Showing 50 real records
NY Aquarium Flood Protection
Project Name: NY Aquarium Flood Protection • Project Received Date: 2017-10-05T00:00:00.000 • Impacted Park Id S: B080;
Project Name
NY Aquarium Flood Protection
Project Received Date
2017-10-05T00:00:00.000
Project Description Type
Tuner Construction is constructing new flood walls to protect the NYC Aquarium located at 602 Surf Ave. The proposed flood walls are located adjacent to an existing path and ramp that provide pedestrian access
to the Coney Island Boardwalk from Surf Ave. The proposed work involves the installation of construction fence, partial demolition of existing
sidewalk, excavation, construction a new flood wall, and sidewalk restoration.
Impacted Park Id S
B080;
Impacted Park Name S
Asser Levy Park;
Address Intersection
602 Surf Ave, Brooklyn
Borough
Brooklyn
Multisite Project
Single Site
Sponsoring Agency Entity
DCulA
Primary Scope Of Work
Retaining Wall/Seawall
Impacted Parks Division S
Borough Operations
Park Impact Type
Staging;#Excavation;#Sidewalk Closure
Current Phase
Construction
Contractor For Construction Permit Firm Name
Turner Construction Company
Construction Permit Id
B080.20180117
Latest Site Visit
2018-07-23T00:00:00.000
Forestry Permit Status
Approved
Forestry Permit Id Number
I17-049
Borough Approval Date
2018-01-19T00:00:00.000
Permit Start Date
2018-01-22T00:00:00.000
Original Permit Expiration Date
2018-12-31T00:00:00.000
Latest Permit Extension Amendment Request Date
2020-09-08T00:00:00.000
Latest Permit Extension Amendment Issuance Date
2020-09-09T00:00:00.000
Latest Permit Expiration Date
2020-10-31T00:00:00.000
Permit Amendment Content
A1 - Install a temporary fence on the Coney Island Boardwalk
A2 - Extension through 6/30/2019
A3 - Extension through 12/31/2019
A4 - Extension through 2/28/20 for boardwalk CAZ only
A5 - Extension through 8/31/20 for boardwalk CAZ only
A6 - Extension through 10/31/20 for boardwalk CAZ only
Created
2018-01-10T15:23:00.000
Modified
2020-09-09T16:39:00.000
Coordinates
40.574900, -73.974750
WHEDco Development Staging at Melrose Commons Site 62
Project Name: WHEDco Development Staging at Melrose Commons Site 62 • Project Received Date: 2018-02-26T00:00:00.000 • Impacted Park Id S: X350;
Project Name
WHEDco Development Staging at Melrose Commons Site 62
Project Received Date
2018-02-26T00:00:00.000
Project Description Type
WHEDco is seeking a construction permit to stage on parkland for their adjacent development. The site is at 163rd St & Melrose Ave. Parks Capital has an active capital project at the park. The land is currently owned by HPB and WHEDco is using the land for staging. Land transfer from HPD to Parks was scheduled to happen in March 2018, but did not.
Impacted Park Id S
X350;
Impacted Park Name S
A. Badillo Community Rose Garden;
Address Intersection
163rd St & Melrose Ave, Bronx, NY
Borough
Bronx
Multisite Project
Single Site
Sponsoring Agency Entity
Parks - Planning
Primary Scope Of Work
Private Development
Impacted Parks Division S
Capital Projects;#Borough Forestry;#Planning and Parklands
Park Impact Type
Staging;#Partial Park Closure;#New Property
Current Phase
Final-Accepted (Closed Out)
Contractor For Construction Permit Firm Name
Bronx Commons Builders LLC
Construction Permit Request Received Date
2018-03-28T00:00:00.000
Construction Permit Id
X350.20180501
Latest Site Visit
2020-02-03T00:00:00.000
Forestry Permit Status
Approved
Forestry Permit Id Number
BX-43
Construction Permit Special Conditions
The other contact is James Travis at JTravis@bfcnyc.com
Borough Approval Date
2018-05-25T00:00:00.000
Permit Start Date
2018-08-17T00:00:00.000
Original Permit Expiration Date
2019-12-31T00:00:00.000
Latest Permit Extension Amendment Request Date
2020-08-03T00:00:00.000
Latest Permit Extension Amendment Issuance Date
2020-08-04T00:00:00.000
Latest Permit Expiration Date
2020-09-01T00:00:00.000
Permit Amendment Content
E1 - Extension through 4/1/20
E2 - Extension through 9/1/20 to fix windows
Final Inspection Date
2020-09-09T00:00:00.000
Latest Inspection Site Visit
2020-09-09T00:00:00.000
Final Acceptance Of Park By Borough
2020-09-09T00:00:00.000
Final Acceptance Letter Date
2020-09-09T00:00:00.000
Created
2018-04-11T17:17:00.000
Modified
2020-09-09T14:35:00.000
Coordinates
40.824705, -73.912415
Above Grade Facility Hardening of Fan Plant 7207, Joralemon tunnel Fan Plant
Project Name: Above Grade Facility Hardening of Fan Plant 7207, Joralemon tunnel Fan Plant • Project Received Date: 2016-09-27T00:00:00.000 • Project Id Number Op: E-31682
Project Name
Above Grade Facility Hardening of Fan Plant 7207, Joralemon tunnel Fan Plant
Project Received Date
2016-09-27T00:00:00.000
Project Id Number Op
E-31682
Project Description Type
Above Grade Facility Hardening of Fan Plant 7207, Joralemon tunnel Fan Plant
Impacted Park Id S
M005;
Impacted Park Name S
The Battery;
Address Intersection
S Ferry Bus Loop
Borough
Manhattan
Multisite Project
Single Site
Sponsoring Agency Entity
MTA NYCT
Primary Scope Of Work
Resiliency
Impacted Parks Division S
Borough Operations;#Borough Forestry;#Conservancy
Park Impact Type
Staging;#Excavation
Current Phase
Final-Accepted (Closed Out)
Public Design Commission Approval Required
No
Contractor For Construction Permit Firm Name
Nagan Construction Inc.
Construction Permit Request Received Date
2018-01-22T00:00:00.000
Construction Permit Id
M005.20180219
Latest Site Visit
2018-01-09T00:00:00.000
Borough Approval Date
2018-04-02T00:00:00.000
Permit Start Date
2018-04-09T00:00:00.000
Original Permit Expiration Date
2019-07-28T00:00:00.000
Final Acceptance Of Park By Borough
2020-01-06T00:00:00.000
Final Acceptance Letter Date
2020-01-09T00:00:00.000
Created
2018-02-19T14:13:00.000
Modified
2020-09-09T09:03:00.000
Coordinates
40.701622,-74.013623
Planting of New Trees In Soundview Park, Bronx
Project Name: Planting of New Trees In Soundview Park, Bronx • Project Received Date: 2020-09-02T00:00:00.000 • Project Id Number Op: D264004
Project Name
Planting of New Trees In Soundview Park, Bronx
Project Received Date
2020-09-02T00:00:00.000
Project Id Number Op
D264004
Project Description Type
Work Order 11, mitigation plantings for Hunts Point Interstate Access Improvements Phase 1
Impacted Park Id S
X118;
Impacted Park Name S
Soundview Park;
Borough
Bronx
Multisite Project
Single Site
Sponsoring Agency Entity
SDOT
Primary Scope Of Work
Park Improvement/New Park
Impacted Parks Division S
Central Forestry
Park Impact Type
Park Improvement
Current Phase
Permitting
Created
2020-09-08T19:12:00.000
Modified
2020-09-08T19:48:00.000
Battery Park Wharf Rehabilitation
Project Name: Battery Park Wharf Rehabilitation • Project Received Date: 2016-09-07T00:00:00.000 • Impacted Park Id S: M005;
Project Name
Battery Park Wharf Rehabilitation
Project Received Date
2016-09-07T00:00:00.000
Project Description Type
Marine construction services for NYCEDC - Battery Park Wharf Rehabilitation; Re-establish the original structural capacity of the pile supported low-level relieving platform
Impacted Park Id S
M005;
Impacted Park Name S
The Battery;
Borough
Manhattan
Multisite Project
Single Site
Sponsoring Agency Entity
EDC
Primary Scope Of Work
Retaining Wall/Seawall
Impacted Parks Division S
Borough Operations;#Arts & Antiquities;#Planning and Parklands;#Other;#Conservancy
Park Impact Type
Other;#Park Improvement
Current Phase
Construction
Contractor For Construction Permit Firm Name
D' Onofrio General Contractor Corp.
Construction Permit Request Received Date
2016-09-26T00:00:00.000
Construction Permit Id
M005.20161116; M005.20191104
Forestry Permit Status
Not Required
Borough Approval Date
2019-11-04T00:00:00.000
Permit Issuance Date
2016-11-16T00:00:00.000
Permit Start Date
2019-11-13T00:00:00.000
Original Permit Expiration Date
2020-01-31T00:00:00.000
Latest Permit Extension Amendment Request Date
2020-08-27T00:00:00.000
Latest Permit Extension Amendment Issuance Date
2020-09-08T00:00:00.000
Latest Permit Expiration Date
2020-12-31T00:00:00.000
Permit Amendment Content
A1 - extension through 7/31/20
E2 - Extension through 12/31/20
Created
2017-11-09T13:41:00.000
Modified
2020-09-08T16:56:00.000
Coordinates
40.703454, -74.017626
Track Segments Replacement at Avenue S & McDonald Ave
Project Name: Track Segments Replacement at Avenue S & McDonald Ave • Project Received Date: 2019-02-22T00:00:00.000 • Project Id Number Op: S-32176
Project Name
Track Segments Replacement at Avenue S & McDonald Ave
Project Received Date
2019-02-22T00:00:00.000
Project Id Number Op
S-32176
Project Description Type
Crane placement for one day of weekend work at McDonald Playground
Impacted Park Id S
B244;
Impacted Park Name S
McDonald Playground;
Address Intersection
McDonald Ave between Ave S and Ave T
Borough
Brooklyn
Multisite Project
Single Site
Sponsoring Agency Entity
MTA NYCT
Impacted Parks Division S
Borough Operations;#Borough Forestry
Park Impact Type
Staging
Current Phase
Presumed Complete
Contractor For Construction Permit Firm Name
LK Comstock
Construction Permit Request Received Date
2020-02-07T00:00:00.000
Construction Permit Id
B244.20200305
Construction Permit Special Conditions
Crane pick permitted the weekend of March 28th only. Without separate written authorization, after March 30th, only restoration work is permitted.
Permit Start Date
2020-03-23T00:00:00.000
Original Permit Expiration Date
2020-04-23T00:00:00.000
Latest Permit Extension Amendment Request Date
2020-05-07T00:00:00.000
Latest Permit Extension Amendment Issuance Date
2020-05-14T00:00:00.000
Latest Permit Expiration Date
2020-07-01T00:00:00.000
Permit Amendment Content
Extended to July 1 and additional staging added in.
Created
2020-03-05T16:40:00.000
Modified
2020-09-08T16:45:00.000
Coordinates
40.600397, -73.972648
3514 Surf Ave Controlled Access Zone on Boardwalk
Project Name: 3514 Surf Ave Controlled Access Zone on Boardwalk • Project Received Date: 2018-03-24T00:00:00.000 • Impacted Park Id S: B169;
Project Name
3514 Surf Ave Controlled Access Zone on Boardwalk
Project Received Date
2018-03-24T00:00:00.000
Project Description Type
Per DOB requirements, the contractor is proposing a controlled access zone with yodock barriers and chain link fence on top, which would be installed on the boardwalk.
Impacted Park Id S
B169;
Impacted Park Name S
Coney Island Beach & Boardwalk;
Address Intersection
3514 Surf Ave, Brooklyn
Borough
Brooklyn
Multisite Project
Single Site
Sponsoring Agency Entity
Parks - Planning
Primary Scope Of Work
Private Development
Impacted Parks Division S
Borough Operations;#Capital Projects;#Planning and Parklands
Park Impact Type
Staging
Current Phase
Final-Accepted (Closed Out)
Contractor For Construction Permit Firm Name
Hudson Meridian Construction Group, LLC
Construction Permit Request Received Date
2018-06-22T00:00:00.000
Construction Permit Id
B169.20180702
Latest Site Visit
2019-10-15T00:00:00.000
Forestry Permit Status
Not Required
Borough Approval Date
2018-04-19T00:00:00.000
Permit Start Date
2018-07-02T00:00:00.000
Original Permit Expiration Date
2019-05-31T00:00:00.000
Latest Permit Extension Amendment Request Date
2019-12-12T00:00:00.000
Latest Permit Extension Amendment Issuance Date
2019-12-13T00:00:00.000
Latest Permit Expiration Date
2020-04-01T00:00:00.000
Permit Amendment Content
E1 - Extension through 9/30/19. Approved at site visit with Comm Maher on 6/4/19
E2 - Extension through 12/31/19. Approved at site visit with Jim Morris on 10/15.
E3 - Extension thru 4/1/20. Approved at site visit w Chris Yandoli & BC Maher on 12/12
Latest Inspection Site Visit
2020-09-08T00:00:00.000
Created
2018-07-02T11:34:00.000
Modified
2020-09-08T16:22:00.000
Coordinates
40.571861, -74.000699
3514 Surf Avenue Boardwalk Ramps
Project Name: 3514 Surf Avenue Boardwalk Ramps • Project Received Date: 2018-01-02T00:00:00.000 • Impacted Park Id S: B169;
Project Name
3514 Surf Avenue Boardwalk Ramps
Project Received Date
2018-01-02T00:00:00.000
Project Description Type
Developer has a project that will require existing ramps leading to the boardwalk to be closed and removed during the duration of the project. During construction, they will install new ramps leading to the boardwalk. The ramps are located on West 35th St and West 36th St.
Impacted Park Id S
B169;
Impacted Park Name S
Coney Island Beach & Boardwalk;
Address Intersection
3514 Surf Ave
Borough
Brooklyn
Multisite Project
Single Site
Sponsoring Agency Entity
Parks - Planning
Primary Scope Of Work
Park Improvement/New Park
Impacted Parks Division S
Borough Operations;#Capital Projects;#Planning and Parklands
Park Impact Type
Staging;#Partial Park Closure;#Park Improvement
Current Phase
Final-Accepted (Closed Out)
Public Design Commission Approval Required
Yes
Final Public Design Commission Approval
2019-01-03T00:00:00.000
Construction Manager Company Op
Hudson Meridian Construction Group
Contractor For Construction Permit Firm Name
Hudson Meridian
Construction Permit Id
B169.20180129
Latest Site Visit
2019-10-15T00:00:00.000
Forestry Permit Status
Not Required
Construction Permit Special Conditions
Amendment 2 required a bond for $250,000. Bond # 20BSBHT6395.
Bond was returned to Maria Rosenfeld at Red Apple Realty on 9/8/20.
Borough Approval Date
2018-01-31T00:00:00.000
Permit Start Date
2018-02-08T00:00:00.000
Original Permit Expiration Date
2018-04-30T00:00:00.000
Latest Permit Extension Amendment Request Date
2019-12-12T00:00:00.000
Latest Permit Extension Amendment Issuance Date
2019-12-13T00:00:00.000
Latest Permit Expiration Date
2020-04-01T00:00:00.000
Permit Amendment Content
A2 - Inner ramp demolition and extension through 5/31
A3 - outer ramp demolition
A4 - Extension thru 9/30/19, approved at site visit with Comm Maher on 6/4/19.
A5 - Extension thru 12/31/19, approved at site visit with Jim Morris on 10/15/19.
A6 - Extension thru 4/1/20, approved at site visit with Chris Yandoli and Marty Maher on 12/12
Created
2018-01-17T14:18:00.000
Modified
2020-09-08T15:55:00.000
Coordinates
40.572120, -74.000270
Belt Parkway Ramps: Installation of Keim Coating and Chain-Link Fence
Project Name: Belt Parkway Ramps: Installation of Keim Coating and Chain-Link Fence • Project Received Date: 2020-08-05T00:00:00.000 • Project Id Number Op: VN-84AX
Project Name
Belt Parkway Ramps: Installation of Keim Coating and Chain-Link Fence
Project Received Date
2020-08-05T00:00:00.000
Project Id Number Op
VN-84AX
Project Description Type
Installation of Keim Coating and Chain-Link Fence for the Belt Parkway Ramps:
Impacted Park Id S
B210W;B166;
Impacted Park Name S
John J Carty Park;Belt Parkway/Shore Parkway;
Address Intersection
Intersection of Along Fort Hamilton Parkway and 100 STREET, Brooklyn
Borough
Brooklyn
Multisite Project
Single Site
Sponsoring Agency Entity
MTA B&T
Primary Scope Of Work
Bridge Component Rehabilitation
Impacted Parks Division S
Borough Operations;#Capital Projects
Park Impact Type
Partial Park Closure;#Access-Only
Current Phase
Construction
Contractor For Construction Permit Firm Name
El Sol Contracting & Construction
Construction Permit Request Received Date
2020-08-14T00:00:00.000
Construction Permit Id
CNYG.20200908
Construction Permit Special Conditions
1. Construction permitted on streets north of 99th St. in J. J. Carty Park
2. A field meeting is required prior to permitting construction activities elsewhere in J.J. Carty Park.
3. Construction activities permitted on Belt Parkway/Shore Parkway permitted no sooner than 10/12/2020, and must be performed at night with a flagger for any incidental bicycle or pedestrian traffic.
Borough Approval Date
2020-09-08T00:00:00.000
Permit Start Date
2020-09-08T00:00:00.000
Original Permit Expiration Date
2021-01-31T00:00:00.000
Created
2020-08-06T10:54:00.000
Modified
2020-09-08T15:29:00.000
Coordinates
40.613263, -74.030153
Reconstruction of Beach Channel Drive from Beach 116 Street to Beach 124 Street
Project Name: Reconstruction of Beach Channel Drive from Beach 116 Street to Beach 124 Street • Project Received Date: 2016-05-05T00:00:00.000 • Project Id Number Op: SANDHW11
Project Name
Reconstruction of Beach Channel Drive from Beach 116 Street to Beach 124 Street
Project Received Date
2016-05-05T00:00:00.000
Project Id Number Op
SANDHW11
Project Description Type
New roadway pavement, new curbs and concrete sidewalks and new drainage facilities. Includes total replanting of a small greenstreet QZ660; on tree transplant in Brackley Pk. Replacement of aging water mains and some sanitary sewer work within the project area are also included. Original scope included mill & repave with longer limits but this was cut down just to reconstruction area.
Impacted Park Id S
Q028;QZ660;QZ661;
Impacted Park Name S
Beach Channel Park;Greenstreet;Greenstreet;
Address Intersection
Beach Channel Drive and Beach 116 St
Borough
Queens
Multisite Project
Multi Site
Sponsoring Agency Entity
DDC
Primary Scope Of Work
Roadway Reconstruction
Impacted Parks Division S
Borough Operations;#Borough Forestry
Park Impact Type
Park Improvement;#Other;#Sidewalk Closure
Current Phase
Construction
Contractor For Construction Permit Firm Name
New York Asphalt
Construction Permit Request Received Date
2018-04-20T00:00:00.000
Construction Permit Id
QZ660.20180425
Latest Site Visit
2019-08-27T00:00:00.000
Forestry Permit Status
Approved
Forestry Permit Id Number
QP18-218
Borough Approval Date
2018-05-29T00:00:00.000
Permit Start Date
2018-05-30T00:00:00.000
Original Permit Expiration Date
2018-12-31T00:00:00.000
Latest Permit Extension Amendment Request Date
2020-08-24T00:00:00.000
Latest Permit Extension Amendment Issuance Date
2020-09-08T00:00:00.000
Latest Permit Expiration Date
2020-12-31T00:00:00.000
Permit Amendment Content
Amendment 4: Sidewalk regrading at Tribute Park. Mural to be protected. Amendment 3: Sidewalk work adjacent to Patricia A. Brackley Park. Amendment 2: Staging Area relocated to new location within Beach Channel Park: between Beach 118th and Beach 120th Streets.
Created
2016-06-24T13:58:00.000
Modified
2020-09-08T15:25:00.000
Coordinates
40.581815, -73.839725
Reconstruction of Westbourne Norton Drive
Project Name: Reconstruction of Westbourne Norton Drive • Project Received Date: 2016-03-29T00:00:00.000 • Project Id Number Op: HWQ1187/SAND1187/SEQ200595/QED1043
Project Name
Reconstruction of Westbourne Norton Drive
Project Received Date
2016-03-29T00:00:00.000
Project Id Number Op
HWQ1187/SAND1187/SEQ200595/QED1043
Project Description Type
Roadway reconstruction: Norton Drive from Westbourne Ave. to Coldspring Road Waterloo Place from Mott Ave. to Westbourne Ave. Westbourne Ave. from Norton Drive to Harbour Court Bay Water Ave. from Norton Drive to Waterview Street
Address Intersection
Norton Drive & Westbourne Ave
Borough
Queens
Multisite Project
Single Site
Sponsoring Agency Entity
DDC
Primary Scope Of Work
Roadway Reconstruction
Park Impact Type
No Parkland Impact
Current Phase
Presumed Complete
Design Consultant Op
EnTech
Created
2016-04-10T12:56:00.000
Modified
2020-09-08T10:30:00.000
Coordinates
40.609163, -73.768496
Combined Sewers, Tide Gate Outfall, and Water Main Work in Calamus Avenue, 69th Street, and 81st Street
Project Received Date: 2012-09-05T00:00:00.000 • Project Id Number Op: SE814 • Address Intersection: Maurice Avenue and 69th Street
Project Name
Combined Sewers, Tide Gate Outfall, and Water Main Work in Calamus Avenue, 69th Street, and 81st Street
Project Received Date
2012-09-05T00:00:00.000
Project Id Number Op
SE814
Project Description Type
Combined Sewers, Tide Gate Outfall, and Water Main Work in Calamus Avenue, 69th Street, and 81st Street
Address Intersection
Maurice Avenue and 69th Street
Borough
Queens
Multisite Project
Single Site
Sponsoring Agency Entity
DDC
Primary Scope Of Work
Sewer/Water Main
Impacted Parks Division S
Borough Forestry;#Central Forestry
Park Impact Type
No Parkland Impact
Current Phase
Presumed Complete
Created
2020-09-08T10:16:00.000
Modified
2020-09-08T10:29:00.000
Coordinates
40.735203, -73.896109
Quarry Ballfield Renovation
Project Name: Quarry Ballfield Renovation • Project Received Date: 2019-03-08T00:00:00.000 • Project Description Type: Quarry Ballfield Renovation
Project Name
Quarry Ballfield Renovation
Project Received Date
2019-03-08T00:00:00.000
Project Description Type
Quarry Ballfield Renovation
Impacted Park Id S
X263;
Impacted Park Name S
Quarry Ballfields;
Address Intersection
Quarry Road and E 181 Street, Bronx
Borough
Bronx
Multisite Project
Single Site
Sponsoring Agency Entity
Parks - Partner Group
Primary Scope Of Work
Park Improvement/New Park
Impacted Parks Division S
Borough Operations;#Capital Projects
Park Impact Type
Staging;#Excavation;#Partial Park Closure;#Park Improvement
Current Phase
Construction
Contractor For Construction Permit Firm Name
PitCCh In Foundation
Construction Permit Request Received Date
2019-07-02T00:00:00.000
Construction Permit Id
X263.20190703
Latest Site Visit
2019-03-21T00:00:00.000
Forestry Permit Status
Not Required
Borough Approval Date
2019-06-26T00:00:00.000
Permit Start Date
2019-07-08T00:00:00.000
Original Permit Expiration Date
2019-10-15T00:00:00.000
Latest Permit Extension Amendment Request Date
2020-07-29T00:00:00.000
Latest Permit Extension Amendment Issuance Date
2020-07-30T00:00:00.000
Latest Permit Expiration Date
2020-09-30T00:00:00.000
Permit Amendment Content
E1 - Extension through 11/30/10
E2 - extension through 4/30/20
E3 - extension through 7/31/20
E4 - extension through 9/30/20
Created
2019-07-04T15:53:00.000
Modified
2020-09-07T17:12:00.000
Coordinates
40.851277, -73.891851
Mullaly Rec Center Refurb
Project Name: Mullaly Rec Center Refurb • Project Received Date: 2018-08-16T00:00:00.000 • Project Description Type: Mullaly Rec Center Refurb
Project Name
Mullaly Rec Center Refurb
Project Received Date
2018-08-16T00:00:00.000
Project Description Type
Mullaly Rec Center Refurb
Impacted Park Id S
X034;
Impacted Park Name S
Mullaly Park;
Address Intersection
1020 Jerome Ave, Bronx
Borough
Bronx
Multisite Project
Single Site
Sponsoring Agency Entity
Parks - Partner Group
Primary Scope Of Work
Public Building
Impacted Parks Division S
Borough Operations
Park Impact Type
Park Improvement;#Staging
Current Phase
Construction
Construction Manager Op
Consultant Designer
Construction Manager Company Op
Urban Form Studio
Contractor For Construction Permit Firm Name
Fara Construction
Construction Permit Request Received Date
2019-10-30T00:00:00.000
Construction Permit Id
X034.20191018
Latest Site Visit
2018-08-16T00:00:00.000
Forestry Permit Status
Not Required
Borough Approval Date
2019-10-07T00:00:00.000
Permit Start Date
2019-11-11T00:00:00.000
Original Permit Expiration Date
2020-08-31T00:00:00.000
Latest Permit Extension Amendment Request Date
2020-08-27T00:00:00.000
Latest Permit Extension Amendment Issuance Date
2020-08-28T00:00:00.000
Latest Permit Expiration Date
2021-01-31T00:00:00.000
Permit Amendment Content
E1 - Extension through 1/31/21
Created
2019-10-16T16:25:00.000
Modified
2020-09-07T17:11:00.000
Coordinates
40.831816, -73.925294
Install Sherman Creek Park Living Shoreline Project
Project Name: Install Sherman Creek Park Living Shoreline Project • Project Received Date: 2020-05-19T00:00:00.000 • Project Description Type: Install Sherman Creek Park Living Shoreline Project
Project Name
Install Sherman Creek Park Living Shoreline Project
Project Received Date
2020-05-19T00:00:00.000
Project Description Type
Install Sherman Creek Park Living Shoreline Project
Impacted Park Id S
M300;
Impacted Park Name S
Sherman Creek;
Address Intersection
Intersection of Dyckman Street and 10th Avenue, Manhattan
Borough
Manhattan
Multisite Project
Single Site
Sponsoring Agency Entity
Parks - Partner Group
Primary Scope Of Work
Park Improvement/New Park
Impacted Parks Division S
Borough Operations;#Conservancy;#Natural Resources Group (NRG)
Park Impact Type
Staging
Current Phase
Construction
Contractor For Construction Permit Firm Name
New York Restoration Project
Construction Permit Request Received Date
2020-05-19T00:00:00.000
Construction Permit Id
M300.20200526
Borough Approval Date
2020-05-27T00:00:00.000
Permit Start Date
2020-06-08T00:00:00.000
Original Permit Expiration Date
2020-09-30T00:00:00.000
Latest Permit Expiration Date
2020-09-30T00:00:00.000
Created
2020-05-21T12:19:00.000
Modified
2020-09-07T17:08:00.000
Coordinates
40.859547, -73.922107
Debris Removal at Peter J. Sharp Boathouse
Project Name: Debris Removal at Peter J. Sharp Boathouse • Project Received Date: 2019-04-18T00:00:00.000 • Project Description Type: Debris Removal at Peter J. Sharp Boathouse
Project Name
Debris Removal at Peter J. Sharp Boathouse
Project Received Date
2019-04-18T00:00:00.000
Project Description Type
Debris Removal at Peter J. Sharp Boathouse
Impacted Park Id S
M300;
Impacted Park Name S
Sherman Creek;
Address Intersection
Harlem River Dr and 10th Avenue, Manhattan
Borough
Manhattan
Multisite Project
Single Site
Sponsoring Agency Entity
Parks - Partner Group
Primary Scope Of Work
Environmental Improvement/Remediation
Impacted Parks Division S
Borough Operations;#Environmental Remediation;#Conservancy;#Natural Resources Group (NRG)
Park Impact Type
Excavation;#Staging
Current Phase
Construction
Contractor For Construction Permit Firm Name
Row New York
Construction Permit Request Received Date
2019-07-30T00:00:00.000
Construction Permit Id
M300.20190802
Forestry Permit Status
Not Required
Construction Permit Special Conditions
i. Vehicle use on the park pedestrian paths/bike paths is restricted.
ii. No heavy trucks should be staging near the boathouse. The pick-up truck and 20’ long trailer should be parked parallel to the storage container which is shown in Attachment B.
Borough Approval Date
2019-08-02T00:00:00.000
Permit Start Date
2019-08-23T00:00:00.000
Original Permit Expiration Date
2019-11-30T00:00:00.000
Latest Permit Extension Amendment Request Date
2019-12-30T00:00:00.000
Latest Permit Extension Amendment Issuance Date
2020-01-07T00:00:00.000
Latest Permit Expiration Date
2020-04-30T00:00:00.000
Permit Amendment Content
E1 - Extension through 1/31/20 due to SBS permit delays
E2 - Extension through 4/30/20 due to SBS permit delays
Exploratory Permit Id
M300.E.20200715
Created
2019-08-02T13:13:00.000
Modified
2020-09-07T17:07:00.000
Coordinates
40.856517, -73.921724
Replace casters on sea rail sliding gate
Project Name: Replace casters on sea rail sliding gate • Project Received Date: 2020-03-20T00:00:00.000 • Project Description Type: Replace casters on the existing sea rail sliding gate
Project Name
Replace casters on sea rail sliding gate
Project Received Date
2020-03-20T00:00:00.000
Project Description Type
Replace casters on the existing sea rail sliding gate
Impacted Park Id S
B135;
Impacted Park Name S
Newtown Barge Playground;
Address Intersection
5 Commercial Street, Brooklyn, NY
Borough
Brooklyn
Multisite Project
Single Site
Sponsoring Agency Entity
EDC
Primary Scope Of Work
Retaining Wall/Seawall
Impacted Parks Division S
Borough Operations;#Planning and Parklands
Park Impact Type
Staging;#Park Improvement
Current Phase
Permitting
Contractor For Construction Permit Firm Name
Galvin Bros
Construction Permit Request Received Date
2020-03-20T00:00:00.000
Construction Permit Id
B135.20200320
Forestry Permit Status
Not Required
Borough Approval Date
2020-03-20T00:00:00.000
Permit Start Date
2020-03-25T00:00:00.000
Original Permit Expiration Date
2020-08-31T00:00:00.000
Latest Permit Expiration Date
2020-08-31T00:00:00.000
Created
2020-03-20T16:10:00.000
Modified
2020-09-07T17:05:00.000
Coordinates
40.736101, -73.960410
Demo of House at 28-16 Edgewater Rd
Project Name: Demo of House at 28-16 Edgewater Rd • Project Received Date: 2020-06-25T00:00:00.000 • Project Description Type: Demo of House at 28-16 Edgewater Rd
Project Name
Demo of House at 28-16 Edgewater Rd
Project Received Date
2020-06-25T00:00:00.000
Project Description Type
Demo of House at 28-16 Edgewater Rd
Impacted Park Id S
Q309;
Impacted Park Name S
Jamaica Bay Park;
Address Intersection
28-16 Edgewater Rd Far Rockaway, NY 11691
Borough
Queens
Multisite Project
Single Site
Sponsoring Agency Entity
Parks - Partner Group
Primary Scope Of Work
Park Improvement/New Park
Impacted Parks Division S
Borough Operations;#Natural Resources Group (NRG)
Park Impact Type
Staging;#Excavation
Current Phase
Construction
Contractor For Construction Permit Firm Name
Always First Demolition NYC
Construction Permit Request Received Date
2020-06-25T00:00:00.000
Construction Permit Id
Q309.20200625
Forestry Permit Status
Not Required
Borough Approval Date
2020-06-25T00:00:00.000
Permit Start Date
2020-06-29T00:00:00.000
Original Permit Expiration Date
2020-08-31T00:00:00.000
Latest Permit Extension Amendment Request Date
2020-08-24T00:00:00.000
Latest Permit Extension Amendment Issuance Date
2020-08-25T00:00:00.000
Latest Permit Expiration Date
2020-10-31T00:00:00.000
Permit Amendment Content
E1 - extension through 10/31/20
Created
2020-06-25T17:01:00.000
Modified
2020-09-07T17:04:00.000
Coordinates
40.611378, -73.763203
Hudson Street Streetscape
Project Name: Hudson Street Streetscape • Project Received Date: 2017-04-04T00:00:00.000 • Project Id Number Op: 60402
Project Name
Hudson Street Streetscape
Project Received Date
2017-04-04T00:00:00.000
Project Id Number Op
60402
Project Description Type
Design-build reconstruction of Hudson Street from West Houston Street to Canal Street, Borough of Manhattan. Design elemetns include sidewalk extension, dedicated bicycle lane, planting beds and public amenities.
Impacted Park Id S
MZ198;
Impacted Park Name S
GREENSTREET;
Address Intersection
Hudson St & Canal St, Manhattan
Borough
Manhattan
Multisite Project
Multi Site
Sponsoring Agency Entity
EDC
Primary Scope Of Work
Roadway Reconstruction
Impacted Parks Division S
Borough Operations;#Borough Horticulture;#Borough Forestry;#Central Forestry
Park Impact Type
Other
Current Phase
Permitting
Design Consultant Op
Sam Schwartz
Public Design Commission Approval Required
Yes
Preliminary Public Design Commission Approval
2018-04-01T00:00:00.000
Created
2017-09-19T11:28:00.000
Modified
2020-09-14T16:32:00.000
Pier 42 Construction
Project Name: Pier 42 Construction • Project Received Date: 2020-08-19T00:00:00.000 • Project Description Type: Pier 42 Construction
Project Name
Pier 42 Construction
Project Received Date
2020-08-19T00:00:00.000
Project Description Type
Pier 42 Construction
Impacted Park Id S
M369;
Impacted Park Name S
Pier 42;
Address Intersection
Montgomery Street & South Street, Manhattan
Borough
Manhattan
Multisite Project
Single Site
Sponsoring Agency Entity
EDC
Primary Scope Of Work
Park Improvement/New Park
Impacted Parks Division S
Capital Projects;#Borough Operations;#Planning and Parklands
Park Impact Type
Staging;#Park Improvement;#Excavation
Current Phase
Permitting
Construction Manager Op
Project Manager
Construction Manager Company Op
LiRO Engineers, Inc.
Contractor For Construction Permit Firm Name
LiRO Engineers, Inc.
Construction Permit Request Received Date
2020-08-14T00:00:00.000
Construction Permit Id
M369.20200819
Borough Approval Date
2020-08-19T00:00:00.000
Permit Start Date
2020-09-01T00:00:00.000
Original Permit Expiration Date
2022-08-31T00:00:00.000
Created
2020-08-24T13:21:00.000
Modified
2020-09-07T17:02:00.000
Coordinates
40.710599, -73.980898
MCU Parking Lot Staging for Adjacent Development
Project Name: MCU Parking Lot Staging for Adjacent Development • Project Received Date: 2018-11-30T00:00:00.000 • Impacted Park Id S: B336;
Project Name
MCU Parking Lot Staging for Adjacent Development
Project Received Date
2018-11-30T00:00:00.000
Project Description Type
Install a construction fence and stage along the west curb line of the MCU parking lot
Impacted Park Id S
B336;
Impacted Park Name S
Abe Stark Skating Rink;
Address Intersection
Surf Ave & W 20th St
Borough
Brooklyn
Multisite Project
Single Site
Sponsoring Agency Entity
Private Developer
Primary Scope Of Work
Private Development
Impacted Parks Division S
Borough Operations;#Revenue/Concession
Park Impact Type
Staging;#Sidewalk Closure
Current Phase
Construction
Contractor For Construction Permit Firm Name
West 20th Construction LLC
Construction Permit Request Received Date
2018-11-30T00:00:00.000
Construction Permit Id
B336.20190206
Latest Site Visit
2018-12-17T00:00:00.000
Forestry Permit Status
Not Required
Construction Permit Special Conditions
i. The fence cannot obstruct or take up parking spaces
ii. The exit out of the parking lot along the west curb line (at W 20th St) must be maintained
iii. Upon permit expiration, the property must either be restored in-kind with chain link fence or to a final treatment approved by the Borough
iv. Permit expires when the land is no longer under Parks’ jurisdiction or when the future 20th Street construction begins
Borough Approval Date
2019-01-23T00:00:00.000
Permit Start Date
2019-02-15T00:00:00.000
Original Permit Expiration Date
2019-09-30T00:00:00.000
Latest Permit Extension Amendment Request Date
2019-08-16T00:00:00.000
Latest Permit Extension Amendment Issuance Date
2019-09-16T00:00:00.000
Latest Permit Expiration Date
2020-05-15T00:00:00.000
Permit Amendment Content
E1 - Extension through 5/15/2020
Created
2019-02-06T15:51:00.000
Modified
2020-09-07T17:01:00.000
Coordinates
40.574299, -73.986423
W 20th Street Extension
Project Name: W 20th Street Extension • Project Received Date: 2020-04-01T00:00:00.000 • Project Description Type: W 20th Street Extension in Coney Island
Project Name
W 20th Street Extension
Project Received Date
2020-04-01T00:00:00.000
Project Description Type
W 20th Street Extension in Coney Island
Impacted Park Id S
B336;
Impacted Park Name S
Abe Stark Skating Rink;
Address Intersection
W 20th St & Surf Ave, Coney Island
Borough
Brooklyn
Multisite Project
Single Site
Sponsoring Agency Entity
EDC
Primary Scope Of Work
New Roadway/Road Extension
Impacted Parks Division S
Borough Operations;#Borough Forestry;#Planning and Parklands;#Revenue/Concession
Park Impact Type
Staging;#Excavation
Current Phase
Permitting
Contractor For Construction Permit Firm Name
Triumph Construction Corp
Created
2020-08-26T14:28:00.000
Modified
2020-09-07T17:00:00.000
Coordinates
40.574054, -73.986412
NYRR Mile Marker Installation
Project Name: NYRR Mile Marker Installation • Project Received Date: 2019-11-01T00:00:00.000 • Project Description Type: NYRR Mile Marker Installation
Project Name
NYRR Mile Marker Installation
Project Received Date
2019-11-01T00:00:00.000
Project Description Type
NYRR Mile Marker Installation
Impacted Park Id S
X118;B057;B018;M042;
Impacted Park Name S
Soundview Park;Marine Park;Canarsie Park;Inwood Hill Park;
Borough
Bronx;#Brooklyn;#Manhattan
Multisite Project
Multi Site
Sponsoring Agency Entity
Parks - Partner Group
Primary Scope Of Work
Park Improvement/New Park
Impacted Parks Division S
Borough Operations;#Borough Forestry
Park Impact Type
Park Improvement;#Excavation
Current Phase
Construction
Public Design Commission Approval Required
Yes
Final Public Design Commission Approval
2019-10-21T00:00:00.000
Contractor For Construction Permit Firm Name
Nela Visual
Construction Permit Request Received Date
2019-11-19T00:00:00.000
Construction Permit Id
CNYG.20191125
Latest Site Visit
2019-11-08T00:00:00.000
Forestry Permit Status
Approved
Borough Approval Date
2019-11-08T00:00:00.000
Permit Start Date
2019-12-12T00:00:00.000
Original Permit Expiration Date
2020-02-28T00:00:00.000
Latest Permit Extension Amendment Request Date
2020-01-07T00:00:00.000
Latest Permit Extension Amendment Issuance Date
2020-01-07T00:00:00.000
Latest Permit Expiration Date
2020-03-31T00:00:00.000
Created
2019-11-08T11:56:00.000
Modified
2020-09-07T16:59:00.000
Install Timber Rail and Gate
Project Name: Install Timber Rail and Gate • Project Received Date: 2018-10-01T00:00:00.000 • Project Description Type: Install Timber Rail and Gate for Soundview Ferry Landing
Project Name
Install Timber Rail and Gate
Project Received Date
2018-10-01T00:00:00.000
Project Description Type
Install Timber Rail and Gate for Soundview Ferry Landing
Impacted Park Id S
X088;
Impacted Park Name S
Pugsley Creek Park;
Borough
Bronx
Multisite Project
Single Site
Sponsoring Agency Entity
EDC
Primary Scope Of Work
Park Improvement/New Park
Impacted Parks Division S
Borough Operations;#Borough Forestry;#Planning and Parklands
Park Impact Type
Staging;#Park Improvement
Current Phase
Construction
Public Design Commission Approval Required
Yes
Preliminary Public Design Commission Approval
2019-11-18T00:00:00.000
Final Public Design Commission Approval
2019-11-18T00:00:00.000
Contractor For Construction Permit Firm Name
City & County Paving
Construction Permit Request Received Date
2019-11-27T00:00:00.000
Construction Permit Id
X088.20191220; X088.20200203
Latest Site Visit
2019-12-11T00:00:00.000
Forestry Permit Status
Approved
Borough Approval Date
2019-12-19T00:00:00.000
Permit Start Date
2020-01-06T00:00:00.000
Original Permit Expiration Date
2020-04-30T00:00:00.000
Latest Permit Expiration Date
2020-04-30T00:00:00.000
Created
2019-12-21T12:34:00.000
Modified
2020-09-07T16:58:00.000
Coordinates
40.805501, -73.848757
Coney Island Amusements East Expansion Project
Project Name: Coney Island Amusements East Expansion Project • Project Received Date: 2020-01-21T00:00:00.000 • Project Description Type: Coney Island Amusements East Expansion Project
Project Name
Coney Island Amusements East Expansion Project
Project Received Date
2020-01-21T00:00:00.000
Project Description Type
Coney Island Amusements East Expansion Project
Impacted Park Id S
B587;
Impacted Park Name S
Park;
Address Intersection
W 16th St & Boardwalk
Borough
Brooklyn
Multisite Project
Single Site
Sponsoring Agency Entity
EDC
Primary Scope Of Work
Park Improvement/New Park
Impacted Parks Division S
Borough Operations;#Borough Forestry;#Revenue/Concession;#Planning and Parklands
Park Impact Type
Staging;#Excavation;#Park Improvement;#Sidewalk Closure;#New Property
Current Phase
Construction
Contractor For Construction Permit Firm Name
Central Amusement International
Construction Permit Request Received Date
2020-05-12T00:00:00.000
Construction Permit Id
B587.20200131; B587.20200515
Latest Site Visit
2020-02-20T00:00:00.000
Forestry Permit Status
Pending
Construction Permit Special Conditions
i. At Site A, work may commence onsite only after Parks has approved a tree protection plan. 12 spaces for parking must be provided for Parks lifeguards.
ii. At Sites C, D, and E (street ends at W 12th, Stillwell, W 15th), one boardwalk access ramp must remain open to the public at all times. Security lighting must be added to the open boardwalk access ramps.
iii. Emergency access must be maintained.
iv. Access to the sewer manholes must be maintained for DEP.
v. Access under the boardwalk must be maintained for Parks
Borough Approval Date
2020-02-21T00:00:00.000
Permit Start Date
2020-05-15T00:00:00.000
Original Permit Expiration Date
2020-07-31T00:00:00.000
Latest Permit Expiration Date
2020-07-31T00:00:00.000
Created
2020-01-31T17:04:00.000
Modified
2020-09-07T16:56:00.000
Coordinates
40.573134, -73.982474
Controlled Access Zone for Parcel G Development
Project Name: Controlled Access Zone for Parcel G Development • Project Received Date: 2019-11-11T00:00:00.000 • Project Description Type: Controlled Access Zone for Parcel G Development
Project Name
Controlled Access Zone for Parcel G Development
Project Received Date
2019-11-11T00:00:00.000
Project Description Type
Controlled Access Zone for Parcel G Development
Impacted Park Id S
Q471;
Impacted Park Name S
Hunter's Point South Park;
Address Intersection
56th Ave & 2nd Street, Long Island City, NY
Borough
Queens
Multisite Project
Single Site
Sponsoring Agency Entity
Parks - Planning
Primary Scope Of Work
Park Improvement/New Park
Impacted Parks Division S
Borough Operations;#Borough Forestry;#Planning and Parklands
Park Impact Type
Staging;#Partial Park Closure;#Park Improvement
Current Phase
Construction
Contractor For Construction Permit Firm Name
Gilbane Residential Construction
Construction Permit Request Received Date
2019-11-11T00:00:00.000
Construction Permit Id
Q471.20200601
Latest Site Visit
2019-12-04T00:00:00.000
Forestry Permit Status
Approved
Borough Approval Date
2020-05-14T00:00:00.000
Permit Start Date
2020-06-01T00:00:00.000
Original Permit Expiration Date
2022-05-31T00:00:00.000
Latest Permit Expiration Date
2022-05-31T00:00:00.000
Created
2019-12-21T12:15:00.000
Modified
2020-09-07T16:53:00.000
Coordinates
40.738950, -73.960041
WSFSSH Development - Construction and Park Restoration
Project Name: WSFSSH Development - Construction and Park Restoration • Project Received Date: 2018-03-05T00:00:00.000 • Impacted Park Id S: M200A;
Project Name
WSFSSH Development - Construction and Park Restoration
Project Received Date
2018-03-05T00:00:00.000
Project Description Type
WSFSSH Development Adjacent to Anibal Aviles Playground – Construction and Park Restoration Phases
Impacted Park Id S
M200A;
Impacted Park Name S
Anibal Aviles Playground;
Address Intersection
108th Street and Amsterdam and Columbus Avenue, Manhattan
Borough
Manhattan
Multisite Project
Single Site
Sponsoring Agency Entity
Parks - Planning
Primary Scope Of Work
Park Improvement/New Park
Impacted Parks Division S
Borough Operations;#Borough Forestry;#Central Forestry;#Planning and Parklands
Park Impact Type
Staging;#Excavation;#Partial Park Closure;#Park Improvement
Current Phase
Construction
Contractor For Construction Permit Firm Name
Procida
Construction Permit Request Received Date
2019-03-07T00:00:00.000
Construction Permit Id
M200A.20190314
Latest Site Visit
2019-02-20T00:00:00.000
Forestry Permit Status
Approved
Forestry Permit Id Number
WSP103MF18
Borough Approval Date
2019-03-29T00:00:00.000
Permit Start Date
2019-04-01T00:00:00.000
Original Permit Expiration Date
2021-02-19T00:00:00.000
Latest Permit Expiration Date
2021-02-19T00:00:00.000
Created
2019-03-14T11:19:00.000
Modified
2020-09-07T16:19:00.000
Coordinates
40.801306, -73.963214
Site Prep and Construction of Gilder Center
Project Name: Site Prep and Construction of Gilder Center • Project Received Date: 2018-08-01T00:00:00.000 • Project Description Type: Construction of AMNH's Gilder Center
Project Name
Site Prep and Construction of Gilder Center
Project Received Date
2018-08-01T00:00:00.000
Project Description Type
Construction of AMNH's Gilder Center
Impacted Park Id S
M053;
Impacted Park Name S
Theodore Roosevelt Park;
Address Intersection
415 Columbus Ave, New York
Borough
Manhattan
Multisite Project
Single Site
Sponsoring Agency Entity
DCulA
Primary Scope Of Work
Public Building
Impacted Parks Division S
Borough Operations;#Borough Forestry;#Capital Projects;#Legal/MOUs;#Environmental Review (EIS/EAS)
Park Impact Type
Staging;#Excavation;#Partial Park Closure;#Sidewalk Closure;#Park Improvement
Current Phase
Construction
Contractor For Construction Permit Firm Name
Tishman Construction Corporation of New York dba AECOM Tishman
Construction Permit Request Received Date
2018-08-10T00:00:00.000
Construction Permit Id
M053.20180914; M053.20200908
Latest Site Visit
2019-09-24T00:00:00.000
Forestry Permit Status
Approved
Forestry Permit Id Number
WSU318MF18
Borough Approval Date
2020-09-03T00:00:00.000
Permit Start Date
2018-09-18T00:00:00.000
Original Permit Expiration Date
2020-09-17T00:00:00.000
Latest Permit Extension Amendment Request Date
2020-09-02T00:00:00.000
Latest Permit Extension Amendment Issuance Date
2020-09-08T00:00:00.000
Latest Permit Expiration Date
2022-09-17T00:00:00.000
Permit Amendment Content
We issued two separate permits for this project.
Created
2018-09-06T16:11:00.000
Modified
2020-09-07T15:47:00.000
Coordinates
40.782015, -73.975222
Controlled Access Zone for 425 Grand Concourse
Project Name: Controlled Access Zone for 425 Grand Concourse • Project Received Date: 2019-07-01T00:00:00.000 • Project Description Type: Controlled Access Zone for 425 Grand Concourse
Project Name
Controlled Access Zone for 425 Grand Concourse
Project Received Date
2019-07-01T00:00:00.000
Project Description Type
Controlled Access Zone for 425 Grand Concourse
Impacted Park Id S
X106;
Impacted Park Name S
Garrison Playground;
Address Intersection
425 Grand Concourse, Bronx
Borough
Bronx
Multisite Project
Single Site
Sponsoring Agency Entity
Parks - Planning
Primary Scope Of Work
Park Improvement/New Park
Impacted Parks Division S
Borough Operations;#Borough Forestry;#Capital Projects;#Planning and Parklands
Park Impact Type
Staging;#Park Improvement;#Partial Park Closure
Current Phase
Construction
Contractor For Construction Permit Firm Name
Monadnock Construction
Construction Permit Request Received Date
2019-12-09T00:00:00.000
Construction Permit Id
X106.20191218
Forestry Permit Status
Approved
Borough Approval Date
2020-02-12T00:00:00.000
Permit Start Date
2020-02-13T00:00:00.000
Original Permit Expiration Date
2022-02-12T00:00:00.000
Latest Permit Expiration Date
2022-02-12T00:00:00.000
Created
2019-12-18T14:35:00.000
Modified
2020-09-07T11:09:00.000
Coordinates
40.817261, -73.928434
Buckeye Pipeline at Bayside Site
Project Name: Buckeye Pipeline at Bayside Site • Project Received Date: 2020-06-01T00:00:00.000 • Project Description Type: Buckeye Pipeline at Bayside Site
Project Name
Buckeye Pipeline at Bayside Site
Project Received Date
2020-06-01T00:00:00.000
Project Description Type
Buckeye Pipeline at Bayside Site
Impacted Park Id S
B529;
Impacted Park Name S
Bushwick Inlet Park;
Borough
Brooklyn
Multisite Project
Single Site
Sponsoring Agency Entity
Parks - Planning
Primary Scope Of Work
Environmental Improvement/Remediation
Impacted Parks Division S
Borough Operations;#Environmental Remediation;#Planning and Parklands
Park Impact Type
Staging;#Excavation
Current Phase
Permitting
Public Design Commission Approval Required
No
Contractor For Construction Permit Firm Name
Buckeye Partners , L.P.
Created
2020-09-07T10:41:00.000
Modified
2021-02-22T10:09:00.000
Gauging and Recovery of NAPL
Project Name: Gauging and Recovery of NAPL • Project Received Date: 2019-04-04T00:00:00.000 • Project Id Number Op: NYSDEC Site No. 224055
Project Name
Gauging and Recovery of NAPL
Project Received Date
2019-04-04T00:00:00.000
Project Id Number Op
NYSDEC Site No. 224055
Project Description Type
NatGrid Gauging and Recovery of NAPL
Impacted Park Id S
B529;
Impacted Park Name S
Bushwick Inlet Park;
Address Intersection
North 11th St & Kent Ave, Brooklyn
Borough
Brooklyn
Multisite Project
Single Site
Sponsoring Agency Entity
Parks - Planning
Primary Scope Of Work
Environmental Improvement/Remediation
Impacted Parks Division S
Borough Operations;#Environmental Remediation;#Legal/MOUs;#Planning and Parklands
Park Impact Type
Excavation;#Staging
Current Phase
Construction
Contractor For Construction Permit Firm Name
National Grid
Construction Permit Id
B529.20190404
Forestry Permit Status
Not Required
Permit Start Date
2019-05-06T00:00:00.000
Original Permit Expiration Date
2022-05-05T00:00:00.000
Latest Permit Expiration Date
2022-05-05T00:00:00.000
Created
2019-04-08T11:46:00.000
Modified
2020-09-07T10:28:00.000
Coordinates
40.723313, -73.960546
Install Frank Stella Sculpture at NY Aquarium
Project Name: Install Frank Stella Sculpture at NY Aquarium • Project Received Date: 2020-02-01T00:00:00.000 • Project Description Type: Install Frank Stella Sculpture
Project Name
Install Frank Stella Sculpture at NY Aquarium
Project Received Date
2020-02-01T00:00:00.000
Project Description Type
Install Frank Stella Sculpture
Impacted Park Id S
B080;
Impacted Park Name S
Asser Levy Park;
Address Intersection
Surf Ave & W 10th St, Coney Island
Borough
Brooklyn
Multisite Project
Single Site
Sponsoring Agency Entity
DCulA
Primary Scope Of Work
Park Improvement/New Park
Impacted Parks Division S
Borough Operations;#Arts & Antiquities
Park Impact Type
Staging;#Excavation
Current Phase
Permitting
Public Design Commission Approval Required
Yes
Preliminary Public Design Commission Approval
2020-05-18T00:00:00.000
Created
2020-05-27T11:00:00.000
Modified
2020-09-07T10:08:00.000
Coordinates
40.574857, -73.976822
Citi Bike expansion - Randall's Island
Project Name: Citi Bike expansion - Randall's Island • Project Received Date: 2020-08-07T00:00:00.000 • Project Description Type: Expansion of Citi Bike service to Randall's Island
Project Name
Citi Bike expansion - Randall's Island
Project Received Date
2020-08-07T00:00:00.000
Project Description Type
Expansion of Citi Bike service to Randall's Island
Impacted Park Id S
M104;
Impacted Park Name S
Randall's Island Park;
Borough
Manhattan
Multisite Project
Single Site
Sponsoring Agency Entity
CDOT
Impacted Parks Division S
Borough Operations;#Conservancy
Park Impact Type
Park Improvement
Current Phase
Permitting
Contractor For Construction Permit Firm Name
Citi Bike, Lyft
Construction Permit Request Received Date
2020-09-03T00:00:00.000
Construction Permit Id
M104.20200904
Borough Approval Date
2020-09-04T00:00:00.000
Permit Start Date
2020-09-08T00:00:00.000
Original Permit Expiration Date
2020-10-31T00:00:00.000
Created
2020-08-14T12:51:00.000
Modified
2020-09-04T11:53:00.000
Coordinates
40.793054, -73.922675
Main Bridge Cable Inspection and Rehabilitation at the Robert F. Kennedy Bridge
Project Name: Main Bridge Cable Inspection and Rehabilitation at the Robert F. Kennedy Bridge • Project Received Date: 2019-10-22T00:00:00.000 • Project Id Number Op: RK-20
Project Name
Main Bridge Cable Inspection and Rehabilitation at the Robert F. Kennedy Bridge
Project Received Date
2019-10-22T00:00:00.000
Project Id Number Op
RK-20
Project Description Type
Installation of a compressor in support of Main Bridge Cable Inspection and Rehabilitation at the Robert F. Kennedy Bridge
Impacted Park Id S
Q004;
Impacted Park Name S
Astoria Park;
Address Intersection
Hoyt Ave N. and 19th St
Borough
Queens
Multisite Project
Multi Borough
Sponsoring Agency Entity
MTA B&T
Primary Scope Of Work
Bridge Component Rehabilitation
Impacted Parks Division S
Borough Operations
Park Impact Type
Staging
Current Phase
Construction
Contractor For Construction Permit Firm Name
Skanska Koch
Construction Permit Request Received Date
2020-08-20T00:00:00.000
Construction Permit Id
CNYG.20200902
Forestry Permit Status
Not Required
Borough Approval Date
2020-08-26T00:00:00.000
Permit Start Date
2020-09-04T00:00:00.000
Original Permit Expiration Date
2020-12-04T00:00:00.000
Created
2020-09-02T18:36:00.000
Modified
2020-09-03T09:57:00.000
Coordinates
40.776600, -73.924163
41-50 78th Street, Façade repairs (Erecting Sidewalk Shed)
Project Name: 41-50 78th Street, Façade repairs (Erecting Sidewalk Shed) • Project Received Date: 2020-07-17T00:00:00.000 • Project Id Number Op: Q098
Project Name
41-50 78th Street, Façade repairs (Erecting Sidewalk Shed)
Project Received Date
2020-07-17T00:00:00.000
Project Id Number Op
Q098
Project Description Type
Façade repairs (Erecting Sidewalk Shed)
Impacted Park Id S
Q098;
Impacted Park Name S
Frank D. O'Connor Playground;
Borough
Queens
Multisite Project
Single Site
Sponsoring Agency Entity
Private Developer
Impacted Parks Division S
Borough Operations
Park Impact Type
Other
Current Phase
Construction
Contractor For Construction Permit Firm Name
Safe Way Construction Corp.
Construction Permit Request Received Date
2020-07-17T00:00:00.000
Construction Permit Id
Q098.20200814
Borough Approval Date
2020-07-24T00:00:00.000
Original Permit Expiration Date
2020-12-01T00:00:00.000
Created
2020-09-01T12:48:00.000
Modified
2020-09-01T13:36:00.000
Accelerated Distribution Water Main & Sewer Replacement/Rehab
Project Name: Accelerated Distribution Water Main & Sewer Replacement/Rehab • Project Received Date: 2018-06-08T00:00:00.000 • Project Id Number Op: MEDA003
Project Name
Accelerated Distribution Water Main & Sewer Replacement/Rehab
Project Received Date
2018-06-08T00:00:00.000
Project Id Number Op
MEDA003
Project Description Type
When and Where Sewer/Water Main contract
Borough
Manhattan
Multisite Project
Multi Site
Sponsoring Agency Entity
DDC
Primary Scope Of Work
Sewer/Water Main
Impacted Parks Division S
Capital Projects
Park Impact Type
No Parkland Impact
Current Phase
Presumed Complete
Mass Mailing 3 Received Date
2018-12-04T00:00:00.000
Construction Manager Op
EIC
Construction Manager Company Op
DDC
Construction Kickoff Op
2017-12-28T00:00:00.000
Expected Construction End Date Op
2019-06-26T00:00:00.000
Created
2018-06-14T10:56:00.000
Modified
2020-08-31T14:50:00.000
Construction Median Replacement on Union Turnpike from Hollis Court Boulevard to 226th Street
Project Received Date: 2017-08-23T00:00:00.000 • Project Id Number Op: HWQ1193 • Borough: Queens
Project Name
Construction Median Replacement on Union Turnpike from Hollis Court Boulevard to 226th Street
Project Received Date
2017-08-23T00:00:00.000
Project Id Number Op
HWQ1193
Project Description Type
This contract will reconstruct medians that are not under the jurisdiction of DPR. The work is adjacent to two greenstreets, QZ485 and QZ160, but there is no impact anticipated.
Address Intersection
Union Turnpike and Peck Avenue (QZ485) and Union Turnpike and Hartland Ave (QZ160)
Borough
Queens
Multisite Project
Single Site
Sponsoring Agency Entity
DDC
Impacted Parks Division S
Borough Forestry
Park Impact Type
No Parkland Impact
Current Phase
Presumed Complete
Created
2020-09-01T10:59:00.000
Modified
2020-09-01T13:46:00.000
Coordinates
40.734574, -73.753670
Concrete Repairs of Queens Approach Substructure at the RFK Bridge Pier-22 Wall Thru Pier-40
Project Received Date: 2019-06-17T00:00:00.000 • Project Id Number Op: RKM-377 / RK-70Ph.1X • Impacted Park Id S: Q004;Q066B;Q066C;Q066D;Q066E;
Project Name
Concrete Repairs of Queens Approach Substructure at the RFK Bridge Pier-22 Wall Thru Pier-40
Project Received Date
2019-06-17T00:00:00.000
Project Id Number Op
RKM-377 / RK-70Ph.1X
Project Description Type
Concrete Repairs of Queens Approach Substructure at the RFK Bridge Pier-22 Wall Thru Pier-40
Impacted Park Id S
Q004;Q066B;Q066C;Q066D;Q066E;
Impacted Park Name S
Astoria Park;Triborough Bridge Playground B;Triborough Bridge Playground C;Triborough Bridge Playground D;Triborough Bridge Playground E;
Borough
Queens
Multisite Project
Single Site
Sponsoring Agency Entity
MTA B&T
Primary Scope Of Work
Bridge Component Rehabilitation
Impacted Parks Division S
Borough Operations;#Borough Forestry
Park Impact Type
Partial Park Closure;#Total Park Closure
Current Phase
Construction
Contractor For Construction Permit Firm Name
Avenue Contracting Inc.
Construction Permit Request Received Date
2020-02-07T00:00:00.000
Construction Permit Id
CNYG.20200320
Construction Permit Special Conditions
1. Contractor is required to hold a field meeting with NYC Parks prior to mobilization to a new site - including initial mobilization - in order to establish exact boundaries of the proposed staging area.
2. Contractor to coordinate directly with FDNY on mobilization to Triborough Playground E.
Borough Approval Date
2020-03-19T00:00:00.000
Permit Start Date
2020-03-26T00:00:00.000
Original Permit Expiration Date
2022-03-26T00:00:00.000
Latest Permit Extension Amendment Request Date
2020-08-27T00:00:00.000
Latest Permit Extension Amendment Issuance Date
2020-08-31T00:00:00.000
Latest Permit Expiration Date
2022-03-26T00:00:00.000
Permit Amendment Content
Permits limited Playground C scope and describes process for allowing additional scope.
Created
2020-03-17T15:27:00.000
Modified
2020-08-31T16:14:00.000
Coordinates
40.774392, -73.922609
Installation of sewers in 20th Ave and Water Main Replacement in College Point Blvd
Project Received Date: 2014-08-26T00:00:00.000 • Project Id Number Op: SE807 • Address Intersection: 20th Ave and 124th Street
Project Name
Installation of sewers in 20th Ave and Water Main Replacement in College Point Blvd
Project Received Date
2014-08-26T00:00:00.000
Project Id Number Op
SE807
Project Description Type
New storm and sanitary sewers, water main, curbs, sidewalks, roadway, etc. 5 year construction divided into four phases. This work is all in the street beds and right of way sidewalk, but work is adjacent to five Parks properties: Q136 Playground 115, Q042 Poppenhusen Park, Q457 College Point Park, Q033 Mall Eighteen, and Q011 Poppenhusen Playground
Address Intersection
20th Ave and 124th Street
Borough
Queens
Multisite Project
Multi Site
Sponsoring Agency Entity
DDC
Primary Scope Of Work
Sewer/Water Main
Impacted Parks Division S
Borough Forestry
Park Impact Type
No Parkland Impact
Current Phase
Presumed Complete
Created
2018-02-19T10:20:00.000
Modified
2020-08-31T15:55:00.000
Coordinates
40.781665, -73.844091
Pedestrian Ramp Rehabilitation in Brooklyn
Project Name: Pedestrian Ramp Rehabilitation in Brooklyn • Project Received Date: 2020-05-20T00:00:00.000 • Project Id Number Op: HWPR19K2
Project Name
Pedestrian Ramp Rehabilitation in Brooklyn
Project Received Date
2020-05-20T00:00:00.000
Project Id Number Op
HWPR19K2
Project Description Type
Pedestrian Ramp Rehabilitation
Borough
Brooklyn
Multisite Project
Multi Site
Sponsoring Agency Entity
DDC
Primary Scope Of Work
Pedestrian Safety
Park Impact Type
No Parkland Impact
Current Phase
Presumed Complete
Created
2020-05-28T14:16:00.000
Modified
2020-08-31T15:54:00.000
Albert Road Area Ozone Park Streets
Project Name: Albert Road Area Ozone Park Streets • Project Received Date: 2009-02-12T00:00:00.000 • Project Id Number Op: SEQ002568 HWQ411B
Project Name
Albert Road Area Ozone Park Streets
Project Received Date
2009-02-12T00:00:00.000
Project Id Number Op
SEQ002568 HWQ411B
Project Description Type
Street reconstruction in the area bounded by Linden Boulevard on the north, North Conduit Avenue on the south, Cross Bay Boulevard to the west and the rail road right-of-way along Aqueduct Race Track to the east.
Address Intersection
Cross Bay Boulevard and 149th Avenue
Borough
Queens
Multisite Project
Multi Borough
Sponsoring Agency Entity
DDC
Primary Scope Of Work
Roadway Reconstruction
Current Phase
Construction
Created
2020-05-19T10:46:00.000
Modified
2020-08-31T15:52:00.000
Coordinates
40.670760, -73.842563
Construction of Storm and Sanitary Sewers, Water mains and appurtenances in Acacia Ave, etc.,
Project Received Date: 2015-05-11T00:00:00.000 • Project Id Number Op: SER200245 • Project Description Type: Storm and Sanitary Sewers, Water Mains, etc.
Project Name
Construction of Storm and Sanitary Sewers, Water mains and appurtenances in Acacia Ave, etc.,
Project Received Date
2015-05-11T00:00:00.000
Project Id Number Op
SER200245
Project Description Type
Storm and Sanitary Sewers, Water Mains, etc.
Impacted Park Id S
R071;
Impacted Park Name S
Great Kills Park;
Address Intersection
Hillcrest Ave and School Street
Borough
Staten Island
Multisite Project
Single Site
Sponsoring Agency Entity
DDC
Primary Scope Of Work
Sewer/Water Main
Impacted Parks Division S
Borough Forestry
Park Impact Type
No Parkland Impact
Current Phase
Presumed Complete
Created
2018-02-20T14:21:00.000
Modified
2020-08-31T15:50:00.000
Coordinates
40.546825, -74.152275
Construction and Replacement of Storm Sewer and Water Main in 95th Street between 160th Ave and 162nd Ave and surrounding blocks in Howard Beach
Project Received Date: 2015-05-07T00:00:00.000 • Project Id Number Op: SEQ200490 • Project Description Type: Storm Sewer and Water Main with Outfall
Project Name
Construction and Replacement of Storm Sewer and Water Main in 95th Street between 160th Ave and 162nd Ave and surrounding blocks in Howard Beach
Project Received Date
2015-05-07T00:00:00.000
Project Id Number Op
SEQ200490
Project Description Type
Storm Sewer and Water Main with Outfall
Address Intersection
95th Street and 161st Avenue
Borough
Queens
Multisite Project
Single Site
Sponsoring Agency Entity
DDC
Primary Scope Of Work
Sewer/Water Main
Park Impact Type
No Parkland Impact
Current Phase
Presumed Complete
Created
2019-07-02T13:02:00.000
Modified
2020-08-31T15:49:00.000
Coordinates
40.656130, -73.837134
Construction of Storm and Combined Sewers Water Mains and Appurtenances in West 9TH Street, etc.
Project Received Date: 2014-10-28T00:00:00.000 • Project Id Number Op: SEK20068 • Project Description Type: Storm, Combined Sewers and Water Mains
Project Name
Construction of Storm and Combined Sewers Water Mains and Appurtenances in West 9TH Street, etc.
Project Received Date
2014-10-28T00:00:00.000
Project Id Number Op
SEK20068
Project Description Type
Storm, Combined Sewers and Water Mains
Address Intersection
9th Street and 2nd Avenue
Borough
Brooklyn
Multisite Project
Single Site
Sponsoring Agency Entity
DDC
Primary Scope Of Work
Sewer/Water Main
Park Impact Type
No Parkland Impact
Current Phase
Presumed Complete
Created
2019-03-25T13:30:00.000
Modified
2020-08-31T15:47:00.000
Coordinates
40.673062, -73.994294
Replacement of Combined Sewers, Water Mains and appurtenances in 70th St. between 54th Ave and Calamus Ave,
Project Received Date: 2017-05-26T00:00:00.000 • Project Id Number Op: SE859 • Project Description Type: Replacement of Combined Sewers, Water Mains and appurtenances
Project Name
Replacement of Combined Sewers, Water Mains and appurtenances in 70th St. between 54th Ave and Calamus Ave,
Project Received Date
2017-05-26T00:00:00.000
Project Id Number Op
SE859
Project Description Type
Replacement of Combined Sewers, Water Mains and appurtenances
Address Intersection
70th St betw 54th Ave and Calamus Ave
Borough
Queens
Multisite Project
Single Site
Sponsoring Agency Entity
DDC
Primary Scope Of Work
Sewer/Water Main
Impacted Parks Division S
Borough Forestry
Park Impact Type
No Parkland Impact
Current Phase
Presumed Complete
Created
2017-09-23T14:05:00.000
Modified
2020-08-31T15:39:00.000
Phase 2B Construction of HLSS and Combined Sewers and Water Work in Fresh Creek Basin Area
Project Received Date: 2016-08-17T00:00:00.000 • Project Id Number Op: SE855 • Address Intersection: Glenwood Road and East 108th Street
Project Name
Phase 2B Construction of HLSS and Combined Sewers and Water Work in Fresh Creek Basin Area
Project Received Date
2016-08-17T00:00:00.000
Project Id Number Op
SE855
Project Description Type
Two parks properties are adjacent to work but no impact is anticipated as work is in roadbed. B342 100% Playground and B504 Ponderosa Playground
Address Intersection
Glenwood Road and East 108th Street
Borough
Brooklyn
Multisite Project
Single Site
Sponsoring Agency Entity
DDC
Primary Scope Of Work
Sewer/Water Main
Impacted Parks Division S
Borough Forestry;#Environmental Review (EIS/EAS)
Park Impact Type
No Parkland Impact
Current Phase
Presumed Complete
Created
2020-05-12T16:00:00.000
Modified
2020-08-31T15:38:00.000
Coordinates
40.650448, -73.894244
High Level Storm and Combined Sewers in 229th Street Area (Laurelton)
Project Name: High Level Storm and Combined Sewers in 229th Street Area (Laurelton) • Project Received Date: 2016-03-29T00:00:00.000 • Project Id Number Op: SE823
Project Name
High Level Storm and Combined Sewers in 229th Street Area (Laurelton)
Project Received Date
2016-03-29T00:00:00.000
Project Id Number Op
SE823
Project Description Type
Storm and Combined Sewers
Impacted Park Id S
Q392;
Impacted Park Name S
Idlewild Park;
Address Intersection
149th Avenue and 226th Street
Borough
Queens
Multisite Project
Single Site
Sponsoring Agency Entity
DDC
Primary Scope Of Work
Sewer/Water Main
Impacted Parks Division S
Natural Resources Group (NRG);#Environmental Review (EIS/EAS);#Borough Operations;#Borough Forestry
Park Impact Type
Excavation;#Partial Park Closure;#Park Improvement
Current Phase
Construction
Public Design Commission Approval Required
No
Mass Mailing 1 Received Date
2016-03-29T00:00:00.000
Mass Mailing 2 Received Date
2016-03-25T00:00:00.000
Contractor For Construction Permit Firm Name
C.A.C. Industries
Construction Permit Request Received Date
2019-03-07T00:00:00.000
Construction Permit Id
Q392.20190418
Latest Site Visit
2019-04-03T00:00:00.000
Forestry Permit Status
Approved
Forestry Permit Id Number
QP18-557 QP19-073
Permit Start Date
2019-04-22T00:00:00.000
Original Permit Expiration Date
2021-04-16T00:00:00.000
Created
2017-09-25T09:45:00.000
Modified
2020-08-31T15:37:00.000
Coordinates
40.657503, -73.756403
Reconstruction of Father Capodanno Blvd South Beach
Project Name: Reconstruction of Father Capodanno Blvd South Beach • Project Received Date: 2016-06-16T00:00:00.000 • Project Id Number Op: SANDHW14
Project Name
Reconstruction of Father Capodanno Blvd South Beach
Project Received Date
2016-06-16T00:00:00.000
Project Id Number Op
SANDHW14
Project Description Type
Roadway Reconstruction
Impacted Park Id S
RZ058A;RZ302;RZ303;RZ305;RZ105;RZ102;R046;
Impacted Park Name S
GREENSTREET;GREENSTREET;GREENSTREET;GREENSTREET;GREENSTREET;GREENSTREET;Franklin D. Roosevelt Boardwalk and Beach;
Address Intersection
Seaview Ave & Father Capodanno Blvd
Borough
Staten Island
Multisite Project
Multi Site
Sponsoring Agency Entity
DDC
Primary Scope Of Work
Roadway Reconstruction
Impacted Parks Division S
Borough Operations;#Borough Forestry
Park Impact Type
Staging;#Excavation;#Access-Only;#Sidewalk Closure;#Other
Current Phase
Construction
Contractor For Construction Permit Firm Name
J. Pizzirusso Landscaping
Construction Permit Id
R046.20180730
Original Permit Expiration Date
2020-08-20T00:00:00.000
Latest Permit Expiration Date
2020-08-20T00:00:00.000
Created
2016-09-28T16:36:00.000
Modified
2020-08-31T15:30:00.000
Coordinates
40.590349, -74.066637
Distribution Water Mains - BK & SI
Project Name: Distribution Water Mains - BK & SI • Project Received Date: 2018-11-26T00:00:00.000 • Project Id Number Op: RED385
Project Name
Distribution Water Mains - BK & SI
Project Received Date
2018-11-26T00:00:00.000
Project Id Number Op
RED385
Project Description Type
Where and when water mains.
Address Intersection
61 St. & 17th Avenue
Borough
Brooklyn;#Staten Island
Multisite Project
Multi Borough
Sponsoring Agency Entity
DDC
Primary Scope Of Work
Sewer/Water Main
Park Impact Type
No Parkland Impact
Current Phase
Presumed Complete
Construction Manager Op
RE
Construction Manager Company Op
Munoz Engineering & Land Surveying D.P.C.
Construction Kickoff Op
2018-12-05T00:00:00.000
Created
2018-11-26T16:25:00.000
Modified
2020-08-31T15:06:00.000
Installation of Water Mains and appurtenances for new buildings construction and improvement of city’s water main distribution system and fire protection in various locations in the Bronx and Queens
Project Received Date: 2018-08-23T00:00:00.000 • Project Id Number Op: QED1047 • Borough: Bronx;#Queens
Project Name
Installation of Water Mains and appurtenances for new buildings construction and improvement of city’s water main distribution system and fire protection in various locations in the Bronx and Queens
Project Received Date
2018-08-23T00:00:00.000
Project Id Number Op
QED1047
Project Description Type
Water mains and hydrants, etc. Work in street adjacent to Greenstreets XZ393, XZ394, XZ381, XZ392, and X191A Bicentennial Veterans Memorial Park.
Borough
Bronx;#Queens
Multisite Project
Multi Borough
Sponsoring Agency Entity
DDC
Primary Scope Of Work
Sewer/Water Main
Park Impact Type
No Parkland Impact
Current Phase
Presumed Complete
Created
2018-09-30T18:21:00.000
Modified
2020-08-31T15:01:00.000
Coordinates
40.823537, -73.814817