150th Street Spine: Phase II - DOT Van Wyck Expressway - Trunk Combined Sewer
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 1202 • Project Name: 150th Street Spine: Phase II - DOT Van Wyck Expressway - Trunk Combined Sewer
Date Reported As Of
2023-01-01T00:00:00.000
Pid
1202
Project Name
150th Street Spine: Phase II - DOT Van Wyck Expressway - Trunk Combined Sewer
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Construction
Design Start
2020-03-02T00:00:00.000
Budget Forecast
138692000.00
Latest Budget Changes
0.00
Total Budget Changes
-676000.00
Forecast Completion
2025-04-14T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
-194
Coastal Resiliency Area 1 - East 23Rd St. To Montg
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 773 • Project Name: Coastal Resiliency Area 1 - East 23Rd St. To Montg
Date Reported As Of
2023-01-01T00:00:00.000
Pid
773
Project Name
Coastal Resiliency Area 1 - East 23Rd St. To Montg
Description
East Side Coastal Resiliency - Montgomery Street to East 15th Street, Manhattan
Category
Industrial Development, Parks
Managing Agency
DDC
Client Agency
Parks & Recreation
Current Phase
Construction
Design Start
2016-04-27T00:00:00.000
Budget Forecast
92660363.63
Latest Budget Changes
0.00
Total Budget Changes
-418193636.37
Forecast Completion
2026-08-15T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
836
Grand Concourse Metro North Railroad Bridge Construction
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 120 • Project Name: Grand Concourse Metro North Railroad Bridge Construction
Date Reported As Of
2023-01-01T00:00:00.000
Pid
120
Project Name
Grand Concourse Metro North Railroad Bridge Construction
Description
Repair the existing bridge and separate the NYCDOT and NYCT components. Includes new steel plate girders, concrete deck, pedestals, backwalls, sidewalks, and bridge railing.
Category
Bridges
Borough
Bronx
Managing Agency
DOT
Client Agency
DOT
Current Phase
Construction
Design Start
2000-02-14T00:00:00.000
Budget Forecast
72968117.00
Latest Budget Changes
-532000.00
Total Budget Changes
22682117.00
Forecast Completion
2023-01-16T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
836
Carl Schurz Park Promenade over FDR (East 81st to 90th Streets)
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 537 • Project Name: Carl Schurz Park Promenade over FDR (East 81st to 90th Streets)
Date Reported As Of
2023-01-01T00:00:00.000
Pid
537
Project Name
Carl Schurz Park Promenade over FDR (East 81st to 90th Streets)
Description
Replace the Promenade over FDR Drive between East 81st to 90th Streets in Manhattan.
Category
Bridges
Borough
Manhattan
Managing Agency
DOT
Client Agency
DOT, DPR
Current Phase
Design
Design Start
2017-05-30T00:00:00.000
Budget Forecast
115852421.00
Latest Budget Changes
115852421.00
Total Budget Changes
-197139579.00
Forecast Completion
2030-02-18T00:00:00.000
Latest Schedule Changes
141
Total Schedule Changes
1571
Broadway Bridge over Harlem River Replacement
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 106 • Project Name: Broadway Bridge over Harlem River Replacement
Date Reported As Of
2023-01-01T00:00:00.000
Pid
106
Project Name
Broadway Bridge over Harlem River Replacement
Description
Replace deteriorated members of lift span superstructure, concrete deck, lift electrical and mechanical systems, and fenders.
Category
Bridges
Borough
Bronx, Manhattan
Managing Agency
DOT
Client Agency
DOT
Current Phase
Construction
Design Start
2005-04-01T00:00:00.000
Budget Forecast
148960388.00
Latest Budget Changes
-1088222.00
Total Budget Changes
39724388.00
Forecast Completion
2027-04-02T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
2797
20th Avenue Storm and Sanitary Sewer Construction
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 432 • Project Name: 20th Avenue Storm and Sanitary Sewer Construction
Date Reported As Of
2023-01-01T00:00:00.000
Pid
432
Project Name
20th Avenue Storm and Sanitary Sewer Construction
Description
Storm and sanitary sewers in 20th Ave between 126th Street and U.S. Bulkhead Line, etc. Water main works.
Category
Sewers
Borough
Queens
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Construction
Design Start
2012-07-10T00:00:00.000
Budget Forecast
141866000.00
Latest Budget Changes
-10000.00
Total Budget Changes
117177000.00
Forecast Completion
2023-06-19T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
2180
Grand Concourse Reconstruction, Phase 4 (Great Streets)
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 476 • Project Name: Grand Concourse Reconstruction, Phase 4 (Great Streets)
Date Reported As Of
2023-01-01T00:00:00.000
Pid
476
Project Name
Grand Concourse Reconstruction, Phase 4 (Great Streets)
Description
RECONSTRUCTION OF GRAND CONCOURSE FROM E 175 ST TO EAST FORDHAM RD- PHASE 4, BX
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Construction
Design Start
2016-07-19T00:00:00.000
Budget Forecast
96108000.00
Latest Budget Changes
0.00
Total Budget Changes
57634000.00
Forecast Completion
2023-06-13T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1448
Woodhaven Blvd SBS Phase B
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 1210 • Project Name: Woodhaven Blvd SBS Phase B
Date Reported As Of
2023-01-01T00:00:00.000
Pid
1210
Project Name
Woodhaven Blvd SBS Phase B
Description
HWQ100SBB, Woodhaven Blvd – SBS – Phase B, calls for capital improvements along Woodhaven Blvd between Union Turnpike and 107th Avenue in the borough of Queens. These improvements include but are not limited to median widening, building out neck downs, normalizing intersections and other features to increase safety and support the Woodhaven SBS.
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2021-07-12T00:00:00.000
Budget Forecast
50718000.00
Latest Budget Changes
0.00
Total Budget Changes
-20000.00
Forecast Completion
2028-10-29T00:00:00.000
Latest Schedule Changes
262
Total Schedule Changes
15
TLC - NEW OFFICE FACILITY - 24-55 BQE WEST
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 665 • Project Name: TLC - NEW OFFICE FACILITY - 24-55 BQE WEST
Date Reported As Of
2023-01-01T00:00:00.000
Pid
665
Project Name
TLC - NEW OFFICE FACILITY - 24-55 BQE WEST
Description
Replace existing administration wing; provide new parking and new inspection lane within the facility.
Category
Other Government Facilities
Borough
Queens
Managing Agency
DDC
Client Agency
DCAS
Current Phase
Construction
Design Start
2015-09-15T00:00:00.000
Budget Forecast
152546000.00
Latest Budget Changes
70000.00
Total Budget Changes
75370000.00
Forecast Completion
2026-05-01T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1248
Rehab Of Queens District 11/13 Sanitation Garage
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 770 • Project Name: Rehab Of Queens District 11/13 Sanitation Garage
Date Reported As Of
2023-01-01T00:00:00.000
Pid
770
Project Name
Rehab Of Queens District 11/13 Sanitation Garage
Description
The Department of Sanitation of the City of New York (DSNY) is planning to rehabilitate Queens Districts 11 and 13 garage. The renovation serving both districts is to extend the useful life of the facility through rehabilitation of the building structure and systems. The renovation includes: Extensive structural work that includes the replacement of reinforced concrete slabs and stiffening of the existing steel frame, select replacement of building MEP systems, including BMS systems, architectural renovation of the entire building, study and implementation of deep energy conservation measures (DECMs), and site work which includes new landscape work and replacement of sidewalks and driveways. Rehabilitation is required to meet LEED Silver requirements.
Category
Sanitation
Borough
Queens
Managing Agency
DDC
Client Agency
Sanitation
Current Phase
Design
Design Start
2017-03-06T00:00:00.000
Budget Forecast
74046000.00
Latest Budget Changes
655000.00
Total Budget Changes
36221000.00
Forecast Completion
2026-12-30T00:00:00.000
Latest Schedule Changes
201
Total Schedule Changes
1521
Bronx Sanitation Garage Rehabilitation: Community District 12
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 956 • Project Name: Bronx Sanitation Garage Rehabilitation: Community District 12
Date Reported As Of
2023-01-01T00:00:00.000
Pid
956
Project Name
Bronx Sanitation Garage Rehabilitation: Community District 12
Description
Rehabilitation of garage that serves Bronx Community District 12 located at 1635 East 233rd Street, Bronx.
Category
Sanitation
Managing Agency
DSNY
Client Agency
DSNY
Current Phase
Design
Design Start
2017-11-01T00:00:00.000
Budget Forecast
57376185.00
Latest Budget Changes
0.00
Total Budget Changes
0.00
Forecast Completion
2027-06-30T00:00:00.000
Latest Schedule Changes
-184
Total Schedule Changes
1064
Reconstruction of Clearview Pump Station
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 1216 • Project Name: Reconstruction of Clearview Pump Station
Date Reported As Of
2023-01-01T00:00:00.000
Pid
1216
Project Name
Reconstruction of Clearview Pump Station
Description
Reconstruction of Clearview Pump Station
Category
Wastewater Treatment
Managing Agency
DEP
Client Agency
BWT
Current Phase
Construction
Design Start
2015-12-24T00:00:00.000
Budget Forecast
37027687.85
Latest Budget Changes
0.00
Total Budget Changes
802582.00
Forecast Completion
2024-12-05T00:00:00.000
Latest Schedule Changes
2
Total Schedule Changes
2
Varick Build-out
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 1226 • Project Name: Varick Build-out
Date Reported As Of
2023-01-01T00:00:00.000
Pid
1226
Project Name
Varick Build-out
Description
Build-out of Varick. Pending DCAS to execute the lease, which is expected this summer. Once executed DCAS will take over management of the capital project and work with the landlord to perform the work.
Category
Other Government Facilities
Managing Agency
DOT
Client Agency
DOT
Current Phase
Construction
Budget Forecast
31462000.00
Latest Budget Changes
0.00
Total Budget Changes
0.00
Shore Road Bridge over Hutchinson River
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 541 • Project Name: Shore Road Bridge over Hutchinson River
Date Reported As Of
2022-09-01T00:00:00.000
Pid
541
Project Name
Shore Road Bridge over Hutchinson River
Description
Replace the Shore Road Bridge over the Hutchinson River with a new bridge.
Category
Bridges, Streets and Roadways
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2017-06-30T00:00:00.000
Budget Forecast
340732843.00
Latest Budget Changes
3266615.00
Total Budget Changes
-19049921.84
Forecast Completion
2029-07-24T00:00:00.000
Latest Schedule Changes
115
Total Schedule Changes
1477
DELANCEY STREET SAFETY IMPROVEMENTS
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 983 • Project Name: DELANCEY STREET SAFETY IMPROVEMENTS
Date Reported As Of
2022-09-01T00:00:00.000
Pid
983
Project Name
DELANCEY STREET SAFETY IMPROVEMENTS
Description
DELANCEY STREET SAFETY IMPROVEMENTS
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2017-07-19T00:00:00.000
Budget Forecast
56531000.00
Latest Budget Changes
150000.00
Total Budget Changes
20937000.00
Forecast Completion
2027-10-22T00:00:00.000
Latest Schedule Changes
364
Total Schedule Changes
1217
BROAD CHANNEL BULKHEADS - PH II
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 617 • Project Name: BROAD CHANNEL BULKHEADS - PH II
Date Reported As Of
2022-09-01T00:00:00.000
Pid
617
Project Name
BROAD CHANNEL BULKHEADS - PH II
Description
West 14th Rd. from Cross Bay Blvd. to Dead end (water side) West 15th Rd. from Cross Bay Blvd. to Dead end (water side) West 16th Rd. from Cross Bay Blvd. to Dead end (water side) West 17th Rd. from Cross Bay Blvd. to Dead end (water side)
Category
Industrial Development
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Construction
Design Start
2015-06-01T00:00:00.000
Budget Forecast
92714000.00
Latest Budget Changes
0.00
Total Budget Changes
61781000.00
Forecast Completion
2024-06-14T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
-74
Asphalt Plant, 30-01 Harper St, Queens Demo/Cons
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 840 • Project Name: Asphalt Plant, 30-01 Harper St, Queens Demo/Cons
Date Reported As Of
2022-09-01T00:00:00.000
Pid
840
Project Name
Asphalt Plant, 30-01 Harper St, Queens Demo/Cons
Description
Demolition and rebuild of the existing structures housing the equipment and related facilities necessary for the production, storage and distribution of asphalt at the NYC Harper Street Asphalt Plant facility. All of the existing equipment, storage facilities, and related buildings will be replaced with a new state of the art plant. In addition, the work will involve installing sanitary and storm drainage systems to comply with current government regulatory standard
Category
Industrial Development
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2019-04-03T00:00:00.000
Budget Forecast
60537000.00
Latest Budget Changes
684000.00
Total Budget Changes
55883745.00
Forecast Completion
2026-06-16T00:00:00.000
Latest Schedule Changes
339
Total Schedule Changes
1211
Harlem River Drive Ramp Reconstruction (George Washington Bridge)
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 708 • Project Name: Harlem River Drive Ramp Reconstruction (George Washington Bridge)
Date Reported As Of
2022-09-01T00:00:00.000
Pid
708
Project Name
Harlem River Drive Ramp Reconstruction (George Washington Bridge)
Description
Repair the Harlem River Drive Ramp to George Washington Bridge over Harlem River Drive Southbound (Trans-Manhattan Expressway), Manhattan
Category
Bridges, Streets and Roadways
Borough
Manhattan
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2019-02-07T00:00:00.000
Budget Forecast
427587546.00
Latest Budget Changes
-2205000.00
Total Budget Changes
-3711870.00
Forecast Completion
2035-04-15T00:00:00.000
Latest Schedule Changes
255
Total Schedule Changes
2697
Metropolitan Hospital Perimeter Flood Protection
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 562 • Project Name: Metropolitan Hospital Perimeter Flood Protection
Date Reported As Of
2022-09-01T00:00:00.000
Pid
562
Project Name
Metropolitan Hospital Perimeter Flood Protection
Description
Flood mitigation system to protect Metropolitan's campus from future flooding due and sea level rise
Category
Industrial Development
Borough
Manhattan
Managing Agency
EDC
Client Agency
H+H
Current Phase
Construction
Design Start
2016-12-01T00:00:00.000
Budget Forecast
108206086.00
Latest Budget Changes
-1426264.00
Total Budget Changes
27046705.00
Forecast Completion
2024-11-21T00:00:00.000
Latest Schedule Changes
-862
Total Schedule Changes
1452
WESTBOURNE - DUNBAR ROADWAYS/BULKHEADS, QNS
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 981 • Project Name: WESTBOURNE - DUNBAR ROADWAYS/BULKHEADS, QNS
Date Reported As Of
2022-09-01T00:00:00.000
Pid
981
Project Name
WESTBOURNE - DUNBAR ROADWAYS/BULKHEADS, QNS
Description
PRELIMINARY AND FINAL DESIGN SERVICES FOR RECONSTRUCTION OF WESTBOURNE NORTON DRIVE. BOROUGH OF QUEENS
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2016-12-15T00:00:00.000
Budget Forecast
64665000.00
Latest Budget Changes
3993000.00
Total Budget Changes
47223000.00
Forecast Completion
2029-09-26T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1840
RED HOOK INTEGRATED FLOOD PROTECTION SYSTEM
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 985 • Project Name: RED HOOK INTEGRATED FLOOD PROTECTION SYSTEM
Date Reported As Of
2022-09-01T00:00:00.000
Pid
985
Project Name
RED HOOK INTEGRATED FLOOD PROTECTION SYSTEM
Description
Reconstruction of Beard Street in the Red Hook neighborhood of Brooklyn, including raising the streets, reconstruction of roadway, curbs and sidewalk, and installing a new bulkhead and floodwall along the waterfront. The reconstruction/raising for Beard Street will cover two blocks (Van Brunt St. to Dwight St).
Category
Public Safety and Criminal Justice
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2019-08-17T00:00:00.000
Budget Forecast
100955000.00
Latest Budget Changes
0.00
Total Budget Changes
86623000.00
Forecast Completion
2026-03-30T00:00:00.000
Latest Schedule Changes
181
Total Schedule Changes
1172
BROWNSVILLE LIBRARY MAJOR RENOVATIONS
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 977 • Project Name: BROWNSVILLE LIBRARY MAJOR RENOVATIONS
Date Reported As Of
2022-09-01T00:00:00.000
Pid
977
Project Name
BROWNSVILLE LIBRARY MAJOR RENOVATIONS
Description
The Brownsville Library is a comprehensive interior/exterior renovation and addition which includes new fire alarm/BMS, new interior layout, new HVAC, new accessible restrooms, exterior rehabilitation and landscape.
Category
Libraries
Managing Agency
DDC
Client Agency
Libraries-BPL
Current Phase
Design
Design Start
2018-07-27T00:00:00.000
Budget Forecast
32254000.00
Latest Budget Changes
180000.00
Total Budget Changes
6752000.00
Forecast Completion
2026-12-19T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
916
Reconstruction of the Ashokan Headworks
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 834 • Project Name: Reconstruction of the Ashokan Headworks
Date Reported As Of
2022-09-01T00:00:00.000
Pid
834
Project Name
Reconstruction of the Ashokan Headworks
Description
CAT-213
Category
Water Supply
Borough
Upstate
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2020-08-07T00:00:00.000
Budget Forecast
316432595.75
Latest Budget Changes
-16634236.00
Total Budget Changes
41950858.00
Forecast Completion
2028-04-16T00:00:00.000
Latest Schedule Changes
164
Total Schedule Changes
-67
SUNSET PARK GOWANUS CONNECTOR, BK
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 979 • Project Name: SUNSET PARK GOWANUS CONNECTOR, BK
Date Reported As Of
2022-09-01T00:00:00.000
Pid
979
Project Name
SUNSET PARK GOWANUS CONNECTOR, BK
Description
Sunset Park Gowanus Connector - Brooklyn Waterfront Greenway.
Category
Parks, Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Construction
Design Start
2017-09-18T00:00:00.000
Budget Forecast
28830000.00
Latest Budget Changes
-1154000.00
Total Budget Changes
-16441000.00
Forecast Completion
2023-05-16T00:00:00.000
Latest Schedule Changes
170
Total Schedule Changes
445
Pelham Bay Equestrian Park over Amtrak
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 703 • Project Name: Pelham Bay Equestrian Park over Amtrak
Date Reported As Of
2022-09-01T00:00:00.000
Pid
703
Project Name
Pelham Bay Equestrian Park over Amtrak
Description
Replace/Rehab the Pelham Bay Equestrian Park bridge over Amtrak, the Bronx
Category
Bridges
Borough
Bronx
Managing Agency
DOT
Client Agency
DPR
Current Phase
Design
Design Start
2019-01-30T00:00:00.000
Budget Forecast
0.00
Latest Budget Changes
-40966997.00
Total Budget Changes
137997.00
Forecast Completion
2027-06-04T00:00:00.000
Latest Schedule Changes
321
Total Schedule Changes
1029
Pelham Parkway Roadway Reconstruction, Phase 2
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 180 • Project Name: Pelham Parkway Roadway Reconstruction, Phase 2
Date Reported As Of
2022-09-01T00:00:00.000
Pid
180
Project Name
Pelham Parkway Roadway Reconstruction, Phase 2
Description
Pelham Pkwy main road W/B from Bronx River Pkwy to Hutchinson River Pkwy Pelham Pkwy North Service Rd. (S/R) from Bronx Park East to Eastchester Rd. Stillwell Ave from westbound mainline to north service road
Category
Streets and Roadways
Borough
Bronx
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Construction
Design Start
2002-02-15T00:00:00.000
Budget Forecast
158533000.00
Latest Budget Changes
104000.00
Total Budget Changes
125164000.00
Forecast Completion
2023-12-22T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
2869
Supreme Courthouse Fire Alarm/ Protection Upgrade
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 837 • Project Name: Supreme Courthouse Fire Alarm/ Protection Upgrade
Date Reported As Of
2022-09-01T00:00:00.000
Pid
837
Project Name
Supreme Courthouse Fire Alarm/ Protection Upgrade
Description
Bronx Supreme Court, Fire Alarm, Sprinkler, 851 Grand Concourse - Replace the existing fire alarm system and install a new sprinkler system.
Category
Public Safety and Criminal Justice
Managing Agency
DDC
Client Agency
DCAS
Current Phase
Design
Design Start
2018-07-11T00:00:00.000
Budget Forecast
80429000.00
Latest Budget Changes
63000.00
Total Budget Changes
37248610.00
Forecast Completion
2027-05-17T00:00:00.000
Latest Schedule Changes
122
Total Schedule Changes
1319
East 174th Street over Sheridan Expressway - Amtrak
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 701 • Project Name: East 174th Street over Sheridan Expressway - Amtrak
Date Reported As Of
2022-09-01T00:00:00.000
Pid
701
Project Name
East 174th Street over Sheridan Expressway - Amtrak
Description
Repair the East 174th Street bridge over Sheridan Expressway/ AMTRAK, the Bronx
Category
Bridges
Borough
Bronx
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2018-08-16T00:00:00.000
Budget Forecast
140939882.00
Latest Budget Changes
0.00
Total Budget Changes
5146882.00
Forecast Completion
2029-10-11T00:00:00.000
Latest Schedule Changes
-63
Total Schedule Changes
1431
I.S. 653 - BROOKLYN
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 1314 • Project Name: I.S. 653 - BROOKLYN
Date Reported As Of
2022-09-01T00:00:00.000
Pid
1314
Project Name
I.S. 653 - BROOKLYN
Description
NEW SCHOOL
Category
Schools
Managing Agency
SCA
Client Agency
DOE
Current Phase
Construction
Design Start
2016-06-07T00:00:00.000
Budget Forecast
58771150.00
Total Budget Changes
0.00
Forecast Completion
2025-09-03T00:00:00.000
Total Schedule Changes
0
4Th Ave. Safety Improvements Phase II-Vision Zero
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 833 • Project Name: 4Th Ave. Safety Improvements Phase II-Vision Zero
Date Reported As Of
2022-09-01T00:00:00.000
Pid
833
Project Name
4Th Ave. Safety Improvements Phase II-Vision Zero
Description
4TH AVENUE SAFETY IMPROVEMENTS PHASE II - VISION ZERO GREAT STREETS
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Construction
Design Start
2017-06-01T00:00:00.000
Budget Forecast
62852000.00
Latest Budget Changes
-5000.00
Total Budget Changes
-11525000.00
Forecast Completion
2024-06-17T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1106
Queensboro Bridge Roadway Replacement over East River
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 594 • Project Name: Queensboro Bridge Roadway Replacement over East River
Date Reported As Of
2022-09-01T00:00:00.000
Pid
594
Project Name
Queensboro Bridge Roadway Replacement over East River
Description
This project includes the replacement of the upper roadway's deck on the main bridge along with steel repairs, fire standpipes, and lighting upgrades.
Category
Bridges, Streets and Roadways
Managing Agency
DOT
Client Agency
DOT
Current Phase
Construction
Design Start
2015-04-09T00:00:00.000
Budget Forecast
358195118.00
Latest Budget Changes
-6340651.00
Total Budget Changes
8567339.67
Forecast Completion
2014-01-31T00:00:00.000
Latest Schedule Changes
-3694
Total Schedule Changes
1970
Power Distribution at Bowery Bay WWTP
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 522 • Project Name: Power Distribution at Bowery Bay WWTP
Date Reported As Of
2022-09-01T00:00:00.000
Pid
522
Project Name
Power Distribution at Bowery Bay WWTP
Description
Power Distribution at Bowery Bay WWTP.
Category
Wastewater Treatment
Borough
Queens
Managing Agency
DEP
Client Agency
DEP
Current Phase
Construction
Design Start
2015-11-13T00:00:00.000
Budget Forecast
68873764.13
Latest Budget Changes
0.00
Total Budget Changes
24235381.01
Forecast Completion
2024-12-24T00:00:00.000
Latest Schedule Changes
270
Total Schedule Changes
1684
East 180th Street over Metro North Railroad (Harrison Line)
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 811 • Project Name: East 180th Street over Metro North Railroad (Harrison Line)
Date Reported As Of
2022-09-01T00:00:00.000
Pid
811
Project Name
East 180th Street over Metro North Railroad (Harrison Line)
Description
Rehabilitation of East 180th Street Bridge over Metro North Railroad, the Bronx
Category
Bridges
Borough
Bronx
Managing Agency
DOT
Client Agency
DOT
Current Phase
Construction
Design Start
2017-02-06T00:00:00.000
Budget Forecast
33959655.00
Latest Budget Changes
533976.00
Total Budget Changes
4194366.00
Forecast Completion
2023-09-29T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
664
New Signals Installation requirement, citywide FY23
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 1316 • Project Name: New Signals Installation requirement, citywide FY23
Date Reported As Of
2022-09-01T00:00:00.000
Pid
1316
Project Name
New Signals Installation requirement, citywide FY23
Description
New Signals Installation requirement, citywide FY23
Category
Streets and Roadways
Managing Agency
DOT
Client Agency
DOT
Current Phase
Construction Procurement
Budget Forecast
36520000.00
Total Budget Changes
-35484942.00
EDUCATIONAL CAMPUS @ 2202 60TH STREET - BROOKLYN
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 1310 • Project Name: EDUCATIONAL CAMPUS @ 2202 60TH STREET - BROOKLYN
Date Reported As Of
2022-09-01T00:00:00.000
Pid
1310
Project Name
EDUCATIONAL CAMPUS @ 2202 60TH STREET - BROOKLYN
Description
LEASE
Category
Schools
Managing Agency
SCA
Client Agency
DOE
Current Phase
Construction
Design Start
2021-11-02T00:00:00.000
Budget Forecast
38246910.00
Total Budget Changes
0.00
Forecast Completion
2025-09-03T00:00:00.000
Total Schedule Changes
0
H.S. @ 165-18 HILLSIDE AVENUE - QUEENS
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 1311 • Project Name: H.S. @ 165-18 HILLSIDE AVENUE - QUEENS
Date Reported As Of
2022-09-01T00:00:00.000
Pid
1311
Project Name
H.S. @ 165-18 HILLSIDE AVENUE - QUEENS
Description
NEW SCHOOL
Category
Schools
Managing Agency
SCA
Client Agency
DOE
Current Phase
Construction
Design Start
2021-09-01T00:00:00.000
Budget Forecast
155610775.00
Total Budget Changes
0.00
Forecast Completion
2026-09-03T00:00:00.000
Total Schedule Changes
0
Williamsburg Bridge Miscellaneous Repairs and Painting
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 599 • Project Name: Williamsburg Bridge Miscellaneous Repairs and Painting
Date Reported As Of
2022-09-01T00:00:00.000
Pid
599
Project Name
Williamsburg Bridge Miscellaneous Repairs and Painting
Description
Scope includes paint the south side of the bridge, repair flags and structural steel, evaluate PP20 Bearings, evaluate tension rods at mid-span of the bridge, repair bridge cables and suspenders, replace modular joint, investigate the feasibility of additional clearance at towers, and resurface bridge decks with new waterproofing membrane.
Category
Bridges
Managing Agency
DOT
Client Agency
DOT
Current Phase
Construction Procurement
Design Start
2018-08-15T00:00:00.000
Budget Forecast
228073406.00
Latest Budget Changes
20690839.00
Total Budget Changes
52784947.00
Forecast Completion
2026-06-18T00:00:00.000
Latest Schedule Changes
58
Total Schedule Changes
362
West 35th Street over Amtrak
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 696 • Project Name: West 35th Street over Amtrak
Date Reported As Of
2022-09-01T00:00:00.000
Pid
696
Project Name
West 35th Street over Amtrak
Description
Repair the West 35th Street bridge over Amtrak, Manhattan
Category
Bridges
Borough
Manhattan
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2018-11-21T00:00:00.000
Budget Forecast
32671034.00
Latest Budget Changes
0.00
Total Budget Changes
-621966.00
Forecast Completion
2032-03-05T00:00:00.000
Latest Schedule Changes
451
Total Schedule Changes
2846
Pelham Parkway Bridge Reconstruction over Hutchinson Parkway
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 506 • Project Name: Pelham Parkway Bridge Reconstruction over Hutchinson Parkway
Date Reported As Of
2022-09-01T00:00:00.000
Pid
506
Project Name
Pelham Parkway Bridge Reconstruction over Hutchinson Parkway
Description
Replace/Rehab the Pelham Parkway bridge over Hutchinson River Parkway, Bronx.
Category
Bridges, Streets and Roadways
Borough
Bronx
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2017-11-08T00:00:00.000
Budget Forecast
66783092.00
Latest Budget Changes
-528000.00
Total Budget Changes
10338071.57
Forecast Completion
2029-06-16T00:00:00.000
Latest Schedule Changes
419
Total Schedule Changes
1934
Westchester Avenue Bridge over Hutch River Parkway Rehabilitation
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 112 • Project Name: Westchester Avenue Bridge over Hutch River Parkway Rehabilitation
Date Reported As Of
2022-09-01T00:00:00.000
Pid
112
Project Name
Westchester Avenue Bridge over Hutch River Parkway Rehabilitation
Description
Repair abutments, piers, approaches, and steel superstructure located in Pelham Bay, Bronx; replace reinforced concrete deck.
Category
Bridges, Streets and Roadways
Borough
Bronx
Managing Agency
DOT
Client Agency
DOT
Current Phase
Construction
Design Start
1995-01-17T00:00:00.000
Budget Forecast
78733057.00
Latest Budget Changes
-3529306.00
Total Budget Changes
20945057.00
Forecast Completion
2023-07-31T00:00:00.000
Latest Schedule Changes
373
Total Schedule Changes
1592
GI - GRAVESEND BAY CSO - PHASE II
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 1198 • Project Name: GI - GRAVESEND BAY CSO - PHASE II
Date Reported As Of
2022-09-01T00:00:00.000
Pid
1198
Project Name
GI - GRAVESEND BAY CSO - PHASE II
Description
GREEN INFRASTRUCTURE IN OH-015 GRAVESEND BAY CSO PH 2
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Design
Design Start
2017-10-30T00:00:00.000
Budget Forecast
55026000.00
Latest Budget Changes
12938000.00
Total Budget Changes
13699000.00
Forecast Completion
2024-12-09T00:00:00.000
Latest Schedule Changes
29
Total Schedule Changes
29
Gilboa Dam Reconstruction, Phase III
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 405 • Project Name: Gilboa Dam Reconstruction, Phase III
Date Reported As Of
2022-09-01T00:00:00.000
Pid
405
Project Name
Gilboa Dam Reconstruction, Phase III
Description
Gilboa Dam Reconstruction Project includes construction of a new low level outlet (LLO) consisting of 2,000 feet of tunneling , an access shaft, oulet structure and gate valve controls.
Category
Water Supply
Borough
Upstate
Managing Agency
DEP
Client Agency
DEP
Current Phase
Construction
Design Start
2004-03-18T00:00:00.000
Budget Forecast
200712336.70
Latest Budget Changes
1641564.89
Total Budget Changes
10376533.49
Forecast Completion
2023-03-26T00:00:00.000
Latest Schedule Changes
104
Total Schedule Changes
1113
TRAVIS AVENUE WIDENING
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 1240 • Project Name: TRAVIS AVENUE WIDENING
Date Reported As Of
2022-09-01T00:00:00.000
Pid
1240
Project Name
TRAVIS AVENUE WIDENING
Description
TRAVIS AVENUE WIDENING
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2015-01-15T00:00:00.000
Budget Forecast
85637000.00
Latest Budget Changes
30000.00
Total Budget Changes
50000.00
Forecast Completion
2027-10-22T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1029
3K CENTER @ 47-09 36TH STREET - QUEENS
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 1313 • Project Name: 3K CENTER @ 47-09 36TH STREET - QUEENS
Date Reported As Of
2022-09-01T00:00:00.000
Pid
1313
Project Name
3K CENTER @ 47-09 36TH STREET - QUEENS
Description
LEASE
Category
Schools
Managing Agency
SCA
Client Agency
DOE
Current Phase
Construction
Design Start
2021-11-05T00:00:00.000
Budget Forecast
25191650.00
Total Budget Changes
0.00
Forecast Completion
2024-09-03T00:00:00.000
Total Schedule Changes
-366
Red Hook Recreation Area Track 1, Soccer Fields 3-5, and Ballfields 1-4 Reconstruction
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 974 • Category: Parks
Date Reported As Of
2022-09-01T00:00:00.000
Pid
974
Project Name
Red Hook Recreation Area Track 1, Soccer Fields 3-5, and Ballfields 1-4 Reconstruction
Description
This project will reconstruct the track & field and convert three soccer fields and four ballfields from natural turf to synthetic turf at Red Hook Recreation Area.
Category
Parks
Managing Agency
DPR
Client Agency
DPR
Current Phase
Construction
Design Start
2017-11-01T00:00:00.000
Budget Forecast
68712000.00
Latest Budget Changes
0.00
Total Budget Changes
-10555000.00
Forecast Completion
2023-01-03T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1082
UNION TURNPIKE CENTER MEDIAN REPLACEMENT
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 986 • Project Name: UNION TURNPIKE CENTER MEDIAN REPLACEMENT
Date Reported As Of
2022-09-01T00:00:00.000
Pid
986
Project Name
UNION TURNPIKE CENTER MEDIAN REPLACEMENT
Description
Union Turnpike Center Median Replacement from Hollis Court Blvd to 226th Street, Borough of Queens
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Construction
Design Start
2019-05-23T00:00:00.000
Budget Forecast
49998000.00
Latest Budget Changes
-2000.00
Total Budget Changes
23766000.00
Forecast Completion
2024-08-20T00:00:00.000
Latest Schedule Changes
-21
Total Schedule Changes
341
Ped Safety Upgrades on Atlantic Avenue, Phase 2
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 519 • Project Name: Ped Safety Upgrades on Atlantic Avenue, Phase 2
Date Reported As Of
2022-09-01T00:00:00.000
Pid
519
Project Name
Ped Safety Upgrades on Atlantic Avenue, Phase 2
Description
PED. SAFETY UPGRADES ON ATLANTIC AVE - PH 2, BROOKLYN
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Construction
Design Start
2016-08-04T00:00:00.000
Budget Forecast
40012000.00
Latest Budget Changes
-1000.00
Total Budget Changes
10136496.00
Forecast Completion
2024-05-30T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1400
Lexington Avenue Pedestrian Safety Improvements
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 1239 • Project Name: Lexington Avenue Pedestrian Safety Improvements
Date Reported As Of
2022-09-01T00:00:00.000
Pid
1239
Project Name
Lexington Avenue Pedestrian Safety Improvements
Description
Lexington Avenue Pedestrian Safety Improvements
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Budget Forecast
29819000.00
Latest Budget Changes
17000.00
Total Budget Changes
17000.00
Oakwood Beach WWTP Headworks Improvements
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 450 • Project Name: Oakwood Beach WWTP Headworks Improvements
Date Reported As Of
2022-09-01T00:00:00.000
Pid
450
Project Name
Oakwood Beach WWTP Headworks Improvements
Description
Replacement of six bar screens, grit bin vibrator, six ring flushing pumps, six main sewage pumps and assoc. piping/valves and motor control center, replacement of four exhaust fans, gas and oxygen detectors and a 15 KVA transformer
Category
Wastewater Treatment
Borough
Staten Island
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2023-02-01T00:00:00.000
Budget Forecast
83229440.00
Latest Budget Changes
0.00
Total Budget Changes
31867440.00
Forecast Completion
2029-04-25T00:00:00.000
Latest Schedule Changes
-100
Total Schedule Changes
2857
Raise Shorelines Citywide
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 689 • Project Name: Raise Shorelines Citywide
Date Reported As Of
2022-09-01T00:00:00.000
Pid
689
Project Name
Raise Shorelines Citywide
Description
The design and construction of shoreline reconstruction projects necessary to provide Citywide protection from future flooding caused by elevated seal elvels.
Category
Industrial Development
Borough
Citywide
Managing Agency
EDC
Client Agency
ORR
Current Phase
Design
Design Start
2017-08-01T00:00:00.000
Budget Forecast
60422401.00
Latest Budget Changes
0.00
Total Budget Changes
0.00
Forecast Completion
2024-09-30T00:00:00.000
Latest Schedule Changes
274
Total Schedule Changes
639