Subject: DOB BIS Open Data: first-permit dates, fire-alarm coverage, and historical application records
Hello NYC Open Data / DOB data team,
Could you route this inquiry to the DOB data steward for these datasets?
• DOB Job Application Filings (ic3t-wcy2)
https://data.cityofnewyork.us/d/ic3t-wcy2
• DOB Permit Issuance (ipu4-2q9a)
https://data.cityofnewyork.us/d/ipu4-2q9a
We are investigating whether public building records can support research on permitting delays. Before modeling, we need to establish whether an application received its first permit within 90 calendar days of filing.
Our November 5, 2026 extract contains 66,708 legacy BIS A2/document-01 application rows with 2019 pre-filing dates, representing 51,608 job numbers, and 94,468 associated permit rows across all documents and dates. DOB NOW is outside this cohort. We recognize that these are current records about historical applications and that a missing match does not establish rejection or delay. No model has been trained.
Could you clarify the following, or point us to existing documentation?
1. Fire-alarm coverage and eligibility. All 3,008 fire-alarm-only jobs in our extract have no associated permit rows. Some nevertheless have a fully_permitted date; for example, job 302585735/document 01 shows 2019-04-23. What event does that field represent for these filings, and where should the corresponding authorization be found? How should pre-transition filings and jobs affected by the June 2019 FDNY transition be linked and classified? Our appendix includes five fire-alarm examples and one non-fire-alarm example, 321933690.
2. Original issuance and coverage. Does issuance_date on an INITIAL record preserve the original issuance after reissue, renewal, correction or replacement? How does it relate to BIS's First Issue Date and permit sequence 01? Are earlier, voided, rescinded, deleted or superseded events omitted or overwritten? What coverage limitations must be considered before interpreting absence of a permit within a 90-day window, including system migrations or missing historical events?
3. Filing origin and linkage. Which field corresponds to completed application filing: pre__filing_date, fully_paid, or BIS's Date Filed? For job 340689446, using pre-filing versus fully_paid changes the observed interval from 134 to 78 days. What is the correct application unit and join key across document and work-type permits? How should different job_s1_no records for the same job/doc, different dobrundate values, and repeated permit work/sequence combinations be interpreted? Job 123769751 has conflicting pre-filing dates across records.
4. Historical records. Are original application versions, dated amendments, archived exports, or event histories available? We need to establish what cost, work scope and other attributes were known at filing, and eventually distinguish review waiting time from applicant revisions, payments and other processing steps. Please identify available records, identifiers, effective/update dates, coverage, and the appropriate access route. If feasible, existing histories for the 11 appendix cases, from original filing through November 5, 2026, would help us test the definitions before seeking a larger extract.
The case appendix separates extract-only observations from BIS-page corroboration. Seven sampled BIS histories agree with our extracted first-issue dates, but this is partial review of the same underlying system, not proof of complete coverage. We have not treated unmatched cases as negative outcomes or later attributes as filing-time predictors.
The 11-case appendix is available on request; this form has no attachment field.
A documentation link, written field definitions, or referral to the appropriate DOB/FDNY data owner would be helpful. Please advise if a separate records request is needed for the historical material. We do not need personal contact details.
Thank you.
Assigned Agencys Response
Numbered by your request sections --
1. Records are updated in BIS to reflect FDNY permitting, but the actual permit attributes are not shared with NYC Dept. of Buildings and therefore not reflected in the permit data set
2. These change instances are on a case-by-case basis rather than a standard rule for whether a sequence is continued or restarted. You would need to review them independently.
3. Depending on what interval is being measured, the fully paid date is closest to the processing date.
4. You would need to utilize the virtual job folder to compare the changes under the different “DATE SCANNED” values.
Department of Buildings (DOB)