Interagency Coordination and Construction Permits Data (MOSYS)

NYC Parks' database of external capital projects affecting parkland.

Data Dictionary and User Guide: https://docs.google.com/spreadsheets/d/1Xx4yDs00L2ab8M4HH9GLTF47Fkt8oXDvr8WtSpTFsm8/edit?usp=sharing

City Government Department of Parks and Recreation (DPR) Dataset wye7-nyek 56 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
Highline 76 11th Avenue
Project Name: Highline 76 11th Avenue • Project Received Date: 2018-05-01T00:00:00.000 • Project Id Number Op: M360
Project Name
Highline 76 11th Avenue
Project Received Date
2018-05-01T00:00:00.000
Project Id Number Op
M360
Project Description Type
Excavation and column extension under Highline 18th Street & 17th Street, 10th Avenue
Impacted Park Id S
M360;
Impacted Park Name S
The High Line;
Address Intersection
76 11th Avenue, New York NY
Borough
Manhattan
Multisite Project
Single Site
Sponsoring Agency Entity
Other
Primary Scope Of Work
Private Development
Impacted Parks Division S
Borough Operations
Current Phase
Construction
Contractor For Construction Permit Firm Name
Omnibuild Construction c/o HFZ Capital Group, L
Construction Permit Request Received Date
2018-05-01T00:00:00.000
Construction Permit Id
M360.20180703
Permit Start Date
2018-05-01T00:00:00.000
Original Permit Expiration Date
2019-01-01T00:00:00.000
Created
2018-08-04T11:19:00.000
Modified
2019-11-05T14:57:00.000
Coordinates
40.742838, -74.008647
135-20 40th Road repairing the stucco on the west wall of the building – Erecting scaffold
Project Received Date: 2018-05-25T00:00:00.000 • Project Id Number Op: Q326 • Impacted Park Id S: Q326;
Project Name
135-20 40th Road repairing the stucco on the west wall of the building – Erecting scaffold
Project Received Date
2018-05-25T00:00:00.000
Project Id Number Op
Q326
Project Description Type
135-20 40th Road repairing the stucco on the west wall of the building – Erecting scaffold
Impacted Park Id S
Q326;
Impacted Park Name S
Bland Playground;
Address Intersection
135-20 40th Road, Queens NY
Borough
Queens
Multisite Project
Single Site
Sponsoring Agency Entity
Private Developer
Primary Scope Of Work
Private Development
Impacted Parks Division S
Borough Operations
Park Impact Type
Other
Current Phase
Construction
Contractor For Construction Permit Firm Name
Orion Development Inc
Construction Permit Request Received Date
2018-05-25T00:00:00.000
Construction Permit Id
Q326.20180630
Construction Permit Special Conditions
i. The playground must remain locked during construction permitting access to park employees only if needed.
ii. Permittee when removing the chain linked fence adjacent to the wall. Once the fence is removed must clean the area behind the fence.
iii. Once they're finished repairing the wall they have to return the fence to original position.
iv. Any damages caused by the scaffolding to the asphalt or basketball court must be repaired.
Borough Approval Date
2018-06-29T00:00:00.000
Permit Start Date
2018-07-11T00:00:00.000
Original Permit Expiration Date
2018-08-01T00:00:00.000
Created
2018-08-04T10:47:00.000
Modified
2019-11-05T15:14:00.000
Coordinates
40.758361, -73.831095
Marine Park Garage -
Project Name: Marine Park Garage - • Project Received Date: 2018-03-19T00:00:00.000 • Project Id Number Op: B057
Project Name
Marine Park Garage -
Project Received Date
2018-03-19T00:00:00.000
Project Id Number Op
B057
Project Description Type
Replace groundwater monitoring well
Impacted Park Id S
B057;
Impacted Park Name S
Marine Park;
Address Intersection
2900 flatbush avenue, brooklyn ny
Borough
Brooklyn
Multisite Project
Single Site
Sponsoring Agency Entity
Other
Primary Scope Of Work
Park Improvement/New Park
Impacted Parks Division S
Borough Operations
Park Impact Type
Other
Current Phase
Construction
Contractor For Construction Permit Firm Name
Aquifer Drilling & Testing, Inc
Construction Permit Request Received Date
2018-03-19T00:00:00.000
Construction Permit Id
B057.20180630
Borough Approval Date
2018-06-27T00:00:00.000
Permit Start Date
2018-07-05T00:00:00.000
Original Permit Expiration Date
2018-08-01T00:00:00.000
Created
2018-08-04T08:50:00.000
Modified
2019-11-05T15:14:00.000
Coordinates
40.599322, -73.911815
ADA Requirements Contract
Project Name: ADA Requirements Contract • Project Received Date: 2018-07-06T00:00:00.000 • Project Id Number Op: XM 17.50
Project Name
ADA Requirements Contract
Project Received Date
2018-07-06T00:00:00.000
Project Id Number Op
XM 17.50
Project Description Type
reconstruction of an ADA ramp at a corner by a highway offramp next to South Shore Country Club
Impacted Park Id S
R104;
Impacted Park Name S
South Shore Country Club;
Address Intersection
Veterans Rd East & Arthur Kill Rd
Borough
Staten Island
Multisite Project
Single Site
Sponsoring Agency Entity
SDOT
Primary Scope Of Work
Pedestrian Safety
Park Impact Type
No Parkland Impact
Current Phase
Presumed Complete
Created
2018-07-26T17:40:00.000
Modified
2019-11-05T15:14:00.000
Coordinates
40.556503, -74.204072
Justice Ave Storm Water BMP Pilot Project
Project Name: Justice Ave Storm Water BMP Pilot Project • Project Received Date: 2017-06-28T00:00:00.000 • Project Description Type: Stormwater capture system to retrofit impervious surface
Project Name
Justice Ave Storm Water BMP Pilot Project
Project Received Date
2017-06-28T00:00:00.000
Project Description Type
Stormwater capture system to retrofit impervious surface
Impacted Park Id S
Q152;
Impacted Park Name S
Horsebrook Island;
Address Intersection
Justice Ave and 90th Street, Queens
Borough
Queens
Multisite Project
Single Site
Sponsoring Agency Entity
DEP
Primary Scope Of Work
Resiliency
Impacted Parks Division S
Borough Operations;#Borough Horticulture
Park Impact Type
Other
Contract Value Op
283071
Current Phase
Construction
Construction Permit Id
Q152.20171017
Forestry Permit Status
Approved
Permit Start Date
2017-11-01T00:00:00.000
Original Permit Expiration Date
2017-12-31T00:00:00.000
Latest Permit Extension Amendment Request Date
2017-12-20T00:00:00.000
Latest Permit Extension Amendment Issuance Date
2018-02-02T00:00:00.000
Latest Permit Expiration Date
2018-06-30T00:00:00.000
Permit Amendment Content
The planting plan dated 3/9/2016, from the stamped bid set, is attached to this amendment:
• it is the approved planting plan for the Justive Ave stormwater capture system; and
• it supersedes the planting plan dated 4/13/2016 that was erroneously included in Attachment B of Permit No. Q152.20171017.
Substantial Completion Date Op
2018-07-03T00:00:00.000
Created
2017-10-04T14:58:00.000
Modified
2019-11-22T16:21:00.000
Coordinates
40.735912, -73.872511
AMNH Times Capsule Sculpture De-Installation
Project Name: AMNH Times Capsule Sculpture De-Installation • Project Received Date: 2018-01-11T00:00:00.000 • Impacted Park Id S: M053;
Project Name
AMNH Times Capsule Sculpture De-Installation
Project Received Date
2018-01-11T00:00:00.000
Project Description Type
Tatti Art Conservation is de-installing the Time Capsule Sculpture at AMNH on the night of July 19 and into the morning of July 20. They received relocation approval from PDC. They are working with professional art riggers to de-install the sculpture and the surrounding granite skirt.
Impacted Park Id S
M053;
Impacted Park Name S
Theodore Roosevelt Park;
Address Intersection
W. 81st St between Central Park West and Columbus Ave
Borough
Manhattan
Multisite Project
Single Site
Sponsoring Agency Entity
DCulA
Primary Scope Of Work
Park Improvement/New Park
Impacted Parks Division S
Borough Operations;#Borough Horticulture;#Arts & Antiquities;#Legal/MOUs
Park Impact Type
Park Improvement;#Partial Park Closure;#Staging
Current Phase
Final-Accepted (Closed Out)
Contractor For Construction Permit Firm Name
Tatti Art Conservation
Construction Permit Request Received Date
2018-07-06T00:00:00.000
Construction Permit Id
M053.20180716
Latest Site Visit
2018-07-16T00:00:00.000
Forestry Permit Status
Not Required
Construction Permit Special Conditions
Post-deinstallation walkthrough will determine needs for backfilling the location where the statue was removed.
Borough Approval Date
2018-07-16T00:00:00.000
Permit Start Date
2018-07-19T00:00:00.000
Original Permit Expiration Date
2018-07-23T00:00:00.000
Latest Permit Expiration Date
2018-07-23T00:00:00.000
Created
2018-01-11T14:42:00.000
Modified
2019-11-05T14:57:00.000
Coordinates
40.781499, -73.974615
Linden Park Basketball Court Refurbishment
Project Name: Linden Park Basketball Court Refurbishment • Project Received Date: 2018-05-31T00:00:00.000 • Impacted Park Id S: B214;
Project Name
Linden Park Basketball Court Refurbishment
Project Received Date
2018-05-31T00:00:00.000
Project Description Type
Nike’s contractor, Ace Surfaces, will refurbish the basketball courts at Linden Park. Per our site visit on 5/23, Ace Surfaces will clean and resurface the 3 basketball courts, provide temporary construction fencing on the bleacher side of the courts, paint the seating area of the bleachers, and install new backboards and rims.
Impacted Park Id S
B214;
Impacted Park Name S
Linden Park;
Address Intersection
Linden Blvd & Vermont St
Borough
Brooklyn
Multisite Project
Single Site
Sponsoring Agency Entity
Parks - Partner Group
Impacted Parks Division S
Borough Operations;#Arts & Antiquities
Park Impact Type
Park Improvement
Current Phase
Final-Accepted (Closed Out)
Contractor For Construction Permit Firm Name
Ace Surfaces
Construction Permit Request Received Date
2018-05-31T00:00:00.000
Construction Permit Id
B214.20180601
Latest Site Visit
2018-05-23T00:00:00.000
Forestry Permit Status
Not Required
Construction Permit Special Conditions
Verbal approval from Borough via phone call with Davey Ives
Borough Approval Date
2018-06-01T00:00:00.000
Permit Start Date
2018-06-04T00:00:00.000
Original Permit Expiration Date
2018-07-27T00:00:00.000
Latest Permit Expiration Date
2018-07-27T00:00:00.000
Created
2018-05-31T15:26:00.000
Modified
2019-11-05T15:14:00.000
Coordinates
40.658781, -73.886942
Installing temporary construction fence
Project Name: Installing temporary construction fence • Project Received Date: 2017-02-17T00:00:00.000 • Project Description Type: Installing temporary construction fence
Project Name
Installing temporary construction fence
Project Received Date
2017-02-17T00:00:00.000
Project Description Type
Installing temporary construction fence
Impacted Park Id S
B401;
Impacted Park Name S
Grand Ferry Park;
Borough
Brooklyn
Multisite Project
Single Site
Sponsoring Agency Entity
Private Developer
Current Phase
Final-Accepted (Closed Out)
Contractor For Construction Permit Firm Name
316 Kent Construction LLC
Construction Permit Id
B401.20170322
Construction Permit Special Conditions
Graffiti on the construction fence within and bordering Grand Ferry Park shall be regularly painted over or removed within 48 hours of its appearance.
Permit Issuance Date
2017-03-22T00:00:00.000
Permit Start Date
2017-04-07T00:00:00.000
Original Permit Expiration Date
2018-01-31T00:00:00.000
Final Inspection Date
2018-07-13T00:00:00.000
Final Acceptance Of Park By Borough
2018-07-13T00:00:00.000
Created
2017-11-09T13:41:00.000
Modified
2019-11-05T15:13:00.000
Truck Intrusion Warning System at Hutchinson River Parkway and Grand Central Parkway (Height Sensors)
Project Received Date: 2014-08-12T00:00:00.000 • Project Id Number Op: X807.21 D262798 • Impacted Park Id S: X101;Q084A;
Project Name
Truck Intrusion Warning System at Hutchinson River Parkway and Grand Central Parkway (Height Sensors)
Project Received Date
2014-08-12T00:00:00.000
Project Id Number Op
X807.21 D262798
Project Description Type
Installation of Truck Intrusion Warning Systems on Hutchinson River Parkway and Grand Central Parkways (Bronx and Queens)
Impacted Park Id S
X101;Q084A;
Impacted Park Name S
Hutchinson River Parkway;Grand Central Parkway Extension;
Address Intersection
Hutchinson River Parkway & Bruckner Blvd
Borough
Bronx;#Queens
Multisite Project
Multi Borough
Sponsoring Agency Entity
SDOT
Impacted Parks Division S
Borough Forestry
Park Impact Type
Staging
Current Phase
Presumed Complete
Construction Permit Id
X-35-14NF
Exploratory Permit Id
CNYG 3-15NF
Latest Inspection Site Visit
2017-05-26T00:00:00.000
Punchlist Generated
2017-04-14T00:00:00.000
Created
2017-06-02T10:42:00.000
Modified
2019-11-05T15:17:00.000
National Grid at Hollis Court Blvd Malls
Project Name: National Grid at Hollis Court Blvd Malls • Project Received Date: 2017-06-13T00:00:00.000 • Impacted Park Id S: QT15;
Project Name
National Grid at Hollis Court Blvd Malls
Project Received Date
2017-06-13T00:00:00.000
Project Description Type
protection of medians during work next to malls. "There are islands in the middle of the road that fall under the Greenstreets program, and I think it would be wise to get the construction permit as a contingency plan. We do not plan to touch these islands at all. There will be no material stored on or around the islands on this street, I will direct the contractor to barricade each of the islands, and be wary of their outriggers, tires, and equipment. We should be able to disconnect and re-connect the majority of these services, and those that need to be replaced will be gophered."
Impacted Park Id S
QT15;
Impacted Park Name S
Hollis Court Malls;
Address Intersection
Hollis Court Blvd & 90 Avenue
Borough
Queens
Multisite Project
Single Site
Sponsoring Agency Entity
National Grid
Park Impact Type
Sidewalk Closure
Current Phase
Presumed Complete
Created
2017-06-14T09:22:00.000
Modified
2019-11-05T15:18:00.000
Gas Main near Great Kills Park
Project Name: Gas Main near Great Kills Park • Project Received Date: 2017-05-30T00:00:00.000 • Project Description Type: HDD under sidewalk in front of park, no impact
Project Name
Gas Main near Great Kills Park
Project Received Date
2017-05-30T00:00:00.000
Project Description Type
HDD under sidewalk in front of park, no impact
Impacted Park Id S
R071;
Impacted Park Name S
Great Kills Park;
Address Intersection
Park Terrace & Hillcrest Ave
Borough
Staten Island
Multisite Project
Single Site
Sponsoring Agency Entity
National Grid
Primary Scope Of Work
Utility (gas, electric, telephone)
Park Impact Type
No Parkland Impact
Current Phase
Presumed Complete
Created
2017-06-09T17:51:00.000
Modified
2019-11-05T15:18:00.000
Parque de Los Ninos Basketball Court Refurb
Project Name: Parque de Los Ninos Basketball Court Refurb • Project Received Date: 2018-05-31T00:00:00.000 • Impacted Park Id S: X004;
Project Name
Parque de Los Ninos Basketball Court Refurb
Project Received Date
2018-05-31T00:00:00.000
Project Description Type
Nike's contractor, Ace Surfaces, will refurbish the basketball court at Parque de los Ninos. Per site visit on 5/23, Ace Surfaces will clean and resurface the basketball court, provide temporary construction fencing on court entrances, paint the seating area of the bleachers, and install new backboards and rims to match existing.
Impacted Park Id S
X004;
Impacted Park Name S
Bronx River Parkway;
Address Intersection
Watson Ave & Morrison Ave
Borough
Bronx
Multisite Project
Single Site
Sponsoring Agency Entity
Parks - Partner Group
Primary Scope Of Work
Park Improvement/New Park
Impacted Parks Division S
Borough Operations;#Arts & Antiquities
Park Impact Type
Park Improvement
Current Phase
Final-Accepted (Closed Out)
Contractor For Construction Permit Firm Name
Ace Surfaces
Construction Permit Request Received Date
2018-05-31T00:00:00.000
Construction Permit Id
X004.20180601
Latest Site Visit
2018-05-23T00:00:00.000
Forestry Permit Status
Not Required
Borough Approval Date
2018-05-31T00:00:00.000
Permit Start Date
2018-06-04T00:00:00.000
Original Permit Expiration Date
2018-07-27T00:00:00.000
Latest Permit Expiration Date
2018-07-27T00:00:00.000
Created
2018-05-31T14:27:00.000
Modified
2019-11-05T15:13:00.000
Coordinates
40.827118, -73.873318
St. Nicholas Park Basketball Court Refurb
Project Name: St. Nicholas Park Basketball Court Refurb • Project Received Date: 2018-06-13T00:00:00.000 • Impacted Park Id S: M077;
Project Name
St. Nicholas Park Basketball Court Refurb
Project Received Date
2018-06-13T00:00:00.000
Project Description Type
Basketball court refurb includes re-surfacing/color sealing the court, new backboards, and cutting out and repairing two areas of the pavement where there are large lumps.
Impacted Park Id S
M077;
Impacted Park Name S
St. Nicholas Park;
Address Intersection
St. Nicholas Ave & W 140th St
Borough
Manhattan
Multisite Project
Single Site
Sponsoring Agency Entity
Parks - Partner Group
Primary Scope Of Work
Park Improvement/New Park
Impacted Parks Division S
Borough Operations
Park Impact Type
Partial Park Closure;#Park Improvement
Current Phase
Final-Accepted (Closed Out)
Contractor For Construction Permit Firm Name
TBO Sitescapes
Construction Permit Request Received Date
2018-06-13T00:00:00.000
Construction Permit Id
M077.20180613
Forestry Permit Status
Not Required
Borough Approval Date
2018-06-13T00:00:00.000
Permit Start Date
2018-06-15T00:00:00.000
Original Permit Expiration Date
2018-06-20T00:00:00.000
Latest Permit Expiration Date
2018-06-20T00:00:00.000
Created
2018-06-13T14:52:00.000
Modified
2019-11-05T15:18:00.000
Coordinates
40.820404, -73.946833
Regulator Tide Gate Upgrades
Project Name: Regulator Tide Gate Upgrades • Project Received Date: 2016-09-10T00:00:00.000 • Project Id Number Op: 14-CN00-DKCGE-008.00, BBLL-22
Project Name
Regulator Tide Gate Upgrades
Project Received Date
2016-09-10T00:00:00.000
Project Id Number Op
14-CN00-DKCGE-008.00, BBLL-22
Project Description Type
Replacement of existing tide gate in underground chamber in roadway, requiring lane closure near entrance to park.
Impacted Park Id S
Q465;
Impacted Park Name S
Socrates Sculpture Park;
Address Intersection
Broadway & Vernon Blvd
Borough
Queens
Multisite Project
Single Site
Sponsoring Agency Entity
DEP
Primary Scope Of Work
Sewer/Water Main
Impacted Parks Division S
Borough Operations;#Other
Park Impact Type
No Parkland Impact
Current Phase
Presumed Complete
Contractor For Construction Permit Firm Name
Brennan Industrial
Construction Permit Id
Q465.20160914
Forestry Permit Status
Not Required
Permit Start Date
2016-09-14T00:00:00.000
Original Permit Expiration Date
2016-10-31T00:00:00.000
Latest Permit Extension Amendment Request Date
2016-10-11T00:00:00.000
Latest Permit Extension Amendment Issuance Date
2016-10-17T00:00:00.000
Latest Permit Expiration Date
2016-12-30T00:00:00.000
Created
2016-10-17T15:19:00.000
Modified
2019-11-05T15:08:00.000
Coordinates
40.767799, -73.936192
Rockaway Ferry Landing Kiosk & Pathway
Project Name: Rockaway Ferry Landing Kiosk & Pathway • Project Received Date: 2018-05-09T00:00:00.000 • Impacted Park Id S: Q496;
Project Name
Rockaway Ferry Landing Kiosk & Pathway
Project Received Date
2018-05-09T00:00:00.000
Project Description Type
EDC is installing two asphalt pathways and an informational kiosk at Rockaway Ferry Landing.
Impacted Park Id S
Q496;
Impacted Park Name S
Park at Beach 108 Street;
Address Intersection
Beach 108th Street and Beach Channel Drive
Borough
Queens
Multisite Project
Single Site
Sponsoring Agency Entity
EDC
Impacted Parks Division S
Borough Operations;#Borough Horticulture;#Planning and Parklands
Park Impact Type
Excavation;#Staging;#Park Improvement
Contract Value Op
75000
Current Phase
Final-Accepted (Closed Out)
Contractor For Construction Permit Firm Name
Demand Electric
Construction Permit Request Received Date
2018-05-09T00:00:00.000
Construction Permit Id
Q496.20180518
Latest Site Visit
2018-05-18T00:00:00.000
Forestry Permit Status
Not Required
Permit Start Date
2018-05-21T00:00:00.000
Original Permit Expiration Date
2018-06-08T00:00:00.000
Latest Permit Expiration Date
2018-06-08T00:00:00.000
Created
2018-05-17T14:10:00.000
Modified
2019-11-05T15:35:00.000
Coordinates
40.583940, -73.831720
Hinton Park Pump Station
Project Name: Hinton Park Pump Station • Project Received Date: 2015-12-04T00:00:00.000 • Project Id Number Op: JO 14-CN00-WADEE-005.00 (N-34AY)
Project Name
Hinton Park Pump Station
Project Received Date
2015-12-04T00:00:00.000
Project Id Number Op
JO 14-CN00-WADEE-005.00 (N-34AY)
Project Description Type
Add electrical feed to existing sub-grade pump station located in paper street through park
Impacted Park Id S
Q410;
Impacted Park Name S
Hinton Park;
Address Intersection
37 Ave & 114 St
Borough
Queens
Multisite Project
Single Site
Sponsoring Agency Entity
DEP
Primary Scope Of Work
Sewer/Water Plant
Impacted Parks Division S
Borough Operations;#Borough Forestry
Park Impact Type
Excavation
Contract Value Op
30000
Current Phase
Final-Accepted (Closed Out)
Construction Manager Op
PM
Construction Manager Company Op
DB-Eng
Expected Construction End Date Op
2017-04-30T00:00:00.000
Contractor For Construction Permit Firm Name
Satnaam International Construction Corp.
Construction Permit Request Received Date
2018-02-14T00:00:00.000
Construction Permit Id
Q410.20180220
Latest Site Visit
2016-12-09T00:00:00.000
Forestry Permit Status
Approved
Forestry Permit Id Number
QA17-095
Borough Approval Date
2017-12-08T00:00:00.000
Permit Issuance Date
2017-03-22T00:00:00.000
Permit Start Date
2018-02-26T00:00:00.000
Original Permit Expiration Date
2018-05-04T00:00:00.000
Latest Permit Extension Amendment Request Date
2018-05-06T00:00:00.000
Latest Permit Extension Amendment Issuance Date
2018-05-07T00:00:00.000
Latest Permit Expiration Date
2018-06-11T00:00:00.000
Latest Inspection Site Visit
2018-06-21T00:00:00.000
Final Acceptance Of Park By Borough
2018-06-27T00:00:00.000
Final Acceptance Letter Date
2018-06-27T00:00:00.000
Created
2016-11-28T14:33:00.000
Modified
2019-11-05T15:16:00.000
Coordinates
40.754967, -73.853823
Alexander Hamilton Bridge And Highbridge Interchange Ramps Rehabilitation
Project Name: Alexander Hamilton Bridge And Highbridge Interchange Ramps Rehabilitation • Project Received Date: 2004-02-12T00:00:00.000 • Project Id Number Op: X726.81 D260888
Project Name
Alexander Hamilton Bridge And Highbridge Interchange Ramps Rehabilitation
Project Received Date
2004-02-12T00:00:00.000
Project Id Number Op
X726.81 D260888
Project Description Type
Major project impacting a small waterfront park in Bronx and clearing and building two properties within Highbridge Park -- reconstruction of Quisqueya Playground and a new Highbridge Skate Park facility
Impacted Park Id S
X094;M037;
Impacted Park Name S
Bridge Park;Highbridge Park;
Borough
Manhattan;#Bronx
Multisite Project
Multi Borough
Sponsoring Agency Entity
SDOT
Primary Scope Of Work
Bridge Reconstruction (Major)
Impacted Parks Division S
Borough Operations;#Borough Forestry;#Legal/MOUs;#Planning and Parklands;#CDOT Arterial Maintenance
Park Impact Type
Staging;#Excavation;#Partial Park Closure;#Park Improvement
Contract Value Op
407000000
Current Phase
Final-Accepted (Closed Out)
Mass Mailing 2 Received Date
2006-08-04T00:00:00.000
Contractor For Construction Permit Firm Name
New York State Dept. of Transportationo
Construction Permit Id
CNYG-05-06 NFSI
Latest Site Visit
2016-03-24T00:00:00.000
Forestry Permit Status
Approved
Construction Permit Special Conditions
X-25-09-NFI half million dollar bond and permit just for Bronx was issued to contractor CCA Civil/Halmar International
Permit Start Date
2009-02-01T00:00:00.000
Original Permit Expiration Date
2011-02-28T00:00:00.000
Latest Permit Extension Amendment Issuance Date
2016-02-17T00:00:00.000
Latest Permit Expiration Date
2016-05-31T00:00:00.000
Permit Amendment Content
last extension was to allow aftercare by Landscape Maintenance Contract for plantings in skate park
Substantial Completion Date Op
2014-07-31T00:00:00.000
Latest Inspection Site Visit
2016-03-24T00:00:00.000
Punchlist Generated
2014-09-03T00:00:00.000
Created
2018-06-26T09:49:00.000
Modified
2019-11-05T15:18:00.000
Briasas Del Caribe
Project Name: Briasas Del Caribe • Project Received Date: 2018-04-13T00:00:00.000 • Project Id Number Op: M334
Project Name
Briasas Del Caribe
Project Received Date
2018-04-13T00:00:00.000
Project Id Number Op
M334
Project Description Type
Briasas Del Caribe - 237 East 3rd Street, Manhattan - Access to perform façade work
Impacted Park Id S
M334;
Impacted Park Name S
Brisas Del Caribe;
Borough
Manhattan
Multisite Project
Single Site
Sponsoring Agency Entity
Other
Impacted Parks Division S
Greenthumb
Park Impact Type
Access-Only;#Other
Current Phase
Construction
Contractor For Construction Permit Firm Name
G.M. Construction & Waterproofing Corp
Construction Permit Request Received Date
2018-06-13T00:00:00.000
Construction Permit Id
M334.20180604
Borough Approval Date
2018-06-05T00:00:00.000
Permit Start Date
2018-06-25T00:00:00.000
Original Permit Expiration Date
2018-09-25T00:00:00.000
Created
2018-06-25T13:44:00.000
Modified
2019-11-05T15:18:00.000
Water Service to Alley Park Tree Nursery
Project Name: Water Service to Alley Park Tree Nursery • Project Received Date: 2013-07-26T00:00:00.000 • Project Id Number Op: ER-AC 2
Project Name
Water Service to Alley Park Tree Nursery
Project Received Date
2013-07-26T00:00:00.000
Project Id Number Op
ER-AC 2
Project Description Type
Installation of water service line to the relocated NRG tree nursery in Alley Pond Park as a last part of of the restoration following ERAC2 / Old Douglaston Pumping Station
Impacted Park Id S
Q001;
Impacted Park Name S
Alley Pond Park;
Address Intersection
Northern Blvd & 234 Street
Borough
Queens
Multisite Project
Single Site
Sponsoring Agency Entity
DEP
Primary Scope Of Work
Sewer/Water Plant
Impacted Parks Division S
Natural Resources Group (NRG)
Park Impact Type
Excavation;#Park Improvement
Current Phase
Final-Accepted (Closed Out)
Latest Site Visit
2017-09-14T00:00:00.000
Forestry Permit Status
Not Required
Final Inspection Date
2018-06-19T00:00:00.000
Latest Inspection Site Visit
2018-06-19T00:00:00.000
Created
2016-09-26T09:11:00.000
Modified
2019-11-05T15:16:00.000
Coordinates
40.764663, -73.747118
Highland Park - Tennis Courts Restoration
Project Name: Highland Park - Tennis Courts Restoration • Project Received Date: 2018-06-07T00:00:00.000 • Project Id Number Op: Q020
Project Name
Highland Park - Tennis Courts Restoration
Project Received Date
2018-06-07T00:00:00.000
Project Id Number Op
Q020
Project Description Type
Highland Park - Power washing, Crack Repair and Repainting of (8) Quick Start tennis Courts
Impacted Park Id S
Q020;
Impacted Park Name S
Highland Park;
Borough
Queens
Multisite Project
Single Site
Sponsoring Agency Entity
Other
Primary Scope Of Work
Park Improvement/New Park
Impacted Parks Division S
Capital Projects
Park Impact Type
Park Improvement
Current Phase
Construction
Contractor For Construction Permit Firm Name
Sport Tech Acrylics Corporation
Construction Permit Request Received Date
2018-06-07T00:00:00.000
Construction Permit Id
Q020.20180619
Latest Site Visit
2018-06-04T00:00:00.000
Borough Approval Date
2018-06-22T00:00:00.000
Permit Start Date
2018-06-25T00:00:00.000
Original Permit Expiration Date
2018-08-01T00:00:00.000
Created
2018-06-25T11:32:00.000
Modified
2019-11-05T15:18:00.000
Drainage Outfall at the Henry Hudson Bridge
Project Name: Drainage Outfall at the Henry Hudson Bridge • Project Received Date: 2016-08-25T00:00:00.000 • Project Id Number Op: GFM-516 W.O. 007
Project Name
Drainage Outfall at the Henry Hudson Bridge
Project Received Date
2016-08-25T00:00:00.000
Project Id Number Op
GFM-516 W.O. 007
Project Description Type
clear drainage outfalls 1 through 9 along Henry Hudson Bridge North and South parkway by Inwood Hill Park
Impacted Park Id S
M042;
Impacted Park Name S
Inwood Hill Park;
Address Intersection
Henry Hudson Parkway from Dyckman Street to Henry Hudson Bridge
Borough
Manhattan;#Queens
Multisite Project
Multi Borough
Sponsoring Agency Entity
MTA B&T
Contract Value Op
2000000
Current Phase
Construction
Contractor For Construction Permit Firm Name
Unicorn Construction Enterprises, Inc.
Construction Permit Request Received Date
2016-08-25T00:00:00.000
Construction Permit Id
M042.20161115
Latest Site Visit
2016-10-17T00:00:00.000
Construction Permit Special Conditions
Within a foot of a tree, no string-trimmer/weedwhacker permitted. Hand removal of underbrush required.

Contractor to apply for a Forestry Permit for 2017 pruning operation at: https://www.nycgovparks.org/services/forestry/tree-work-permit

Alert NYC Parks Interagency two (2) weeks before operations begin at interagency@parks.nyc.gov

Contractor to submit before and after photos of removal sites.
Permit Issuance Date
2016-11-15T00:00:00.000
Permit Start Date
2016-11-21T00:00:00.000
Original Permit Expiration Date
2017-12-29T00:00:00.000
Latest Permit Extension Amendment Request Date
2018-05-30T00:00:00.000
Latest Permit Extension Amendment Issuance Date
2018-05-25T00:00:00.000
Latest Permit Expiration Date
2019-06-21T00:00:00.000
Permit Amendment Content
• Revised Scope of work: completely clean, prepare and paint all areas in accordance with the applicable Sections of the Specification and standards for TBTA Project HHM-390, cleaning and Full Overcoat of Manhattan South Approach Galvanized Deck Pans – Henry Hudson Bridge and Lower Roadway; Cleaning and Full Overcoat of the Henry Hudson Bridge South Viaduct Pier columns; Cleaning and Full Overcoat at South Tower.
Created
2016-10-28T14:30:00.000
Modified
2019-11-05T15:16:00.000
Reconstruction of the Sludge Manhole No. 6 at Coney Island WWTP
Project Name: Reconstruction of the Sludge Manhole No. 6 at Coney Island WWTP • Project Received Date: 2018-02-07T00:00:00.000 • Project Id Number Op: JOC17EG JO#17-CS00-WDFCS-002.00
Project Name
Reconstruction of the Sludge Manhole No. 6 at Coney Island WWTP
Project Received Date
2018-02-07T00:00:00.000
Project Id Number Op
JOC17EG JO#17-CS00-WDFCS-002.00
Project Description Type
Reconstruction to install a new heavy duty watertight manhole located in the center of a portion of the Jamaica Bay Greenway along Shore Parkway
Impacted Park Id S
B057;
Impacted Park Name S
Marine Park;
Address Intersection
Emmons Avenue & Shore Parkway
Borough
Brooklyn
Multisite Project
Single Site
Sponsoring Agency Entity
DEP
Primary Scope Of Work
Sewer/Water Main
Impacted Parks Division S
Borough Operations
Park Impact Type
Excavation
Contract Value Op
22529.91
Current Phase
Presumed Complete
Public Design Commission Approval Required
No
Actual Construction End Date Op
2018-05-23T00:00:00.000
Contractor For Construction Permit Firm Name
WDF Inc.
Construction Permit Request Received Date
2018-02-22T00:00:00.000
Construction Permit Id
B057.20180222
Latest Site Visit
2018-06-14T00:00:00.000
Construction Permit Special Conditions
i. During active work, intermittent closure of the Jamaica Bay Greenway (bike path) is permitted. Permittee may direct users around an active worksite.
Borough Approval Date
2018-02-22T00:00:00.000
Permit Start Date
2018-03-15T00:00:00.000
Original Permit Expiration Date
2018-05-31T00:00:00.000
Substantial Completion Date Op
2018-05-23T00:00:00.000
Latest Inspection Site Visit
2018-06-14T00:00:00.000
Created
2018-02-09T11:43:00.000
Modified
2019-11-05T15:18:00.000
Coordinates
40.584004, -73.926755
Metropolitan Natural Gas Reliability Project
Project Name: Metropolitan Natural Gas Reliability Project • Project Received Date: 2017-12-08T00:00:00.000 • Project Id Number Op: Smart#186582 W.O.#90000175643
Project Name
Metropolitan Natural Gas Reliability Project
Project Received Date
2017-12-08T00:00:00.000
Project Id Number Op
Smart#186582 W.O.#90000175643
Project Description Type
Five-phase major transmission capacity development project that involves installing approximately 30,000’ of transmission pipeline through Brooklyn from Linden and Mother Gaston Blvd, heading north. Phase 2:
Impacted Park Id S
B561;BZ372;BZ373;B325;
Impacted Park Name S
BSCAH Urban Farm;GREENSTREET;GREENSTREET;Fish Playground;
Address Intersection
Dean St & Sackman St
Borough
Brooklyn
Multisite Project
Multi Site
Sponsoring Agency Entity
National Grid
Primary Scope Of Work
Utility (gas, electric, telephone)
Impacted Parks Division S
Greenthumb;#Borough Horticulture;#Borough Forestry
Park Impact Type
Sidewalk Closure;#No Parkland Impact
Current Phase
Presumed Complete
Mass Mailing 2 Received Date
2017-12-08T00:00:00.000
Construction Manager Op
Associate Engineer
Construction Manager Company Op
National Grid
Contractor For Construction Permit Firm Name
National Grid
Construction Permit Request Received Date
2018-05-10T00:00:00.000
Construction Permit Id
BG.20180612
Forestry Permit Status
Approved
Forestry Permit Id Number
Z18-154
Construction Permit Special Conditions
Fish Playground: Permittee may obstruct and close the entrance onto Herkimer St. as necessary, for up to two hours per day, to facilitate safe and efficient construction activities.
Borough Approval Date
2018-06-12T00:00:00.000
Permit Start Date
2018-06-12T00:00:00.000
Original Permit Expiration Date
2018-07-22T00:00:00.000
Created
2017-12-08T15:52:00.000
Modified
2020-09-08T19:09:00.000
Coordinates
40.674411, -73.906122
Herbicide Spraying at Roy Wilkins - second attempt
Project Name: Herbicide Spraying at Roy Wilkins - second attempt • Project Received Date: 2018-04-19T00:00:00.000 • Impacted Park Id S: Q448;
Project Name
Herbicide Spraying at Roy Wilkins - second attempt
Project Received Date
2018-04-19T00:00:00.000
Project Description Type
spray approximately 25,000 square feet of Phragmites australis surrounding the pond area, which will contribute to pond restoration efforts.
Impacted Park Id S
Q448;
Impacted Park Name S
Roy Wilkins Recreation Center;
Address Intersection
Merrick Blvd and Baisley Blvd
Borough
Queens
Multisite Project
Single Site
Sponsoring Agency Entity
DEP
Primary Scope Of Work
Resiliency
Impacted Parks Division S
Borough Horticulture;#Borough Operations;#Green Infrastructure
Park Impact Type
Other
Current Phase
Presumed Complete
Construction Permit Id
Q448.20180601
Permit Start Date
2018-06-15T00:00:00.000
Original Permit Expiration Date
2018-10-31T00:00:00.000
Created
2018-04-23T16:24:00.000
Modified
2021-01-26T11:24:00.000
Coordinates
40.686016, -73.771092
Right-of-Way Green Infrastructure GQBB09-01 (BB08) in Flushing Bay watershed
Project Name: Right-of-Way Green Infrastructure GQBB09-01 (BB08) in Flushing Bay watershed • Project Received Date: 2018-03-22T00:00:00.000 • Project Id Number Op: GQBB09-01
Project Name
Right-of-Way Green Infrastructure GQBB09-01 (BB08) in Flushing Bay watershed
Project Received Date
2018-03-22T00:00:00.000
Project Id Number Op
GQBB09-01
Project Description Type
ROW bioswales adjacent to parks.
Impacted Park Id S
Q098;Q450;
Impacted Park Name S
Frank D. O'Connor Playground;Corona Golf Playground;
Address Intersection
Broadway and 78th Street
Borough
Queens
Multisite Project
Multi Site
Sponsoring Agency Entity
DEP
Primary Scope Of Work
Resiliency
Impacted Parks Division S
Borough Operations;#Central Forestry;#Green Infrastructure
Park Impact Type
Sidewalk Closure;#Staging;#Excavation;#Park Improvement
Current Phase
Final-Accepted (Closed Out)
Contractor For Construction Permit Firm Name
J. Pizzirusso Landscaping Corp.
Construction Permit Request Received Date
2018-03-22T00:00:00.000
Construction Permit Id
QG.20180405
Permit Start Date
2018-04-12T00:00:00.000
Original Permit Expiration Date
2019-04-30T00:00:00.000
Created
2018-04-05T15:32:00.000
Modified
2021-03-17T14:51:00.000
Coordinates
40.744720, -73.887119
Right-of-Way Green Infrastructure GQBB06-03 Flushing Bay Watershed
Project Name: Right-of-Way Green Infrastructure GQBB06-03 Flushing Bay Watershed • Project Received Date: 2018-03-29T00:00:00.000 • Project Id Number Op: GQBB06-03
Project Name
Right-of-Way Green Infrastructure GQBB06-03 Flushing Bay Watershed
Project Received Date
2018-03-29T00:00:00.000
Project Id Number Op
GQBB06-03
Project Description Type
Parkland frontage bioswale
Impacted Park Id S
Q360J;
Impacted Park Name S
Crowley Playground;
Borough
Queens
Multisite Project
Single Site
Sponsoring Agency Entity
DEP
Primary Scope Of Work
Resiliency
Impacted Parks Division S
Borough Operations;#Borough Horticulture;#Central Forestry
Current Phase
Construction
Contractor For Construction Permit Firm Name
J. Pizzirusso Landscaping Corp.
Construction Permit Request Received Date
2018-03-29T00:00:00.000
Construction Permit Id
Q360J.20180501
Permit Start Date
2018-05-25T00:00:00.000
Original Permit Expiration Date
2019-05-01T00:00:00.000
Created
2018-04-05T14:02:00.000
Modified
2019-11-05T15:18:00.000
Coordinates
40.729588, -73.879946
Right of Way Green Infrastructure in CSO Tributary Area NCB-083 in the Borough of Queens/Brooklyn
Project Received Date: 2018-04-11T00:00:00.000 • Project Id Number Op: GQROWB-01 • Impacted Park Id S: Q291;Q101;
Project Name
Right of Way Green Infrastructure in CSO Tributary Area NCB-083 in the Borough of Queens/Brooklyn
Project Received Date
2018-04-11T00:00:00.000
Project Id Number Op
GQROWB-01
Project Description Type
Construction of Right of Way Bioswales, Rain Gardens, and Infiltration Basins - 2 Parkland frontage sites
Impacted Park Id S
Q291;Q101;
Impacted Park Name S
Starr Playground;Middle Village Playground;
Address Intersection
Starr Street and Onderdonk Ave
Borough
Queens
Multisite Project
Multi Site
Sponsoring Agency Entity
DEP
Primary Scope Of Work
Resiliency
Impacted Parks Division S
Green Infrastructure;#Borough Operations;#Central Forestry
Park Impact Type
Sidewalk Closure;#Staging;#Excavation
Current Phase
Construction
Contractor For Construction Permit Firm Name
Biltwel General Contractor Corp
Construction Permit Request Received Date
2018-04-11T00:00:00.000
Construction Permit Id
QG.20180605
Forestry Permit Status
Approved
Borough Approval Date
2018-05-14T00:00:00.000
Permit Start Date
2018-06-11T00:00:00.000
Original Permit Expiration Date
2019-06-30T00:00:00.000
Created
2018-05-01T14:24:00.000
Modified
2019-11-05T15:17:00.000
Coordinates
40.709655, -73.917645
Greenhouses in community gardens in the Melrose Section
Project Name: Greenhouses in community gardens in the Melrose Section • Project Received Date: 2018-01-05T00:00:00.000 • Impacted Park Id S: X337;X357;X341;X347;X351;
Project Name
Greenhouses in community gardens in the Melrose Section
Project Received Date
2018-01-05T00:00:00.000
Project Description Type
Installation of (3) greenhouses and (2) shade canopies at GreenThumb community gardens in the Melrose neighborhood of the Bronx.
Impacted Park Id S
X337;X357;X341;X347;X351;
Impacted Park Name S
Latinos Unidos Garden;Garden;Edith Garden;Vogue Garden;811 Family and Friends Garden;
Borough
Bronx
Multisite Project
Multi Site
Sponsoring Agency Entity
Private Developer
Primary Scope Of Work
Park Improvement/New Park
Impacted Parks Division S
Greenthumb
Current Phase
Construction
Contractor For Construction Permit Firm Name
Greenwood Robinson LTD
Construction Permit Request Received Date
2018-01-05T00:00:00.000
Construction Permit Id
XG.20171218
Borough Approval Date
2018-01-22T00:00:00.000
Permit Start Date
2018-01-05T00:00:00.000
Original Permit Expiration Date
2018-06-30T00:00:00.000
Latest Permit Extension Amendment Issuance Date
2018-06-08T00:00:00.000
Latest Permit Expiration Date
2018-07-31T00:00:00.000
Permit Amendment Content
Permit amended to include (Shade canopies for Vogue Garden -747 Elton Avenue and 811 Family Friends Garden 809 Courtlandt Avenue)
Created
2018-02-22T09:11:00.000
Modified
2019-11-05T15:11:00.000
Temporary Detour Ramp from Henry Hudson Parkway (Ramp HR18 to Riverside Drive).
Project Name: Temporary Detour Ramp from Henry Hudson Parkway (Ramp HR18 to Riverside Drive). • Project Received Date: 2015-06-09T00:00:00.000 • Project Id Number Op: GWB 244.024
Project Name
Temporary Detour Ramp from Henry Hudson Parkway (Ramp HR18 to Riverside Drive).
Project Received Date
2015-06-09T00:00:00.000
Project Id Number Op
GWB 244.024
Project Description Type
Temporary ramp for George Washington Bridge contract 244.024.
Impacted Park Id S
M028;
Impacted Park Name S
Fort Washington Park;
Address Intersection
Riverside Drive and Henry Hudson Parkway Ramp HR18
Borough
Manhattan
Multisite Project
Single Site
Sponsoring Agency Entity
PANYNJ
Primary Scope Of Work
Bridge Component Rehabilitation
Impacted Parks Division S
Borough Operations;#Borough Forestry
Park Impact Type
Partial Park Closure;#Staging;#Other
Current Phase
Construction
Contractor For Construction Permit Firm Name
El Sol Contracting & Construction
Construction Permit Request Received Date
2018-04-20T00:00:00.000
Construction Permit Id
M028.20180426
Forestry Permit Status
Approved
Forestry Permit Id Number
WSP311MF18
Borough Approval Date
2018-04-26T00:00:00.000
Permit Start Date
2018-05-02T00:00:00.000
Original Permit Expiration Date
2019-05-31T00:00:00.000
Created
2018-06-07T17:29:00.000
Modified
2019-11-05T15:18:00.000
Coordinates
40.846958, -73.943656
Reconstruction of Jerome Ave Retaining Wall and 36” Trunk Main Installation
Project Name: Reconstruction of Jerome Ave Retaining Wall and 36” Trunk Main Installation • Project Received Date: 2011-09-15T00:00:00.000 • Project Id Number Op: RWX020
Project Name
Reconstruction of Jerome Ave Retaining Wall and 36” Trunk Main Installation
Project Received Date
2011-09-15T00:00:00.000
Project Id Number Op
RWX020
Project Description Type
reconstruct a retaining wall and install a 36” trunk main on Jerome Ave btw the intersections of East 196th St and Morris Ave in the Bronx and replant shrubs along the retaining wall
Impacted Park Id S
XZ282;XZ458;
Impacted Park Name S
GREENSTREET;Greenstreet;
Address Intersection
Jerome Ave between E 196th and Morris Ave
Borough
Bronx
Multisite Project
Multi Site
Sponsoring Agency Entity
DDC
Primary Scope Of Work
Retaining Wall/Seawall
Impacted Parks Division S
Borough Operations;#Borough Forestry
Park Impact Type
Staging
Contract Value Op
10556000
Current Phase
Construction
Contractor For Construction Permit Firm Name
EIC Associates, Inc.
Construction Permit Request Received Date
2016-08-29T00:00:00.000
Construction Permit Id
XZ254.20161215
Latest Site Visit
2016-09-15T00:00:00.000
Forestry Permit Status
Pending
Permit Start Date
2016-12-15T00:00:00.000
Original Permit Expiration Date
2017-12-15T00:00:00.000
Latest Permit Extension Amendment Request Date
2017-12-05T00:00:00.000
Latest Permit Extension Amendment Issuance Date
2017-12-11T00:00:00.000
Latest Permit Expiration Date
2018-12-31T00:00:00.000
Permit Amendment Content
Installation and maintenance of construction fencing around Greenstreet XZ458.
Created
2016-10-20T14:31:00.000
Modified
2020-04-29T11:24:00.000
Coordinates
40.871038, -73.893601
American Museum of Natural History Bollard Replacement
Project Name: American Museum of Natural History Bollard Replacement • Project Received Date: 2017-11-09T00:00:00.000 • Project Description Type: Replacing defunct manual bollard system with new electric bollard system
Project Name
American Museum of Natural History Bollard Replacement
Project Received Date
2017-11-09T00:00:00.000
Project Description Type
Replacing defunct manual bollard system with new electric bollard system
Impacted Park Id S
M053;
Impacted Park Name S
Theodore Roosevelt Park;
Address Intersection
77th St and CPW
Borough
Manhattan
Multisite Project
Single Site
Sponsoring Agency Entity
DCulA
Primary Scope Of Work
Pedestrian Safety
Current Phase
Final-Accepted (Closed Out)
Contractor For Construction Permit Firm Name
A. Bulfamante Landscaping, Inc.
Construction Permit Id
M053.20180105
Forestry Permit Status
Not Required
Construction Permit Special Conditions
No special conditions
Permit Start Date
2018-01-15T00:00:00.000
Original Permit Expiration Date
2018-04-30T00:00:00.000
Latest Permit Expiration Date
2018-04-30T00:00:00.000
Created
2017-12-06T16:45:00.000
Modified
2019-11-05T15:11:00.000
Coordinates
40.780220, -73.974890
emergency sewer repair contract at Brinkerhoof Ave & Rye Place
Project Name: emergency sewer repair contract at Brinkerhoof Ave & Rye Place • Project Received Date: 2017-01-01T00:00:00.000 • Impacted Park Id S: QT11;
Project Name
emergency sewer repair contract at Brinkerhoof Ave & Rye Place
Project Received Date
2017-01-01T00:00:00.000
Project Description Type
sewer work order at planted median, but field review by contractor suggests that QED1025 got to and fixed the site before DEP could get to it
Impacted Park Id S
QT11;
Impacted Park Name S
Mall;
Address Intersection
Brinkerhoff Ave & Rye Place
Borough
Queens
Multisite Project
Single Site
Sponsoring Agency Entity
DEP
Primary Scope Of Work
Sewer/Water Main
Impacted Parks Division S
Borough Horticulture
Park Impact Type
Excavation
Current Phase
Presumed Complete
Created
2018-01-03T11:51:00.000
Modified
2019-11-05T15:18:00.000
Coordinates
40.702684, -73.769090
new gas main in Granite St sidewalk by Thomas Boyland Park
Project Name: new gas main in Granite St sidewalk by Thomas Boyland Park • Project Received Date: 2017-11-21T00:00:00.000 • Project Description Type: new gas main in Granite St sidewalk by Thomas Boyland Park
Project Name
new gas main in Granite St sidewalk by Thomas Boyland Park
Project Received Date
2017-11-21T00:00:00.000
Project Description Type
new gas main in Granite St sidewalk by Thomas Boyland Park
Impacted Park Id S
B381;B470;
Impacted Park Name S
Thomas Boyland Park;Granite St Block Association;
Address Intersection
Granite St & Broadway
Borough
Brooklyn
Multisite Project
Single Site
Sponsoring Agency Entity
National Grid
Primary Scope Of Work
Utility (gas, electric, telephone)
Park Impact Type
No Parkland Impact;#Sidewalk Closure
Current Phase
Presumed Complete
Created
2017-11-22T10:17:00.000
Modified
2020-09-08T19:05:00.000
Coordinates
40.682060, -73.908190
Flushing Creek Ecosystem Restoration Survey
Project Name: Flushing Creek Ecosystem Restoration Survey • Project Received Date: 2013-02-12T00:00:00.000 • Project Id Number Op: CSO-DRDG
Project Name
Flushing Creek Ecosystem Restoration Survey
Project Received Date
2013-02-12T00:00:00.000
Project Id Number Op
CSO-DRDG
Project Description Type
Upland and bathymetric survey of the creek
Impacted Park Id S
Q099;
Impacted Park Name S
Flushing Meadows Corona Park;
Address Intersection
Meridian Road & New York Path
Borough
Queens
Multisite Project
Single Site
Sponsoring Agency Entity
DEP
Primary Scope Of Work
Environmental Improvement/Remediation
Park Impact Type
Access-Only
Current Phase
Presumed Complete
Contractor For Construction Permit Firm Name
AECOM Technology Corporation
Construction Permit Request Received Date
2013-04-18T00:00:00.000
Construction Permit Id
Q-19-13NFL
Forestry Permit Status
Not Required
Construction Permit Special Conditions
• Agreement to Share Data: Within a month after the expiry of this permit, permittee shall furnish to DPR copies of all work completed under this permit, including raw data, photos,
and maps files.
• Blackout Dates: Due to major events pre-scheduled within Flushing Meadows Corona
Park no work within the Park may take place between July 14th and July 16th, and between August 19th and September 10th.
Permit Start Date
2013-05-13T00:00:00.000
Original Permit Expiration Date
2013-10-01T00:00:00.000
Created
2018-02-21T08:54:00.000
Modified
2019-11-05T15:11:00.000
Coordinates
40.753000, -73.840000
(High Line – 76 11th Avenue-Manhattan) Installing a temporary stair tower
Project Name: (High Line – 76 11th Avenue-Manhattan) Installing a temporary stair tower • Project Received Date: 2018-03-09T00:00:00.000 • Project Id Number Op: M360
Project Name
(High Line – 76 11th Avenue-Manhattan) Installing a temporary stair tower
Project Received Date
2018-03-09T00:00:00.000
Project Id Number Op
M360
Project Description Type
(High Line – 76 11th Avenue-Manhattan) Installing a temporary stair tower
Impacted Park Id S
M360;
Impacted Park Name S
The High Line;
Address Intersection
76 11th Avenue, NY NY
Borough
Manhattan
Multisite Project
Single Site
Sponsoring Agency Entity
Private Developer
Primary Scope Of Work
Private Development
Impacted Parks Division S
Borough Operations
Park Impact Type
Other
Contract Value Op
50000
Current Phase
Construction
Contractor For Construction Permit Firm Name
DHS Franco, LLC
Construction Permit Request Received Date
2018-03-09T00:00:00.000
Created
2018-03-23T09:30:00.000
Modified
2019-11-05T15:11:00.000
Coordinates
40.748226,-74.00714779999998
Landscape Planting on Grand Central Parkway from 82nd to 111th Street for Visual Enhancement of the Corridor and Mitigation Impacts from the Rehabilitation of 94th Street Interchange in Queens County, NYC
Project Received Date: 2012-12-01T00:00:00.000 • Project Id Number Op: X051.64 • Impacted Park Id S: Q084A;Q393I;
Project Name
Landscape Planting on Grand Central Parkway from 82nd to 111th Street for Visual Enhancement of the Corridor and Mitigation Impacts from the Rehabilitation of 94th Street Interchange in Queens County, NYC
Project Received Date
2012-12-01T00:00:00.000
Project Id Number Op
X051.64
Project Description Type
Follow-up landscaping of parkway verges after X051.54, as well as Planeview Park. Associated fences and landscape features.
Impacted Park Id S
Q084A;Q393I;
Impacted Park Name S
Grand Central Parkway Extension;Planeview Park;
Address Intersection
Grand Central Parkway & 94th Street
Borough
Queens
Multisite Project
Multi Site
Sponsoring Agency Entity
SDOT
Primary Scope Of Work
Parkway/Arterial Improvement
Impacted Parks Division S
Borough Operations;#Borough Forestry;#Central Forestry;#Planning and Parklands
Park Impact Type
Staging;#Partial Park Closure
Contract Value Op
2436325
Current Phase
Conditional-Accepted (Subst. Compl.)
Actual Construction End Date Op
2016-03-31T00:00:00.000
Contractor For Construction Permit Firm Name
Constar
Construction Permit Id
QG.20140115
Latest Site Visit
2017-10-17T00:00:00.000
Permit Issuance Date
2014-01-15T00:00:00.000
Permit Start Date
2014-02-15T00:00:00.000
Original Permit Expiration Date
2016-03-15T00:00:00.000
Substantial Completion Date Op
2016-03-31T00:00:00.000
Final Inspection Date
2017-10-17T00:00:00.000
Latest Inspection Site Visit
2017-10-17T00:00:00.000
Punchlist Generated
2016-03-31T00:00:00.000
Conditional Letter Issued
2016-03-31T00:00:00.000
Created
2016-06-23T14:20:00.000
Modified
2019-11-05T15:17:00.000
Coordinates
40.770942, -73.875688
Kew Gardens Interchange Phase 1
Project Name: Kew Gardens Interchange Phase 1 • Project Received Date: 2008-04-01T00:00:00.000 • Project Id Number Op: X735.56 D261344 HCP13362
Project Name
Kew Gardens Interchange Phase 1
Project Received Date
2008-04-01T00:00:00.000
Project Id Number Op
X735.56 D261344 HCP13362
Project Description Type
Replace 4 Bridges (BINS: 1076050,1055740,1075250,1055739), Rehabilitate 2 Bridges (BINS: 1076449,1076089) & Widening of Van Wyck Expwy (I-678) in the vicinity of Kew Gardens Interchange (AKA KGI Phase I) to provide Operational & Safety Improv. Qns, NYC..
Impacted Park Id S
Q220F;Q220G;
Impacted Park Name S
Maple Grove Park;Hoover - Manton Playgrounds;
Address Intersection
Queens Blvd & Main Street
Borough
Queens
Multisite Project
Multi Site
Sponsoring Agency Entity
SDOT
Primary Scope Of Work
Parkway/Arterial Improvement
Impacted Parks Division S
Borough Operations;#Legal/MOUs;#Central Forestry;#Borough Forestry;#Planning and Parklands
Park Impact Type
Staging;#Partial Park Closure;#Sidewalk Closure
Contract Value Op
159507149
Current Phase
Conditional-Accepted (Subst. Compl.)
Construction Manager Op
RE
Construction Manager Company Op
GPI
Expected Construction End Date Op
2015-01-30T00:00:00.000
Actual Construction End Date Op
2017-10-13T00:00:00.000
Contractor For Construction Permit Firm Name
Ecco III
Construction Permit Id
Q220F.20171031
Latest Site Visit
2017-10-30T00:00:00.000
Borough Approval Date
2017-10-30T00:00:00.000
Permit Issuance Date
2017-10-31T00:00:00.000
Permit Start Date
2017-11-13T00:00:00.000
Original Permit Expiration Date
2018-06-30T00:00:00.000
Substantial Completion Date Op
2017-04-06T00:00:00.000
Latest Inspection Site Visit
2017-04-19T00:00:00.000
Punchlist Generated
2017-04-19T00:00:00.000
Created
2017-03-07T14:07:00.000
Modified
2019-11-05T15:17:00.000
Coordinates
40.711711, -73.823775
Mitigation and Restoration of Golconda Park
Project Name: Mitigation and Restoration of Golconda Park • Project Received Date: 2013-04-01T00:00:00.000 • Project Id Number Op: X731.38
Project Name
Mitigation and Restoration of Golconda Park
Project Received Date
2013-04-01T00:00:00.000
Project Id Number Op
X731.38
Project Description Type
Rehabilitation of Park Features:
New Skate Park
New Basketball Court
Spray Shower Replacement
Handball Court Rehab
Drainage Infrastructure throughout park
Impacted Park Id S
B243;
Impacted Park Name S
Golconda Playground;
Address Intersection
Gold St & Concord St
Borough
Brooklyn
Multisite Project
Single Site
Sponsoring Agency Entity
SDOT
Primary Scope Of Work
Park Improvement/New Park
Impacted Parks Division S
Borough Operations;#Borough Forestry
Park Impact Type
Staging;#Total Park Closure;#Park Improvement
Contract Value Op
3663307
Current Phase
Final-Accepted (Closed Out)
Construction Permit Id
B-11-14NF
Latest Site Visit
2016-11-16T00:00:00.000
Permit Start Date
2014-07-24T00:00:00.000
Original Permit Expiration Date
2016-10-24T00:00:00.000
Substantial Completion Date Op
2016-11-16T00:00:00.000
Final Inspection Date
2017-04-10T00:00:00.000
Latest Inspection Site Visit
2016-11-16T00:00:00.000
Punchlist Generated
2016-11-16T00:00:00.000
Conditional Letter Issued
2016-11-17T00:00:00.000
Final Acceptance Of Park By Borough
2016-11-16T00:00:00.000
Final Acceptance Letter Date
2017-09-01T00:00:00.000
Created
2016-09-19T13:39:00.000
Modified
2019-11-05T15:16:00.000
Coordinates
40.698010, -73.982779
Maximization of Wet Weather Flow to Tallman Island Wastewater Treatment Plant
Project Name: Maximization of Wet Weather Flow to Tallman Island Wastewater Treatment Plant • Project Received Date: 2011-03-03T00:00:00.000 • Project Id Number Op: TI-WW1 WP-169
Project Name
Maximization of Wet Weather Flow to Tallman Island Wastewater Treatment Plant
Project Received Date
2011-03-03T00:00:00.000
Project Id Number Op
TI-WW1 WP-169
Project Description Type
Installation of a new and increased capacity sewer interceptor and regulator in Powell's Cove Park, and associated wetland and upland restoration.
Impacted Park Id S
Q461;
Impacted Park Name S
Powell's Cove Park;
Address Intersection
130 St & 11 Ave
Borough
Queens
Multisite Project
Single Site
Sponsoring Agency Entity
DEP
Primary Scope Of Work
Sewer/Water Main
Impacted Parks Division S
Natural Resources Group (NRG);#Borough Operations;#Borough Forestry
Park Impact Type
Staging;#Excavation;#Partial Park Closure;#Park Improvement;#Sidewalk Closure
Current Phase
Final-Accepted (Closed Out)
Contractor For Construction Permit Firm Name
John P. Picone, Inc.
Construction Permit Id
Q-15-12NF
Latest Site Visit
2017-11-09T00:00:00.000
Forestry Permit Status
Approved
Forestry Permit Id Number
QP12-221
Permit Start Date
2012-06-05T00:00:00.000
Original Permit Expiration Date
2013-12-31T00:00:00.000
Latest Permit Extension Amendment Request Date
2016-10-16T00:00:00.000
Latest Permit Extension Amendment Issuance Date
2015-11-06T00:00:00.000
Latest Permit Expiration Date
2017-12-31T00:00:00.000
Permit Amendment Content
Warranty and Maintenance of Plantings only
Final Inspection Date
2018-02-05T00:00:00.000
Latest Inspection Site Visit
2015-08-26T00:00:00.000
Punchlist Generated
2105-08-26T00:00:00.000
Conditional Letter Issued
2015-09-09T00:00:00.000
Final Acceptance Letter Date
2018-03-09T00:00:00.000
Created
2017-11-15T15:47:00.000
Modified
2019-11-05T15:09:00.000
Coordinates
40.788595, -73.837470
Pier 42 Outfall Sewer Reconstruction
Project Name: Pier 42 Outfall Sewer Reconstruction • Project Received Date: 2017-05-31T00:00:00.000 • Project Id Number Op: WO186317676 SEC20004T NCM23
Project Name
Pier 42 Outfall Sewer Reconstruction
Project Received Date
2017-05-31T00:00:00.000
Project Id Number Op
WO186317676 SEC20004T NCM23
Project Description Type
Reconstructon of a collapsed outfall sewer (55' between Jackson Street Outfall and Diversion Chamber NCM23) located at Pier 42, Manhattan, by DEP under their Emergency Sewer Repair contract. Associated with Regulator M-23
Impacted Park Id S
M369;
Impacted Park Name S
Pier 42;
Address Intersection
South St & Jackson St
Borough
Manhattan
Multisite Project
Single Site
Sponsoring Agency Entity
DEP
Primary Scope Of Work
Sewer/Water Main
Impacted Parks Division S
Capital Projects;#Borough Operations;#Arts & Antiquities;#Planning and Parklands;#Other
Park Impact Type
Staging;#Excavation;#Partial Park Closure
Current Phase
Final-Accepted (Closed Out)
Expected Construction End Date Op
2017-10-27T00:00:00.000
Actual Construction End Date Op
2017-10-30T00:00:00.000
Contractor For Construction Permit Firm Name
Delaney Associates
Construction Permit Request Received Date
2017-08-17T00:00:00.000
Construction Permit Id
M369.20170905
Latest Site Visit
2017-06-02T00:00:00.000
Forestry Permit Status
Not Required
Borough Approval Date
2017-06-28T00:00:00.000
Permit Issuance Date
2017-09-05T00:00:00.000
Permit Start Date
2017-09-18T00:00:00.000
Original Permit Expiration Date
2017-12-01T00:00:00.000
Substantial Completion Date Op
2017-10-30T00:00:00.000
Conditional Letter Issued
2017-11-27T00:00:00.000
Final Acceptance Letter Date
2017-11-27T00:00:00.000
Created
2017-06-19T15:15:00.000
Modified
2019-11-05T15:18:00.000
Coordinates
40.710331, -73.980451
Reconstruction of Pavement of Korean War Veterans Memorial Parkway
Project Name: Reconstruction of Pavement of Korean War Veterans Memorial Parkway • Project Received Date: 2016-10-12T00:00:00.000 • Project Id Number Op: X349.15 XM16.49
Project Name
Reconstruction of Pavement of Korean War Veterans Memorial Parkway
Project Received Date
2016-10-12T00:00:00.000
Project Id Number Op
X349.15 XM16.49
Project Description Type
Construction of a new sidewalk along the north side of Drumgoole Rd, the service road of Korean War Veterans Parkway. Project scope was formerly DDCHWR 200-01
Impacted Park Id S
R065;
Impacted Park Name S
Richmond Parkway;
Address Intersection
Drumgoole Rd W & Maguire Ave
Borough
Staten Island
Multisite Project
Single Site
Sponsoring Agency Entity
SDOT
Primary Scope Of Work
Parkway/Arterial Improvement
Impacted Parks Division S
Borough Forestry;#Planning and Parklands
Park Impact Type
Other
Current Phase
Final-Accepted (Closed Out)
Final Inspection Date
2017-11-08T00:00:00.000
Latest Inspection Site Visit
2017-11-08T00:00:00.000
Final Acceptance Of Park By Borough
2017-11-13T00:00:00.000
Created
2017-07-11T12:14:00.000
Modified
2019-11-05T15:18:00.000
Coordinates
40.530639, -74.210090
SI Expressway - Turbidity Curtain Removal
Project Name: SI Expressway - Turbidity Curtain Removal • Project Received Date: 2017-12-16T00:00:00.000 • Project Id Number Op: XM15.25 D262872 WO #34
Project Name
SI Expressway - Turbidity Curtain Removal
Project Received Date
2017-12-16T00:00:00.000
Project Id Number Op
XM15.25 D262872 WO #34
Project Description Type
Removal of an old turbidity curtain by a highway outfall into this pond. Park not open to the public. NOTE: XM15.25 D262872 is the 2016-2017 Landscape Work Orders contract and so incorporates citywide range. Seperate MOSYS entries made for each work order under it.
Impacted Park Id S
R075G;
Impacted Park Name S
Bradys Pond Park;
Address Intersection
Staten Island Expressway & Hylan Blvd
Borough
Staten Island
Multisite Project
Single Site
Sponsoring Agency Entity
SDOT
Primary Scope Of Work
Environmental Improvement/Remediation
Impacted Parks Division S
Natural Resources Group (NRG);#Borough Forestry
Park Impact Type
Other
Current Phase
Final-Accepted (Closed Out)
Construction Manager Op
EIC
Construction Manager Company Op
NYSDOT
Latest Site Visit
2017-10-11T00:00:00.000
Final Inspection Date
2018-10-11T00:00:00.000
Final Acceptance Of Park By Borough
2018-10-25T00:00:00.000
Final Acceptance Letter Date
2018-10-27T00:00:00.000
Created
2017-03-14T15:10:00.000
Modified
2019-11-05T15:17:00.000
Coordinates
40.605748, -74.079621
East Houston Street Reconstruction
Project Name: East Houston Street Reconstruction • Project Received Date: 2006-01-27T00:00:00.000 • Project Id Number Op: HWMP2019
Project Name
East Houston Street Reconstruction
Project Received Date
2006-01-27T00:00:00.000
Project Id Number Op
HWMP2019
Project Description Type
Re/Construction of new raised planted medians and two attendant greenstreets on East Houston. All planted areas are DPR jurisdiction.
Impacted Park Id S
MZ10;MZ66;MZ106;MZ116;MZ117;MZ118;MZ119;MZ125;MZ127;MZ132;MZ270;
Impacted Park Name S
GREENSTREET;GREENSTREET;GREENSTREET;GREENSTREET;GREENSTREET;GREENSTREET;GREENSTREET;GREENSTREET;GREENSTREET;GREENSTREET;Greenstreet;
Address Intersection
Chrystie St & East Houston St
Borough
Manhattan
Multisite Project
Multi Site
Sponsoring Agency Entity
DDC
Primary Scope Of Work
Roadway Reconstruction
Impacted Parks Division S
Borough Operations;#Central Forestry;#Borough Forestry
Park Impact Type
Staging;#Excavation;#Total Park Closure;#Park Improvement;#New Property
Contract Value Op
53207975.8
Current Phase
Final-Accepted (Closed Out)
Construction Manager Op
EIC
Construction Kickoff Op
2010-06-21T00:00:00.000
Expected Construction End Date Op
2013-06-19T00:00:00.000
Latest Site Visit
2017-01-24T00:00:00.000
Substantial Completion Date Op
2016-11-18T00:00:00.000
Final Inspection Date
2017-01-27T00:00:00.000
Latest Inspection Site Visit
2017-01-24T00:00:00.000
Punchlist Generated
2016-01-24T00:00:00.000
Conditional Letter Issued
2016-02-07T00:00:00.000
Final Acceptance Of Park By Borough
2017-06-13T00:00:00.000
Final Acceptance Letter Date
2018-02-16T00:00:00.000
Created
2017-01-11T14:09:00.000
Modified
2019-11-05T15:11:00.000
Coordinates
40.720161, -73.979430
Emergency Sewer Repair Contract at Little Bay Park Outfalls
Project Name: Emergency Sewer Repair Contract at Little Bay Park Outfalls • Project Received Date: 2018-01-05T00:00:00.000 • Project Id Number Op: SEC20004T Record#015533
Project Name
Emergency Sewer Repair Contract at Little Bay Park Outfalls
Project Received Date
2018-01-05T00:00:00.000
Project Id Number Op
SEC20004T Record#015533
Project Description Type
To relieve dangerous recurring flooding on Bell Blvd, directly south of a large landscape fringe of the Cross Island Parkway, DEP is uncovering two existing buried outfalls, TI-928 & -929, to improve their drainage function. At minimum, coastal sediment needs to be removed from these two. It is also possible that corrugated pipe running under the parkway and parks has collapsed, in which case more invasive followup work will be required. Separate from, but related to this project, DEP's GI/bluebelt group was considering whether a new detention pond and tank at the CIP may also be an appropriate treatment for this condition.
Impacted Park Id S
Q010A;
Impacted Park Name S
Little Bay Park;
Address Intersection
Bell Blvd & 209 St
Borough
Queens
Multisite Project
Single Site
Sponsoring Agency Entity
DEP
Primary Scope Of Work
Sewer/Water Main
Impacted Parks Division S
Borough Operations;#Borough Forestry;#Capital Projects
Park Impact Type
Staging;#Excavation
Current Phase
Final-Accepted (Closed Out)
Contractor For Construction Permit Firm Name
Delaney Associates LP
Construction Permit Request Received Date
2018-01-15T00:00:00.000
Construction Permit Id
Q010A.20180116
Latest Site Visit
2018-02-08T00:00:00.000
Forestry Permit Status
Approved
Forestry Permit Id Number
QP18-020; QP18078
Construction Permit Special Conditions
Area conflict exists between Permitted Premises and conduit installation work by an ongoing Parks contract (QG-116M). Parks may adjust Premises to accommodate this work.
Borough Approval Date
2018-01-16T00:00:00.000
Permit Start Date
2018-01-22T00:00:00.000
Original Permit Expiration Date
2018-05-18T00:00:00.000
Latest Permit Extension Amendment Request Date
2018-02-05T00:00:00.000
Latest Permit Extension Amendment Issuance Date
2018-02-16T00:00:00.000
Permit Amendment Content
Five additional outfalls added to work: TI-930, TI-871, TI-931, TI-661, TI-927
Final Inspection Date
2018-04-26T00:00:00.000
Latest Inspection Site Visit
2018-04-26T00:00:00.000
Final Acceptance Of Park By Borough
2018-04-26T00:00:00.000
Final Acceptance Letter Date
2018-04-26T00:00:00.000
Created
2018-01-09T09:08:00.000
Modified
2019-11-05T15:18:00.000
Coordinates
40.790304, -73.785911
(High Line) 76 11th Avenue - New building construction
Project Name: (High Line) 76 11th Avenue - New building construction • Project Received Date: 2018-02-27T00:00:00.000 • Project Id Number Op: M360
Project Name
(High Line) 76 11th Avenue - New building construction
Project Received Date
2018-02-27T00:00:00.000
Project Id Number Op
M360
Project Description Type
76 11th Avenue, Installing a temporary heavy duty sidewalk bridge 250 ft. (Block 689 / Lot 17)
Impacted Park Id S
M360;
Impacted Park Name S
The High Line;
Borough
Manhattan
Multisite Project
Single Site
Sponsoring Agency Entity
Private Developer
Primary Scope Of Work
Private Development
Impacted Parks Division S
Other
Park Impact Type
New Property
Contract Value Op
50000
Current Phase
Construction
Contractor For Construction Permit Firm Name
Ed
Construction Permit Request Received Date
2018-02-27T00:00:00.000
Construction Permit Id
M360.20180313
Borough Approval Date
2018-02-28T00:00:00.000
Permit Start Date
2018-03-16T00:00:00.000
Original Permit Expiration Date
2018-04-15T00:00:00.000
Created
2018-03-14T10:02:00.000
Modified
2019-11-05T15:11:00.000
62 Bridges Project - Bridges in Various locations - Van Cortlandt Park & Starlight Park
Project Received Date: 2017-04-11T00:00:00.000 • Project Id Number Op: XM12.53 D262631 • Impacted Park Id S: X092;X147A;
Project Name
62 Bridges Project - Bridges in Various locations - Van Cortlandt Park & Starlight Park
Project Received Date
2017-04-11T00:00:00.000
Project Id Number Op
XM12.53 D262631
Project Description Type
Bridge Repair: concrete removal, bearing replacement, painting and concrete repair
Impacted Park Id S
X092;X147A;
Impacted Park Name S
Van Cortlandt Park;Starlight Park;
Address Intersection
Van Cortlandt Park South & Major Deegan Expressway
Borough
Bronx
Multisite Project
Multi Borough
Sponsoring Agency Entity
SDOT
Primary Scope Of Work
Bridge Component Rehabilitation
Impacted Parks Division S
Borough Operations
Park Impact Type
Access-Only
Contract Value Op
62800000
Current Phase
Final-Accepted (Closed Out)
Construction Manager Op
RE
Construction Manager Company Op
STV, Inc.
Contractor For Construction Permit Firm Name
Kiska Construction
Construction Permit Request Received Date
2017-04-11T00:00:00.000
Construction Permit Id
X092.20170509
Latest Site Visit
2017-05-04T00:00:00.000
Forestry Permit Status
Not Required
Borough Approval Date
2017-05-11T00:00:00.000
Permit Issuance Date
2017-05-09T00:00:00.000
Permit Start Date
2017-05-15T00:00:00.000
Original Permit Expiration Date
2017-10-06T00:00:00.000
Final Inspection Date
2018-04-24T00:00:00.000
Latest Inspection Site Visit
2018-04-24T00:00:00.000
Final Acceptance Of Park By Borough
2018-04-24T00:00:00.000
Final Acceptance Letter Date
2018-05-07T00:00:00.000
Created
2017-05-11T15:04:00.000
Modified
2019-11-05T15:20:00.000
Coordinates
40.886137, -73.897453
Gas Main Sniff Tests at Arden Woods and LaTourette
Project Name: Gas Main Sniff Tests at Arden Woods and LaTourette • Project Received Date: 2017-12-19T00:00:00.000 • Project Id Number Op: WO 90000127494
Project Name
Gas Main Sniff Tests at Arden Woods and LaTourette
Project Received Date
2017-12-19T00:00:00.000
Project Id Number Op
WO 90000127494
Project Description Type
Preventative testing for leaks requiring hand clearing of non-tree vegetation on main locations on parkland edges, solely for foot access.
Impacted Park Id S
R013;R120;
Impacted Park Name S
LaTourette Park & Golf Course;Arden Woods;
Address Intersection
Muldoon Ave & Arthur Kill Rd
Borough
Staten Island
Multisite Project
Multi Site
Sponsoring Agency Entity
National Grid
Primary Scope Of Work
Utility (gas, electric, telephone)
Impacted Parks Division S
Borough Forestry;#Natural Resources Group (NRG)
Park Impact Type
Other
Contract Value Op
30000
Current Phase
Final-Accepted (Closed Out)
Construction Manager Op
Consulting Arborist
Construction Manager Company Op
AECOM
Expected Construction End Date Op
2018-04-18T00:00:00.000
Actual Construction End Date Op
2018-04-18T00:00:00.000
Contractor For Construction Permit Firm Name
National Grid
Construction Permit Request Received Date
2017-12-19T00:00:00.000
Construction Permit Id
RG.20180216
Latest Site Visit
2018-02-12T00:00:00.000
Forestry Permit Status
Approved
Forestry Permit Id Number
FY18-225; FY18-226
Construction Permit Special Conditions
i. Limited vegetation clearing: Mechanical cutting of aboveground vegetation no greater than one inch diameter within a five foot distance from the centerline of existing gas mains is permitted. No grubbing is permitted. Pruning of trees is as detailed in Attachment C.
Borough Approval Date
2018-02-15T00:00:00.000
Permit Start Date
2018-02-20T00:00:00.000
Original Permit Expiration Date
2018-04-06T00:00:00.000
Final Acceptance Of Park By Borough
2018-05-10T00:00:00.000
Final Acceptance Letter Date
2018-05-10T00:00:00.000
Created
2018-01-16T16:45:00.000
Modified
2019-11-05T15:18:00.000
Coordinates
40.562550, -74.192652
Broadway Junction Pedestrian Safety Improvements
Project Name: Broadway Junction Pedestrian Safety Improvements • Project Received Date: 2009-08-07T00:00:00.000 • Project Id Number Op: HWK1310
Project Name
Broadway Junction Pedestrian Safety Improvements
Project Received Date
2009-08-07T00:00:00.000
Project Id Number Op
HWK1310
Project Description Type
Reconstruction of major trasnsit hub: bus pad, Parks newsstand, garden areas, pedestrian ramp to park
Impacted Park Id S
B219;
Impacted Park Name S
Callahan-Kelly Playground;
Address Intersection
Van Sinderan Ave & Fulton St
Borough
Brooklyn
Multisite Project
Single Site
Sponsoring Agency Entity
DDC
Primary Scope Of Work
Pedestrian Safety
Impacted Parks Division S
Borough Horticulture;#Borough Operations;#Central Forestry;#Capital Projects;#CPI Site;#Revenue/Concession;#ADA Accessibility
Park Impact Type
Partial Park Closure;#Park Improvement;#Sidewalk Closure
Current Phase
Final-Accepted (Closed Out)
Construction Manager Company Op
DDC
Contractor For Construction Permit Firm Name
Perfetto
Latest Site Visit
2017-12-06T00:00:00.000
Substantial Completion Date Op
2016-10-17T00:00:00.000
Final Inspection Date
2017-12-05T00:00:00.000
Latest Inspection Site Visit
2017-04-17T00:00:00.000
Punchlist Generated
2016-10-13T00:00:00.000
Conditional Letter Issued
2016-10-25T00:00:00.000
Final Acceptance Of Park By Borough
2018-05-14T00:00:00.000
Final Acceptance Letter Date
2018-05-24T00:00:00.000
Created
2017-10-16T11:57:00.000
Modified
2019-11-05T15:08:00.000
Coordinates
40.677968, -73.903553
Unity Community Garden - 59 West 128th Street – Overhead protection
Project Name: Unity Community Garden - 59 West 128th Street – Overhead protection • Project Received Date: 2018-03-20T00:00:00.000 • Project Id Number Op: M298
Project Name
Unity Community Garden - 59 West 128th Street – Overhead protection
Project Received Date
2018-03-20T00:00:00.000
Project Id Number Op
M298
Project Description Type
59 West 128th Street – Overhead protection
Impacted Park Id S
M298;
Impacted Park Name S
Unity Gardens;
Address Intersection
59 west 128 street, new york ny
Borough
Manhattan
Multisite Project
Single Site
Sponsoring Agency Entity
Private Developer
Primary Scope Of Work
Private Development
Impacted Parks Division S
Greenthumb
Park Impact Type
Staging
Contract Value Op
985000
Current Phase
Construction
Contractor For Construction Permit Firm Name
Atomic Contracting, Inc.
Construction Permit Request Received Date
2018-03-20T00:00:00.000
Borough Approval Date
2018-04-10T00:00:00.000
Permit Start Date
2018-05-10T00:00:00.000
Original Permit Expiration Date
2019-03-01T00:00:00.000
Created
2018-05-21T13:04:00.000
Modified
2019-11-05T15:17:00.000
Coordinates
40.741895,-73.989308
Heaven Little Angles Garden - Installing exterior fence and gates
Project Name: Heaven Little Angles Garden - Installing exterior fence and gates • Project Received Date: 2018-02-16T00:00:00.000 • Project Id Number Op: B522
Project Name
Heaven Little Angles Garden - Installing exterior fence and gates
Project Received Date
2018-02-16T00:00:00.000
Project Id Number Op
B522
Project Description Type
Installing exterior fence and gates
Impacted Park Id S
B522;
Impacted Park Name S
Garden Party;
Address Intersection
Jerome St / Glenmore Ave
Borough
Brooklyn
Multisite Project
Single Site
Sponsoring Agency Entity
Other
Primary Scope Of Work
Park Improvement/New Park
Impacted Parks Division S
Greenthumb
Contract Value Op
32000
Current Phase
Presumed Complete
Contractor For Construction Permit Firm Name
Rainbow Fencing Inc.
Construction Permit Request Received Date
2018-02-16T00:00:00.000
Construction Permit Id
B522.20180507
Borough Approval Date
2018-05-08T00:00:00.000
Permit Start Date
2018-05-10T00:00:00.000
Original Permit Expiration Date
2018-07-01T00:00:00.000
Created
2018-05-18T12:15:00.000
Modified
2019-11-05T15:17:00.000