List of all approved construction permits in DOB NOW except for Electrical, Elevator, and Limited Alteration Application (LAA) which have their own datasets.
Housing & DevelopmentDepartment of Buildings (DOB)
Dataset rbx6-tga4
46 fields
PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGES IN USE, EGRESS, OR OCCUPANCY.
PROPOSED INTERIOR RENOVATION ON CELLAR TO ADDRESS VIOLATION: 39165961H, 39165960X, 39165959Z & VACATE ORDER: 3989253. CEILING, FLOORING, PARTITION WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
INSTALL 8' HT CONSTRUCTION FENCE ALIGNED WITH PROPERTY AND WORK IN-CONJUNCTION WITH NB#321590765. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEING APPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.
Hunter East Bldg, Glass Barrier installation @8th Fl Terrace per the plans: Installation of metal guard rails, structural steel bypass support structure. Repairs to railings & aluminum trellis structure. Install new gates & lifeline system. Roof repairs.
Basement/Sub-basement, Floor Number(s) 001 through 005, Roof
Work Type
General Construction
Permittee S License Type
GC
Applicant License
001714
Applicant First Name
ANTHONY
Applicant Last Name
DIGUGLIELMO
Applicant Business Name
NOTIAS CONSTRUCTION INC
Applicant Business Address
28-06 120TH STREET
Filing Representative First Name
BERNARD
Filing Representative Last Name
OCASIO
Filing Representative Business Name
BETRO DESIGN GROUP
Approved Date
2021-10-14T00:00:00.000
Issued Date
2025-07-29T00:00:00.000
Expired Date
2026-07-29T04:00:00.000
Job Description
INTERIOR RENOVATION OF EX. BLDNG, MINOR FACADE/SIDEWALK REPAIR. NEW FINISHES, REPLACEMENT OF WINDOWS/DOORS, KITCHEN & BATH FIXTURES IN EX. LOCATION. ROOF/BULKHEAD/PARAPET WORK. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APP.
Interior modifications on the 15th Floor Unit 1514 Includes removal of select existing ductwork and mechanical components, installation of new HVAC distribution and air devices. No change in use, egress, or occupancy.
This application is being filed for Support of Excavation work related to the New Building application #421694857 at the subject premises. There is no change in use, egress or occupancy.
Installation of temporary Site Specific Engineered Enclosure System per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Floor Number(s) 001 through 001, Open Space, Underground
Work Type
General Construction
Permittee S License Type
GC
Applicant License
602380
Applicant First Name
HARVINDER
Applicant Last Name
SINGH
Applicant Business Name
BOLLA CONSTRUCTION LLC
Applicant Business Address
809 STEWART AVE
Filing Representative First Name
MEGAN
Filing Representative Last Name
DASILVA
Filing Representative Business Name
HIGH POINT ENGINEERING
Approved Date
2022-12-23T00:00:00.000
Issued Date
2025-11-21T00:00:00.000
Expired Date
2026-11-21T05:00:00.000
Job Description
Post approval amendment for the installation of (2) 10,000 gal UST's and (1) 10,000 gal compartment UST with associated piping, islands and dispensers. Amendment depicts change in design details of the bottom slab. No change in use, egress or occupancy
INSTALL (2) 49'-3 x 21'-2 x 17'-3 DEEP INTERLOCKING STEEL SHEET PILE SUPPORT OF EXCAVATION SYSTEMS TO FACILITATE THE REMOVAL OF 2 UNDERGROUND FUEL STORAGE TANKS ON SITE. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Subsequent application for Structural work. 1. New Stairway core. 2. Leveling/ strengthening of existing floor joists. 3. New horizontal enlargement. 4. New vertical enlargement.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
3 story wood frame building to be fully demolished with hand tools only. Mechanical equipment to be used for debris removal, truck loading, and crushed slab on grade.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE.LIVE LOAD 300PSF.
INTERIOR RENOVATION OF EXISTING CELLAR, 1ST AND 2ND FLOOR IN EXISTING 4 STORY MIX USE BUILDING and mechanical work all as per plans. NO WORK ON 3RD OR 4TH FLOOR. NO CHANGE TO EGRESS, OCCUPANCY, OR BULK.