This dataset reports each of the projects and programs requested by the City’s 59 community boards. The Register is the charter mandated product of a dynamic and cyclical budget process for the 59 community boards. The community boards consult with agencies on the capital and expense needs of the district. After consulting, each community board develops and votes separate priorities for up to 40 capital and 25 expense budget requests which the agencies review and respond to in the Register of Community Board Requests for the Preliminary Budget in January. The Mayor’s Office of Management and Budget (OMB) reviews these same budget requests and updates the responses for the Executive and Adopted Budgets. This dataset is updated three times per year after publication of the Preliminary, Executive and Adopted Budget, usually in January, April and June respectively.

City Government New York City Office of Management and Budget Dataset vn4m-mk4t 26 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
CS
Tracking Code
301202446C
Request
Invest in capital projects to improve access to waterfront
Explanation
Complete construction of East River Waterfront Esplanade up to Brooklyn Bridge.
Response
The agency will try to accommodate this issue within existing resources. OMB supports the agency's position.
Responded By
OMB
Responsible Agency
Economic Development Corporation
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
CS
Tracking Code
301202447C
Request
Invest in infrastructure that will support growth in commercial business districts
Explanation
These historic mid-19th century buildings that house the Melville Gallery and other SSSM facilities urgently need to be upgraded to allow for safe and legal access, security and flood resiliency. The SSSM did get a $4.8 million grant for this renovation from LMDC but that funding is insufficient. The project needs an additional $3 million for capital work and $300,000 for design and engineering.
Response
Work on this project/program has either been completed or will be finished in FY 2024.
Responded By
OMB
Responsible Agency
Economic Development Corporation
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
CS
Tracking Code
301202448C
Request
Other capital budget request for EDC
Explanation
Construct a pool for the aquatics program
Response
More information is needed from the community board before making a funding decision. The community board should contact the agency.
Responded By
OMB
Responsible Agency
Economic Development Corporation
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
CS
Tracking Code
301202449C
Request
Improve traffic and pedestrian safety, including traffic calming
Explanation
A new school under construction at 42 Trinity lacks adequate outdoor gathering space and a safe place designated for buses to stop and let children on and off. Funds are needed to complete the Edgar Street project to close a lane and create an expanded sidewalk or pedestrian area on the south side of the school. Planning and approval of the needed bus stops are also requested that will accommodate the children before and after school.
Response
OMB supports the agency's position as follows: Temporary improvements have been made at this location until permanent improvements can be made.
Responded By
OMB
Responsible Agency
Department of Transportation
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
CS
Tracking Code
301202450C
Request
Reconstruct or upgrade a park or amenity (i.e. playground, outdoor athletic field)
Explanation
Rebuild comfort station and park office in The Battery.
Response
The agency has stated that they will try to accommodate this request with existing resources. OMB supports this.
Responded By
OMB
Responsible Agency
Department of Parks and Recreation
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
01
Tracking Code
301202401C
Request
Invest in capital projects to improve access to waterfront
Explanation
Rebuild the New Market Building for public use with community amenities. This idea comes from the 2002 Downtown East River Waterfront Concept Plan sponsored by CB 1 and the Alliance for Downtown NY. Such uses could include, but are not limited to a community center with indoor and rooftop recreation space, public uses, community amenities, and possibly a restaurant, rental and repair facilities for bicycles, boats and other recreational equipment.
Response
Further study by the agency of this request is needed. Therefore, OMB does not take any position.
Responded By
OMB
Responsible Agency
Economic Development Corporation
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
02
Tracking Code
301202402C
Request
Other capital budget request for DEP
Explanation
Integrate the remediation of the CSO system to reduce overflow into the East and Hudson Rivers by including them within resiliency projects, such as the Fidi/Seaport Climate Resiliency Master Plan.
Response
Further investigation of this request is needed. Contact the agency.
Responded By
OMB
Responsible Agency
Department of Environmental Protection
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
03
Tracking Code
301202403C
Request
Repair or construct new curbs or pedestrian ramps
Explanation
Continue funding projects to make intersections safe for all users using best available technology and techniques such as sidewalk ramps, smooth crosswalks, auditory signals, etc.
Response
Sidewalks are the responsibility of the adjacent property owner. For curb repair, please submit specific locations to the Borough Commissioner for review. For Pedestrian Ramps, the Adopted Budget includes a Citywide allocation. Specific locations are determined by DOT.
Responded By
OMB
Responsible Agency
Department of Transportation
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
04
Tracking Code
301202404C
Request
Improve traffic and pedestrian safety, including traffic calming
Explanation
Canal Street has long-needed improvements in pedestrian safety, deliveries, and traffic flow. A traffic study is requested along with a plan for improving Canal Street for its users is requested and is timely since the implementation of two-way tolling on the Verrazzano Bridge is planned for 2021.
Response
Further study by the agency of this request is needed. Therefore, OMB does not take any position.
Responded By
OMB
Responsible Agency
Department of Transportation
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
05
Tracking Code
301202405C
Request
Invest in infrastructure that will support growth in commercial business districts
Explanation
Funds for the demolition and reconstruction of pier/pilings underneath New Market Building site.
Response
Further study by the agency of this request is needed. Therefore, OMB does not take any position.
Responded By
OMB
Responsible Agency
Economic Development Corporation
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
06
Tracking Code
301202406C
Request
Roadway maintenance (i.e. pothole repair, resurfacing, trench restoration, etc.)
Explanation
Reconstruct and restore Franklin Street between Hudson and Varick Streets, a cobblestone street within CB 1's historic district.
Response
Further study by the agency of this request is needed. Therefore, OMB does not take any position.
Responded By
OMB
Responsible Agency
Department of Transportation
Site Street
Franklin Street
Cross Street 1
Hudson Street
Cross Street 2
Hudson Street
Street
Franklin Street
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
07
Tracking Code
301202407C
Request
Roadway maintenance (i.e. pothole repair, resurfacing, trench restoration, etc.)
Explanation
Repair Theater Alley behind the Park Row block.
Response
Please contact the Borough Commissioner's office to discuss this request.
Responded By
OMB
Responsible Agency
Department of Transportation
Site Street
Theater Alley
Cross Street 1
Beekman Street
Cross Street 2
Beekman Street
Street
Theater Alley
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
08
Tracking Code
301202408C
Request
Roadway maintenance (i.e. pothole repair, resurfacing, trench restoration, etc.)
Explanation
Repair the currently cobbled roadbed of Moore Street between Water and Pearl Streets.
Response
Further study by the agency of this request is needed. Therefore, OMB does not take any position.
Responded By
OMB
Responsible Agency
Department of Transportation
Site Street
Moore Street
Cross Street 1
Water Street
Cross Street 2
Water Street
Street
Moore Street
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
09
Tracking Code
301202409C
Request
Roadway maintenance (i.e. pothole repair, resurfacing, trench restoration, etc.)
Explanation
Reconstruct and restore Vestry Street between West and Greenwich Streets, a cobblestone street within CB 1's historic district.
Response
Further study by the agency of this request is needed. Therefore, OMB does not take any position.
Responded By
OMB
Responsible Agency
Department of Transportation
Site Street
Vestry Street
Cross Street 1
West Street
Cross Street 2
West Street
Street
Vestry Street
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
10
Tracking Code
301202410C
Request
Roadway maintenance (i.e. pothole repair, resurfacing, trench restoration, etc.)
Explanation
Reconstruct and restore Staple Street between Duane and Harrison Streets, a cobblestone street within CB1's historic district.
Response
Further study by the agency of this request is needed. Therefore, OMB does not take any position.
Responded By
OMB
Responsible Agency
Department of Transportation
Site Street
Staple St
Cross Street 1
Duane St
Cross Street 2
Duane St
Street
Staple St
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
11
Tracking Code
301202411C
Request
Roadway maintenance (i.e. pothole repair, resurfacing, trench restoration, etc.)
Explanation
Reconstruct and restore N. Moore Street between Hudson Street and Varick Street within CB1's historic district.
Response
Further study by the agency of this request is needed. Therefore, OMB does not take any position.
Responded By
OMB
Responsible Agency
Department of Transportation
Site Street
North Moore Street
Cross Street 1
Hudson Street
Cross Street 2
Hudson Street
Street
North Moore Street
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
12
Tracking Code
301202412C
Request
Roadway maintenance (i.e. pothole repair, resurfacing, trench restoration, etc.)
Explanation
Reconstruct and restore Greenwich Street between Vestry Street and Hubert Street, a cobblestone street within CB's historic district.
Response
Further study by the agency of this request is needed. Therefore, OMB does not take any position.
Responded By
OMB
Responsible Agency
Department of Transportation
Site Street
Greenwich Street
Cross Street 1
Vestry Street
Cross Street 2
Vestry Street
Street
Greenwich Street
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
13
Tracking Code
301202413C
Request
Roadway maintenance (i.e. pothole repair, resurfacing, trench restoration, etc.)
Explanation
Reconstruct and restore Duane Street between Greenwich and Hudson Streets, a cobblestone street within CB 1's historic district.
Response
Further study by the agency of this request is needed. Therefore, OMB does not take any position.
Responded By
OMB
Responsible Agency
Department of Transportation
Site Street
Duane St
Cross Street 1
Greenwich St
Cross Street 2
Greenwich St
Street
Duane St
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
14
Tracking Code
301202414C
Request
Other requests for park, building, or access improvements
Explanation
Replace the current pathway material at City Hall Park with the more durable Bluestone.
Response
It is recommended that this request be brought to the attention of your Elected Officials.
Responded By
OMB
Responsible Agency
Department of Parks and Recreation
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
15
Tracking Code
301202415C
Request
Roadway maintenance (i.e. pothole repair, resurfacing, trench restoration, etc.)
Explanation
Reconstruct and restore Collister Alley between Laight and Beach Streets, a cobblestone street within CB1's historic district.
Response
Further study by the agency of this request is needed. Therefore, OMB does not take any position.
Responded By
OMB
Responsible Agency
Department of Transportation
Site Street
Collister Street
Cross Street 1
Laight Street
Cross Street 2
Laight Street
Street
Collister Street
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
16
Tracking Code
301202416C
Request
Improve traffic and pedestrian safety, including traffic calming
Explanation
Fund NYCs portion of any redesign and reconstruction of South End Avenue in Battery Park City.
Response
Further study by the agency of this request is needed. Therefore, OMB does not take any position.
Responded By
OMB
Responsible Agency
Department of Transportation
Site Street
South End Avenue
Cross Street 1
Liberty Street
Cross Street 2
Liberty Street
Street
South End Avenue
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
17
Tracking Code
301202417C
Request
Reconstruct or upgrade a park or amenity (i.e. playground, outdoor athletic field)
Explanation
Renovate the pathway of Bowling Green Park, which currently pools with water after heavy rains.
Response
It is recommended that this request be brought to the attention of your Elected Officials.
Responded By
OMB
Responsible Agency
Department of Parks and Recreation
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
18
Tracking Code
301202418C
Request
Invest in infrastructure that will support growth in commercial business districts
Explanation
Provide funds to continue transformation of Governors Island. As the Island completed its ambitious 40-acre park project last year, it is now focusing on a new plan to create a 24/7 community with even more public parks, nonprofit tenants, restaurants, and 5 million square feet of new commercial, office and education space. Funds are also needed for the Islands aging or absent infrastructure and for the maintenance of historic buildings.
Response
Securing funding for this request is outside of EDC's jurisdiction; please contact the agency if you have any questions about the EDC budget process.
Responded By
OMB
Responsible Agency
Economic Development Corporation
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
19
Tracking Code
301202419C
Request
Other capital budget request for DEP
Explanation
Plan for and construct long-term comprehensive resiliency infrastructure from Stuyvesant High School-north. City needs to protect the West side of the Island and to be meaningful needs to connect with resiliency infrastructure north of Canal Street. This is especially timely as the federal government has not renewed funding for the NY & NJ Harbor & Tributaries Focus Area Feasibility Study (HATS) which was expected to address flood resiliency protection for this area.
Response
Further investigation of this request is needed. Contact the agency.
Responded By
OMB
Responsible Agency
Department of Environmental Protection
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
20
Tracking Code
301202420C
Request
Other capital budget request for EDC
Explanation
For short/medium flood resiliency infrastructure, we encourage innovative barrier design that is economical, effective and that can be manufactured locally
Response
More information is needed from the community board before making a funding decision. The community board should contact the agency.
Responded By
OMB
Responsible Agency
Economic Development Corporation
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
21
Tracking Code
301202421C
Request
Provide more housing for extremely low and low income households
Explanation
Build income restricted housing for a mix of family sizes. (studio through many-bedroom residential units)
Response
OMB supports the agency's position as follows: The agency will accommodate this issue within existing resources.
Responded By
OMB
Responsible Agency
Department of Housing Preservation & Development
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
22
Tracking Code
301202422C
Request
Reconstruct or upgrade a park or amenity (i.e. playground, outdoor athletic field)
Explanation
Enlarge and make this major tourist destination safer. Now that the City has decided to keep the Charging Bull statue there, we need to find a way to separate visitors from vehicular traffic by enlarging this busy park.
Response
Further study by the agency of this request is needed. Therefore, OMB does not take any position.
Responded By
OMB
Responsible Agency
Department of Parks and Recreation
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
23
Tracking Code
301202423C
Request
Other requests for park, building, or access improvements
Explanation
This large space should be re-examined to make it into a more useful open space to serve the community. This area has also suffered damage from NYPD vehicle parking.
Response
The agency has stated that they will try to accommodate this request with existing resources. OMB supports this.
Responded By
OMB
Responsible Agency
Department of Parks and Recreation
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
24
Tracking Code
301202424C
Request
Enhance park safety through design interventions, e.g. better lighting
Explanation
Study the transition from gas lights at City Hall Park to LED
Response
It is recommended that this request be brought to the attention of your Elected Officials.
Responded By
OMB
Responsible Agency
Department of Parks and Recreation
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
25
Tracking Code
301202425C
Request
Create a new, or renovate or upgrade an existing public library (NYPL)
Explanation
Provide funding for a new library on the east side of CD1, where the residential population has been increasing rapidly with a particular increase in families and children.
Response
Further investigation is required. Contact the agency.
Responded By
OMB
Responsible Agency
New York Public Library
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
26
Tracking Code
301202426C
Request
Improve traffic and pedestrian safety, including traffic calming
Explanation
Build out a mid block crosswalk that serve P.S.89/I.S. 289 with additional signage at a minimum.
Response
Please contact the Borough Commissioner's office to discuss this request.
Responded By
OMB
Responsible Agency
Department of Transportation
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
27
Tracking Code
301202427C
Request
Other traffic improvement requests
Explanation
Fund NYCs portion of the redesign and reconstruction of South End Avenue in Battery Park City.
Response
Further study by the agency of this request is needed. Therefore, OMB does not take any position.
Responded By
OMB
Responsible Agency
Department of Transportation
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
28
Tracking Code
301202428C
Request
Improve traffic and pedestrian safety, including traffic calming
Explanation
The increased reliance on cycling as a means of transportation to, from and around MCD1 has led to frequent overcrowding and conflict with pedestrians on the Hudson River Park Greenway. Since workers, students and visitors to our district state their intent to use bikes as they return, the need for more safe pedestrian and cycling space will be needed even more. They NYC and NYS DOT's need to work together to study and implement this much needed safety measure.
Response
Further study by the agency of this request is needed. Therefore, OMB does not take any position.
Responded By
OMB
Responsible Agency
Department of Transportation
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
29
Tracking Code
301202429C
Request
Improve traffic and pedestrian safety, including traffic calming
Explanation
Perform a safety study of the intersection of Albany Street and West Street, which should include whether crossing guards, audible signals, or other safety enhancements are necessary for this intersection.
Response
Please contact the Borough Commissioner's office to discuss this request.
Responded By
OMB
Responsible Agency
Department of Transportation
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
30
Tracking Code
301202430C
Request
Other capital budget request for NYCTA
Explanation
Study the construction of a Bus Stop in Front of P.S. 276 in Battery Park City
Response
More information is needed from the community board before making a funding decision. The community board should contact the agency.
Responded By
OMB
Responsible Agency
Transit Authority
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
31
Tracking Code
301202431C
Request
Improve traffic and pedestrian safety, including traffic calming
Explanation
Pilot education/enforcement activities to reduce human powered and electrically propelled bicycle riding on sidewalks and in dense crowds of pedestrians.
Response
Please contact the Borough Commissioner's office to discuss this request.
Responded By
OMB
Responsible Agency
Department of Transportation
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
32
Tracking Code
301202432C
Request
Provide a new or expanded park or amenity (i.e. playground, outdoor athletic field)
Explanation
New Public Pool in CD1: Neighboring community boards have outdoor public pools which are free for public use during the summer, whereas CD1 has none. CD1?s indoor ?community pools? such as those at Manhattan Youth, BMCC or Stuyvesant all have fees to swim, and are rarely if ever open to the general public. Swimming lessons are very expensive and few children can participate because there are limited spots even if one can afford. Especially now that +Pool will not be designed for CD1, a local public pool must be considered for the CD1 area. For example, a small pop up pool in a shipping container like Brooklyn Bridge Park in Brooklyn, or an above-ground pool to minimize costs. CD1 should have a summer pool outside, free for all like neighboring Community Districts.
Response
Further study by the agency of this request is needed. Therefore, OMB does not take any position.
Responded By
OMB
Responsible Agency
Department of Parks and Recreation
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
33
Tracking Code
301202433C
Request
Provide a new or expanded park or amenity (i.e. playground, outdoor athletic field)
Explanation
Expand Finn Square into a Park
Response
Further study by the agency of this request is needed. Therefore, OMB does not take any position.
Responded By
OMB
Responsible Agency
Department of Parks and Recreation
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
34
Tracking Code
301202434C
Request
Provide a new or expanded park or amenity (i.e. playground, outdoor athletic field)
Explanation
Contribute funding to the expansion of Duane Park as proposed by the Friends of Duane Park in order to be more consistent with its historic footprint (and as supported by CB1 via prior resolution)
Response
Further study by the agency of this request is needed. Therefore, OMB does not take any position.
Responded By
OMB
Responsible Agency
Department of Parks and Recreation
Street
Duane Park, Manhattan, New York,
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
35
Tracking Code
301202435C
Request
Other capital budget request for DEP
Explanation
Provide funding for capturing/managing stormwater runoff in connection with the Brooklyn Bridge elevated roadway downspouts.
Response
Further study by the agency of this request is needed. Therefore, OMB does not take any position.
Responded By
OMB
Responsible Agency
Department of Environmental Protection
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
36
Tracking Code
301202436C
Request
Reconstruct or upgrade a building in a park
Explanation
Expand grant programs for restorations of landmarked buildings in parks
Response
It is recommended that this request be brought to the attention of your Elected Officials.
Responded By
OMB
Responsible Agency
Department of Parks and Recreation
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
37
Tracking Code
301202437C
Request
Other capital budget request for DOT
Explanation
Reconstruction of Sidewalks of Finn Square.
Response
Sidewalks are the responsibility of the adjacent property owner. For curb repair, please submit specific locations to the Borough Commissioner for review. For Pedestrian Ramps, the Adopted Budget includes a Citywide allocation. Specific locations are determined by DOT.
Responded By
OMB
Responsible Agency
Department of Transportation
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
38
Tracking Code
301202438C
Request
Other traffic improvement requests
Explanation
Additional funding of up to $1.5 million to add to the $500,000 that was already allocated in order to expand the scope of the study and the implementation of a pilot(s) for what is framed by the DOT as Pedestrian Priority in the Financial District (bordered by Broadway, Brooklyn Bridge, Water St and State St) to address street safety, sanitation, freight delivery and crowding issues that have been noted in CB1 resolutions and by numerous other groups including in the ?Make Way for Lower Manhattan? initiative and report.
Response
Further study by the agency of this request is needed. Therefore, OMB does not take any position.
Responded By
OMB
Responsible Agency
Department of Transportation
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
39
Tracking Code
301202439C
Request
Other capital budget request for DPR
Explanation
City Hall Park Northeast Plaza - This large space should be re-examined to make it into a more useful open space to serve the community. This area has also suffered damage from NYPD vehicle parking. More lawn area be open to the public.
Response
The agency has stated that they will try to accommodate this request with existing resources. OMB supports this.
Responded By
OMB
Responsible Agency
Department of Parks and Recreation
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
40
Tracking Code
301202440C
Request
Provide a new or expanded park or amenity (i.e. playground, outdoor athletic field)
Explanation
Bowling Green - Create a design to enlarge and make this major tourist destination safer. Now that the City has decided to keep the Charging Bull statue there, we need to find a way to separate visitors from vehicular traffic by enlarging this busy park.
Response
Further study by the agency of this request is needed. Therefore, OMB does not take any position.
Responded By
OMB
Responsible Agency
Department of Parks and Recreation
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
41
Tracking Code
301202441C
Request
Other capital budget request for EDC
Explanation
The Downtown Community center was awarded $500,000 to fix its hvac system that was three or four years ago. However the grant is not enough. We estimate it can range form 1.3 to 1.8 million. The center is in danger of losing its ability to cool the floors. The programs of the center are critical to seniors, school age children and young families.
Response
Securing funding for this request is outside of EDC's jurisdiction; please contact the agency if you have any questions about the EDC budget process.
Responded By
OMB
Responsible Agency
Economic Development Corporation
Street
120 Warren Street
Postcode
11201
Latitude
40.688455
Longitude
-73.998965
Council Disctrict
39
Census Tract
49
Nta
BK0601
VIEW LOCATION
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
42
Tracking Code
301202442C
Request
Other capital budget request for EDC
Explanation
Brooklyn Bridge - Renovate Stairwell and Area Around Stairwell for economic development, tourism and safety.
Response
Securing funding for this request is outside of EDC's jurisdiction; please contact the agency if you have any questions about the EDC budget process.
Responded By
OMB
Responsible Agency
Economic Development Corporation
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
43
Tracking Code
301202443C
Request
Other capital budget request
Explanation
Landmarks Preservation Commission - Expand grant programs for restorations of landmarked buildings in parks.
Response
It is recommended that this request be brought to the attention of your Elected Officials.
Responded By
OMB
Responsible Agency
Landmarks Preservation Commission
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
01
Tracking Code
301202401E
Request
Provide more community board staff
Explanation
Increase Community Board budget to $400,000 which would be the first increase in over 20 years.
Response
As of the FY 2024 Adopted Budget, each Community Board's budget is $257,507.
Responded By
OMB
Responsible Agency
Mayor's Office of Management and Budget
20230630
Publication: 20230630 • Boro: 3 • Board: 01
Publication
20230630
Boro
3
Board
01
Priority
02
Tracking Code
301202402E
Request
Other expense budget request for EDC
Explanation
Brooklyn Bridge Economic and Social Analysis: CB1 requests an economic and social analysis to examine the cost/benefits of siting public facilities/amenities at this location (public uses such as libraries, parkland, marketspace, active and passive recreation space, etc). This study can evaluate quality of life benefits of greening this space, returning it to public use, and restoring it as a link between Community Districts 1 and 3 as opposed to the de facto barrier that currently stands. The economic portion of the study should analyze increase visitors/tourists coming down from the Bridge and into the community generating economic and job benefits.
Response
Further study by the agency of this request is needed. Therefore, OMB does not take any position.
Responded By
OMB
Responsible Agency