Street and Highway Capital Reconstruction Projects - Block

This data is a spatial representation of street construction projects. Street and Highway capital projects are major street reconstruction projects, ranging from general street resurfacing projects to full reconstruction of the roadbed, sidewalks, sewer and water pipes and other utilities. Capital projects are essential to keep the City's infrastructure in a state of good repair.

Transportation Department of Transportation (DOT) Dataset jvk9-k4re 27 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
424
Projectid: 424 • Projtitle: Coney Island Phase 3A • Fmsid: CONISPH3A
The Geom
{"type":"MultiLineString","coordinates":[[[-73.98239606617557,40.57551347520351],[-73.9829171162113,40.57546909497741],[-73.98342313376075,40.57541478644122]]]}
Projectid
424
Projtitle
Coney Island Phase 3A
Fmsid
CONISPH3A
Fmsagencyi
826
Leadagency
DEP
Managingag
3
Projectdes
Coney Island Phase 3A: Storm and Sanitary Sewer and Installation of Trunk and Distribution Water Main in Coney Island Area etc. Project construction extended to June 2025 as of 7/2/24 MM
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Substantial Completion
Constructi
2019
Designstar
2016-01-01T00:00:00.000
Construc 2
2022-09-18T00:00:00.000
Currentfun
1899000
Projectcos
1899000
Overallsco
General Roadway
Otherscope
Green Opportunities
Projectjus
The Coney Island Infrastructure Project consists of two phases: Phase 3B, submitted by Stantec (consultant to NYC EDC) to the Public Design Commission (PDC) for preliminary and final review on October 21st, 2016 (approval obtained at December 12th, 2016
Onstreetna
SURF AVENUE
Fromstreet
WEST 15 STREET
Tostreetna
WEST 16 STREET
Boroughnam
BROOKLYN
Oftcode
383630391180391230
Location 1
287.604024275
Designfy
0
Safetyscop
Bus Bulb,Curb Extensions
424
Projectid: 424 • Projtitle: Coney Island Phase 3A • Fmsid: CONISPH3A
The Geom
{"type":"MultiLineString","coordinates":[[[-73.98369997412968,40.58238420709623],[-73.98464613815449,40.58153794408903],[-73.98564359586116,40.58060967433597]]]}
Projectid
424
Projtitle
Coney Island Phase 3A
Fmsid
CONISPH3A
Fmsagencyi
826
Leadagency
DEP
Managingag
3
Projectdes
Coney Island Phase 3A: Storm and Sanitary Sewer and Installation of Trunk and Distribution Water Main in Coney Island Area etc. Project construction extended to June 2025 as of 7/2/24 MM
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Substantial Completion
Constructi
2019
Designstar
2016-01-01T00:00:00.000
Construc 2
2022-09-18T00:00:00.000
Currentfun
1899000
Projectcos
1899000
Overallsco
General Roadway
Otherscope
Green Opportunities
Projectjus
The Coney Island Infrastructure Project consists of two phases: Phase 3B, submitted by Stantec (consultant to NYC EDC) to the Public Design Commission (PDC) for preliminary and final review on October 21st, 2016 (approval obtained at December 12th, 2016
Onstreetna
HART PLACE
Fromstreet
CROPSEY AVENUE
Tostreetna
WEST 15 STREET
Boroughnam
BROOKLYN
Oftcode
347625330630391180
Location 1
842.327850269
Designfy
0
Safetyscop
Bus Bulb,Curb Extensions
424
Projectid: 424 • Projtitle: Coney Island Phase 3A • Fmsid: CONISPH3A
The Geom
{"type":"MultiLineString","coordinates":[[[-73.9841492646602,40.57905270961472],[-73.98521063891316,40.57893714280865]]]}
Projectid
424
Projtitle
Coney Island Phase 3A
Fmsid
CONISPH3A
Fmsagencyi
826
Leadagency
DEP
Managingag
3
Projectdes
Coney Island Phase 3A: Storm and Sanitary Sewer and Installation of Trunk and Distribution Water Main in Coney Island Area etc. Project construction extended to June 2025 as of 7/2/24 MM
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Substantial Completion
Constructi
2019
Designstar
2016-01-01T00:00:00.000
Construc 2
2022-09-18T00:00:00.000
Currentfun
1899000
Projectcos
1899000
Overallsco
General Roadway
Otherscope
Green Opportunities
Projectjus
The Coney Island Infrastructure Project consists of two phases: Phase 3B, submitted by Stantec (consultant to NYC EDC) to the Public Design Commission (PDC) for preliminary and final review on October 21st, 2016 (approval obtained at December 12th, 2016
Onstreetna
NEPTUNE AVENUE
Fromstreet
WEST 16 STREET
Tostreetna
WEST 17 STREET
Boroughnam
BROOKLYN
Oftcode
364230391230391280
Location 1
297.82406006
Designfy
0
Safetyscop
Bus Bulb,Curb Extensions
424
Projectid: 424 • Projtitle: Coney Island Phase 3A • Fmsid: CONISPH3A
The Geom
{"type":"MultiLineString","coordinates":[[[-73.97963850334689,40.575536730356745],[-73.98064359542964,40.57555270110052]]]}
Projectid
424
Projtitle
Coney Island Phase 3A
Fmsid
CONISPH3A
Fmsagencyi
826
Leadagency
DEP
Managingag
3
Projectdes
Coney Island Phase 3A: Storm and Sanitary Sewer and Installation of Trunk and Distribution Water Main in Coney Island Area etc. Project construction extended to June 2025 as of 7/2/24 MM
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Substantial Completion
Constructi
2019
Designstar
2016-01-01T00:00:00.000
Construc 2
2022-09-18T00:00:00.000
Currentfun
1899000
Projectcos
1899000
Overallsco
General Roadway
Otherscope
Green Opportunities
Projectjus
The Coney Island Infrastructure Project consists of two phases: Phase 3B, submitted by Stantec (consultant to NYC EDC) to the Public Design Commission (PDC) for preliminary and final review on October 21st, 2016 (approval obtained at December 12th, 2016
Onstreetna
SURF AVENUE
Fromstreet
WEST 12 STREET
Tostreetna
HENDERSON WALK
Boroughnam
BROOKLYN
Oftcode
383630391080348530
Location 1
279.273644507
Designfy
0
Safetyscop
Bus Bulb,Curb Extensions
424
Projectid: 424 • Projtitle: Coney Island Phase 3A • Fmsid: CONISPH3A
The Geom
{"type":"MultiLineString","coordinates":[[[-73.9812181261717,40.57556893206242],[-73.98173293002148,40.575549914952155]]]}
Projectid
424
Projtitle
Coney Island Phase 3A
Fmsid
CONISPH3A
Fmsagencyi
826
Leadagency
DEP
Managingag
3
Projectdes
Coney Island Phase 3A: Storm and Sanitary Sewer and Installation of Trunk and Distribution Water Main in Coney Island Area etc. Project construction extended to June 2025 as of 7/2/24 MM
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Substantial Completion
Constructi
2019
Designstar
2016-01-01T00:00:00.000
Construc 2
2022-09-18T00:00:00.000
Currentfun
1899000
Projectcos
1899000
Overallsco
General Roadway
Otherscope
Green Opportunities
Projectjus
The Coney Island Infrastructure Project consists of two phases: Phase 3B, submitted by Stantec (consultant to NYC EDC) to the Public Design Commission (PDC) for preliminary and final review on October 21st, 2016 (approval obtained at December 12th, 2016
Onstreetna
SURF AVENUE
Fromstreet
STILLWELL AVENUE
Tostreetna
SCHWEIKERTS WALK
Boroughnam
BROOKLYN
Oftcode
383630381830375750
Location 1
143.179410887
Designfy
0
Safetyscop
Bus Bulb,Curb Extensions
424
Projectid: 424 • Projtitle: Coney Island Phase 3A • Fmsid: CONISPH3A
The Geom
{"type":"MultiLineString","coordinates":[[[-73.9841492646602,40.57905270961472],[-73.98371127142198,40.57674332615874]]]}
Projectid
424
Projtitle
Coney Island Phase 3A
Fmsid
CONISPH3A
Fmsagencyi
826
Leadagency
DEP
Managingag
3
Projectdes
Coney Island Phase 3A: Storm and Sanitary Sewer and Installation of Trunk and Distribution Water Main in Coney Island Area etc. Project construction extended to June 2025 as of 7/2/24 MM
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Substantial Completion
Constructi
2019
Designstar
2016-01-01T00:00:00.000
Construc 2
2022-09-18T00:00:00.000
Currentfun
1899000
Projectcos
1899000
Overallsco
General Roadway
Otherscope
Green Opportunities
Projectjus
The Coney Island Infrastructure Project consists of two phases: Phase 3B, submitted by Stantec (consultant to NYC EDC) to the Public Design Commission (PDC) for preliminary and final review on October 21st, 2016 (approval obtained at December 12th, 2016
Onstreetna
WEST 16 STREET
Fromstreet
MERMAID AVENUE
Tostreetna
NEPTUNE AVENUE
Boroughnam
BROOKLYN
Oftcode
391230360330364230
Location 1
850.117570641
Designfy
0
Safetyscop
Bus Bulb,Curb Extensions
424
Projectid: 424 • Projtitle: Coney Island Phase 3A • Fmsid: CONISPH3A
The Geom
{"type":"MultiLineString","coordinates":[[[-73.98193839582153,40.5791997090519],[-73.9830861651907,40.57916176457695]]]}
Projectid
424
Projtitle
Coney Island Phase 3A
Fmsid
CONISPH3A
Fmsagencyi
826
Leadagency
DEP
Managingag
3
Projectdes
Coney Island Phase 3A: Storm and Sanitary Sewer and Installation of Trunk and Distribution Water Main in Coney Island Area etc. Project construction extended to June 2025 as of 7/2/24 MM
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Substantial Completion
Constructi
2019
Designstar
2016-01-01T00:00:00.000
Construc 2
2022-09-18T00:00:00.000
Currentfun
1899000
Projectcos
1899000
Overallsco
General Roadway
Otherscope
Green Opportunities
Projectjus
The Coney Island Infrastructure Project consists of two phases: Phase 3B, submitted by Stantec (consultant to NYC EDC) to the Public Design Commission (PDC) for preliminary and final review on October 21st, 2016 (approval obtained at December 12th, 2016
Onstreetna
NEPTUNE AVENUE
Fromstreet
STILLWELL AVENUE
Tostreetna
WEST 15 STREET
Boroughnam
BROOKLYN
Oftcode
364230381830391180
Location 1
319.130754134
Designfy
0
Safetyscop
Bus Bulb,Curb Extensions
424
Projectid: 424 • Projtitle: Coney Island Phase 3A • Fmsid: CONISPH3A
The Geom
{"type":"MultiLineString","coordinates":[[[-73.9830861651907,40.57916176457695],[-73.9841492646602,40.57905270961472]]]}
Projectid
424
Projtitle
Coney Island Phase 3A
Fmsid
CONISPH3A
Fmsagencyi
826
Leadagency
DEP
Managingag
3
Projectdes
Coney Island Phase 3A: Storm and Sanitary Sewer and Installation of Trunk and Distribution Water Main in Coney Island Area etc. Project construction extended to June 2025 as of 7/2/24 MM
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Substantial Completion
Constructi
2019
Designstar
2016-01-01T00:00:00.000
Construc 2
2022-09-18T00:00:00.000
Currentfun
1899000
Projectcos
1899000
Overallsco
General Roadway
Otherscope
Green Opportunities
Projectjus
The Coney Island Infrastructure Project consists of two phases: Phase 3B, submitted by Stantec (consultant to NYC EDC) to the Public Design Commission (PDC) for preliminary and final review on October 21st, 2016 (approval obtained at December 12th, 2016
Onstreetna
NEPTUNE AVENUE
Fromstreet
WEST 15 STREET
Tostreetna
WEST 16 STREET
Boroughnam
BROOKLYN
Oftcode
364230391180391230
Location 1
297.972396324
Designfy
0
Safetyscop
Bus Bulb,Curb Extensions
424
Projectid: 424 • Projtitle: Coney Island Phase 3A • Fmsid: CONISPH3A
The Geom
{"type":"MultiLineString","coordinates":[[[-73.9841492646602,40.57905270961472],[-73.98521063891316,40.57893714280865]]]}
Projectid
424
Projtitle
Coney Island Phase 3A
Fmsid
CONISPH3A
Fmsagencyi
826
Leadagency
DEP
Managingag
3
Projectdes
Coney Island Phase 3A: Storm and Sanitary Sewer and Installation of Trunk and Distribution Water Main in Coney Island Area etc. Project construction extended to June 2025 as of 7/2/24 MM
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Substantial Completion
Constructi
2019
Designstar
2016-01-01T00:00:00.000
Construc 2
2022-09-18T00:00:00.000
Currentfun
1899000
Projectcos
1899000
Overallsco
General Roadway
Otherscope
Green Opportunities
Projectjus
The Coney Island Infrastructure Project consists of two phases: Phase 3B, submitted by Stantec (consultant to NYC EDC) to the Public Design Commission (PDC) for preliminary and final review on October 21st, 2016 (approval obtained at December 12th, 2016
Onstreetna
NEPTUNE AVENUE
Fromstreet
WEST 16 STREET
Tostreetna
WEST 17 STREET
Boroughnam
BROOKLYN
Oftcode
364230391230391280
Location 1
297.82406006
Designfy
0
Safetyscop
Bus Bulb,Curb Extensions
424
Projectid: 424 • Projtitle: Coney Island Phase 3A • Fmsid: CONISPH3A
The Geom
{"type":"MultiLineString","coordinates":[[[-73.9841492646602,40.57905270961472],[-73.98521063891316,40.57893714280865]]]}
Projectid
424
Projtitle
Coney Island Phase 3A
Fmsid
CONISPH3A
Fmsagencyi
826
Leadagency
DEP
Managingag
3
Projectdes
Coney Island Phase 3A: Storm and Sanitary Sewer and Installation of Trunk and Distribution Water Main in Coney Island Area etc. Project construction extended to June 2025 as of 7/2/24 MM
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Substantial Completion
Constructi
2019
Designstar
2016-01-01T00:00:00.000
Construc 2
2022-09-18T00:00:00.000
Currentfun
1899000
Projectcos
1899000
Overallsco
General Roadway
Otherscope
Green Opportunities
Projectjus
The Coney Island Infrastructure Project consists of two phases: Phase 3B, submitted by Stantec (consultant to NYC EDC) to the Public Design Commission (PDC) for preliminary and final review on October 21st, 2016 (approval obtained at December 12th, 2016
Onstreetna
NEPTUNE AVENUE
Fromstreet
WEST 16 STREET
Tostreetna
WEST 17 STREET
Boroughnam
BROOKLYN
Oftcode
364230391230391280
Location 1
297.82406006
Designfy
0
Safetyscop
Bus Bulb,Curb Extensions
424
Projectid: 424 • Projtitle: Coney Island Phase 3A • Fmsid: CONISPH3A
The Geom
{"type":"MultiLineString","coordinates":[[[-73.98156367365765,40.57698182062202],[-73.98265122964403,40.57685931158431]]]}
Projectid
424
Projtitle
Coney Island Phase 3A
Fmsid
CONISPH3A
Fmsagencyi
826
Leadagency
DEP
Managingag
3
Projectdes
Coney Island Phase 3A: Storm and Sanitary Sewer and Installation of Trunk and Distribution Water Main in Coney Island Area etc. Project construction extended to June 2025 as of 7/2/24 MM
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Substantial Completion
Constructi
2019
Designstar
2016-01-01T00:00:00.000
Construc 2
2022-09-18T00:00:00.000
Currentfun
1899000
Projectcos
1899000
Overallsco
General Roadway
Otherscope
Green Opportunities
Projectjus
The Coney Island Infrastructure Project consists of two phases: Phase 3B, submitted by Stantec (consultant to NYC EDC) to the Public Design Commission (PDC) for preliminary and final review on October 21st, 2016 (approval obtained at December 12th, 2016
Onstreetna
MERMAID AVENUE
Fromstreet
STILLWELL AVENUE
Tostreetna
WEST 15 STREET
Boroughnam
BROOKLYN
Oftcode
360330381830391180
Location 1
305.394292121
Designfy
0
Safetyscop
Bus Bulb,Curb Extensions
424
Projectid: 424 • Projtitle: Coney Island Phase 3A • Fmsid: CONISPH3A
The Geom
{"type":"MultiLineString","coordinates":[[[-73.9812181261717,40.57556893206242],[-73.9810495601479,40.574803368589755]]]}
Projectid
424
Projtitle
Coney Island Phase 3A
Fmsid
CONISPH3A
Fmsagencyi
826
Leadagency
DEP
Managingag
3
Projectdes
Coney Island Phase 3A: Storm and Sanitary Sewer and Installation of Trunk and Distribution Water Main in Coney Island Area etc. Project construction extended to June 2025 as of 7/2/24 MM
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Substantial Completion
Constructi
2019
Designstar
2016-01-01T00:00:00.000
Construc 2
2022-09-18T00:00:00.000
Currentfun
1899000
Projectcos
1899000
Overallsco
General Roadway
Otherscope
Green Opportunities
Projectjus
The Coney Island Infrastructure Project consists of two phases: Phase 3B, submitted by Stantec (consultant to NYC EDC) to the Public Design Commission (PDC) for preliminary and final review on October 21st, 2016 (approval obtained at December 12th, 2016
Onstreetna
STILLWELL AVENUE
Fromstreet
BOWERY
Tostreetna
SURF AVENUE
Boroughnam
BROOKLYN
Oftcode
381830320670383630
Location 1
282.817428542
Designfy
0
Safetyscop
Bus Bulb,Curb Extensions
424
Projectid: 424 • Projtitle: Coney Island Phase 3A • Fmsid: CONISPH3A
The Geom
{"type":"MultiLineString","coordinates":[[[-73.98156367365765,40.57698182062202],[-73.9812181261717,40.57556893206242]]]}
Projectid
424
Projtitle
Coney Island Phase 3A
Fmsid
CONISPH3A
Fmsagencyi
826
Leadagency
DEP
Managingag
3
Projectdes
Coney Island Phase 3A: Storm and Sanitary Sewer and Installation of Trunk and Distribution Water Main in Coney Island Area etc. Project construction extended to June 2025 as of 7/2/24 MM
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Substantial Completion
Constructi
2019
Designstar
2016-01-01T00:00:00.000
Construc 2
2022-09-18T00:00:00.000
Currentfun
1899000
Projectcos
1899000
Overallsco
General Roadway
Otherscope
Green Opportunities
Projectjus
The Coney Island Infrastructure Project consists of two phases: Phase 3B, submitted by Stantec (consultant to NYC EDC) to the Public Design Commission (PDC) for preliminary and final review on October 21st, 2016 (approval obtained at December 12th, 2016
Onstreetna
STILLWELL AVENUE
Fromstreet
MERMAID AVENUE
Tostreetna
SURF AVENUE
Boroughnam
BROOKLYN
Oftcode
381830360330383630
Location 1
523.62418555
Designfy
0
Safetyscop
Bus Bulb,Curb Extensions
437
Projectid: 437 • Projtitle: Purchase and Installation of Telephone System for 55 Water St • Fmsid: DOTCONTEL
The Geom
{"type":"MultiLineString","coordinates":[[[-74.01034630533326,40.70326847744708],[-74.00898755324148,40.70408482794114]]]}
Projectid
437
Projtitle
Purchase and Installation of Telephone System for 55 Water St
Fmsid
DOTCONTEL
Fmsagencyi
841
Leadagency
DOT
Managingag
1
Projectdes
Purchase and Installation of Telephone System for 55 Water St
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2012
Currentfun
140000
Projectcos
140000
Onstreetna
WATER STREET
Fromstreet
COENTIES SLIP
Tostreetna
OLD SLIP
Boroughnam
MANHATTAN
Oftcode
133490115550127410
Location 1
479.988072669
Designfy
0
Safetyscop
Plaza
437
Projectid: 437 • Projtitle: Purchase and Installation of Telephone System for 55 Water St • Fmsid: DOTCONTEL
The Geom
{"type":"MultiLineString","coordinates":[[[-74.01034630533326,40.70326847744708],[-74.00898755324148,40.70408482794114]]]}
Projectid
437
Projtitle
Purchase and Installation of Telephone System for 55 Water St
Fmsid
DOTCONTEL
Fmsagencyi
841
Leadagency
DOT
Managingag
1
Projectdes
Purchase and Installation of Telephone System for 55 Water St
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2012
Currentfun
140000
Projectcos
140000
Onstreetna
WATER STREET
Fromstreet
COENTIES SLIP
Tostreetna
OLD SLIP
Boroughnam
MANHATTAN
Oftcode
133490115550127410
Location 1
479.988072669
Designfy
0
Safetyscop
Plaza
437
Projectid: 437 • Projtitle: Purchase and Installation of Telephone System for 55 Water St • Fmsid: DOTCONTEL
The Geom
{"type":"MultiLineString","coordinates":[[[-74.00898755324148,40.70408482794114],[-74.01034630533326,40.70326847744708],[-74.01150567189198,40.70295884350316]]]}
Projectid
437
Projtitle
Purchase and Installation of Telephone System for 55 Water St
Fmsid
DOTCONTEL
Fmsagencyi
841
Leadagency
DOT
Managingag
1
Projectdes
Purchase and Installation of Telephone System for 55 Water St
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2012
Currentfun
140000
Projectcos
140000
Onstreetna
WATER STREET
Fromstreet
BROAD STREET
Tostreetna
OLD SLIP
Boroughnam
MANHATTAN
Oftcode
133490113590127410
Location 1
820.66274506
Designfy
0
Safetyscop
Plaza
437
Projectid: 437 • Projtitle: Purchase and Installation of Telephone System for 55 Water St • Fmsid: DOTCONTEL
The Geom
{"type":"MultiLineString","coordinates":[[[-74.00898755324148,40.70408482794114],[-74.01034630533326,40.70326847744708],[-74.01150567189198,40.70295884350316]]]}
Projectid
437
Projtitle
Purchase and Installation of Telephone System for 55 Water St
Fmsid
DOTCONTEL
Fmsagencyi
841
Leadagency
DOT
Managingag
1
Projectdes
Purchase and Installation of Telephone System for 55 Water St
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2012
Currentfun
140000
Projectcos
140000
Onstreetna
WATER STREET
Fromstreet
BROAD STREET
Tostreetna
OLD SLIP
Boroughnam
MANHATTAN
Oftcode
133490113590127410
Location 1
820.66274506
Designfy
0
Safetyscop
Plaza
439
Projectid: 439 • Projtitle: Downtown Brooklyn redevelopment - Fox Square • Fmsid: DTBKFLATM
The Geom
{"type":"MultiLineString","coordinates":[[[-73.98092822894237,40.68890247709402],[-73.98087617951285,40.688816214583305],[-73.98084308022202,40.68876136150933]]]}
Projectid
439
Projtitle
Downtown Brooklyn redevelopment - Fox Square
Fmsid
DTBKFLATM
Fmsagencyi
801
Leadagency
EDC
Managingag
31
Projectdes
Fox Square lies at the convergence of Fulton Street and Flatbush Avenue in Downtown Brooklyn. The design will permanently reconfigure pedestrian circulation at Fox Square to enhance mobility. The design includes significant improvements to the design o
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2014
Currentfun
1769342.0
Projectcos
1769342.0
Overallsco
General Roadway
Onstreetna
FLATBUSH AVENUE
Fromstreet
FULTON STREET
Tostreetna
NEVINS STREET
Boroughnam
BROOKLYN
Oftcode
340930342730364330
Location 1
56.5762525822
Designfy
2012
Safetyscop
Lane Removal or Road Narrowing,Plaza
439
Projectid: 439 • Projtitle: Downtown Brooklyn redevelopment - Fox Square • Fmsid: DTBKFLATM
The Geom
{"type":"MultiLineString","coordinates":[[[-73.98092822894237,40.68890247709402],[-73.98083375226479,40.68886378434822],[-73.98057426175227,40.68876219714738],[-73.98025764136456,40.688638243427384]]]}
Projectid
439
Projtitle
Downtown Brooklyn redevelopment - Fox Square
Fmsid
DTBKFLATM
Fmsagencyi
801
Leadagency
EDC
Managingag
31
Projectdes
Fox Square lies at the convergence of Fulton Street and Flatbush Avenue in Downtown Brooklyn. The design will permanently reconfigure pedestrian circulation at Fox Square to enhance mobility. The design includes significant improvements to the design o
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2014
Currentfun
1769342.0
Projectcos
1769342.0
Overallsco
General Roadway
Onstreetna
FULTON STREET
Fromstreet
FLATBUSH AVENUE
Tostreetna
HUDSON AVENUE
Boroughnam
BROOKLYN
Oftcode
342730340930351330
Location 1
209.416131685
Designfy
2012
Safetyscop
Lane Removal or Road Narrowing,Plaza
439
Projectid: 439 • Projtitle: Downtown Brooklyn redevelopment - Fox Square • Fmsid: DTBKFLATM
The Geom
{"type":"MultiLineString","coordinates":[[[-73.98092822894237,40.68890247709402],[-73.98083375226479,40.68886378434822],[-73.98057426175227,40.68876219714738],[-73.98025764136456,40.688638243427384],[-73.97928542986571,40.68825404767924]]]}
Projectid
439
Projtitle
Downtown Brooklyn redevelopment - Fox Square
Fmsid
DTBKFLATM
Fmsagencyi
801
Leadagency
EDC
Managingag
31
Projectdes
Fox Square lies at the convergence of Fulton Street and Flatbush Avenue in Downtown Brooklyn. The design will permanently reconfigure pedestrian circulation at Fox Square to enhance mobility. The design includes significant improvements to the design o
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2014
Currentfun
1769342.0
Projectcos
1769342.0
Overallsco
General Roadway
Onstreetna
FULTON STREET
Fromstreet
FLATBUSH AVENUE
Tostreetna
ROCKWELL PLACE
Boroughnam
BROOKLYN
Oftcode
342730340930373490
Location 1
513.206923937
Designfy
2012
Safetyscop
Lane Removal or Road Narrowing,Plaza
439
Projectid: 439 • Projtitle: Downtown Brooklyn redevelopment - Fox Square • Fmsid: DTBKFLATM
The Geom
{"type":"MultiLineString","coordinates":[[[-73.98092822894237,40.68890247709402],[-73.98087617951285,40.688816214583305],[-73.98084308022202,40.68876136150933]]]}
Projectid
439
Projtitle
Downtown Brooklyn redevelopment - Fox Square
Fmsid
DTBKFLATM
Fmsagencyi
801
Leadagency
EDC
Managingag
31
Projectdes
Fox Square lies at the convergence of Fulton Street and Flatbush Avenue in Downtown Brooklyn. The design will permanently reconfigure pedestrian circulation at Fox Square to enhance mobility. The design includes significant improvements to the design o
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2014
Currentfun
1769342.0
Projectcos
1769342.0
Overallsco
General Roadway
Onstreetna
FLATBUSH AVENUE
Fromstreet
FULTON STREET
Tostreetna
NEVINS STREET
Boroughnam
BROOKLYN
Oftcode
340930342730364330
Location 1
56.5762525822
Designfy
2012
Safetyscop
Lane Removal or Road Narrowing,Plaza
439
Projectid: 439 • Projtitle: Downtown Brooklyn redevelopment - Fox Square • Fmsid: DTBKFLATM
The Geom
{"type":"MultiLineString","coordinates":[[[-73.98092822894237,40.68890247709402],[-73.98083375226479,40.68886378434822],[-73.98057426175227,40.68876219714738],[-73.98025764136456,40.688638243427384]]]}
Projectid
439
Projtitle
Downtown Brooklyn redevelopment - Fox Square
Fmsid
DTBKFLATM
Fmsagencyi
801
Leadagency
EDC
Managingag
31
Projectdes
Fox Square lies at the convergence of Fulton Street and Flatbush Avenue in Downtown Brooklyn. The design will permanently reconfigure pedestrian circulation at Fox Square to enhance mobility. The design includes significant improvements to the design o
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2014
Currentfun
1769342.0
Projectcos
1769342.0
Overallsco
General Roadway
Onstreetna
FULTON STREET
Fromstreet
FLATBUSH AVENUE
Tostreetna
HUDSON AVENUE
Boroughnam
BROOKLYN
Oftcode
342730340930351330
Location 1
209.416131685
Designfy
2012
Safetyscop
Lane Removal or Road Narrowing,Plaza
439
Projectid: 439 • Projtitle: Downtown Brooklyn redevelopment - Fox Square • Fmsid: DTBKFLATM
The Geom
{"type":"MultiLineString","coordinates":[[[-73.98092822894237,40.68890247709402],[-73.98083375226479,40.68886378434822],[-73.98057426175227,40.68876219714738],[-73.98025764136456,40.688638243427384],[-73.97928542986571,40.68825404767924]]]}
Projectid
439
Projtitle
Downtown Brooklyn redevelopment - Fox Square
Fmsid
DTBKFLATM
Fmsagencyi
801
Leadagency
EDC
Managingag
31
Projectdes
Fox Square lies at the convergence of Fulton Street and Flatbush Avenue in Downtown Brooklyn. The design will permanently reconfigure pedestrian circulation at Fox Square to enhance mobility. The design includes significant improvements to the design o
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2014
Currentfun
1769342.0
Projectcos
1769342.0
Overallsco
General Roadway
Onstreetna
FULTON STREET
Fromstreet
FLATBUSH AVENUE
Tostreetna
ROCKWELL PLACE
Boroughnam
BROOKLYN
Oftcode
342730340930373490
Location 1
513.206923937
Designfy
2012
Safetyscop
Lane Removal or Road Narrowing,Plaza
439
Projectid: 439 • Projtitle: Downtown Brooklyn redevelopment - Fox Square • Fmsid: DTBKFLATM
The Geom
{"type":"MultiLineString","coordinates":[[[-73.98038169236804,40.687552515558586],[-73.98032737292147,40.68753988108561],[-73.98026066457356,40.6875412384428],[-73.98019191298908,40.687563181148825],[-73.98013763639447,40.68760535184672],[-73.98011024610463,40.687658126213066],[-73.98010985239003,40.687708933117264],[-73.9801275614694,40.68775000859782],[-73.98064972200712,40.688459477065024],[-73.98069118209625,40.68851581114349],[-73.98084308022202,40.68876136150933],[-73.98087617951285,40.688816214583305],[-73.98092822894237,40.68890247709402]]]}
Projectid
439
Projtitle
Downtown Brooklyn redevelopment - Fox Square
Fmsid
DTBKFLATM
Fmsagencyi
801
Leadagency
EDC
Managingag
31
Projectdes
Fox Square lies at the convergence of Fulton Street and Flatbush Avenue in Downtown Brooklyn. The design will permanently reconfigure pedestrian circulation at Fox Square to enhance mobility. The design includes significant improvements to the design o
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2014
Currentfun
1769342.0
Projectcos
1769342.0
Overallsco
General Roadway
Onstreetna
FLATBUSH AVENUE
Fromstreet
FLATBUSH AVENUE EXTENSION
Tostreetna
LIVINGSTON STREET
Boroughnam
BROOKLYN
Oftcode
340930340830356530
Location 1
606.64305668
Designfy
2012
Safetyscop
Lane Removal or Road Narrowing,Plaza
440
Projectid: 440 • Projtitle: Downtown Brooklyn Redevelopment - Fulton Mall • Fmsid: DTBKLYNFM
The Geom
{"type":"MultiLineString","coordinates":[[[-73.98902944739646,40.692123860618445],[-73.98893356281373,40.69208664134061],[-73.9882070140924,40.69180695989094]]]}
Projectid
440
Projtitle
Downtown Brooklyn Redevelopment - Fulton Mall
Fmsid
DTBKLYNFM
Fmsagencyi
801
Leadagency
EDC
Managingag
31
Projectdes
Fulton St from Adams St to Flatbush Ave Extension (EDC project)
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2011-02-08T00:00:00.000
Construc 2
2013-04-05T00:00:00.000
Currentfun
2354329.0
Projectcos
2354230.0
Overallsco
General Roadway
Onstreetna
FULTON STREET
Fromstreet
BOERUM PLACE
Tostreetna
PEARL STREET
Boroughnam
BROOKLYN
Oftcode
342730320110370130
Location 1
255.63112521
Designfy
2009
Safetyscop
Plaza
440
Projectid: 440 • Projtitle: Downtown Brooklyn Redevelopment - Fulton Mall • Fmsid: DTBKLYNFM
The Geom
{"type":"MultiLineString","coordinates":[[[-73.98295684393194,40.68969981904458],[-73.98209737984415,40.68935800948967]]]}
Projectid
440
Projtitle
Downtown Brooklyn Redevelopment - Fulton Mall
Fmsid
DTBKLYNFM
Fmsagencyi
801
Leadagency
EDC
Managingag
31
Projectdes
Fulton St from Adams St to Flatbush Ave Extension (EDC project)
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2011-02-08T00:00:00.000
Construc 2
2013-04-05T00:00:00.000
Currentfun
2354329.0
Projectcos
2354230.0
Overallsco
General Roadway
Onstreetna
FULTON STREET
Fromstreet
BOND STREET
Tostreetna
HANOVER PLACE
Boroughnam
BROOKLYN
Oftcode
342730320530347100
Location 1
268.921757176
Designfy
2009
Safetyscop
Plaza
440
Projectid: 440 • Projtitle: Downtown Brooklyn Redevelopment - Fulton Mall • Fmsid: DTBKLYNFM
The Geom
{"type":"MultiLineString","coordinates":[[[-73.98536391906634,40.69066661266113],[-73.98510412092583,40.69056114544354]]]}
Projectid
440
Projtitle
Downtown Brooklyn Redevelopment - Fulton Mall
Fmsid
DTBKLYNFM
Fmsagencyi
801
Leadagency
EDC
Managingag
31
Projectdes
Fulton St from Adams St to Flatbush Ave Extension (EDC project)
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2011-02-08T00:00:00.000
Construc 2
2013-04-05T00:00:00.000
Currentfun
2354329.0
Projectcos
2354230.0
Overallsco
General Roadway
Onstreetna
FULTON STREET
Fromstreet
BRIDGE STREET
Tostreetna
HOYT STREET
Boroughnam
BROOKLYN
Oftcode
342730321130351030
Location 1
81.6533040193
Designfy
2009
Safetyscop
Plaza
440
Projectid: 440 • Projtitle: Downtown Brooklyn Redevelopment - Fulton Mall • Fmsid: DTBKLYNFM
The Geom
{"type":"MultiLineString","coordinates":[[[-73.98443216320744,40.69029217227023],[-73.98407034099083,40.69014307881223]]]}
Projectid
440
Projtitle
Downtown Brooklyn Redevelopment - Fulton Mall
Fmsid
DTBKLYNFM
Fmsagencyi
801
Leadagency
EDC
Managingag
31
Projectdes
Fulton St from Adams St to Flatbush Ave Extension (EDC project)
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2011-02-08T00:00:00.000
Construc 2
2013-04-05T00:00:00.000
Currentfun
2354329.0
Projectcos
2354230.0
Overallsco
General Roadway
Onstreetna
FULTON STREET
Fromstreet
DUFFIELD STREET
Tostreetna
ELM PLACE
Boroughnam
BROOKLYN
Oftcode
342730334230338950
Location 1
114.100391775
Designfy
2009
Safetyscop
Plaza
440
Projectid: 440 • Projtitle: Downtown Brooklyn Redevelopment - Fulton Mall • Fmsid: DTBKLYNFM
The Geom
{"type":"MultiLineString","coordinates":[[[-73.98510412092583,40.69056114544354],[-73.98443216320744,40.69029217227023]]]}
Projectid
440
Projtitle
Downtown Brooklyn Redevelopment - Fulton Mall
Fmsid
DTBKLYNFM
Fmsagencyi
801
Leadagency
EDC
Managingag
31
Projectdes
Fulton St from Adams St to Flatbush Ave Extension (EDC project)
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2011-02-08T00:00:00.000
Construc 2
2013-04-05T00:00:00.000
Currentfun
2354329.0
Projectcos
2354230.0
Overallsco
General Roadway
Onstreetna
FULTON STREET
Fromstreet
DUFFIELD STREET
Tostreetna
HOYT STREET
Boroughnam
BROOKLYN
Oftcode
342730334230351030
Location 1
210.543262297
Designfy
2009
Safetyscop
Plaza
440
Projectid: 440 • Projtitle: Downtown Brooklyn Redevelopment - Fulton Mall • Fmsid: DTBKLYNFM
The Geom
{"type":"MultiLineString","coordinates":[[[-73.98209737984415,40.68935800948967],[-73.9815529829494,40.689146164199116],[-73.98101786809855,40.68893792711602],[-73.98092822894237,40.68890247709402]]]}
Projectid
440
Projtitle
Downtown Brooklyn Redevelopment - Fulton Mall
Fmsid
DTBKLYNFM
Fmsagencyi
801
Leadagency
EDC
Managingag
31
Projectdes
Fulton St from Adams St to Flatbush Ave Extension (EDC project)
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2011-02-08T00:00:00.000
Construc 2
2013-04-05T00:00:00.000
Currentfun
2354329.0
Projectcos
2354230.0
Overallsco
General Roadway
Onstreetna
FULTON STREET
Fromstreet
FLATBUSH AVENUE
Tostreetna
HANOVER PLACE
Boroughnam
BROOKLYN
Oftcode
342730340930347100
Location 1
364.243536396
Designfy
2009
Safetyscop
Plaza
440
Projectid: 440 • Projtitle: Downtown Brooklyn Redevelopment - Fulton Mall • Fmsid: DTBKLYNFM
The Geom
{"type":"MultiLineString","coordinates":[[[-73.98734787475532,40.69145766769347],[-73.986464362539,40.69110361149252]]]}
Projectid
440
Projtitle
Downtown Brooklyn Redevelopment - Fulton Mall
Fmsid
DTBKLYNFM
Fmsagencyi
801
Leadagency
EDC
Managingag
31
Projectdes
Fulton St from Adams St to Flatbush Ave Extension (EDC project)
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2011-02-08T00:00:00.000
Construc 2
2013-04-05T00:00:00.000
Currentfun
2354329.0
Projectcos
2354230.0
Overallsco
General Roadway
Onstreetna
FULTON STREET
Fromstreet
GALLATIN PLACE
Tostreetna
SMITH STREET
Boroughnam
BROOKLYN
Oftcode
342730342900377730
Location 1
276.894563247
Designfy
2009
Safetyscop
Plaza
440
Projectid: 440 • Projtitle: Downtown Brooklyn Redevelopment - Fulton Mall • Fmsid: DTBKLYNFM
The Geom
{"type":"MultiLineString","coordinates":[[[-73.9882070140924,40.69180695989094],[-73.98734787475532,40.69145766769347]]]}
Projectid
440
Projtitle
Downtown Brooklyn Redevelopment - Fulton Mall
Fmsid
DTBKLYNFM
Fmsagencyi
801
Leadagency
EDC
Managingag
31
Projectdes
Fulton St from Adams St to Flatbush Ave Extension (EDC project)
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2011-02-08T00:00:00.000
Construc 2
2013-04-05T00:00:00.000
Currentfun
2354329.0
Projectcos
2354230.0
Overallsco
General Roadway
Onstreetna
FULTON STREET
Fromstreet
PEARL STREET
Tostreetna
SMITH STREET
Boroughnam
BROOKLYN
Oftcode
342730370130377730
Location 1
270.108916391
Designfy
2009
Safetyscop
Plaza
440
Projectid: 440 • Projtitle: Downtown Brooklyn Redevelopment - Fulton Mall • Fmsid: DTBKLYNFM
The Geom
{"type":"MultiLineString","coordinates":[[[-73.99097186984802,40.69254880045733],[-73.99066626266715,40.69249717668546],[-73.98947238563522,40.6922954938385],[-73.98910541742515,40.692153313709696],[-73.98902944739646,40.692123860618445]]]}
Projectid
440
Projtitle
Downtown Brooklyn Redevelopment - Fulton Mall
Fmsid
DTBKLYNFM
Fmsagencyi
801
Leadagency
EDC
Managingag
31
Projectdes
Fulton St from Adams St to Flatbush Ave Extension (EDC project)
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2011-02-08T00:00:00.000
Construc 2
2013-04-05T00:00:00.000
Currentfun
2354329.0
Projectcos
2354230.0
Overallsco
General Roadway
Onstreetna
JORALEMON STREET
Fromstreet
ADAMS STREET
Tostreetna
COURT STREET
Boroughnam
BROOKLYN
Oftcode
353830311800329830
Location 1
563.776521323
Designfy
2009
Safetyscop
Plaza
440
Projectid: 440 • Projtitle: Downtown Brooklyn Redevelopment - Fulton Mall • Fmsid: DTBKLYNFM
The Geom
{"type":"MultiLineString","coordinates":[[[-73.98510412092583,40.69056114544354],[-73.98443216320744,40.69029217227023],[-73.98407034099083,40.69014307881223]]]}
Projectid
440
Projtitle
Downtown Brooklyn Redevelopment - Fulton Mall
Fmsid
DTBKLYNFM
Fmsagencyi
801
Leadagency
EDC
Managingag
31
Projectdes
Fulton St from Adams St to Flatbush Ave Extension (EDC project)
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2011-02-08T00:00:00.000
Construc 2
2013-04-05T00:00:00.000
Currentfun
2354329.0
Projectcos
2354230.0
Overallsco
General Roadway
Onstreetna
FULTON STREET
Fromstreet
ELM PLACE
Tostreetna
HOYT STREET
Boroughnam
BROOKLYN
Oftcode
342730338950351030
Location 1
324.643654071
Designfy
2009
Safetyscop
Plaza
440
Projectid: 440 • Projtitle: Downtown Brooklyn Redevelopment - Fulton Mall • Fmsid: DTBKLYNFM
The Geom
{"type":"MultiLineString","coordinates":[[[-73.98536391906634,40.69066661266113],[-73.98510412092583,40.69056114544354],[-73.98443216320744,40.69029217227023]]]}
Projectid
440
Projtitle
Downtown Brooklyn Redevelopment - Fulton Mall
Fmsid
DTBKLYNFM
Fmsagencyi
801
Leadagency
EDC
Managingag
31
Projectdes
Fulton St from Adams St to Flatbush Ave Extension (EDC project)
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2011-02-08T00:00:00.000
Construc 2
2013-04-05T00:00:00.000
Currentfun
2354329.0
Projectcos
2354230.0
Overallsco
General Roadway
Onstreetna
FULTON STREET
Fromstreet
BRIDGE STREET
Tostreetna
DUFFIELD STREET
Boroughnam
BROOKLYN
Oftcode
342730321130334230
Location 1
292.196566316
Designfy
2009
Safetyscop
Plaza
440
Projectid: 440 • Projtitle: Downtown Brooklyn Redevelopment - Fulton Mall • Fmsid: DTBKLYNFM
The Geom
{"type":"MultiLineString","coordinates":[[[-73.986464362539,40.69110361149252],[-73.98633135027752,40.6910505096223],[-73.98536391906634,40.69066661266113],[-73.98510412092583,40.69056114544354]]]}
Projectid
440
Projtitle
Downtown Brooklyn Redevelopment - Fulton Mall
Fmsid
DTBKLYNFM
Fmsagencyi
801
Leadagency
EDC
Managingag
31
Projectdes
Fulton St from Adams St to Flatbush Ave Extension (EDC project)
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2011-02-08T00:00:00.000
Construc 2
2013-04-05T00:00:00.000
Currentfun
2354329.0
Projectcos
2354230.0
Overallsco
General Roadway
Onstreetna
FULTON STREET
Fromstreet
GALLATIN PLACE
Tostreetna
HOYT STREET
Boroughnam
BROOKLYN
Oftcode
342730342900351030
Location 1
425.861523648
Designfy
2009
Safetyscop
Plaza
440
Projectid: 440 • Projtitle: Downtown Brooklyn Redevelopment - Fulton Mall • Fmsid: DTBKLYNFM
The Geom
{"type":"MultiLineString","coordinates":[[[-73.98734787475532,40.69145766769347],[-73.986464362539,40.69110361149252]]]}
Projectid
440
Projtitle
Downtown Brooklyn Redevelopment - Fulton Mall
Fmsid
DTBKLYNFM
Fmsagencyi
801
Leadagency
EDC
Managingag
31
Projectdes
Fulton St from Adams St to Flatbush Ave Extension (EDC project)
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2011-02-08T00:00:00.000
Construc 2
2013-04-05T00:00:00.000
Currentfun
2354329.0
Projectcos
2354230.0
Overallsco
General Roadway
Onstreetna
FULTON STREET
Fromstreet
GALLATIN PLACE
Tostreetna
SMITH STREET
Boroughnam
BROOKLYN
Oftcode
342730342900377730
Location 1
276.894563247
Designfy
2009
Safetyscop
Plaza
440
Projectid: 440 • Projtitle: Downtown Brooklyn Redevelopment - Fulton Mall • Fmsid: DTBKLYNFM
The Geom
{"type":"MultiLineString","coordinates":[[[-73.98633135027752,40.6910505096223],[-73.98536391906634,40.69066661266113]]]}
Projectid
440
Projtitle
Downtown Brooklyn Redevelopment - Fulton Mall
Fmsid
DTBKLYNFM
Fmsagencyi
801
Leadagency
EDC
Managingag
31
Projectdes
Fulton St from Adams St to Flatbush Ave Extension (EDC project)
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2011-02-08T00:00:00.000
Construc 2
2013-04-05T00:00:00.000
Currentfun
2354329.0
Projectcos
2354230.0
Overallsco
General Roadway
Onstreetna
FULTON STREET
Fromstreet
BRIDGE STREET
Tostreetna
LAWRENCE STREET
Boroughnam
BROOKLYN
Oftcode
342730321130354650
Location 1
302.555880645
Designfy
2009
Safetyscop
Plaza
440
Projectid: 440 • Projtitle: Downtown Brooklyn Redevelopment - Fulton Mall • Fmsid: DTBKLYNFM
The Geom
{"type":"MultiLineString","coordinates":[[[-73.986464362539,40.69110361149252],[-73.98633135027752,40.6910505096223]]]}
Projectid
440
Projtitle
Downtown Brooklyn Redevelopment - Fulton Mall
Fmsid
DTBKLYNFM
Fmsagencyi
801
Leadagency
EDC
Managingag
31
Projectdes
Fulton St from Adams St to Flatbush Ave Extension (EDC project)
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2011-02-08T00:00:00.000
Construc 2
2013-04-05T00:00:00.000
Currentfun
2354329.0
Projectcos
2354230.0
Overallsco
General Roadway
Onstreetna
FULTON STREET
Fromstreet
GALLATIN PLACE
Tostreetna
LAWRENCE STREET
Boroughnam
BROOKLYN
Oftcode
342730342900354650
Location 1
41.6523389831
Designfy
2009
Safetyscop
Plaza
440
Projectid: 440 • Projtitle: Downtown Brooklyn Redevelopment - Fulton Mall • Fmsid: DTBKLYNFM
The Geom
{"type":"MultiLineString","coordinates":[[[-73.98902944739646,40.692123860618445],[-73.98893356281373,40.69208664134061],[-73.9882070140924,40.69180695989094]]]}
Projectid
440
Projtitle
Downtown Brooklyn Redevelopment - Fulton Mall
Fmsid
DTBKLYNFM
Fmsagencyi
801
Leadagency
EDC
Managingag
31
Projectdes
Fulton St from Adams St to Flatbush Ave Extension (EDC project)
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2011-02-08T00:00:00.000
Construc 2
2013-04-05T00:00:00.000
Currentfun
2354329.0
Projectcos
2354230.0
Overallsco
General Roadway
Onstreetna
FULTON STREET
Fromstreet
BOERUM PLACE
Tostreetna
PEARL STREET
Boroughnam
BROOKLYN
Oftcode
342730320110370130
Location 1
255.63112521
Designfy
2009
Safetyscop
Plaza
440
Projectid: 440 • Projtitle: Downtown Brooklyn Redevelopment - Fulton Mall • Fmsid: DTBKLYNFM
The Geom
{"type":"MultiLineString","coordinates":[[[-73.98407034099083,40.69014307881223],[-73.98372011106792,40.69000671821084],[-73.98350982186518,40.68992217059913],[-73.98295684393194,40.68969981904458]]]}
Projectid
440
Projtitle
Downtown Brooklyn Redevelopment - Fulton Mall
Fmsid
DTBKLYNFM
Fmsagencyi
801
Leadagency
EDC
Managingag
31
Projectdes
Fulton St from Adams St to Flatbush Ave Extension (EDC project)
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2011-02-08T00:00:00.000
Construc 2
2013-04-05T00:00:00.000
Currentfun
2354329.0
Projectcos
2354230.0
Overallsco
General Roadway
Onstreetna
FULTON STREET
Fromstreet
BOND STREET
Tostreetna
ELM PLACE
Boroughnam
BROOKLYN
Oftcode
342730320530338950
Location 1
348.483288542
Designfy
2009
Safetyscop
Plaza
440
Projectid: 440 • Projtitle: Downtown Brooklyn Redevelopment - Fulton Mall • Fmsid: DTBKLYNFM
The Geom
{"type":"MultiLineString","coordinates":[[[-73.98209737984415,40.68935800948967],[-73.9815529829494,40.689146164199116],[-73.98101786809855,40.68893792711602],[-73.98092822894237,40.68890247709402]]]}
Projectid
440
Projtitle
Downtown Brooklyn Redevelopment - Fulton Mall
Fmsid
DTBKLYNFM
Fmsagencyi
801
Leadagency
EDC
Managingag
31
Projectdes
Fulton St from Adams St to Flatbush Ave Extension (EDC project)
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2011-02-08T00:00:00.000
Construc 2
2013-04-05T00:00:00.000
Currentfun
2354329.0
Projectcos
2354230.0
Overallsco
General Roadway
Onstreetna
FULTON STREET
Fromstreet
FLATBUSH AVENUE
Tostreetna
HANOVER PLACE
Boroughnam
BROOKLYN
Oftcode
342730340930347100
Location 1
364.243536396
Designfy
2009
Safetyscop
Plaza
440
Projectid: 440 • Projtitle: Downtown Brooklyn Redevelopment - Fulton Mall • Fmsid: DTBKLYNFM
The Geom
{"type":"MultiLineString","coordinates":[[[-73.98734787475532,40.69145766769347],[-73.986464362539,40.69110361149252]]]}
Projectid
440
Projtitle
Downtown Brooklyn Redevelopment - Fulton Mall
Fmsid
DTBKLYNFM
Fmsagencyi
801
Leadagency
EDC
Managingag
31
Projectdes
Fulton St from Adams St to Flatbush Ave Extension (EDC project)
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2011-02-08T00:00:00.000
Construc 2
2013-04-05T00:00:00.000
Currentfun
2354329.0
Projectcos
2354230.0
Overallsco
General Roadway
Onstreetna
FULTON STREET
Fromstreet
GALLATIN PLACE
Tostreetna
SMITH STREET
Boroughnam
BROOKLYN
Oftcode
342730342900377730
Location 1
276.894563247
Designfy
2009
Safetyscop
Plaza
440
Projectid: 440 • Projtitle: Downtown Brooklyn Redevelopment - Fulton Mall • Fmsid: DTBKLYNFM
The Geom
{"type":"MultiLineString","coordinates":[[[-73.98734787475532,40.69145766769347],[-73.986464362539,40.69110361149252],[-73.98633135027752,40.6910505096223]]]}
Projectid
440
Projtitle
Downtown Brooklyn Redevelopment - Fulton Mall
Fmsid
DTBKLYNFM
Fmsagencyi
801
Leadagency
EDC
Managingag
31
Projectdes
Fulton St from Adams St to Flatbush Ave Extension (EDC project)
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2011-02-08T00:00:00.000
Construc 2
2013-04-05T00:00:00.000
Currentfun
2354329.0
Projectcos
2354230.0
Overallsco
General Roadway
Onstreetna
FULTON STREET
Fromstreet
LAWRENCE STREET
Tostreetna
SMITH STREET
Boroughnam
BROOKLYN
Oftcode
342730354650377730
Location 1
318.54690223
Designfy
2009
Safetyscop
Plaza
440
Projectid: 440 • Projtitle: Downtown Brooklyn Redevelopment - Fulton Mall • Fmsid: DTBKLYNFM
The Geom
{"type":"MultiLineString","coordinates":[[[-73.98734787475532,40.69145766769347],[-73.986464362539,40.69110361149252],[-73.98633135027752,40.6910505096223]]]}
Projectid
440
Projtitle
Downtown Brooklyn Redevelopment - Fulton Mall
Fmsid
DTBKLYNFM
Fmsagencyi
801
Leadagency
EDC
Managingag
31
Projectdes
Fulton St from Adams St to Flatbush Ave Extension (EDC project)
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2011-02-08T00:00:00.000
Construc 2
2013-04-05T00:00:00.000
Currentfun
2354329.0
Projectcos
2354230.0
Overallsco
General Roadway
Onstreetna
FULTON STREET
Fromstreet
LAWRENCE STREET
Tostreetna
SMITH STREET
Boroughnam
BROOKLYN
Oftcode
342730354650377730
Location 1
318.54690223
Designfy
2009
Safetyscop
Plaza
440
Projectid: 440 • Projtitle: Downtown Brooklyn Redevelopment - Fulton Mall • Fmsid: DTBKLYNFM
The Geom
{"type":"MultiLineString","coordinates":[[[-73.9882070140924,40.69180695989094],[-73.98734787475532,40.69145766769347]]]}
Projectid
440
Projtitle
Downtown Brooklyn Redevelopment - Fulton Mall
Fmsid
DTBKLYNFM
Fmsagencyi
801
Leadagency
EDC
Managingag
31
Projectdes
Fulton St from Adams St to Flatbush Ave Extension (EDC project)
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2011-02-08T00:00:00.000
Construc 2
2013-04-05T00:00:00.000
Currentfun
2354329.0
Projectcos
2354230.0
Overallsco
General Roadway
Onstreetna
FULTON STREET
Fromstreet
PEARL STREET
Tostreetna
SMITH STREET
Boroughnam
BROOKLYN
Oftcode
342730370130377730
Location 1
270.108916391
Designfy
2009
Safetyscop
Plaza
440
Projectid: 440 • Projtitle: Downtown Brooklyn Redevelopment - Fulton Mall • Fmsid: DTBKLYNFM
The Geom
{"type":"MultiLineString","coordinates":[[[-73.98350982186518,40.68992217059913],[-73.98295684393194,40.68969981904458]]]}
Projectid
440
Projtitle
Downtown Brooklyn Redevelopment - Fulton Mall
Fmsid
DTBKLYNFM
Fmsagencyi
801
Leadagency
EDC
Managingag
31
Projectdes
Fulton St from Adams St to Flatbush Ave Extension (EDC project)
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2011-02-08T00:00:00.000
Construc 2
2013-04-05T00:00:00.000
Currentfun
2354329.0
Projectcos
2354230.0
Overallsco
General Roadway
Onstreetna
FULTON STREET
Fromstreet
BOND STREET
Tostreetna
GOLD STREET
Boroughnam
BROOKLYN
Oftcode
342730320530344530
Location 1
173.435341655
Designfy
2009
Safetyscop
Plaza
440
Projectid: 440 • Projtitle: Downtown Brooklyn Redevelopment - Fulton Mall • Fmsid: DTBKLYNFM
The Geom
{"type":"MultiLineString","coordinates":[[[-73.99097186984802,40.69254880045733],[-73.99066626266715,40.69249717668546],[-73.98947238563522,40.6922954938385],[-73.98910541742515,40.692153313709696],[-73.98902944739646,40.692123860618445]]]}
Projectid
440
Projtitle
Downtown Brooklyn Redevelopment - Fulton Mall
Fmsid
DTBKLYNFM
Fmsagencyi
801
Leadagency
EDC
Managingag
31
Projectdes
Fulton St from Adams St to Flatbush Ave Extension (EDC project)
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2009
Designstar
2011-02-08T00:00:00.000
Construc 2
2013-04-05T00:00:00.000
Currentfun
2354329.0
Projectcos
2354230.0
Overallsco
General Roadway
Onstreetna
JORALEMON STREET
Fromstreet
ADAMS STREET
Tostreetna
COURT STREET
Boroughnam
BROOKLYN
Oftcode
353830311800329830
Location 1
563.776521323
Designfy
2009
Safetyscop
Plaza
458
Projectid: 458 • Projtitle: Liz Berger Plaza Reconstruction • Fmsid: P-301EPPK
The Geom
{"type":"MultiLineString","coordinates":[[[-74.01351885419912,40.706943271072795],[-74.0139602988348,40.707111010648056]]]}
Projectid
458
Projtitle
Liz Berger Plaza Reconstruction
Fmsid
P-301EPPK
Fmsagencyi
846
Leadagency
DPR
Managingag
0
Projectdes
Edgar Square Triangle Reconstruction
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2019
Currentfun
2163000
Projectcos
2163000
Overallsco
Sidewalk (Standalone)
Onstreetna
EDGAR STREET
Fromstreet
GREENWICH STREET
Tostreetna
TRINITY PLACE
Boroughnam
MANHATTAN
Oftcode
119985121790132615
Location 1
136.800438708
Designfy
0
Safetyscop
Lane Removal or Road Narrowing,Median Improvement (Raised or Widened),Widened Sidewalks (Full Block),Plaza
458
Projectid: 458 • Projtitle: Liz Berger Plaza Reconstruction • Fmsid: P-301EPPK
The Geom
{"type":"MultiLineString","coordinates":[[[-74.01417811369609,40.70670145850502],[-74.0139602988348,40.707111010648056]]]}
Projectid
458
Projtitle
Liz Berger Plaza Reconstruction
Fmsid
P-301EPPK
Fmsagencyi
846
Leadagency
DPR
Managingag
0
Projectdes
Edgar Square Triangle Reconstruction
Projecttyp
REC
Projectt 1
CAPITAL RECONSTRUCTION
Projectsta
Completed Project
Constructi
2019
Currentfun
2163000
Projectcos
2163000
Overallsco
Sidewalk (Standalone)
Onstreetna
GREENWICH STREET
Fromstreet
EDGAR STREET
Tostreetna
HUGH L CAREY TUNNEL EXIT
Boroughnam
MANHATTAN
Oftcode
121790119985197040
Location 1
160.969486404
Designfy
0
Safetyscop
Lane Removal or Road Narrowing,Median Improvement (Raised or Widened),Widened Sidewalks (Full Block),Plaza