Date
2021-01-20
Change Order Project Ball In Court Code
IND.TEMP
Change Order Project Title
Bklyn Tech(K) Boiler, Climate Cntrl
Change Order Document Type
CO
Change Order Project Stage Date
2021-01-20
Change Order Number
00005W
Change Order Project To Status Name
APP
Change Order Project To Vendor
IND.TEMP
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015521 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015521
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK19
Change Management Number
00008
Change Order Document Date
2021-06-02
Change Order Project Ball In Court Code
IND.TEMP
Change Order Project Title
Bklyn Tech(K) Boiler, Climate Cntrl
Change Order Document Type
CO
Change Order Project Stage Date
2021-07-26
Change Order Number
00008W
Change Order Project To Status Name
APP
Change Order Project To Vendor
IND.TEMP
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015521 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015521
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK19
Change Management Number
00001
Change Order Document Date
2020-04-06
Change Order Project Ball In Court Code
IND.TEMP
Change Order Project Title
Bklyn Tech(K) Boiler, Climate Cntrl
Change Order Document Type
EST
Change Order Project Stage Date
2020-04-06
Change Order Number
00001
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015521 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015521
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK19
Change Management Number
00005
Change Order Document Date
2021-01-20
Change Order Project Ball In Court Code
IND.TEMP
Change Order Project Title
Bklyn Tech(K) Boiler, Climate Cntrl
Change Order Document Type
CO
Change Order Project Stage Date
2021-04-19
Change Order Number
00005WA
Change Order Project To Status Name
APP
Change Order Project To Vendor
IND.TEMP
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015521 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015521
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK19
Change Management Number
00005
Change Order Document Date
2021-01-20
Change Order Project Ball In Court Code
IND.TEMP
Change Order Project Title
Bklyn Tech(K) Boiler, Climate Cntrl
Change Order Document Type
EST
Change Order Project Stage Date
2021-01-20
Change Order Number
00005
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015319 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015319
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK15
Change Management Number
00005
Change Order Document Date
2021-04-21
Change Order Project Ball In Court Code
ALLVOLTS
Change Order Project Title
Bklyn Tech(K) IPDVS Camera Install
Change Order Document Type
PCO
Change Order Project Stage Date
2021-08-16
Change Order Number
00005
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015319 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015319
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK15
Change Management Number
00005
Change Order Document Date
2021-04-21
Change Order Project Ball In Court Code
ALLVOLTS
Change Order Project Title
Bklyn Tech(K) IPDVS Camera Install
Change Order Document Type
EST
Change Order Project Stage Date
2021-05-05
Change Order Number
00005
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015319 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015319
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK15
Change Management Number
00005
Change Order Document Date
2021-04-21
Change Order Project Ball In Court Code
ALLVOLTS
Change Order Project Title
Bklyn Tech(K) IPDVS Camera Install
Change Order Document Type
FRE
Change Order Project Stage Date
2021-08-19
Change Order Number
00005
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015498 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015498
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK17
Change Management Number
00004
Change Order Document Date
2021-07-14
Change Order Project Ball In Court Code
ATJ
Change Order Project Title
Bklyn Tech(K) PA Systems
Change Order Document Type
FRE
Change Order Project Stage Date
2021-10-27
Change Order Number
00004
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015498 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015498
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK17
Change Management Number
00004
Change Order Document Date
2021-07-14
Change Order Project Ball In Court Code
ATJ
Change Order Project Title
Bklyn Tech(K) PA Systems
Change Order Document Type
EST
Change Order Project Stage Date
2021-07-14
Change Order Number
00004
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015498 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015498
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK17
Change Management Number
00004
Change Order Document Date
2021-07-14
Change Order Project Ball In Court Code
ATJ
Change Order Project Title
Bklyn Tech(K) PA Systems
Change Order Document Type
PCO
Change Order Project Stage Date
2021-10-26
Change Order Number
00004
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015498 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015498
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK17
Change Management Number
00006
Change Order Document Date
2021-07-14
Change Order Project Ball In Court Code
ATJ
Change Order Project Title
Bklyn Tech(K) PA Systems
Change Order Document Type
FRE
Change Order Project Stage Date
2021-10-27
Change Order Number
00006
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015498 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015498
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK17
Change Management Number
00006
Change Order Document Date
2021-07-14
Change Order Project Ball In Court Code
ATJ
Change Order Project Title
Bklyn Tech(K) PA Systems
Change Order Document Type
PCO
Change Order Project Stage Date
2021-10-26
Change Order Number
00006
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015498 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015498
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK17
Change Management Number
00004
Change Order Document Date
2021-07-14
Change Order Project Ball In Court Code
ATJ
Change Order Project Title
Bklyn Tech(K) PA Systems
Change Order Document Type
CO
Change Order Project Stage Date
2021-10-27
Change Order Number
00004
Change Order Project To Status Name
NEW
Change Order Project To Vendor
ATJ
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015498 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015498
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK17
Change Management Number
00003
Change Order Document Date
2021-07-14
Change Order Project Ball In Court Code
ATJ
Change Order Project Title
Bklyn Tech(K) PA Systems
Change Order Document Type
PCO
Change Order Project Stage Date
2021-10-19
Change Order Number
00003
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015498 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015498
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK17
Change Management Number
00003
Change Order Document Date
2021-07-14
Change Order Project Ball In Court Code
ATJ
Change Order Project Title
Bklyn Tech(K) PA Systems
Change Order Document Type
EST
Change Order Project Stage Date
2021-07-14
Change Order Number
00003
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015498 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015498
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK17
Change Management Number
00002
Change Order Document Date
2020-09-25
Change Order Project Ball In Court Code
ATJ
Change Order Project Title
Bklyn Tech(K) PA Systems
Change Order Document Type
EST
Change Order Project Stage Date
2020-09-25
Change Order Number
00002
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015498 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015498
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK17
Change Management Number
00005
Change Order Document Date
2021-07-14
Change Order Project Ball In Court Code
ATJ
Change Order Project Title
Bklyn Tech(K) PA Systems
Change Order Document Type
PCO
Change Order Project Stage Date
2021-10-26
Change Order Number
00005
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015498 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015498
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK17
Change Management Number
00008
Change Order Document Date
2021-08-26
Change Order Project Ball In Court Code
ATJ
Change Order Project Title
Bklyn Tech(K) PA Systems
Change Order Document Type
EST
Change Order Project Stage Date
2021-08-26
Change Order Number
00008
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015498 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015498
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK17
Change Management Number
00002
Change Order Document Date
2020-09-25
Change Order Project Ball In Court Code
ATJ
Change Order Project Title
Bklyn Tech(K) PA Systems
Change Order Document Type
PCO
Change Order Project Stage Date
2021-09-24
Change Order Number
00002
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015498 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015498
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK17
Change Management Number
00006
Change Order Document Date
2021-07-14
Change Order Project Ball In Court Code
ATJ
Change Order Project Title
Bklyn Tech(K) PA Systems
Change Order Document Type
CO
Change Order Project Stage Date
2021-10-27
Change Order Number
00006
Change Order Project To Status Name
NEW
Change Order Project To Vendor
ATJ
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015498 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015498
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK17
Change Management Number
00006
Change Order Document Date
2021-07-14
Change Order Project Ball In Court Code
ATJ
Change Order Project Title
Bklyn Tech(K) PA Systems
Change Order Document Type
EST
Change Order Project Stage Date
2021-07-14
Change Order Number
00006
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015498 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015498
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK17
Change Management Number
00005
Change Order Document Date
2021-07-14
Change Order Project Ball In Court Code
ATJ
Change Order Project Title
Bklyn Tech(K) PA Systems
Change Order Document Type
FRE
Change Order Project Stage Date
2021-10-27
Change Order Number
00005
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015498 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015498
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK17
Change Management Number
00005
Change Order Document Date
2021-07-14
Change Order Project Ball In Court Code
ATJ
Change Order Project Title
Bklyn Tech(K) PA Systems
Change Order Document Type
EST
Change Order Project Stage Date
2021-07-14
Change Order Number
00005
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015498 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015498
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK17
Change Management Number
00005
Change Order Document Date
2021-07-14
Change Order Project Ball In Court Code
ATJ
Change Order Project Title
Bklyn Tech(K) PA Systems
Change Order Document Type
CO
Change Order Project Stage Date
2021-10-27
Change Order Number
00005
Change Order Project To Status Name
NEW
Change Order Project To Vendor
ATJ
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014970 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014970
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK14
Change Management Number
00010
Change Order Document Date
2021-10-28
Change Order Project Ball In Court Code
ASHNU
Change Order Project Title
Bklyn Tech(K) Roofs,Prpts,Ext Mas
Change Order Document Type
CO
Change Order Project Stage Date
2021-10-28
Change Order Number
00010W
Change Order Project To Status Name
NEW
Change Order Project To Vendor
ASHNU
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014970 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014970
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK14
Change Management Number
00010
Change Order Document Date
2021-10-28
Change Order Project Ball In Court Code
ASHNU
Change Order Project Title
Bklyn Tech(K) Roofs,Prpts,Ext Mas
Change Order Document Type
EST
Change Order Project Stage Date
2021-10-28
Change Order Number
00010
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014970 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014970
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK14
Change Management Number
00006
Change Order Document Date
2021-03-08
Change Order Project Ball In Court Code
ASHNU
Change Order Project Title
Bklyn Tech(K) Roofs,Prpts,Ext Mas
Change Order Document Type
CO
Change Order Project Stage Date
2021-03-31
Change Order Number
00006W
Change Order Project To Status Name
APP
Change Order Project To Vendor
ASHNU
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000014970 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000014970
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK14
Change Management Number
00006
Change Order Document Date
2021-03-08
Change Order Project Ball In Court Code
ASHNU
Change Order Project Title
Bklyn Tech(K) Roofs,Prpts,Ext Mas
Change Order Document Type
EST
Change Order Project Stage Date
2021-03-08
Change Order Number
00006
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015477 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015477
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK16
Change Management Number
00011
Change Order Document Date
2021-04-07
Change Order Project Ball In Court Code
RED&BLUE
Change Order Project Title
Bklyn Tech(K) Science Lab Upgr
Change Order Document Type
EST
Change Order Project Stage Date
2021-04-07
Change Order Number
00011
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015477 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015477
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK16
Change Management Number
00013
Change Order Document Date
2021-07-21
Change Order Project Ball In Court Code
RED&BLUE
Change Order Project Title
Bklyn Tech(K) Science Lab Upgr
Change Order Document Type
EST
Change Order Project Stage Date
2021-07-21
Change Order Number
00013
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015477 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015477
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK16
Change Management Number
00010
Change Order Document Date
2021-04-07
Change Order Project Ball In Court Code
RED&BLUE
Change Order Project Title
Bklyn Tech(K) Science Lab Upgr
Change Order Document Type
EST
Change Order Project Stage Date
2021-04-07
Change Order Number
000010
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015477 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015477
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK16
Change Management Number
00003
Change Order Document Date
2019-11-08
Change Order Project Ball In Court Code
RED&BLUE
Change Order Project Title
Bklyn Tech(K) Science Lab Upgr
Change Order Document Type
EST
Change Order Project Stage Date
2019-11-08
Change Order Number
00003
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015477 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015477
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK16
Change Management Number
00003
Change Order Document Date
2019-11-08
Change Order Project Ball In Court Code
RED&BLUE
Change Order Project Title
Bklyn Tech(K) Science Lab Upgr
Change Order Document Type
FRE
Change Order Project Stage Date
2021-06-17
Change Order Number
00003
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015477 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015477
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK16
Change Management Number
00003
Change Order Document Date
2019-11-08
Change Order Project Ball In Court Code
RED&BLUE
Change Order Project Title
Bklyn Tech(K) Science Lab Upgr
Change Order Document Type
PCO
Change Order Project Stage Date
2021-06-11
Change Order Number
00003
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015477 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015477
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK16
Change Management Number
00007
Change Order Document Date
2020-03-09
Change Order Project Ball In Court Code
RED&BLUE
Change Order Project Title
Bklyn Tech(K) Science Lab Upgr
Change Order Document Type
EST
Change Order Project Stage Date
2020-03-09
Change Order Number
00007
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015477 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015477
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK16
Change Management Number
00012
Change Order Document Date
2021-07-21
Change Order Project Ball In Court Code
RED&BLUE
Change Order Project Title
Bklyn Tech(K) Science Lab Upgr
Change Order Document Type
EST
Change Order Project Stage Date
2021-07-21
Change Order Number
00012
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015477 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015477
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK16
Change Management Number
00009
Change Order Document Date
2020-07-15
Change Order Project Ball In Court Code
RED&BLUE
Change Order Project Title
Bklyn Tech(K) Science Lab Upgr
Change Order Document Type
EST
Change Order Project Stage Date
2020-07-15
Change Order Number
00009
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015477 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015477
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK16
Change Management Number
00007
Change Order Document Date
2020-03-09
Change Order Project Ball In Court Code
RED&BLUE
Change Order Project Title
Bklyn Tech(K) Science Lab Upgr
Change Order Document Type
FRE
Change Order Project Stage Date
2021-06-17
Change Order Number
00007
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015477 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015477
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK16
Change Management Number
00007
Change Order Document Date
2020-03-09
Change Order Project Ball In Court Code
RED&BLUE
Change Order Project Title
Bklyn Tech(K) Science Lab Upgr
Change Order Document Type
PCO
Change Order Project Stage Date
2021-06-11
Change Order Number
00007
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000013088 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000013088
Change Order Boro Identifier
K
Change Order Project District Identifier
16
Change Order Project Identifier
HSBGHK06
Change Management Number
00019
Change Order Document Date
2016-07-27
Change Order Project Ball In Court Code
FRAMAN
Change Order Project Title
Boys&Girls HS(K)Boil Conv,Clim Cntrl
Change Order Document Type
EST
Change Order Project Stage Date
2016-07-27
Change Order Number
00019
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000013649 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000013649
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK11
Change Management Number
00035
Change Order Document Date
2021-07-16
Change Order Project Ball In Court Code
NEELAM
Change Order Project Title
Brklyn Tech (K) Low Volt,Fire Supp
Change Order Document Type
CO
Change Order Project Stage Date
2021-07-16
Change Order Number
00035W
Change Order Project To Status Name
NEW
Change Order Project To Vendor
NEELAM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000013649 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000013649
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK11
Change Management Number
00016S
Change Order Document Date
2016-12-08
Change Order Project Ball In Court Code
NEELAM
Change Order Project Title
Brklyn Tech (K) Low Volt,Fire Supp
Change Order Document Type
PCO
Change Order Project Stage Date
2017-02-15
Change Order Number
00016S
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000013649 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000013649
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK11
Change Management Number
00036
Change Order Document Date
2021-09-23
Change Order Project Ball In Court Code
NEELAM
Change Order Project Title
Brklyn Tech (K) Low Volt,Fire Supp
Change Order Document Type
EST
Change Order Project Stage Date
2021-09-23
Change Order Number
00036
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000013649 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000013649
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK11
Change Management Number
00035
Change Order Document Date
2021-07-16
Change Order Project Ball In Court Code
NEELAM
Change Order Project Title
Brklyn Tech (K) Low Volt,Fire Supp
Change Order Document Type
EST
Change Order Project Stage Date
2021-07-16
Change Order Number
00035
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000013649 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000013649
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK11
Change Management Number
00030
Change Order Document Date
2020-04-06
Change Order Project Ball In Court Code
NEELAM
Change Order Project Title
Brklyn Tech (K) Low Volt,Fire Supp
Change Order Document Type
EST
Change Order Project Stage Date
2020-04-06
Change Order Number
00030
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000013649 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000013649
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK11
Change Management Number
00016S
Change Order Document Date
2016-12-08
Change Order Project Ball In Court Code
NEELAM
Change Order Project Title
Brklyn Tech (K) Low Volt,Fire Supp
Change Order Document Type
FRE
Change Order Project Stage Date
2017-03-17
Change Order Number
00016S
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000013649 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000013649
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK11
Change Management Number
00032
Change Order Document Date
2020-08-26
Change Order Project Ball In Court Code
NEELAM
Change Order Project Title
Brklyn Tech (K) Low Volt,Fire Supp
Change Order Document Type
EST
Change Order Project Stage Date
2020-08-26
Change Order Number
00032
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000013649 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000013649
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK11
Change Management Number
00016S
Change Order Document Date
2016-12-08
Change Order Project Ball In Court Code
NEELAM
Change Order Project Title
Brklyn Tech (K) Low Volt,Fire Supp
Change Order Document Type
EST
Change Order Project Stage Date
2016-12-08
Change Order Number
00016S
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000013649 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000013649
Change Order Boro Identifier
K
Change Order Project District Identifier
13
Change Order Project Identifier
HSBTHK11
Change Management Number
00016S
Change Order Document Date
2016-12-08
Change Order Project Ball In Court Code
NEELAM
Change Order Project Title
Brklyn Tech (K) Low Volt,Fire Supp
Change Order Document Type
CO
Change Order Project Stage Date
2017-06-05
Change Order Number
00016SU
Change Order Project To Status Name
APP
Change Order Project To Vendor
NEELAM