Hazard Mitigation Plan - Mitigation Actions Database

New York City’s comprehensive effort to reduce or eliminate potential losses from the hazards described in the Hazard Specific section of the website. The map includes existing and completed mitigation actions that will minimize the effects of a hazard event on New York City’s population, economy, property, building stock, and infrastructure. It is the result of a coordinated effort by 46 New York City agencies and partners to develop and implement a broad range of inventive and effective ways to mitigate hazards.

NOTE: This table can be joined to the mapped projects using the HMP Index field.
For the Hazard Mitigation Plan map, please follow this link: https://data.cityofnewyork.us/d/n6jh-qsrw

Spatial data for projects that were mapped is available here:
Points: https://data.cityofnewyork.us/City-Government/New-York-City-Emergency-Management-Points-/t7k8-wj6b
Lines: https://data.cityofnewyork.us/City-Government/Hazard-Mitigation-Plan-Mitigation-Actions-Database/hqhh-iv7p
Polygons: https://data.cityofnewyork.us/City-Government/Hazard-Mitigation-Plan-Mitigation-Actions-Database/cj2p-e3ej

City Government NYC Emergency Management (NYCEM) Dataset veqt-eu3t 28 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
MA.00319
Hmp Index: MA.00319 • Mitigation Actions Title: Soundview Park Bolton Point Coastal Habitat Restoration and Park Construction • Lead Agency: Department of Parks and Recreation
Hmp Index
MA.00319
Mitigation Actions Title
Soundview Park Bolton Point Coastal Habitat Restoration and Park Construction
Mitigation Actions Description
This project will restore the coastal wetland and upland maritime area, and construct a park entry, pedestrian pathway, and plaza area at Bolton Point in Soundview Park.
Lead Agency
Department of Parks and Recreation
Action Category
Coastal and Natural Resource Protection
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms,Flooding,Coastal Erosion,Winter Weather
Estimated Start
2018-11-01T00:00:00.000
Estimated Finish
2025-10-31T00:00:00.000
Estimated Cost
$7,500,000.00
State Funding Source
Other State
City Funding Source
Mayoral,City Capital
Description Of Social Vulnerability Addressed
Occurring alongside census tracts with high SVI.
Administrative Technical Capability
Natural Resources Group
Financial Capability
NYC Capital Budget,Funding from Elected Officials
Web Link
https://data.cityofnewyork.us/City-Government/Environmental-Justice-Area-Census-Tract-Designatio/ircm-rcjd
MA.00320
Hmp Index: MA.00320 • Mitigation Actions Title: Van Cortlandt Park Forest Tree Replacement • Lead Agency: Department of Parks and Recreation
Hmp Index
MA.00320
Mitigation Actions Title
Van Cortlandt Park Forest Tree Replacement
Mitigation Actions Description
This project will plant replacement trees and restore native species habitat within forested natural areas in Van Cortlandt Park.
Lead Agency
Department of Parks and Recreation
Action Category
Coastal and Natural Resource Protection
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Poor Air Quality,Extreme Heat,Flooding
Estimated Start
2022-02-01T00:00:00.000
Estimated Finish
2025-10-31T00:00:00.000
Estimated Cost
$400,000.00
City Funding Source
Mayoral
Administrative Technical Capability
Borough Forestry Managers
Financial Capability
NYC Capital Budget
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/10305
MA.00321
Hmp Index: MA.00321 • Mitigation Actions Title: Bronx Street Tree Planting FY23 - Community Boards 1-4 • Lead Agency: Department of Parks and Recreation
Hmp Index
MA.00321
Mitigation Actions Title
Bronx Street Tree Planting FY23 - Community Boards 1-4
Mitigation Actions Description
This project will plant new and replacement trees in Community Boards 1-4 in The Bronx.
Lead Agency
Department of Parks and Recreation
Action Category
Coastal and Natural Resource Protection
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Extreme Heat,Poor Air Quality,Flooding
Estimated Start
2022-08-01T00:00:00.000
Estimated Finish
2025-08-30T00:00:00.000
Estimated Cost
$2,000,000.00
City Funding Source
Borough President,Mayoral
Private Funding Source
Private
Description Of Social Vulnerability Addressed
Heat vulnerability index (which incorporates social vulnerability index) used as a prioritization metric for planting.
Administrative Technical Capability
Borough Forestry Managers,Chief Building Official
Financial Capability
Public - Private Partnerships (P3s),Funding from Elected Officials
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/10416
MA.00322
Hmp Index: MA.00322 • Mitigation Actions Title: Bronx Street Tree Planting FY23 - Community Boards 9-10 • Lead Agency: Department of Parks and Recreation
Hmp Index
MA.00322
Mitigation Actions Title
Bronx Street Tree Planting FY23 - Community Boards 9-10
Mitigation Actions Description
This project will plant new and replacement trees in Community Boards 9-10 in the Bronx.
Lead Agency
Department of Parks and Recreation
Action Category
Coastal and Natural Resource Protection
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Poor Air Quality,Extreme Heat,Flooding
Estimated Start
2022-08-01T00:00:00.000
Estimated Finish
2025-08-30T00:00:00.000
Estimated Cost
$2,000,000.00
City Funding Source
City Capital,Mayoral
Private Funding Source
Private
Description Of Social Vulnerability Addressed
Heat vulnerability index (which incorporates social vulnerability index) used as a prioritization metric for planting.
Administrative Technical Capability
Borough Forestry Managers
Financial Capability
NYC Capital Budget,Funding from Elected Officials,Public - Private Partnerships (P3s)
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/10417
MA.00323
Hmp Index: MA.00323 • Mitigation Actions Title: Bronx Park Tree Planting FY22 • Mitigation Actions Description: This project will plant new and replacement park trees in the Bronx.
Hmp Index
MA.00323
Mitigation Actions Title
Bronx Park Tree Planting FY22
Mitigation Actions Description
This project will plant new and replacement park trees in the Bronx.
Lead Agency
Department of Parks and Recreation
Action Category
Coastal and Natural Resource Protection
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Poor Air Quality,Extreme Heat,Flooding
Estimated Start
2021-09-01T00:00:00.000
Estimated Finish
2025-11-30T00:00:00.000
Estimated Cost
$2,000,000.00
City Funding Source
Mayoral,City Capital
Private Funding Source
Private
Description Of Social Vulnerability Addressed
Heat vulnerability index (which incorporates social vulnerability index) used as a prioritization metric for planting.
Administrative Technical Capability
Borough Forestry Managers
Financial Capability
NYC Capital Budget,Public - Private Partnerships (P3s),Funding from Elected Officials
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/10195
MA.00324
Hmp Index: MA.00324 • Mitigation Actions Title: Bronx Street Tree Planting FY21 - Community Boards 5-8, 11, 12 • Lead Agency: Department of Parks and Recreation
Hmp Index
MA.00324
Mitigation Actions Title
Bronx Street Tree Planting FY21 - Community Boards 5-8, 11, 12
Mitigation Actions Description
This project will plant new trees in Community Boards 5-8, 11, and 12 in the Bronx.
Lead Agency
Department of Parks and Recreation
Action Category
Coastal and Natural Resource Protection
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Poor Air Quality,Extreme Heat,Flooding
Estimated Start
2019-06-01T00:00:00.000
Estimated Finish
2025-03-30T00:00:00.000
Description Of Social Vulnerability Addressed
Heat vulnerability index (which incorporates social vulnerability index) used as a prioritization metric for planting.
Administrative Technical Capability
Borough Forestry Managers
Financial Capability
NYC Capital Budget,Public - Private Partnerships (P3s),Funding from Elected Officials,Pre-Disaster Mitigation (PDM)
MA.00325
Hmp Index: MA.00325 • Mitigation Actions Title: Belt Parkway Tree Planting and Ecological Restoration • Lead Agency: Department of Parks and Recreation
Hmp Index
MA.00325
Mitigation Actions Title
Belt Parkway Tree Planting and Ecological Restoration
Mitigation Actions Description
This project will plant trees within the Belt Parkway right-of-way. It will also restore natural areas adjacent to the Parkway.
Lead Agency
Department of Parks and Recreation
Action Category
Coastal and Natural Resource Protection
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Poor Air Quality,Extreme Heat,Flooding
Estimated Start
2018-07-01T00:00:00.000
Estimated Finish
2026-11-20T00:00:00.000
Estimated Cost
$11,070,000.00
City Funding Source
Mayoral
Description Of Social Vulnerability Addressed
Occurs in neighborhoods with high SVI
Administrative Technical Capability
Natural Resources Group,Borough Forestry Managers
Financial Capability
Funding from Elected Officials
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/7389
MA.00326
Hmp Index: MA.00326 • Mitigation Actions Title: Brooklyn Park Tree Planting FY23 • Mitigation Actions Description: This project will plant new and replacement park trees in Brooklyn.
Hmp Index
MA.00326
Mitigation Actions Title
Brooklyn Park Tree Planting FY23
Mitigation Actions Description
This project will plant new and replacement park trees in Brooklyn.
Lead Agency
Department of Parks and Recreation
Action Category
Coastal and Natural Resource Protection
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Extreme Heat,Poor Air Quality,Flooding
Estimated Start
2022-08-01T00:00:00.000
Estimated Finish
2025-12-31T00:00:00.000
Estimated Cost
$2,000,000.00
City Funding Source
Mayoral
Private Funding Source
Private
Description Of Social Vulnerability Addressed
Heat vulnerability index (which incorporates social vulnerability index) used as a prioritization metric for planting.
Administrative Technical Capability
Borough Forestry Managers
Financial Capability
NYC Capital Budget,Public - Private Partnerships (P3s)
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/10408
MA.00327
Hmp Index: MA.00327 • Mitigation Actions Title: Brooklyn Park Tree Planting FY22 • Mitigation Actions Description: This project will plant new and replacement park trees in Brooklyn.
Hmp Index
MA.00327
Mitigation Actions Title
Brooklyn Park Tree Planting FY22
Mitigation Actions Description
This project will plant new and replacement park trees in Brooklyn.
Lead Agency
Department of Parks and Recreation
Action Category
Coastal and Natural Resource Protection
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Poor Air Quality,Extreme Heat,Flooding
Estimated Start
2022-09-01T00:00:00.000
Estimated Finish
2025-06-30T00:00:00.000
Estimated Cost
$2,444,000.00
City Funding Source
Mayoral
Private Funding Source
Private
Description Of Social Vulnerability Addressed
Heat vulnerability index (which incorporates social vulnerability index) used as a prioritization metric for planting.
Administrative Technical Capability
Borough Offices
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/10184
MA.00328
Hmp Index: MA.00328 • Mitigation Actions Title: Brooklyn Tree Planting and Greenstreets Construction • Mitigation Actions Description: This project will plant street trees and construct Greenstreets on Union Street.
Hmp Index
MA.00328
Mitigation Actions Title
Brooklyn Tree Planting and Greenstreets Construction
Mitigation Actions Description
This project will plant street trees and construct Greenstreets on Union Street.
Lead Agency
Department of Parks and Recreation
Action Category
Coastal and Natural Resource Protection
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Poor Air Quality,Extreme Heat,Flooding
Estimated Start
2015-09-01T00:00:00.000
Estimated Finish
2024-12-31T00:00:00.000
Estimated Cost
$500,000.00
City Funding Source
City Capital
Description Of Social Vulnerability Addressed
Occurring in a community with high SVI.
Administrative Technical Capability
Borough Offices
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/9956
MA.00329
Hmp Index: MA.00329 • Mitigation Actions Title: Staten Island Forest Restoration • Lead Agency: Department of Parks and Recreation
Hmp Index
MA.00329
Mitigation Actions Title
Staten Island Forest Restoration
Mitigation Actions Description
This project will remove invasive species and plant new and replacement trees in Staten Island.
Lead Agency
Department of Parks and Recreation
Action Category
Coastal and Natural Resource Protection
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Extreme Heat,Poor Air Quality,Flooding
Estimated Start
2022-02-01T00:00:00.000
Estimated Finish
2025-12-31T00:00:00.000
Estimated Cost
$2,000,000.00
City Funding Source
Mayoral
Description Of Social Vulnerability Addressed
Heat vulnerability index (which incorporates social vulnerability index) used as a prioritization metric for planting.
Administrative Technical Capability
Borough Offices,Borough Forestry Managers
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/10306
MA.00330
Hmp Index: MA.00330 • Mitigation Actions Title: Staten Island Street Tree Planting FY23 • Mitigation Actions Description: This project will plant new and replacement trees in Staten Island.
Hmp Index
MA.00330
Mitigation Actions Title
Staten Island Street Tree Planting FY23
Mitigation Actions Description
This project will plant new and replacement trees in Staten Island.
Lead Agency
Department of Parks and Recreation
Action Category
Coastal and Natural Resource Protection
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Extreme Heat,Poor Air Quality,Flooding
Estimated Start
2022-08-01T00:00:00.000
Estimated Finish
2025-10-31T00:00:00.000
Estimated Cost
$4,000,000.00
City Funding Source
Mayoral
Private Funding Source
Private
Description Of Social Vulnerability Addressed
Heat vulnerability index (which incorporates social vulnerability index) used as a prioritization metric for planting.
Administrative Technical Capability
Borough Offices,Borough Forestry Managers
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/10420
MA.00331
Hmp Index: MA.00331 • Mitigation Actions Title: Tidegate upgrade in Flushing Meadow Corona Park • Lead Agency: Department of Parks and Recreation
Hmp Index
MA.00331
Mitigation Actions Title
Tidegate upgrade in Flushing Meadow Corona Park
Mitigation Actions Description
Update and upgrade tidegates in the floodwater flow control structure under the north fascia of the Purpose Bridge. Install automated system that can be opened and closed based on tides, replacing the current gate system, which is manually controlled and difficult to operate.
Lead Agency
Department of Parks and Recreation
Action Category
Emergency Services
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding,High Winds
Estimated Start
2015-03-31T00:00:00.000
Estimated Finish
2015-03-19T00:00:00.000
Estimated Cost
$5,000,000.00
Federal Funding Source
FEMA-HMGP
City Funding Source
City Capital
Financial Capability
NYC Capital Budget,Hazard Mitigation Grant Program (HMGP)
MA.00332
Hmp Index: MA.00332 • Mitigation Actions Title: New Brighton Comfort Station Reconstruction • Lead Agency: Department of Parks and Recreation
Hmp Index
MA.00332
Mitigation Actions Title
New Brighton Comfort Station Reconstruction
Mitigation Actions Description
The installation of a modular comfort station to replace the previous New Brighton comfort station, which was damaged beyond repair by Super Storm Sandy and subsequently demolished
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms,Flooding
Estimated Finish
2018-05-31T00:00:00.000
Estimated Cost
$2,000,000.00
Federal Funding Source
FEMA-406
Planning Regulation Capability
National Flood Insurance Program (NFIP) Compliance,Flood Resiliency Guidelines,Flood Resilience Zoning Text Amendment
Financial Capability
406 Mitigation Funding
MA.00333
Hmp Index: MA.00333 • Mitigation Actions Title: North 5th Street Bulkhead Reconstruction (Hurricane Sandy) • Lead Agency: Department of Parks and Recreation
Hmp Index
MA.00333
Mitigation Actions Title
North 5th Street Bulkhead Reconstruction (Hurricane Sandy)
Mitigation Actions Description
This project will reconstruct the North 5th Street bulkhead in Brooklyn, which was damaged by Hurricane Sandy.
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms,Flooding
Estimated Start
2013-09-30T00:00:00.000
Estimated Finish
2018-08-31T00:00:00.000
Estimated Cost
$1,771,000.00
Federal Funding Source
FEMA-406
City Funding Source
Mayoral
Description Of Social Vulnerability Addressed
Occurs in a neighborhood with high SVI
Financial Capability
406 Mitigation Funding
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/6156
MA.00334
Hmp Index: MA.00334 • Mitigation Actions Title: Tiffany Street Pier Reconstruction (Hurricane Sandy) • Lead Agency: Department of Parks and Recreation
Hmp Index
MA.00334
Mitigation Actions Title
Tiffany Street Pier Reconstruction (Hurricane Sandy)
Mitigation Actions Description
This project will reconstruct the fishing pier that was damaged by Hurricane Sandy.
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms,Flooding
Estimated Start
2013-07-31T00:00:00.000
Estimated Finish
2018-03-31T00:00:00.000
Estimated Cost
$1,915,000.00
Federal Funding Source
FEMA-406
City Funding Source
Mayoral
Financial Capability
406 Mitigation Funding
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/6119
MA.00335
Hmp Index: MA.00335 • Mitigation Actions Title: Joe Michael's Mile Reconstruction (Hurricane Sandy) • Mitigation Actions Description: This project will reconstruct the southern portion of Joe Michael's Mile.
Hmp Index
MA.00335
Mitigation Actions Title
Joe Michael's Mile Reconstruction (Hurricane Sandy)
Mitigation Actions Description
This project will reconstruct the southern portion of Joe Michael's Mile.
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms,Flooding
Estimated Start
2014-05-31T00:00:00.000
Estimated Finish
2018-07-31T00:00:00.000
Estimated Cost
$1,445,000.00
Federal Funding Source
FEMA-406
City Funding Source
Borough President
Financial Capability
406 Mitigation Funding
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/6257
MA.00336
Hmp Index: MA.00336 • Mitigation Actions Title: Sandpiper Playground Reconstruction • Mitigation Actions Description: This project will reconstruct Sandpiper Playground.
Hmp Index
MA.00336
Mitigation Actions Title
Sandpiper Playground Reconstruction
Mitigation Actions Description
This project will reconstruct Sandpiper Playground.
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms,Flooding
Estimated Start
2018-06-01T00:00:00.000
Estimated Finish
2019-10-31T00:00:00.000
Estimated Cost
$6,996,000.00
Federal Funding Source
FEMA
City Funding Source
Mayoral,Borough President,City Capital
Financial Capability
NYC Capital Budget,406 Mitigation Funding,Funding from Elected Officials
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/6478
MA.00337
Hmp Index: MA.00337 • Mitigation Actions Title: Mannahatta Fountain Reconstruction • Lead Agency: Department of Parks and Recreation
Hmp Index
MA.00337
Mitigation Actions Title
Mannahatta Fountain Reconstruction
Mitigation Actions Description
This project will reconstruct the fountain and lighting damaged by Hurricane Sandy in Mannahatta Park.
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
Proposed or Not Started
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms,Flooding
Estimated Start
2016-05-31T00:00:00.000
Estimated Finish
2020-03-31T00:00:00.000
Estimated Cost
$3,296,000.00
Federal Funding Source
FEMA
City Funding Source
City Capital
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/6275
MA.00338
Hmp Index: MA.00338 • Mitigation Actions Title: New Dorp Center Interior Reconstruction (Hurricane Sandy) • Lead Agency: Department of Parks and Recreation
Hmp Index
MA.00338
Mitigation Actions Title
New Dorp Center Interior Reconstruction (Hurricane Sandy)
Mitigation Actions Description
This project will reconstruct the first floor of the New Dorp Center in Staten Island due to damage from Hurricane Sandy.
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms,Flooding
Estimated Start
2014-03-31T00:00:00.000
Estimated Finish
2019-08-31T00:00:00.000
Estimated Cost
$2,435,000.00
Federal Funding Source
FEMA
City Funding Source
Mayoral,Borough President,City Capital
Financial Capability
406 Mitigation Funding,NYC Capital Budget,Funding from Elected Officials
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/6318
MA.00339
Hmp Index: MA.00339 • Mitigation Actions Title: World's Fair Marina Reconstruction • Lead Agency: Department of Parks and Recreation
Hmp Index
MA.00339
Mitigation Actions Title
World's Fair Marina Reconstruction
Mitigation Actions Description
This project will reconstruct the deteriorated fixed piers, floating docks, bulkhead, and related components, including Sandy-damaged elements.
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms,Flooding
Estimated Start
2017-07-31T00:00:00.000
Estimated Finish
2019-03-31T00:00:00.000
Estimated Cost
$47,049,000.00
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/8551
MA.00340
Hmp Index: MA.00340 • Mitigation Actions Title: Bayside Marina Reconstruction • Lead Agency: Department of Parks and Recreation
Hmp Index
MA.00340
Mitigation Actions Title
Bayside Marina Reconstruction
Mitigation Actions Description
This contract will replace electrical equipment, conduits and cable damaged by Hurricane Sandy at Bayside Marina.
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms,Flooding
Estimated Start
2014-06-30T00:00:00.000
Estimated Finish
2019-05-31T00:00:00.000
Estimated Cost
$457,000.00
Federal Funding Source
FEMA
City Funding Source
Mayoral
Planning Regulation Capability
New York City Construction Codes
Financial Capability
406 Mitigation Funding
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/6652
MA.00341
Hmp Index: MA.00341 • Mitigation Actions Title: Beach 24th/25th Ramps • Lead Agency: Department of Parks and Recreation
Hmp Index
MA.00341
Mitigation Actions Title
Beach 24th/25th Ramps
Mitigation Actions Description
This project will construct a ramp to the Rockaway Beach Boardwalk at Beach 24th-25th Streets.
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms,Flooding
Estimated Start
2018-03-31T00:00:00.000
Estimated Finish
2023-12-30T00:00:00.000
Estimated Cost
$1,251,000.00
Federal Funding Source
USACE
Description Of Social Vulnerability Addressed
This ramp will make the beach more accessible to people with disabilities.
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/8972
MA.00342
Hmp Index: MA.00342 • Mitigation Actions Title: Beach 88th Street Park Construction (Baybreeze Park) • Mitigation Actions Description: This project will construct Bay Breeze Park.
Hmp Index
MA.00342
Mitigation Actions Title
Beach 88th Street Park Construction (Baybreeze Park)
Mitigation Actions Description
This project will construct Bay Breeze Park.
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms,Flooding
Estimated Start
2018-03-31T00:00:00.000
Estimated Finish
2024-10-31T00:00:00.000
Estimated Cost
$9,576,000.00
Federal Funding Source
Other Federal
City Funding Source
Mayoral,City Capital
Planning Regulation Capability
Flood Resiliency Guidelines
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/8970
MA.00343
Hmp Index: MA.00343 • Mitigation Actions Title: Asser Levy Boiler and Pool Dehumidifier Repair • Mitigation Actions Description: Reconstructed the boiler after Hurricane Sandy damage
Hmp Index
MA.00343
Mitigation Actions Title
Asser Levy Boiler and Pool Dehumidifier Repair
Mitigation Actions Description
Reconstructed the boiler after Hurricane Sandy damage
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Estimated Start
2012-09-30T00:00:00.000
Estimated Finish
2017-05-31T00:00:00.000
Estimated Cost
$1,381,000.00
Federal Funding Source
FEMA-406
City Funding Source
Mayoral,City Capital
Planning Regulation Capability
New York City Construction Codes
Financial Capability
406 Mitigation Funding,NYC Capital Budget
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/6134
MA.00344
Hmp Index: MA.00344 • Mitigation Actions Title: Rockaway Beach Shorefront Parkway Handball Court Reconstruction • Mitigation Actions Description: This project will reconstruct the handball courts at Rockaway Beach.
Hmp Index
MA.00344
Mitigation Actions Title
Rockaway Beach Shorefront Parkway Handball Court Reconstruction
Mitigation Actions Description
This project will reconstruct the handball courts at Rockaway Beach.
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Estimated Start
2015-10-31T00:00:00.000
Estimated Finish
2020-03-30T00:00:00.000
Estimated Cost
$3,578,000.00
Federal Funding Source
FEMA
City Funding Source
City Capital
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/6852
MA.00345
Hmp Index: MA.00345 • Mitigation Actions Title: Rockaway Beach Skate Park Reconstruction • Mitigation Actions Description: This project will reconstruct the skate park at Rockaway Beach.
Hmp Index
MA.00345
Mitigation Actions Title
Rockaway Beach Skate Park Reconstruction
Mitigation Actions Description
This project will reconstruct the skate park at Rockaway Beach.
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Estimated Start
2015-03-30T00:00:00.000
Estimated Finish
2020-10-31T00:00:00.000
Estimated Cost
$3,472,000.00
Federal Funding Source
FEMA
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/3358
MA.00346
Hmp Index: MA.00346 • Mitigation Actions Title: Vietnam Veterans Plaza Reconstruction (Hurricane Sandy) (M046-114M) • Lead Agency: Department of Parks and Recreation
Hmp Index
MA.00346
Mitigation Actions Title
Vietnam Veterans Plaza Reconstruction (Hurricane Sandy) (M046-114M)
Mitigation Actions Description
This project will reconstruct lighting and electrical components damaged by Hurricane Sandy at Vietnam Veterans Plaza.
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Estimated Start
2015-05-31T00:00:00.000
Estimated Finish
2023-07-30T00:00:00.000
Estimated Cost
$1,728,000.00
Federal Funding Source
FEMA
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/6176
MA.00347
Hmp Index: MA.00347 • Mitigation Actions Title: Glick Park Electrical Repairs (Hurricane Sandy) • Lead Agency: Department of Parks and Recreation
Hmp Index
MA.00347
Mitigation Actions Title
Glick Park Electrical Repairs (Hurricane Sandy)
Mitigation Actions Description
This project will reconstruct the electrical systems at Glick Park due to damage from Hurricane Sandy.
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Estimated Start
2015-10-31T00:00:00.000
Estimated Finish
2019-06-29T00:00:00.000
Estimated Cost
$732,000.00
Federal Funding Source
FEMA
Planning Regulation Capability
New York City Construction Codes
MA.00348
Hmp Index: MA.00348 • Mitigation Actions Title: Inwood Hill Nature Center Post-Sandy Reconstruction • Lead Agency: Department of Parks and Recreation
Hmp Index
MA.00348
Mitigation Actions Title
Inwood Hill Nature Center Post-Sandy Reconstruction
Mitigation Actions Description
This project will reconstruct the Inwood Hill Nature Center at Inwood Hill Park due to damage caused by Hurricane Sandy.
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Estimated Start
2017-02-01T00:00:00.000
Estimated Finish
2023-09-30T00:00:00.000
Estimated Cost
$5,255,000.00
Federal Funding Source
FEMA
City Funding Source
Mayoral,City Capital
Description Of Social Vulnerability Addressed
Updates occur in a social vulnerable neighborhood.
Planning Regulation Capability
New York City Construction Codes
Financial Capability
406 Mitigation Funding,NYC Capital Budget
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/7365
MA.00349
Hmp Index: MA.00349 • Mitigation Actions Title: Tappen and South Beach • Lead Agency: Department of Parks and Recreation
Hmp Index
MA.00349
Mitigation Actions Title
Tappen and South Beach
Mitigation Actions Description
This project will reconstruct the electrical and mechanical components of fountains damaged during Hurricane Sandy at Tappen Park and South Beach.
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Estimated Start
2015-06-30T00:00:00.000
Estimated Finish
2022-05-31T00:00:00.000
Estimated Cost
$2,290,000.00
Federal Funding Source
FEMA
City Funding Source
Mayoral
Financial Capability
406 Mitigation Funding
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/6171
MA.00350
Hmp Index: MA.00350 • Mitigation Actions Title: Buono Beach Fountain Repair • Lead Agency: Department of Parks and Recreation
Hmp Index
MA.00350
Mitigation Actions Title
Buono Beach Fountain Repair
Mitigation Actions Description
This project will reconstruct the electrical and mechanical components of the fountain at Buono Beach in Alice Austen Park.
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Estimated Start
2015-06-30T00:00:00.000
Estimated Finish
2023-10-22T00:00:00.000
Estimated Cost
$1,416,000.00
Federal Funding Source
FEMA
State Funding Source
Other State
City Funding Source
Mayoral
Financial Capability
406 Mitigation Funding
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/7154
MA.00351
Hmp Index: MA.00351 • Mitigation Actions Title: Tribute Park Reconstruction (Hurricane Sandy) • Mitigation Actions Description: This project will reconstruct Tribute Park due to damage from Hurricane Sandy.
Hmp Index
MA.00351
Mitigation Actions Title
Tribute Park Reconstruction (Hurricane Sandy)
Mitigation Actions Description
This project will reconstruct Tribute Park due to damage from Hurricane Sandy.
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Estimated Start
2015-05-31T00:00:00.000
Estimated Finish
2019-11-30T00:00:00.000
Estimated Cost
$2,463,000.00
Federal Funding Source
FEMA
City Funding Source
Mayoral,Borough President,City Capital
Financial Capability
NYC Capital Budget,Funding from Elected Officials
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/6618
MA.00352
Hmp Index: MA.00352 • Mitigation Actions Title: Fairview Park Multi-Purpose Field and Landscape Construction • Lead Agency: Department of Parks and Recreation
Hmp Index
MA.00352
Mitigation Actions Title
Fairview Park Multi-Purpose Field and Landscape Construction
Mitigation Actions Description
This project will construct a multi-purpose field, baseball field, tennis courts, pickleball courts, adult fitness equipment, picnic area, parking area, bio-retention areas, paths, and landscape elements at Fairview Park
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Estimated Start
2015-05-31T00:00:00.000
Estimated Finish
2021-05-31T00:00:00.000
Estimated Cost
$18,015,000.00
Federal Funding Source
Other Federal
City Funding Source
Mayoral,Borough President,City Capital,City Expense
Financial Capability
NYC Capital Budget,Funding from Elected Officials
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/8779
MA.00353
Hmp Index: MA.00353 • Mitigation Actions Title: Wolfe's Pond Park Playground Reconstruction (Hurricane Sandy) • Lead Agency: Department of Parks and Recreation
Hmp Index
MA.00353
Mitigation Actions Title
Wolfe's Pond Park Playground Reconstruction (Hurricane Sandy)
Mitigation Actions Description
This project will reconstruct the basketball courts, paths, fencing, landscape and park amenities at Wolfe's Pond Park.
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Estimated Start
2017-08-31T00:00:00.000
Estimated Finish
2021-07-30T00:00:00.000
Estimated Cost
$2,542,000.00
City Funding Source
Mayoral,Borough President,City Capital
Financial Capability
NYC Capital Budget,Funding from Elected Officials
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/8884
MA.00354
Hmp Index: MA.00354 • Mitigation Actions Title: Midland Beach Landscape and Drainage Reconstruction • Lead Agency: Department of Parks and Recreation
Hmp Index
MA.00354
Mitigation Actions Title
Midland Beach Landscape and Drainage Reconstruction
Mitigation Actions Description
This project will reconstruct Hurricane Sandy-damaged drain inlets, catch basins and lines, timber barrier rail fencing, vehicular barrier gates (and concrete island) and electrical utility boxes at Midland Beach.
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Estimated Start
2015-03-31T00:00:00.000
Estimated Finish
2018-05-31T00:00:00.000
Estimated Cost
$425,000.00
Federal Funding Source
FEMA-406
Financial Capability
406 Mitigation Funding
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/8682
MA.00355
Hmp Index: MA.00355 • Mitigation Actions Title: Buono Beach and Alice Austen Reconstruction due to Hurricane Sandy • Lead Agency: Department of Parks and Recreation
Hmp Index
MA.00355
Mitigation Actions Title
Buono Beach and Alice Austen Reconstruction due to Hurricane Sandy
Mitigation Actions Description
This project will reconstruct the landscape elements at Alice Austen House including picket fences and paths due to damage sustained during Hurricane Sandy. The project will also include the installation of security lighting.
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Estimated Start
2014-08-31T00:00:00.000
Estimated Finish
2019-06-30T00:00:00.000
Estimated Cost
$772,000.00
Federal Funding Source
FEMA
City Funding Source
Mayoral,City Capital
Financial Capability
NYC Capital Budget
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/6625
MA.00356
Hmp Index: MA.00356 • Mitigation Actions Title: Riverside Park and Fort Washington Park Pathway Reconstruction (Hurricane Sandy) • Lead Agency: Department of Parks and Recreation
Hmp Index
MA.00356
Mitigation Actions Title
Riverside Park and Fort Washington Park Pathway Reconstruction (Hurricane Sandy)
Mitigation Actions Description
This project will reconstruct paths, pavements, and general site work in Riverside Park South, Riverside Park and Fort Washington Park in Manhattan, which were damaged by Hurricane Sandy.
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Erosion,Coastal Storms,Flooding
Estimated Start
2013-05-31T00:00:00.000
Estimated Finish
2020-11-29T00:00:00.000
Estimated Cost
$1,945,000.00
Federal Funding Source
FEMA
City Funding Source
Mayoral
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/6178
MA.00357
Hmp Index: MA.00357 • Mitigation Actions Title: Ralph Demarco Park Shoreline Reconstruction (Hurricane Sandy) • Lead Agency: Department of Parks and Recreation
Hmp Index
MA.00357
Mitigation Actions Title
Ralph Demarco Park Shoreline Reconstruction (Hurricane Sandy)
Mitigation Actions Description
This project will reconstruct the shoreline damaged by Hurricane Sandy in Ralph Demarco Park.
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Erosion,Coastal Storms,Flooding
Estimated Start
2016-06-30T00:00:00.000
Estimated Finish
2024-10-31T00:00:00.000
Estimated Cost
$7,733,000.00
Federal Funding Source
FEMA
City Funding Source
Mayoral
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/6170">https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/6170</a>
MA.00358
Hmp Index: MA.00358 • Mitigation Actions Title: Bayswater Park • Lead Agency: Department of Parks and Recreation
Hmp Index
MA.00358
Mitigation Actions Title
Bayswater Park
Mitigation Actions Description
Resiliency measures and community park improvements including berm and sports fields. Park of 428 related to Rockaway Beach Boardwalk.
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Erosion,Coastal Storms,Flooding
Estimated Start
2018-09-30T00:00:00.000
Estimated Finish
2026-01-30T00:00:00.000
Estimated Cost
$39,486,000.00
Federal Funding Source
FEMA
City Funding Source
Mayoral
Administrative Technical Capability
Resiliency Planning Staff
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/9669
MA.00359
Hmp Index: MA.00359 • Mitigation Actions Title: Wolfe's Pond Park Landscape Reconstruction • Lead Agency: Department of Parks and Recreation
Hmp Index
MA.00359
Mitigation Actions Title
Wolfe's Pond Park Landscape Reconstruction
Mitigation Actions Description
This project will reconstruct the berm and restore the landscape in Wolfe's Pond Park.
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Erosion,Coastal Storms
Estimated Start
2013-02-28T00:00:00.000
Estimated Finish
2019-10-29T00:00:00.000
Estimated Cost
$2,948,000.00
Federal Funding Source
FEMA
State Funding Source
Other State
City Funding Source
Mayoral
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/5963">https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/5963</a>
MA.00360
Hmp Index: MA.00360 • Mitigation Actions Title: Crotona Park Green Infrastructure Construction • Mitigation Actions Description: This project will install green infrastructure within Crotona Park.
Hmp Index
MA.00360
Mitigation Actions Title
Crotona Park Green Infrastructure Construction
Mitigation Actions Description
This project will install green infrastructure within Crotona Park.
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Estimated Start
2022-08-01T00:00:00.000
Estimated Finish
2025-12-31T00:00:00.000
Estimated Cost
$2,000,000.00
City Funding Source
Mayoral
Description Of Social Vulnerability Addressed
Occurring alongside census tracts with high SVI.
Planning Regulation Capability
NYC Green Infrastructure Plan
Administrative Technical Capability
Floodplain Maps/Flood Insurance Studies – NFIP Compliance,Resiliency Planning Staff
Financial Capability
Funding from Elected Officials
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/10260
MA.00361
Hmp Index: MA.00361 • Mitigation Actions Title: Bronx Green Infrastructure Construction • Lead Agency: Department of Parks and Recreation
Hmp Index
MA.00361
Mitigation Actions Title
Bronx Green Infrastructure Construction
Mitigation Actions Description
This project will construct green infrastructure to capture storm water at Magenta Playground and Watson Gleason Playground.
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Estimated Start
2021-05-01T00:00:00.000
Estimated Finish
2024-11-30T00:00:00.000
Estimated Cost
$850,000.00
City Funding Source
Mayoral
Description Of Social Vulnerability Addressed
Occurring alongside census tracts with high SVI.
Planning Regulation Capability
NYC Green Infrastructure Plan
Administrative Technical Capability
Floodplain Maps/Flood Insurance Studies – NFIP Compliance,Resiliency Planning Staff
Financial Capability
Funding from Elected Officials
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/10014
MA.00362
Hmp Index: MA.00362 • Mitigation Actions Title: Parkside Playground Green Infrastructure Construction • Lead Agency: Department of Parks and Recreation
Hmp Index
MA.00362
Mitigation Actions Title
Parkside Playground Green Infrastructure Construction
Mitigation Actions Description
This project will construct green infrastructure to capture stormwater at Parkside Playground.
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Estimated Start
2017-08-01T00:00:00.000
Estimated Finish
2024-09-30T00:00:00.000
Estimated Cost
$593,000.00
City Funding Source
Mayoral
Description Of Social Vulnerability Addressed
Occurring alongside census tracts with high SVI.
Planning Regulation Capability
NYC Green Infrastructure Plan
Administrative Technical Capability
Floodplain Maps/Flood Insurance Studies – NFIP Compliance,Resiliency Planning Staff
Financial Capability
Funding from Elected Officials
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/8775
MA.00363
Hmp Index: MA.00363 • Mitigation Actions Title: Van Cortlandt Park Green Infrastructure Construction • Lead Agency: Department of Parks and Recreation
Hmp Index
MA.00363
Mitigation Actions Title
Van Cortlandt Park Green Infrastructure Construction
Mitigation Actions Description
This project will install multiple green infrastructure elements throughout Van Cortlandt Park.
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Estimated Start
2022-04-01T00:00:00.000
Estimated Finish
2025-12-31T00:00:00.000
Estimated Cost
$4,000,000.00
City Funding Source
Mayoral
Planning Regulation Capability
NYC Green Infrastructure Plan
Administrative Technical Capability
Floodplain Maps/Flood Insurance Studies – NFIP Compliance,Resiliency Planning Staff
Financial Capability
Funding from Elected Officials
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/10031
MA.00364
Hmp Index: MA.00364 • Mitigation Actions Title: Brooklyn Green Infrastructure Construction • Lead Agency: Department of Parks and Recreation
Hmp Index
MA.00364
Mitigation Actions Title
Brooklyn Green Infrastructure Construction
Mitigation Actions Description
This project will construct green infrastructure to capture storm water at Classon Playground, Colonel David Marcus Playground and Oracle Playground.
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Estimated Start
2017-10-01T00:00:00.000
Estimated Finish
2024-11-30T00:00:00.000
Estimated Cost
$3,060,000.00
City Funding Source
Mayoral
Description Of Social Vulnerability Addressed
Occurs alongside neighborhoods with high SVI
Planning Regulation Capability
NYC Green Infrastructure Plan
Administrative Technical Capability
Floodplain Maps/Flood Insurance Studies – NFIP Compliance,Resiliency Planning Staff
Financial Capability
Funding from Elected Officials
MA.00365
Hmp Index: MA.00365 • Lead Agency: Department of Parks and Recreation • Action Category: Infrastructure Projects
Hmp Index
MA.00365
Mitigation Actions Title
Bushwick Inlet Park Motiva Parcel Remediation and Passive Seating Area Construction
Mitigation Actions Description
This project will remediate contaminated soils and construct a new passive seating area in Bushwick Inlet Park.
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding,Coastal Storms
Estimated Start
2019-01-01T00:00:00.000
Estimated Finish
2025-12-31T00:00:00.000
Estimated Cost
$7,500,000.00
City Funding Source
Mayoral
Description Of Social Vulnerability Addressed
Occurs alongside neighborhoods with high SVI
Financial Capability
Funding from Elected Officials
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/8919
MA.00366
Hmp Index: MA.00366 • Mitigation Actions Title: Citywide Seawall Reconstruction • Mitigation Actions Description: This project will reconstruct seawalls in various locations, citywide.
Hmp Index
MA.00366
Mitigation Actions Title
Citywide Seawall Reconstruction
Mitigation Actions Description
This project will reconstruct seawalls in various locations, citywide.
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding,Coastal Erosion,Coastal Storms
Estimated Start
2019-10-01T00:00:00.000
Estimated Finish
2025-10-31T00:00:00.000
Estimated Cost
$10,000,000.00
City Funding Source
Mayoral,Borough President,City Capital
Description Of Social Vulnerability Addressed
Occurs in neighborhoods with high SVI
Financial Capability
NYC Capital Budget,Funding from Elected Officials
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/10477
MA.00367
Hmp Index: MA.00367 • Lead Agency: Department of Parks and Recreation • Action Category: Infrastructure Projects
Hmp Index
MA.00367
Mitigation Actions Title
Fort Greene Park Entrances, Paths, Plaza and Drainage Infrastructure Reconstruction
Mitigation Actions Description
This project will reconstruct the entrances, paths, plaza and drainage infrastructure at Fort Greene Park.
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Estimated Start
2021-02-01T00:00:00.000
Estimated Finish
2025-12-31T00:00:00.000
Estimated Cost
$10,000,000.00
City Funding Source
Mayoral,Borough President,City Capital
Financial Capability
NYC Capital Budget,Funding from Elected Officials
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/9990
MA.00368
Hmp Index: MA.00368 • Mitigation Actions Title: Coney Island Boardwalk Reconstruction • Mitigation Actions Description: This project will reconstruct a portion of the Coney Island Boardwalk.
Hmp Index
MA.00368
Mitigation Actions Title
Coney Island Boardwalk Reconstruction
Mitigation Actions Description
This project will reconstruct a portion of the Coney Island Boardwalk.
Lead Agency
Department of Parks and Recreation
Action Category
Infrastructure Projects
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Estimated Start
2021-02-01T00:00:00.000
Estimated Finish
2025-12-31T00:00:00.000
Estimated Cost
$10,000,000.00
City Funding Source
Mayoral
Description Of Social Vulnerability Addressed
Occurs in neighborhoods with high SVI
Planning Regulation Capability
Climate Resiliency Guidelines,Flood Resiliency Guidelines,Sustainable Design Guidelines (Includes Sustainable Building Guidelines (SBG) and Sustainable Infrastructure Guidelines (SIG))
Administrative Technical Capability
Floodplain Maps/Flood Insurance Studies – NFIP Compliance,Resiliency Planning Staff
Financial Capability
Funding from Elected Officials
Web Link
https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/6291