Active Projects - Infrastructure (Historical)

List of currently active infrastructure projects including description and high level schedule and budget range.

Housing & Development Department of Design and Construction (DDC) Dataset rukc-mmqu 9 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
HWK700B
Project Id: HWK700B • Description: Reconstruction of Columbia Street Area Phase II (BED-768B) • Client Agency: TRANSPORTATION
Project Id
HWK700B
Description
Reconstruction of Columbia Street Area Phase II (BED-768B)
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2024-07-14T00:00:00.000
Scope
RECONSTRUCTION OF COLUMBIA STREET AREA PHASE II HAS BEEN DEVELOPED IN COORDINATION WITH NYCDEP BED-768B. IT INCLUDES ALL THE STREETS IN THAT PROJECT SOUTH OF HAMILTON AVE AND ALSO INCLUDES A SERIES OF STREETS IN THE NEIGHBORHOOD REQUIRING CAPITAL RECONSTRUCTION. PROPOSED WORK INCLUDES FULL RECONSTRUCTION OF SEVERAL BLOCKS ALONG WITH STREETSCAPE AND SAFETY IMPROVEMENTS AT A SERIES OF INTERSECTIONS. THE OVERALL PURPOSE OF THIS PROJECT IS TO BRING THE STREETS IN THIS AREA TO A STATE OF GOOD REPAIR IN CONJUNCTION WITH UTILITY REPLACEMENT AND TO PROVIDE SAFETY ENHANCEMENTS AT KEY LOCATIONS.
Dollar Amount
$30M to 100M
Status
Active
BB05-01-A
Project Id: BB05-01-A • Description: GI - Cons of ROW Bioswales & Stormwwater GS in BB-005, Ph 1 • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
BB05-01-A
Description
GI - Cons of ROW Bioswales & Stormwwater GS in BB-005, Ph 1
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2021-09-15T00:00:00.000
Scope
GI - CONSTRUCTION OF ROW GI IN BB-005 PHASE I IN THE QUEENS BOROUGH. CONSTRUCTION OF ROW GREEN INFRASTRUCTURE IN TRIBUTARY AREA BB005 INCLUDES BIOSWALES, GREENSTRIPS, INFILTRATION BASINS AND STORMWATER GREENSTREETS. ROW BIOSWALES ARE VEGETATED SYSTEMS THAT MANAGE STORMWATER RUNOFF BY STORING, INFILTRATING AND EVAPOTRANSPIRATION ELIMINATING IT FROM THE CITY'S COMBINED SEWER SYSTEM. CONSTRUCTION INVOLVES EXCAVATION, BACKFILL OF BROKEN STONE AND ENGINEERED SOIL, CONSTRUCTION OF CONCRETE INLETS AND OUTLETS, CONCRETE CURBS AND HEADERS, SIDEWALK AND PLANTINGS WHICH MAY INCLUDE TREES.
Dollar Amount
$10M to 30M
Status
Active
P-1SAND01
Project Id: P-1SAND01 • Description: STARLIGHT PARK PEDESTRIAN BRIDGE (P-1PBSTAR) • Client Agency: PARKS & RECREATION
Project Id
P-1SAND01
Description
STARLIGHT PARK PEDESTRIAN BRIDGE (P-1PBSTAR)
Client Agency
PARKS & RECREATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-06-04T00:00:00.000
Scope
STARLIGHT PARK - PEDESTRIAN BRIDGES, BRONX
Dollar Amount
$3M to 10M
Status
Active
BB05-02-A
Project Id: BB05-02-A • Description: GI - Cons of ROW Bioswales & Stormwwater GS in BB-005, Ph 2 • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
BB05-02-A
Description
GI - Cons of ROW Bioswales & Stormwwater GS in BB-005, Ph 2
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2021-09-15T00:00:00.000
Scope
GI - CONSTRUCTION OF ROW GI IN BB-005 PHASE 2 IN THE QUEENS BOROUGH. CONSTRUCTION OF ROW GREEN INFRASTRUCTURE IN TRIBUTARY AREA BB005 INCLUDES BIOSWALES, GREENSTRIPS, INFILTRATION BASINS AND STORMWATER GREENSTREETS. ROW BIOSWALES ARE VEGETATED SYSTEMS THAT MANAGE STORMWATER RUNOFF BY STORING, INFILTRATING AND EVAPOTRANSPIRATION ELIMINATING IT FROM THE CITY'S COMBINED SEWER SYSTEM. CONSTRUCTION INVOLVES EXCAVATION, BACKFILL OF BROKEN STONE AND ENGINEERED SOIL, CONSTRUCTION OF CONCRETE INLETS AND OUTLETS, CONCRETE CURBS AND HEADERS, SIDEWALK AND PLANTINGS WHICH MAY INCLUDE TREES.
Dollar Amount
$10M to 30M
Status
Active
BED778A
Project Id: BED778A • Description: Trunk & Dist WM Rep in Atlantic Ave b/t Carlton & Portland • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
BED778A
Description
Trunk & Dist WM Rep in Atlantic Ave b/t Carlton & Portland
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2021-04-11T00:00:00.000
Scope
Trunk and Distribution Water Mains Replacement in Atlantic Avenue between Carlton Avenue and Portland Avenue in the Borough of Brooklyn.

Water Main (WM-6) in:
1. Atlantic Avenue from Carlton Avenue to South Portland Avenue.
2. Intersection of Atlantic Avenue and Carlton Avenue.

Water Main(WM -1) in:
1. Atlantic Avenue(SS) from Carlton Avenue to South Portland Avenue
2. Intersection of Atlantic Avenue and Carlton Avenue
3. Intersection of Atlantic Avenue and Cumberland Street.
Dollar Amount
$10M to 30M
Status
Active
P-1STARLP
Project Id: P-1STARLP • Description: BRONX RIVER GREENWAY: STARLIGHT PARK PHASE II, STAGE 2, BX • Client Agency: PARKS & RECREATION
Project Id
P-1STARLP
Description
BRONX RIVER GREENWAY: STARLIGHT PARK PHASE II, STAGE 2, BX
Client Agency
PARKS & RECREATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2021-06-01T00:00:00.000
Scope
BRONX RIVER GREENWAY - STARLIGHT PARK PHASE II, STAGE 2, BRONX
Dollar Amount
$30M to 100M
Status
Active
BED798
Project Id: BED798 • Description: 72" Replacement in Flatbush Avenue between Sterling Pl & 8th • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
BED798
Description
72" Replacement in Flatbush Avenue between Sterling Pl & 8th
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2021-07-12T00:00:00.000
Scope
72" Trunk Water Main and Combined Sewer Replacement in Flatbush Ave. between Sterling Pl. and 8th Ave., etc., Borough of Brooklyn.

WM-6 in:
1. Flatbush Ave. between Park Place and 8th Ave
2. 8th Ave. between Flatbush Ave. and Lincoln Place
3. Park Place between 5th Ave. and 6th Avenue
4. St. Johns Place between 5th Ave. and 8th Ave
5. 6th Avenue between Park Place and Union Street

WM-1 in:
1. Flatbush Avenue between Park Place and 8th Avenue

Combined sewer in:
1. Park Place between 5th Ave. and 6th Avenue
2. St. Johns Place between 5th Ave. and Flatbush Ave.
3. 6th Avenue between Park Place and Union Street
4. 8th Ave. between St. John's Place and Lincoln Place

Additional scope:
Reconstruction of triangle at 8th Avenue and Flatbush Avenue removed from HWK300-01 and to be constructed under the BED-798.
Dollar Amount
$30M to 100M
Status
Active
BED809
Project Id: BED809 • Description: Replacement of Water Mains in Avenue S • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
BED809
Description
Replacement of Water Mains in Avenue S
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2021-09-21T00:00:00.000
Scope
RECONSTRUCTION OF WATER MAIN IN AVENUE S, BK
Dollar Amount
$10M to 30M
Status
Active
BED819
Project Id: BED819 • Description: WM replacement in Oriental Blvd • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
BED819
Description
WM replacement in Oriental Blvd
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2022-07-28T00:00:00.000
Scope
WATERMAIN REPLACEMENT IN ORIENTAL BLVD, BROOKLYN
Dollar Amount
$30M to 100M
Status
Active
BED-827
Project Id: BED-827 • Description: Regulator Chamber Roof Replacements • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
BED-827
Description
Regulator Chamber Roof Replacements
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2022-02-08T00:00:00.000
Scope
REGULATOR CHAMBER ROOF REPLACEMENTS: BROOKLYN (5), BRONX (1). FIVE REGULATOR LOCATIONS IN BROOKLYN AND ONE REGULATOR LOCATION IN THE BRONX WILL HAVE THEIR EXISTING CONCRETE SLAB ROOFS REMOVED AND REPLACED WITH NEWLY POURED ROOFS SO THAT ACCESS COVERS ARE APPROPRIATELY CENTERED OVER DISTRIBUTION ASSETS. THIS WORK WILL INCLUDE THE DESIGN AND CONSTRUCTION OF STRUCTURAL STEEL SUPPORTING THE CONCRETE ROOFS.
Dollar Amount
$1M or less
Status
Active
BEDA002
Project Id: BEDA002 • Description: Accelerated Distribution WM replcmnt & sewer rehab- BKLYN • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
BEDA002
Description
Accelerated Distribution WM replcmnt & sewer rehab- BKLYN
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-03-28T00:00:00.000
Scope
ACCELERATED DISTRIBUTION WATER MAIN REPLACEMENT AND SEWER REHABILITATION/REPLACEMENT, BROOKLYN
Dollar Amount
$10M to 30M
Status
Active
BEDA003
Project Id: BEDA003 • Description: Accelerated Distribution WM replcmnt & sewer rehab- BKLYN • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
BEDA003
Description
Accelerated Distribution WM replcmnt & sewer rehab- BKLYN
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-05-23T00:00:00.000
Scope
ACCELERATED DISTRIBUTION WATER MAIN REPLACEMENT AND SEWER REHABILITATION/REPLACEMENT, BROOKLYN
Dollar Amount
$10M to 30M
Status
Active
CONISPH04
Project Id: CONISPH04 • Description: SAN & STRM SWR, WM1, IN CONEY ISL AREA, PH 4 • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
CONISPH04
Description
SAN & STRM SWR, WM1, IN CONEY ISL AREA, PH 4
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2024-08-09T00:00:00.000
Scope
INSTALLATION OF NEW TRUNK WATER MAINS AND STORM SEWERS AND REPLACEMENT OF DISTRIBUTION WATER MAINS IN NEPTUNE AVENUE BETWEEN W 8TH/12TH STREET AND OCEAN PARKWAY IN THE BOROUGH OF BROOKLYN. TRUNK WATER MAIN INSTALLATION IS IN ACCORDANCE WITH TRUNK MAIN MASTER PLAN. SEWER INSTALLATION IS PER PRELIMINARY AMENDED DRAINAGE PLAN.
Dollar Amount
$10M to 30M
Status
Active
CONISPH2B
Project Id: CONISPH2B • Description: SAN & STRM SWR, WM1, WM6 IN CONEY ISL AREA, PH 2B • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
CONISPH2B
Description
SAN & STRM SWR, WM1, WM6 IN CONEY ISL AREA, PH 2B
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2021-09-24T00:00:00.000
Scope
Storm and Sanitary sewer, Trunk and distribution water main in Coney Island area, Borough of Brooklyn Phase-2B

Storm Sewer
1-Neptune Ave. b/t Stillwell Ave. and West 12th St. (both North & South side)
2-Stillwell Ave. b/t Coney Island Creek and Surf Ave.
3-Outfall at West 12th St.and Neptune Ave. to Coney Is Land Creek

Sanitary Sewer
1-Stillwell Ave. b/t Coney Island Creek to Surf Ave.
2-Neptune Ave. b/t Stillwell Ave. and West 12th St.(both North side and South side)

Watermain
1-Neptune Ave b/t Stillwell Ave. and W. 12th St.
2-Stillwell Ave. b/t Surf Ave. and Coney Island Creek
Dollar Amount
$30M to 100M
Status
Active
CONISPH3A
Project Id: CONISPH3A • Description: Storm and Sanitary Sewer, Trunk and Distribution Water Main • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
CONISPH3A
Description
Storm and Sanitary Sewer, Trunk and Distribution Water Main
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2023-03-13T00:00:00.000
Scope
Storm and Sanitary sewer, Trunk and distribution water main in Coney Island area, Borough of Brooklyn

Storm Sewer
1-West 16 St. b/t Surf Ave. and Hart Pl.
2-Surf Ave b/t West 12 St. and West 17 St.
3-Mermaid Ave b/t W 16 St. and Stillwell Ave.
4.-Neptune Ave b/t W 17 St. and Stillwell Ave.
5- Hart Pl. b/t Cropsey Ave and W 15 St.

Sanitary Sewer
1-West 16 St. b/t Surf Ave and Mermaid Ave.
2-West 16 St. b/t Mermaid Ave. and Hart Pl (both East and West side of W 16 St)
3-Surf Ave b/t West 12 St. and West 17 St. (both north and south side of Surf Ave)
4-Mermaid Ave b/t W 17 St. and Stillwell Ave.
5.-Neptune Ave b/t W 17 St. and W 15 St. (both north and south side of Neptune Ave)
6- Hart Pl. b/t W 16 St. and W 15 St. (North Side)
7.-Hart Pl. b/t Cropsey Ave and W 16 St.(both north and south sides)

Watermain (WM-6)
1-Neptune Ave b/t Stillwell Ave. and W 17 St.
2- Surf Ave b/t W 17 St and W 12 St

Water Main (WM-1)
1-Neptune Ave b/t Stillwell Ave. and W 17 St.
2-Mermaid Ave b/t Stillwell Ave. and W 17 St.
3- Surf Ave b/t W 17 St and Stillwell Ave (north and south sides of the strret)
4- Hart Pl. b/t W 16 St. and W 15 St.
5 - W 16 St b/t Surf Ave & Hart Pl.
Dollar Amount
$30M to 100M
Status
Active
CS-ER-WCP
Project Id: CS-ER-WCP • Description: PARALLEL SEWER-REDUCE CSO DISCHARGE FROM PUGSLEY CREEK • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
CS-ER-WCP
Description
PARALLEL SEWER-REDUCE CSO DISCHARGE FROM PUGSLEY CREEK
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-08-28T00:00:00.000
Scope
Pugsley Creek Relief Sewer and Repair of Existing Combined Trunk, with Water Main work, Borough of the Bronx.
Dollar Amount
$30M to 100M
Status
Active
CT2-INTER
Project Id: CT2-INTER • Description: CITY TUNNEL #2, REPLACE GUARD VALVES @ 16A • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
CT2-INTER
Description
CITY TUNNEL #2, REPLACE GUARD VALVES @ 16A
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2021-05-01T00:00:00.000
Scope
INSTALLATION OF NEW TRUNK MAIN, VALVES & APPURTENANCES IN SHAFT 16A, BK
Dollar Amount
$3M to 10M
Status
Active
DOTSEQ01
Project Id: DOTSEQ01 • Description: SEQ - Southeast Queens-DOT Priority Grids 1 (SEQPGRD1) • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
DOTSEQ01
Description
SEQ - Southeast Queens-DOT Priority Grids 1 (SEQPGRD1)
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-08-14T00:00:00.000
Scope
PROJECT DOTSEQ01 (SECONDARY ID IS SEQPGRD1) SEP IS A SEQ JOINT PROGRAM BETWEEN THE DOT AND DEP TO IMPROVE DRAINAGE CONDITIONS. SCOPE OF WORK UNDER THIS ID AND THE SECONDARY ID WILL INCLUDE STREET RESURFACING, GRADE ADJUSTMENT, STREET RECON, AND/OR NEW SIDWALKS AND CURB RECON. ALSO, INSTALLATION OF NEW STORM SEWERS AND WATER MAINS.
Dollar Amount
$3M to 10M
Status
Active
DOTSEQ01
Project Id: DOTSEQ01 • Description: Southeast Queens - DOT Priority Grids Group 1 (SEQPGRD1) • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
DOTSEQ01
Description
Southeast Queens - DOT Priority Grids Group 1 (SEQPGRD1)
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-08-14T00:00:00.000
Scope
PROJECT DOTSEQ01 (SECONDARY ID IS SEQPGRD1) SEP IS A SEQ JOINT PROGRAM BETWEEN THE DOT AND DEP TO IMPROVE DRAINAGE CONDITIONS. SCOPE OF WORK UNDER THIS ID AND THE SECONDARY ID WILL INCLUDE STREET RESURFACING, GRADE ADJUSTMENT, STREET RECON, AND/OR NEW SIDWALKS AND CURB RECON. ALSO, INSTALLATION OF NEW STORM SEWERS AND WATER MAINS.
Dollar Amount
$3M to 10M
Status
Active
DOTSEQ02
Project Id: DOTSEQ02 • Description: SEQ - Southeast Queens-DOT Priority Grids 2 (SEQPGRD2) • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
DOTSEQ02
Description
SEQ - Southeast Queens-DOT Priority Grids 2 (SEQPGRD2)
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Initiation
Projected Construction Completion
2024-09-13T00:00:00.000
Scope
PROJECT DOTSEQ02 (SECONDARY ID IS SEQPGRD2) SEP IS A SEQ JOINT PROGRAM BETWEEN THE DOT AND DEP TO IMPROVE DRAINAGE CONDITIONS. SCOPE OF WORK UNDER THIS ID AND THE SECONDARY ID WILL INCLUDE STREET RESURFACING, GRADE ADJUSTMENT, STREET RECON, AND/OR NEW SIDWALKS AND CURB RECON. ALSO, INSTALLATION OF NEW STORM SEWERS AND WATER MAINS.
Dollar Amount
$10M to 30M
Status
Active
P-1VCPDBR
Project Id: P-1VCPDBR • Description: Vancortlandt Park pedestrian bridge • Client Agency: PARKS & RECREATION
Project Id
P-1VCPDBR
Description
Vancortlandt Park pedestrian bridge
Client Agency
PARKS & RECREATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-05-19T00:00:00.000
Scope
VAN CORTLANDT PARK PEDESTRIAN BRIDGE OVER MAJOR DEEGAN EXPRESSWAY, BX
Dollar Amount
$10M to 30M
Status
Active
DOTSEQ02
Project Id: DOTSEQ02 • Description: Southeast Queens - DOT Priority Grids Group 2 (SEQPGRD2) • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
DOTSEQ02
Description
Southeast Queens - DOT Priority Grids Group 2 (SEQPGRD2)
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Initiation
Projected Construction Completion
2024-09-13T00:00:00.000
Scope
PROJECT DOTSEQ02 (SECONDARY ID IS SEQPGRD2) SEP IS A SEQ JOINT PROGRAM BETWEEN THE DOT AND DEP TO IMPROVE DRAINAGE CONDITIONS. SCOPE OF WORK UNDER THIS ID AND THE SECONDARY ID WILL INCLUDE STREET RESURFACING, GRADE ADJUSTMENT, STREET RECON, AND/OR NEW SIDWALKS AND CURB RECON. ALSO, INSTALLATION OF NEW STORM SEWERS AND WATER MAINS.
Dollar Amount
$10M to 30M
Status
Active
GCBB26-01
Project Id: GCBB26-01 • Description: GI - CONS OF ROW GI IN BOWERY BAY CSO TRIBUTARY AREAS • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
GCBB26-01
Description
GI - CONS OF ROW GI IN BOWERY BAY CSO TRIBUTARY AREAS
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2021-01-30T00:00:00.000
Scope
CONSTRUCTION OF RIGHT-OF-WAY GREEN INFRASTRUCTURE IN THE BOWERY BAY CSO TRIBUTARY AREAS, QUEENS
Dollar Amount
$3M to 10M
Status
Active
GCJA03-2A
Project Id: GCJA03-2A • Description: GI - CONS OF ROW GI IN CSO TRIBUTARY AREA JAM-003, PH 2A • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
GCJA03-2A
Description
GI - CONS OF ROW GI IN CSO TRIBUTARY AREA JAM-003, PH 2A
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2021-06-15T00:00:00.000
Scope
GI - CONS OF ROW GI IN CSO TRIBUTARY AREA JAM-003, PH 2A
Dollar Amount
$10M to 30M
Status
Active
GCJA03-2B
Project Id: GCJA03-2B • Description: GI - CONS OF ROW GI IN JAMAICA BAY CSO AREAS JAM-03 & JAM-3A • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
GCJA03-2B
Description
GI - CONS OF ROW GI IN JAMAICA BAY CSO AREAS JAM-03 & JAM-3A
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2021-06-30T00:00:00.000
Scope
CONSTRUCTION OF RIGHT-OF-WAY GREEN INFRASTRUCTURE IN THE JAMAICA BAY CSO TRIBUTARY AREAS JAM-003 AND JAM-003A
Dollar Amount
$10M to 30M
Status
Active
GCJA03-3A
Project Id: GCJA03-3A • Description: GI - Cons of ROW Bioswales & Stormwater GS in JAM-003, 3A • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
GCJA03-3A
Description
GI - Cons of ROW Bioswales & Stormwater GS in JAM-003, 3A
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-07-05T00:00:00.000
Scope
GI - Cons of ROW Bioswales & Stormwater GS in JAM-003, 3A
Dollar Amount
$10M to 30M
Status
Active
GCJA03-3B
Project Id: GCJA03-3B • Description: GI - CONS OF ROW GI IN JAMAICA BAY CSO AREAS JAM-03 & JAM-3A • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
GCJA03-3B
Description
GI - CONS OF ROW GI IN JAMAICA BAY CSO AREAS JAM-03 & JAM-3A
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2021-06-12T00:00:00.000
Scope
ROW GI in Jamaica Bay CSO Tributary Jam-003 & Jam 003A
Dollar Amount
$10M to 30M
Status
Active
GCNC77-PA
Project Id: GCNC77-PA • Description: GI - PERMEABLE ASPHALT PAVEMENT PILOT & GI IN CSO AREA NC-77 • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
GCNC77-PA
Description
GI - PERMEABLE ASPHALT PAVEMENT PILOT & GI IN CSO AREA NC-77
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2021-02-20T00:00:00.000
Scope
Permeable Asphalt Pavement Pilot & GI In CSO Tributary Area NC-077
Dollar Amount
$3M to 10M
Status
Active
GCTI10-02
Project Id: GCTI10-02 • Description: CONS OF ROW GI PHASE 2 IN FLUSHING CREEK CSO AREA TI-010 • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
GCTI10-02
Description
CONS OF ROW GI PHASE 2 IN FLUSHING CREEK CSO AREA TI-010
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2021-06-26T00:00:00.000
Scope
CONSTRUCTION OF RIGHT-OF-WAY GREEN INFRA IN FLUSHING CREEK CSO TRIBUTARY AREA TI-010, PHASE 2
Dollar Amount
$10M to 30M
Status
Active
GCTI10-03
Project Id: GCTI10-03 • Description: CONS OF ROW GI PHASE 3 IN FLUSHING CREEK CSO AREA TI-010 • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
GCTI10-03
Description
CONS OF ROW GI PHASE 3 IN FLUSHING CREEK CSO AREA TI-010
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2021-06-26T00:00:00.000
Scope
CONSTRUCTION OF RIGHT-OF-WAY GREEN INFRA IN FLUSHING CREEK CSO TRIBUTARY AREA TI-10, PHASE 3
Dollar Amount
$10M to 30M
Status
Active
GCTI10-1A
Project Id: GCTI10-1A • Description: CONS OF ROW GI FLUSHING CRK CSO TRIB AREA TI-10, ST 1, PH A • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
GCTI10-1A
Description
CONS OF ROW GI FLUSHING CRK CSO TRIB AREA TI-10, ST 1, PH A
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2021-06-25T00:00:00.000
Scope
CONS OF ROW GI FLUSHING CRK CSO TRIB AREA TI-10 ST 1, PH A
Dollar Amount
$10M to 30M
Status
Active
GCTI10-1B
Project Id: GCTI10-1B • Description: CONS OF ROW GI FLUSHING CRK CSO TRIB AREA TI-10, ST 1, PH B • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
GCTI10-1B
Description
CONS OF ROW GI FLUSHING CRK CSO TRIB AREA TI-10, ST 1, PH B
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2022-03-31T00:00:00.000
Scope
CONS OF ROW GI FLUSHING CRK CSO TRIB AREA TI-10, ST 1, PH B
Dollar Amount
$10M to 30M
Status
Active
GCTI10-4A
Project Id: GCTI10-4A • Description: CONS OF ROW GI FLUSHING CRK CSO TRIB AREA TI-10, ST 4, PH A • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
GCTI10-4A
Description
CONS OF ROW GI FLUSHING CRK CSO TRIB AREA TI-10, ST 4, PH A
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2021-09-25T00:00:00.000
Scope
CONSTRUCTION OF RIGHT-OF-WAY GREEN INFRA IN FLUSHING CREEK CSO TRIBUTARY AREA TI-010-4A
Dollar Amount
$30M to 100M
Status
Active
GCTI10-4B
Project Id: GCTI10-4B • Description: CONS OF ROW GI IN PHASE 4 FLUSHING CRK CSO TRIB AREA TI-10 • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
GCTI10-4B
Description
CONS OF ROW GI IN PHASE 4 FLUSHING CRK CSO TRIB AREA TI-10
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2021-06-26T00:00:00.000
Scope
CONSTRUCTION OF RIGHT-OF-WAY GREEN INFRA IN FLUSHING CREEK CSO TRIBUTARY AREA TI-010-4B
Dollar Amount
$10M to 30M
Status
Active
GCTI11-02
Project Id: GCTI11-02 • Description: GI-Construct ROW Bioswales Stormwater Greenstreets in TI-011 • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
GCTI11-02
Description
GI-Construct ROW Bioswales Stormwater Greenstreets in TI-011
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-05-30T00:00:00.000
Scope
GI-Construct ROW Bioswales Stormwater Greenstreets in TI-011
Dollar Amount
$3M to 10M
Status
Active
GE-361
Project Id: GE-361 • Description: Emergency reconstruction of Water Mains • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
GE-361
Description
Emergency reconstruction of Water Mains
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-09-14T00:00:00.000
Scope
CITYWIDE EMERGENCY RECONSTRUCTION OF WATER MAINS.
Dollar Amount
$10M to 30M
Status
Active
GKOH15-01
Project Id: GKOH15-01 • Description: GI - GREEN INFRASTRUCTURE IN OH-015 GRAVESEND BAY CSO PH 1 • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
GKOH15-01
Description
GI - GREEN INFRASTRUCTURE IN OH-015 GRAVESEND BAY CSO PH 1
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-03-31T00:00:00.000
Scope
GI - GREEN INFRASTRUCTURE IN OH-015 GRAVESEND BAY CSO PH 1
Dollar Amount
$10M to 30M
Status
Active
GKOH15-02
Project Id: GKOH15-02 • Description: GI - GREEN INFRASTRUCTURE IN OH-015 GRAVESEND BAY CSO PH 2 • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
GKOH15-02
Description
GI - GREEN INFRASTRUCTURE IN OH-015 GRAVESEND BAY CSO PH 2
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-08-31T00:00:00.000
Scope
GI - GREEN INFRASTRUCTURE IN OH-015 GRAVESEND BAY CSO PH 2
Dollar Amount
$10M to 30M
Status
Active
GKOH15-03
Project Id: GKOH15-03 • Description: GI - GREEN INFRASTRUCTURE IN OH-015 GRAVESEND BAY CSO PH 3 • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
GKOH15-03
Description
GI - GREEN INFRASTRUCTURE IN OH-015 GRAVESEND BAY CSO PH 3
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-08-31T00:00:00.000
Scope
GI - GREEN INFRASTRUCTURE IN OH-015 GRAVESEND BAY CSO PH 3
Dollar Amount
$10M to 30M
Status
Active
GKOH15-04
Project Id: GKOH15-04 • Description: GI - GREEN INFRASTRUCTURE IN OH-015 GRAVESEND BAY CSO PH 4 • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
GKOH15-04
Description
GI - GREEN INFRASTRUCTURE IN OH-015 GRAVESEND BAY CSO PH 4
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2024-03-31T00:00:00.000
Scope
GREEN INFRASTRUCTURE IN OWLS HEAD TRIBUTARY DRAINAGE AREAS, BROOKLYN
Dollar Amount
$10M to 30M
Status
Active
GNCB14-1A
Project Id: GNCB14-1A • Description: GI-CONSTRUCTION OF GI NIN NCB-014, PHASE 1 • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
GNCB14-1A
Description
GI-CONSTRUCTION OF GI NIN NCB-014, PHASE 1
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-06-05T00:00:00.000
Scope
GREEN INFRASTRUCTURE IN THE NCB-014 CSO PH1 TRIBUTARY AREA, STAGE 1, BK
Dollar Amount
$3M to 10M
Status
Active
GNCB14-2A
Project Id: GNCB14-2A • Description: GI-CONSTRUCTION OF GI NIN NCB-014, PHASE II • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
GNCB14-2A
Description
GI-CONSTRUCTION OF GI NIN NCB-014, PHASE II
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2021-06-25T00:00:00.000
Scope
GREEN INFRASTRUCTURE IN THE NCB-014 CSO PHASE 2 TRIBUTARY AREA, STAGE 1, BK
Dollar Amount
$10M to 30M
Status
Active
HBMA24662
Project Id: HBMA24662 • Description: W 128TH ST PED BRIDGE BIN:2246620 • Client Agency: TRANSPORTATION
Project Id
HBMA24662
Description
W 128TH ST PED BRIDGE BIN:2246620
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Initiation
Projected Construction Completion
2024-03-22T00:00:00.000
Scope
Rehabilitation or replacement of the E 128th Street Pedestrian Bridge over 3rd Avenue in Manhattan
Dollar Amount
$10M to 30M
Status
Active
HBPED800Q
Project Id: HBPED800Q • Description: PED BRIDGE - PORPOISE BRIDGE AND TIDE GATE • Client Agency: TRANSPORTATION
Project Id
HBPED800Q
Description
PED BRIDGE - PORPOISE BRIDGE AND TIDE GATE
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2024-07-26T00:00:00.000
Scope
Feasibility Study for the repair and or restoration for Porpoise (Tide Gate) Bridge in Flushing Meadows Corona Park.
Dollar Amount
$30M to 100M
Status
Active
HD161E
Project Id: HD161E • Description: GATEWAY ESTATE - PHASE E (BED-805) • Client Agency: HPD
Project Id
HD161E
Description
GATEWAY ESTATE - PHASE E (BED-805)
Client Agency
HPD
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-04-25T00:00:00.000
Scope
Reconstruction of Gateway Estates Area (Nehemiah Creek) including sewer, watermain, street lighting and traffic signal work. Phase E

DEP scope:
water Main:New
1. Locke Street between Gateway Drive and Elton Street
2. Egan Street between Vandalia Avenue and Elton Street
3. Gateway Drive between Flatlands Avenue and Vandalia Avenue
4. Ashford Street between Flatlands Avenue and Vandalia Avenue
5. Cleveland Street between Locke Street and Vandalia Avenue
Sanitary Sewers: New
1. Locke Street between Gateway Drive and Elton Street
2. Egan Street between Gateway Drive and Elton Street
3. Gateway Drive between Egan Street and Flatlands Avenue
4. Ashford Street between Egan Street and Flatlands Avenue
5. Cleveland Street between Egan Street and Locke Street
Storm Sewer: New
1. Gateway Drive between Egan Street and Flatlands Avenue
2. Ashford Street between Egan Street and Flatlands Avenue
3. Locke Street between Gateway Drive and Cleveland Street
Dollar Amount
$10M to 30M
Status
Active
HED562
Project Id: HED562 • Description: New 46" Trunk Water Main in E.233rd St. Bronx • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
HED562
Description
New 46" Trunk Water Main in E.233rd St. Bronx
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-03-12T00:00:00.000
Scope
New 48" Trunk Water Main in E 233rd Street between Bronxwood Avenue & Baychester Avenue, etc.
Dollar Amount
$30M to 100M
Status
Active
HED564
Project Id: HED564 • Description: NEW 20" SUB-AQUEOUS WATER MAIN TO CITY ISLAND • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
HED564
Description
NEW 20" SUB-AQUEOUS WATER MAIN TO CITY ISLAND
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2021-06-14T00:00:00.000
Scope
New 20" sub-aqueous water mains on City Island Road (City Island Bridge) between Park Road and City Island Avenue
Dollar Amount
$10M to 30M
Status
Active
HED568
Project Id: HED568 • Description: New 20" sub-aqueous water main extension to Randall's Island • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
HED568
Description
New 20" sub-aqueous water main extension to Randall's Island
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2019-12-24T00:00:00.000
Scope
New 20" sub-aqueous water main extension to Randall's Island.

20" water main connected from existing 36" water main in Brook Ave and Bruckner Blvd, Bronx to existing 20" water main in Randall's Island.
Dollar Amount
$30M to 100M
Status
Active
HED569
Project Id: HED569 • Description: Replacement of Trunk WM in Bainbridge Ave • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
HED569
Description
Replacement of Trunk WM in Bainbridge Ave
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-11-17T00:00:00.000
Scope
Replacement of Trunk Water Main in Bainbridge Avenue Between Gunhill Road and Holly Lane and in Jerome Avenue Between Holly Lane and E233th Street, etc.
Also, New 36" WM in West Burnside Avenue & Phelan Place
Dollar Amount
$30M to 100M
Status
Active
HED570
Project Id: HED570 • Description: Trunk & Dist WM & Comb. Sewer Replacement, bx • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
HED570
Description
Trunk & Dist WM & Comb. Sewer Replacement, bx
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-02-21T00:00:00.000
Scope
REPLACEMENT OF TRUNK AND DISTRIBUTION WM AND COMBINED SEWER IN UNIVERSITY AVE, BX
Dollar Amount
$10M to 30M
Status
Active